CLARiiON CX3-40 Setup Guide P/N 300-003-512 REV. A03

Transcript of CLARiiON CX3-40 Setup Guide - Dell EMC Italy guide explains how to install and initialize a CLARiiON...

CLARiiON CX3-40Setup Guide

P/N 300-003-512REV. A03

Notice

Copyright © 2006 EMC Corporation. All rights reserved.Published August, 2006

EMC believes the information in this publication is accurate as of its publication date. However, the information is subject to change without notice.

THE INFORMATION IN THIS PUBLICATION IS PROVIDED “AS IS.” EMC CORPORATION MAKES NO REPRESENTATIONS OR WARRANTIES OF ANY KIND WITH RESPECT TO THE INFORMATION IN THIS PUBLICATION, AND SPECIFICALLY DISCLAIMS IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE.

Use, copying, and distribution of any EMC software described in this publication require an applicable software license.

For the most up-to-date listing of EMC product names, see EMC Corporation Trademarks on EMC.com.

All other trademarks used herein are the property of their respective owners.

1

Overview

Note: Some functions described in this document may not be supported by all revisions of the software or hardware currently in use. For the most up-to-date information on product features, refer to your product release notes.

This guide explains how to install and initialize a CLARiiON® CX3-40 Fibre Channel storage processor enclosure (SPE3). The EMC Installation Roadmap for CX3-Series, CX-Series, AX-Series and FC-Series Storage Systems provides detailed checklists of installation procedures for supported storage-system environments, and lists the documents you will need to complete each task. This installation roadmap includes checklists for many storage-system configurations; you need to read only the chapter for your operating system.

EMC CLARiiON documents related to the storage system are on the Documentation and Resources for CX3-Series Storage Systems CD that shipped with the storage system. The most recent versions of these documents, the installation roadmap, and software release notes are available in the documentation section of the Powerlink™ site (http://Powerlink.EMC.com).

2

Preinstall - Step 1Prepare site

1. Verify that your facility has adequate network wiring to provide each storage-system storage processor (SP) with a management port Ethernet connection.

2. Confirm that your facility has appropriate electrical wiring in place to accommodate your cabinet’s power cables. For EMC cabinets, see the Site Preparation Guide, which is on the Powerlink site and the Documentation and Resources for CX3-Series Storage Systems CD. To support all of the storage system’s high-availability features, you must receive power from at least two discrete circuits.

3. Have an optional Windows host available that you can connect to the same subnet as the storage system’s management ports. You can use this host:

• To initialize the storage system

• To run the Navisphere® Service Taskbar, which only runs on a Windows host

• As a CLARalert® monitor station, which must be a Windows host, but cannot send I/O to the storage-system data ports

• As a Navisphere management station

3

Preinstall - Step 2Plan configuration

To plan your installation, refer to the guide for planning your storage-system configuration. You can generate a customized version of this guide from the CX3-series customized documentation section on the Powerlink site or view a non-customized version on the Documentation and Resources for CX3-Series Storage Systems CD. The guide includes background material, planning rules, and administrative worksheets. Use it to choose and understand hardware components, RAID types, replication and data mobility software options, LUNs, and file systems.

Fill out the worksheets in the planning guide so you have parameters, such as network addresses, available for the installation.

4

Preinstall - Step 3Verify environment

If you know the revision and patch level of the operating system and HBA type and driver revision for each server that you will connect to the storage system, use theE-Lab™ Interoperability Navigator on the Powerlink site to make sure that each server configuration is supported. If you do not have this information, use the server high-availability feature in the Navisphere Server Utility to determine this information.

A host connected to a storage system is called a server.

Generate a server configuration report (Fibre Channel data ports only)

On each server that you plan to connect to the storage system:

1. Locate the CLARiiON Core Server Support CD that shipped with the storage system and use it to run the Navisphere Server Utility for the server’s operating system.

For information on running this utility, refer to the instructions in the appropriate server support products installation guide on the Powerlink site and the Documentation and Resources for CX3-Series Storage Systems CD.

2. In the Navisphere Server Utility, select Verify Server High-Availability to generate a report of the host’s environment.

3. Save the report to verify the host’s configuration and components.

Verify a server configuration with the E-Lab InteroperabilityNavigator

1. From your web browser, go to the Powerlink site (http://Powerlink.EMC.com/) and log in.

If you are not registered with Powerlink, you will need to register and create a username and password.

2. Navigate to the E-Lab Interoperability Navigator page and launch the E-Lab Interoperability Wizard to view the interoperability support matrices relevant to your system.

5

Preinstall - Step 3 continuedVerify environment

3. In the wizard, enter the information about your configuration (either information that you know or information from the server high-availability report) to get a report on the supported configuration and components.

4. Compare the report to your configuration, paying particular attention to any footnotes that mention required patches, hot fixes, or other configuration requirements.

If any hardware components in your configuration are not supported, replace them with components that are before continuing. If any software components are not supported, a later step will tell you how to update them.

Verify the storage-system parts

Verify that your basic configuration has the following parts:

❒ CX3-40 SPE3 with:

❒ Two storage processors (SPs)

❒ Four power supply/system cooling (power/cooling) modules

❒ Two standby power supplies (SPSs)

❒ One Fibre Channel disk-array enclosure (DAE3P) with a minimum of five disk drives

EMC3454

B

A

TLA

S/N

xxxx

xxxx

SPS B SPS A

Storage processor B Storage processor APower/cooling modules

Front Rear

6

Preinstall - Step 3 continuedVerify environment

❒ Optional additional disk-array enclosures (DAE3Ps) with disks

❒ 1-meter copper Fibre Channel HSSDC2-HSSDC2 cables (two per optional DAE3P) for external disks on back-end bus

❒ Four 2- or 5-meter copper Fibre Channel SFP-HSSDC2 cables (two per back-end bus) for SPE3 - DAE3P connections

❒ Two micro DB-9 to RJ45 SPS serial (sense) cables - one per storage processor

❒ Rail kits (if your storage system is not already installed in a cabinet)

❒ CLARiiON Core Server Support CD

You must provide the following:

❒ CAT 5 or better Ethernet LAN RJ45 cables (one per SP) for storage-system management connections

❒ Fibre Channel optical cables (two maximum per SP) for server or switch connections

!!

!!

!EXP PRI

EXP PRI

#

!

EXPPRI

EXPPRI

#A

B

Power LED(green)

Fault LED(amber)Power/cooling module B Link control card B

Fault LED(amber)

Disk activityLED (green)

Power/cooling module A Link control card AEMC3437

7

Preinstall - Step 4 (field installation only)Install in cabinet

If your CX3-40 SPE3 or any DAE3Ps are not already installed in a cabinet, follow the instructions in the EMC Rails and Enclosures (CX3-Series Storage Systems) Field Installation Guide (P/N 300-003-630) and the CLARiiON DAE2P and DAE3P Disk-Array Enclosures Hardware Reference (P/N 300-002-407).

IMPORTANT The disk modules in slots 0 through 4 of the first DAE3P (enclosure 0, bus 0) provide mirrored boot and recovery capability, and are preconfigured according to their slot assignment before shipment. Do not move a module in slots 0 through 4 from its assigned slot to another slot. Remove one of these modules only if it has failed and you are replacing it with a new module.

8

Install - Step 1Before you begin

Verify storage-system back-end connections

Use the information below and the diagram on the next page to verify the enclosure address settings and bus (loop) cabling for the SPE3 and your DAE3Ps.

The CX3-40 SPE3 supports two redundant Fibre Channel back-end (BE) buses. On each bus, the two independent loops from SP A and SP B are paired, and share access to the same dual-port disks. BE ports 0 and 1 connect to the link control card (LCC) A or LCC B primary (PRI) ports on the first DAE3P in their respective loops. The DAE3P expansion (EXP) ports connect to the next PRI ports in their loops. Each bus includes up to 8 DAE3Ps (120 disks).

For the system to boot and operate, the enclosure address (EA) of the DAE3P connected to BE 0 must be EA 0. Each enclosure in a bus requires a unique EA. The enclosure addresses for additional DAE3Ps should be set sequentially. For each bus, the first DAE3P should be EA 0, the second DAE3P should be EA 1, the third DAE3P should be EA 2, the fourth DAE3P should be EA 3, and so on.

You should optimize your system by using all available back-end buses, and spreading the DAE3Ps as evenly as possible across the buses.

9

Install - Step 1 continued Before you begin

!!

!!

!

EXP PRI

EXP PRI

#

!

EXPPRI

EXPPRI

#A

B

!!

!!

!

EXP PRI

EXP PRI

#

!

EXPPRI

EXPPRI

#A

B

!!

!!

!

EXP PRI

EXP PRI

#

!

EXPPRI

EXPPRI

#A

B

!!

!!

!

EXP PRI

EXP PRI

#

!

EXPPRI

EXPPRI

#A

B

!!

!!

!

EXP PRI

EXP PRI

#

!

EXPPRI

EXPPRI

#A

B

!!

!!

!

EXP PRI

EXP PRI

#

!

EXPPRI

EXPPRI

#A

B

!!

!!

!

EXP PRI

EXP PRI

#

!

EXPPRI

EXPPRI

#A

B

!!

!!

!

EXP PRI

EXP PRI

#

!

EXPPRI

EXPPRI

#A

B

SPS ASPS B

LCC B LCC A

EMC3412

Bus 1

Bus 0

Bus 1

Bus 0EA0/Bus 0

EA1/Bus 0

EA2/Bus 0

EA3/Bus 0

EA0/Bus 1

EA1/Bus 1

EA2/Bus 1

EA3/Bus 1

10

Install - Step 1 continued Before you begin

Verify power settings and connections

1. Verify that the cabinet master switches on the power distribution panel (PDP) are in the off position.

2. Verify that the power switch on each standby power supply (SPS) is off.3. For high availability, verify that the A and B power cords in each enclosure are

connected to different power strips. 4. Verify that all power connections are correct and fully seated (see the figure on the

next page).

• Standby power supply A (SPS A) connects to the SPS serial port (marked with a battery symbol) on SP A; SPS B connects to SP B.

• The AC power cord for SP A connects to SPS A; the SP B cord connects to SPS B.

• The SPSs connect to separate power distribution units (PDUs) in the cabinet.

• Power/cooling module A in the first DAE3P (EA 0, bus 0) in the system connects to SPS A, and power/cooling module B in the first DAE3P connects to SPS B. Subsequent DAE3Ps connect directly to the cabinet’s PDUs.

• Power/cooling modules A and modules B connect to different PDUs.

Connect the cabinet to a power source

Connect the cabinet AC power cables to the power outlets in your facility.

In general, EMC cabinets use two 240-volt AC cables. Connect power cables on either side of the cabinet to different branch circuits. Connecting to only one branch circuit will degrade the system’s high availability.

11

Install - Step 1 continued Before you begin

ONI

OFFO

ONI

OFFO

ONI

OFFO

ONI

OFFO

ONI

OFFO

ONI

OFFO

ONI

OFFO

ONI

OFFO

ONI

OFFO

ONI

OFFO

ONI

OFFO

ONI

OFFO

!!

!!

!

EXP PRI

EXP PRI

#

!

EXPPRI

EXPPRI

#A

B

!!

!!

!

EXP PRI

EXP PRI

#

!

EXPPRI

EXPPRI

#A

B

!!

!!

!

EXP PRI

EXP PRI

#

!

EXPPRI

EXPPRI

#A

B

!!

!!

!

EXP PRI

EXP PRI

#

!

EXPPRI

EXPPRI

#A

B

!!

!!

!

EXP PRI

EXP PRI

#

!

EXPPRI

EXPPRI

#A

B!

!

!!

!

EXP PRI

EXP PRI

#

!

EXPPRI

EXPPRI

#A

B

!!

!!

!

EXP PRI

EXP PRI

#

!

EXPPRI

EXPPRI

#A

B

!!

!!

!

EXP PRI

EXP PRI

#

!

EXPPRI

EXPPRI

#A

B

SPS + -

Power source APower source BEMC3418

12

Install - Step 1 continued Before you begin

Some cabinet configurations may exceed the 24A derating supported by a single pair of power sources/branch circuits. These configurations use a second pair of PDPs (the upper two in your cabinet). Since each active PDP requires a separate power source, a fully configured cabinet uses a total of four 240V branch circuit source connections.

ONI

OFFO

ONI

OFFO

ONI

OFFO

ONI

OFFO

ONI

OFFO

ONI

OFFO

ONI

OFFO

ONI

OFFO

ONI

OFFO

ONI

OFFO

ONI

OFFO

ONI

OFFO

!!

!!

!

EXP PRI

EXP PRI

#

!

EXPPRI

EXPPRI

#A

B

!!

!!

!

EXP PRI

EXP PRI

#

!

EXPPRI

EXPPRI

#A

B

!!

!!

!

EXP PRI

EXP PRI

#

!

EXPPRI

EXPPRI

#A

B

!!

!!

!

EXP PRI

EXP PRI

#

!

EXPPRI

EXPPRI

#A

B

!!

!!

!

EXP PRI

EXP PRI

#

!

EXPPRI

EXPPRI

#A

B

!!

!!

!

EXP PRI

EXP PRI

#

!

EXPPRI

EXPPRI

#A

B

!!

!!

!

EXP PRI

EXP PRI

#

!

EXPPRI

EXPPRI

#A

B

!!

!!

!

EXP PRI

EXP PRI

#

!

EXPPRI

EXPPRI

#A

B

SPS + -

Power source A

Power source CPower source D

Power source B

EMC3407

13

Install - Step 2 Power up

1. Turn on the power switch for each standby power supply (SPS).

2. Be sure any other devices in the cabinet are correctly installed and ready for powerup, then turn on the master switch/circuit breakers for each cabinet/rack power strip. (In standard EMC cabinets, master switches are on the power distribution panels as shown in the figure on the next page).

The storage system can take 10 to 15 minutes to complete a typical powerup. If the storage system was installed in a cabinet at your site (field-installed system), the first powerup will require several reboots and can take 30 to 45 minutes. Amber warning lights will flash during power on self test (POST) and then go off.

The front fault light and the SPS recharge lights commonly stay on for several minutes while the SPS units fully charge.

If any amber lights on the front or back of the storage system remain on for more than 15 minutes (45 minutes for the first powerup of a field-installed system), make sure the storage system is correctly cabled and then refer to the CX3-series troubleshooting flowcharts on the Powerlink site. If you cannot determine any reasons for errors, contact your authorized service provider.

14

Install - Step 2 continuedPower up

ONI

OFFO

ONI

OFFO

ONI

OFFO

ONI

OFFO

ONI

OFFO

ONI

OFFO

ONI

OFFO

ONI

OFFO

ONI

OFFO

ONI

OFFO

ONI

OFFO

ONI

OFFO

!!

!!

!

EXP PRI

EXP PRI

#

!

EXPPRI

EXPPRI

#A

B

!!

!!

!

EXP PRI

EXP PRI

#

!

EXPPRI

EXPPRI

#A

B

!!

!!

!

EXP PRI

EXP PRI

#

!

EXPPRI

EXPPRI

#A

B

!!

!!

!

EXP PRI

EXP PRI

#

!

EXPPRI

EXPPRI

#A

B

!!

!!

!

EXP PRI

EXP PRI

#

!

EXPPRI

EXPPRI

#A

B

!!

!!

!

EXP PRI

EXP PRI

#

!

EXPPRI

EXPPRI

#A

B

!!

!!

!

EXP PRI

EXP PRI

#

!

EXPPRI

EXPPRI

#A

B

!!

!!

!

EXP PRI

EXP PRI

#

!

EXPPRI

EXPPRI

#A

B

Power source A

Power source CPower source D

Power source B

EMC3438

Master switch

Master switch

Master switch

Master switch

15

Install - Step 3Connect management station

Using CAT 5 or better Ethernet cables, connect each SP to the network that is connected to the host from which you will manage the storage system (the management station). This host can be an AIX, ESX Server, HP-UX, Linux, Solaris, or Windows host with the required Java runtime environment (JRE), or a Windows host set up as an off-array station (manager) as described in the Navisphere Manager Administrator’s Guide (P/N 300-003-511).

To initialize the storage system you will need a host connected to the same subnet as the storage system’s SP. This host can be the management station, but it cannot be running AIX.

Connecting to a local management client

Connecting to a shared management LAN

BE 0 BE 1 BE 1BE 00 Fibre 1 Fibre 0 Fibre 1 Fibre

EMC3447

Hub

BE 0 BE 1 BE 1BE 00 Fibre 1 Fibre 0 Fibre 1 Fibre

LAN

EMC3448

16

Install - Step 4Initialize storage system

To initialize the storage system, you must configure the management network interfaces for the storage system’s SPs with the Navisphere Storage System Initialization Utility.

Requirements for initialization

Make sure you have the following:

❒ A host that is on the same subnet as the storage system’s management ports and that is running one of the operating systems listed below. This host can also be a server.

• ESX Server• HP-UX• Linux• Solaris• Windows 2000• Windows Server 2003

Note: The initialization utility is not available for AIX hosts.

❒ The configuration planning worksheets from the planning guide for your storage-system configuration (on the Powerlink site or the Documentation and Resources for CX3-Series Storage Systems CD) with the following information filled in:

• A static IP address for each storage processor in the storage system.

• The subnet mask of the LAN to which each storage-system management port and host is connected.

• The default gateway address of the LAN to which each storage-system management port is connected.

17

Install - Step 4 continuedInitialize storage system

❒ The hardware serial number of the storage system. On a CX3-40 storage system, the hardware serial number (TLA S/N) is located on a blue vertical label on the far left side of the chassis behind the front bezel (front panel), as shown below. To remove the front bezel, unlock it, and then press the latches on its front sides and pull the bezel toward you.

❒ The CLARiiON Core Server Support CD that shipped with the storage system.

We recommend that you install and run the initialization utility on a host, but you can run this utility directly from the CLARiiON Core Server Support CD.

Install the initialization utility on a host that is connected to the same subnet as the storage system. Follow the instructions in the server support products installation guide for the operating system running on the host. These installation guides are on the Powerlink site and the Documentation and Resources for CX3-Series Storage Systems CD.

Run the Storage System Initialization Utility on the host

After the storage system is fully powered up for the first time, you must run the initialization utility to set management network parameters for the storage system so that you can manage it over the LAN.

1. Before continuing, make sure that the storage system is powered up, that each SP power light (rear of enclosure) is steady green, and that no amber lights are blinking.

EMC3420

Serial number

TLA

S/N

xxxx

xxxx

18

Install - Step 4 continuedInitialize storage system

2. Start the initialization utility:

• On an ESX Server host or virtual machine, open a console window and enter/opt/Navisphere/bin/naviinittoolcli

• On an HP-UX host, open an hpterm window and enter/opt/Navisphere/bin/naviinittool

• On a Linux host or virtual machine, open a console window and enter/opt/Navisphere/bin/naviinittoolcli

• On a Solaris host or virtual machine, open a shell window and enter/opt/Navisphere/bin/naviinittool

• On a Windows host or virtual machine, from the toolbar, selectStart > Programs > EMC > Navisphere > Navisphere Storage SystemInitialization

3. Read the license agreement and accept it by entering y for an ESX Server, HP-UX, Linux, or Solaris host or clicking I accept and Next for a Windows host.

The utility automatically scans the subnet for storage systems. When the discovery operation is complete, the utility lists, by hardware serial number (see page 17 for the location of the serial number) all uninitialized and initialized CLARiiON storage systems that it found. If the discovery operation did not find the storage system that you are installing, verify that the storage system’s management ports are properly cabled to the LAN on which the host resides. The storage system and host must both reside on the same subnet.

4. Select the storage system to initialize:

• On an ESX Server, HP-UX, Linux, or Solaris host or virtual machine, enter the item number for the storage-system’s serial number and press Enter.

• On a Windows host or virtual machine, in the Uninitialized Systems list select the storage system’s serial number and click Next.

5. Enter the name you want to use for the storage system. The name cannot exceed 32 characters.

19

Install - Step 4 continuedInitialize storage system

6. Enter the following network parameters for the storage-system management ports, and click Next.

Use the information from the completed planning worksheet in the storage-system management chapter in Planning Your CX3-Series Fibre Channel Storage System Configuration.

7. The utility asks if you want to change the storage-system name, and prompts you to initialize security by providing a username or password. We strongly recommend that you initialize security now.

8. On an ESX Server, HP-UX, Linux, or Solaris host or virtual machine:a. Enter a to apply the network parameter values.b. Enter e to exit the utility.

9. On a Windows host or virtual machine:a. Click Next to view the summary of the storage-system network settings.b. If the settings are correct, click Finish.

The storage system reboots.

Storage Processor A - IP IP address for SP A management port. Do not use 128.221.1.250, 128.221.1.251, 192.168.1.1, or 192.168.1.2.

Storage Processor B - IP IP address for SP B management port. Do not use 128.221.1.250, 128.221.1.251, 192.168.1.1, or 192.168.1.2.

Subnet Mask Subnet mask associated with the LAN to which the storage-system management port is connected.

Default Gateway Default gateway address for the LAN to which the storage-system management port is connected.

20

Install - Step 5Register storage system for service

To receive software updates and service for your storage system, you need to register your storage system with your service provider using the Storage System Registration wizard. The wizard is part of the Navisphere Service Taskbar (NST), which only runs on a Windows host.

The Storage System Registration wizard asks you several questions about the site where the storage system is installed and your support provider contact. It sends this information and basic storage-system configuration details to your service provider either directly over the Internet or using email. If you do not have an Internet connection, the wizard lets you save the registration information to a file, which you can send to your service provider.

The Navisphere Service Taskbar to which you have access may not include the Storage System Registration wizard. In this case, your service provider will register your storage system.

We strongly recommend that you register your storage system with your provider now. If you decide not to register your storage system at this time or you do not have Internet/email, you can still run the wizard to collect the data and send it to your service provider at a later time. If you do not register now, you may spend significantly more time registering it later.

1. Download the Navisphere Service Taskbar from the CLARiiON tools page on the Powerlink site. Install it on a Windows host that is connected to the same network as both the storage-system management ports and the Internet.

2. Start the Navisphere Service Taskbar.

3. In the taskbar’s navigation pane, select the Hardware Registration tab.

4. In the tab’s navigation pane, select Register Storage System to start the Storage System Registration wizard.

If the navigation pane does not contain this wizard, your service provider will register your storage system for you.

5. Follow the steps in the wizard to provide contact and storage-system information to your service provider.

6. Leave the Navisphere Service Taskbar running, as you may need it in future steps.

21

Install - Step 6Update software

Use the Software Assistant wizard to update your storage-system software if you need to install a FLARE operating environment (OE) patch or an enabler for optional SnapView™, MirrorView™, or SAN Copy™ software. The Software Assistant wizard is part of the Navisphere Service Taskbar. If you are installing an enabler, you will need the enabler CD from the optional software kit.

The Navisphere Service Taskbar to which you have access may not include the Software Assistant wizard. In this case, your service provider will update your storage-system software.

Installing a FLARE OE patch

1. If you do not have the Navisphere Service Taskbar running:

a. Download the Navisphere Service Taskbar from the CLARiiON tools page on the Powerlink site. Install it on a Windows host that is connected to the same network as the storage-system management ports.

b. Start the Navisphere Service Taskbar.

2. In the taskbar’s navigation pane, click the Software Assistant tab.

If the navigation pane does not contain a Software Assistant tab, an authorized service provider must update the storage system’s software.

3. In the assistant’s navigation pane, click Prepare for Installation.

4. In the welcome page, select Download software only, follow the instructions to download the required software patch, and close the Prepare for Installation wizard.

5. In the assistant’s navigation pane, click Install software and follow the instructions to install the patch and perform any necessary post-installation tasks.

22

Install - Step 6 continuedUpdate software

Installing an optional software enabler

1. Locate the software enabler CD that shipped in the software kit, and insert it into a drive on the host from which you are running the Navisphere Service Taskbar.

If you do not have the Navisphere Service Taskbar running:

a. Download the Navisphere Service Taskbar from the CLARiiON tools page on the Powerlink site. Install it on a Windows host on the same network as the storage-system management ports.

b. Start the Navisphere Service Taskbar.

2. In the taskbar’s navigation pane, click the Software Assistant tab.

If the navigation pane does not contain a Software Assistant tab, an authorized service provider must update the storage system’s software.

3. In the taskbar’s navigation pane, click Install software, and follow the instructions to install the software enabler and perform any necessary post-installation tasks.

23

Install - Step 7Prepare server

To prepare the server:

• Install any required host bus adapters (HBAs) and their drivers (this page).

• Install failover software (such as PowerPath® software) on the servers connected to the storage system (this page).

• Install the Navisphere Server Utility and/or Navisphere Host Agent (page 24).

• If you installed the SnapView and/or SAN Copy enabler on the storage system, install admsnap and/or admhost software on any hosts that will use SnapView or SAN Copy (page 26).

Install HBAs and drivers

On each server, install HBAs, the appropriate HBA drivers, and any required driver updates (such as service packs, hot fixes, or patches). Use the instructions in the manuals that shipped with the HBAs or that are available on the HBA vendor’s website. Be sure to reboot the server after the driver installation or driver update is complete.

Install failover (path management) software

If you have path management software other than PowerPath, install it on each server as described in the software documentation. If you purchased PowerPath, install it on each server as follows:

1. Locate the PowerPath CD and the license key that came with the PowerPath kit.

You will need a separate PowerPath kit with its own license for each server.

2. Insert the CD into the server’s CD drive to begin the installation.

3. For a Windows server, follow the instructions in the installation wizard using the defaults.

4. For an AIX, HP-UX, Linux, or Solaris server, use the instructions in the AIX, HP-UX, Linux, or Solaris PowerPath installation guide on the Powerlink site.

24

Install - Step 7 continuedPrepare server

Install the Server Utility or the Host Agent

You will use either the Navisphere Host Agent or the Navisphere Server Utility later to register the server NICs or HBAs with the storage system. Depending on your application needs, you can install either the Server Utility, Host Agent, or both on a server. If you install both applications, the registration feature of the Server Utility will be disabled and the Host Agent will be used to register the server’s HBAs with the storage system. If you do not want to install both applications, but want to use some of the features available in the Server Utility, you may run the Server Utility from the Server Support CD.

25

Install - Step 7 continuedPrepare server

Table 1 describes the differences between the Host Agent and the Server Utility.

Table 1. Differences between the Host Agent and the Server Utility

Function Host Agent Server Utility

Pushes LUN mapping and OS information to the storage system.

Yes – LUN mapping information is displayed in the Manager UI, next to the LUN icon, or with the CLI using the -lunmapinfo command.

No – LUN mapping information is not sent to the storage system. Only the host’s name, ID, and IP address are sent to the storage system. Note: The text Manually Registered appears next to the hostname icon in the Manager UI indicating that the Host Agent was not used to register this server.

Runs automatically to send information to the storage system.

Yes – No user interaction is required.

Yes (Windows only) – You can control whether server information is automatically sent to the storage system by enabling or disabling the Registration Servicea feature. It is automatically enabled during the installation of the Server Utility but you can stop the service at anytime through the Services option in the Microsoft UI. Note: Only the host’s name, ID, and IP address are sent to the storage system; LUN mapping information is not sent. No (non-Windows platforms) – You must manually update the information by starting the utility or you can create a script to run the utility. Since you run the Server Utility on demand, you have more control over how often or when the utility is executed.

a. If you install both the Host Agent and the Server Utility, the Sever Utility’s Registration Service feature will not beinstalled.

Provides high-availability (HA) validation

No – You can run the Server Utility’s HA validation feature from the CD without having to install the Server Utility.

Yes – The HA validation feature verifies that failover software is installed on the server and that working paths exist between the server and each SP in the storage system.

Requires network connectivity to the storage system.

Yes – Network connectivity allows LUN mapping information to be available to the storage system.

No – LUN mapping information is not sent to the storage system.Note: If you are using the Server Utility to upload a high availability report to the storage system, you must have network connectivity.

Requires installation. Yes – You must install the Host Agent on the server.

No – You can run the Server Utility from the CD. However, we recommend that you install it on the server. For Windows platforms, you must install the utility to use the Registration Service feature (described above).

26

Install - Step 7 continuedPrepare server

If you have not already installed the Host Agent or the Server Utility, install it now. Use the instructions in the server support products installation guide for the operating system running on each server you will connect to the storage system. These installation guides are on the Powerlink site and the Documentation and Resources for CX3-Series Storage Systems CD.

Install admsnap and/or admhost software

If you installed the SnapView and/or SAN Copy enabler on the storage system, then the servers that use SnapView require admsnap software and the servers that use SAN Copy require the admhost software. Install this software on the appropriate servers from the CLARiiON Core Server Support CD. Use the instructions in the server support products installation guide for the operating system running on each server connected to the storage system. These installation guides are on the Powerlink site and the Documentation and Resources for CX3-Series Storage Systems CD.

27

Install - Step 8Set up switches

If your configuration includes Fibre Channel switches, install or upgrade any switch software or patches on switches connected to the storage system and the servers. See the installation manuals that shipped with the switch or that are available on the switch vendor’s website.

28

Install - Step 9Cable storage system

Connect storage-system Fibre Channel data ports

Use fiber-optic cables to connect the storage-system data ports to the server’s Fibre Channel HBAs or to ports on a Fibre Channel switch that is connected to the server.

1. Remove the protective covers from each optical connector on the fiber-optic cable and on the HBA or switch port.

2. Plug the cables into the Fibre Channel front-end ports (marked 0 Fibre and 1 Fibre) on the SPs.

3. Connect the free end of each fiber-optic cable:

a. For a direct connection between the storage system and the server, connect the cable to the server’s HBA. If the HBAs are not yet installed, install them as described in the server and adapter documentation.

b. For a switch configuration between the storage system and the server, connect the cable to a Fibre Channel switch port.

Applications such as MirrorView/A, MirrorView/S, or SAN Copy software may restrict or require the use of certain SP ports. Refer to the application documentation for specific cabling information.

EMC3459

1 Fibre

29

Install - Step 10Power up Fibre Channel switches

Power up and zone Fibre Channel switches

If your configuration uses Fibre Channel switches, power them up. If the switches do not have hard-wired zones, zone them now. We recommend that you use single-initiator zoning, which limits a zone to a single HBA port with one or more storage-system SP ports. Make sure that each HBA is zoned to at least one port on each SP.

30

Install - Step 11Register HBAs

On each server, run either the Server Utility or the Host Agent to register the server’s HBAs with the storage system.

To run the Server Utility

1. Start the Server Utility:

• On an AIX server, enter/usr/lpp/HOSTUTIL/naviserverutil

• On an ESX Server, open a console window and enter/opt/Navisphere/bin/naviserverutilcli

• On an HP-UX server, open an hpterm window and enter/opt/Navisphere/bin/naviserverutil

• On a Linux server, open a console window and enter/opt/Navisphere/bin/naviserverutilcli

• On a Solaris server, open a shell window and enter/opt/Navisphere/bin/naviserverutil

• On a Windows server, from the toolbar, selectStart > Programs > EMC > Navisphere > Navisphere Server Utility

2. For an AIX, ESX Server, HP-UX, Linux, or Solaris server:

a. If a menu appears, select 1 (Update Server Information).

The utility scans and displays a list of all storage systems connected to the server.

b. Enter u to register the server with each storage system that the utility found.

c. Enter c (cancel) to stop the utility.

3. For a Windows server:

a. Select Register this server to all connected storage systems, and click Next.

b. Click Next to send the server information to the storage system.

c. Click Finish to exit the utility.

31

Install - Step 11 continuedRegister HBAs

The utility sends the initiator records for the HBA initiators in the server to each storage system that is connected to the server.

To run the Host Agent

When the Host Agent starts, it registers server Fibre Channel HBAs with any storage systems that are connected to the HBAs either directly or through Fibre Channel switches. It does this registration by sending the HBA initiator records to the storage systems.

For certain operating systems, the Host Agent starts automatically when you boot the server.

To run the Host Agent, either start or restart (stop and start) it:

• On an AIX server:

To start the Host Agent, enterre.agent start

To stop the Host Agent, enterre.agent stop

• On an ESX Server:

To start the Host Agent, enter/etc/init.d/naviagent start

To stop the Host Agent, enter/etc/init.d/naviagent stop

• On an HP-UX server:

To start the Host Agent, enter/sbin/init.d/agent start

To stop the Host Agent, enter/sbin/init.d/agent stop

32

Install - Step 11 continuedRegister HBAs

• On a Linux server or Linux virtual machine:

To start the Host Agent, enter/etc/init.d/naviagent start

To stop the Host Agent, enter/etc/init.d/naviagent stop

• On a Solaris server or Solaris virtual machine:

To start the Host Agent, enter/etc/init.d/agent start

To stop the Host Agent, enter/etc/init.d/agent stop

• On a Windows Server 2003 or Windows 2000 server, or Windows virtual machine:

To start the Host Agent:a. As Administrator or the equivalent, from the desktop, right-click My

Computer and selectManage > Services and Applications > Services

b. In the Services pane, right-click Navisphere Agent and select Start.

To stop the Host Agent:a. As Administrator or the equivalent, from the desktop, right-click My

Computer and selectManage > Services and Applications > Services

b. In the Services pane, right-click Navisphere Agent and select Stop.

33

Install - Step 12Verify the storage-system and high-availability

configuration

Check storage-system health

To determine if a storage system’s parts are operating correctly, use the Verify Storage System wizard, which is part of the Navisphere Service Taskbar.

The version of the Navisphere Service Taskbar that you can access may not contain the Verify Storage System wizard. In this case, an authorized service provider can perform this step.

1. If you do not have the Navisphere Service Taskbar running:

a. Download the Navisphere Service Taskbar from the CLARiiON tools page on the Powerlink site. Install it on a Windows host on the same network as the storage-system management ports.

b. Start the Navisphere Service Taskbar.

2. In the taskbar, select the Hardware Maintenance tab.

If the navigation pane does not contain a Hardware Maintenance tab, an authorized service provider may run the Storage System Verification wizard.

3. In the tab’s navigation pane, select Verify Storage System, and follow the steps in the wizard.

4. Enter the IP address or hostname of an SP in the storage system, and follow any instructions.

5. Review the report that the wizard generates, and if it lists any problems try to resolve them.

The troubleshooting flowcharts for the CX3-series storage system on the Powerlink site may be helpful in resolving problems.

34

Install - Step 12 continuedVerify the storage-system and high-availability

configuration

Verify your high-availability configuration

Use the server high-availability feature in the Navisphere Server Utility to verify that your Fibre Channel configuration is highly available (each Fibre Channel HBA has at least one active path to each storage processor), and that path management software, such as PowerPath, is installed and running.

On each server that you plan to connect to the storage system:

1. Locate the CLARiiON Core Server Support CD that shipped with the storage system and use it to run the Navisphere Server Utility for the server’s operating system.

For information on running this utility, refer to the instructions in the appropriate server support products installation guide on the Powerlink site and the Documentation and Resources for CX3-Series Storage Systems CD.

2. From the Navisphere Server Utility, select Verify Server High-Availability to generate a report of the host’s environment.

3. Review the generated report to confirm that your server configuration is highly available.

35

Install - Step 13Install CLARalert

CLARalert® software monitors your storage system’s operation for error events and automatically notifies your service provider of any error events.

CLARalert software requires:

• A monitor station, which is a host running a supported Windows operating system. The monitor station cannot be a server (host connected to storage-system data ports), and it must be on the same network as your storage-system management ports.

• A portal system, which is a CX3-series storage system with FLARE OE 03.22.xxx.5.5yy or higher. The CX3-series storage system can be the one you are installing.

If you do not have an existing monitor station - You can create a monitor station by installing CLARalert software on a Windows host.

If you have an existing monitor station running CLARalert software - You can upgrade the CLARalert software on the monitor station.

If you have an existing monitor station running Event Monitor - You can install CLARalert software on the monitor station.

To install or update CLARalert Remote Services

1. From the Windows host that is or will be the monitor station:

a. Log in to Powerlink and navigate to the CLARiiON tools page.

b. In the install section of this page, click the CLARalert link and run the CLARalert installation wizard.

If your Powerlink view does not contain a CLARiiON tools page or a CLARalert link on this page, your service provider can install the CLARalert software.

2. Follow the steps in the wizard. Use the information from the completed CLARalert Worksheet in the guide for planning your storage-system configuration. You can generate the worksheet from the plan section of the user customized documentation page for CX3-series storage systems on the Powerlink site, or view it on the Documentation and Resources for CX3-Series Storage Systems CD.

36

Install - Step 14Configure

You are now ready to use Navisphere Manager to define your storage-system security settings and configure your storage system.

If you have only Windows servers connected to your storage system:

1. On the Powerlink site, navigate to the customized documentation section for the CX3-series storage systems, and click Install to create an installation document customized for your configuration.

2. In your customized document, start with the section on configuring the storage system.

If you have an AIX, ESX Server, Linux, HP-UX, or Solaris server connected to the storage system:

1. On the Powerlink site, navigate to the documentation page for your storage-system model and select the section on installation and configuration.

2. In this section, select the entry for the Installation Roadmap for CX3-Series, CX-Series, AX-Series, and FC-Series Storage Systems.

3. In this document, go the chapter for the operating system running on your server and select the new storage system checklist that is appropriate to your configuration.

4. In this checklist, start with the steps for configuring the storage system.

37

If you need help

For questions about technical support and service, contact your service provider.

For questions about upgrades, contact your local sales office.