Civil & Steel Structure Mechanical Work Electrical Work … · 2013. 12. 29. · Factory : Jln....
Transcript of Civil & Steel Structure Mechanical Work Electrical Work … · 2013. 12. 29. · Factory : Jln....
PT MULTI KARYA ENGINEERINGCONSTRUCTION & STEEL FABRICATION
Civil & Steel Structure
Blast & Paint Work
Mechanical Work
Electrical Work
Engineering
Insulation
Piping
Factory :
Jln. Raya Trans Sumatera – Bakauheni
Km 27 Desa Pardasuka Kec. Katibung
Lampung Selatan – Lampung
Telp. : +62 – 721 – 370008, +62 – 721 – 370089
Fax. : +62 – 721 – 370099
Website : www.multikaryaengineering.com
E-mail : [email protected]
Head Office :
Synergy Building Lt.5 No.5 Jl. Jalur Sutera Barat No.17
Alam Sutera – Tanggerang
Telp. : +62 – 21 – 3044 8286
Fax. : +62 – 21 – 3044 8285
Website : www.multikaryaengineering.com
E-mail : [email protected]
PT MULTI KARYA ENGINEERINGCONSTRUCTION & STEEL FABRICATION
PT MULTI KARYA ENGINEERING
CONTENT
INTRODUCTION
PERFORMANCE
EQUIPMENT & TOOLS
LEGALITY
PT MULTI KARYA ENGINEERING
INTRODUCTION
1. Vision
To be the best fabrication and Engineering Contractor and remind to be
trusted
partner for successful EPC and solution Provider.
2. Mission
• To ensure that all jobs are carried out to the best of our quality.
• To ensure that all jobs are carried out to the best of schedule and team work.
• To ensure that all jobs are carried out to the best of our ability and
continuously develop our manpower and quality.
• To ensure our customer's satisfaction by accurately grasping their needs and
meet them by bringing the Company's unique intellectual capital and
operational assets to bear on these needs.
3. Coorporate Value
• Committed to work procedure, rule and regulation.
• Develop professional relationship, team work and proactive.
• Committed to timeline and through in works, accountable and
responsible.
• Being true and faithful, good conduct, best behavior and honesty.
• Strive for success and quality works and forward thinking.
• Customer satisfaction oriented.
PT MULTI KARYA ENGINEERING
INTRODUCTION
Civil & Steel Structure
Mechanical Work
Electrical Work
Piping
Insulation
Engineering
Blast & Paint Work
Oil & Gas Petroch Industrial Power Plant
PT MULTI KARYA ENGINEERING
Commercial
Division
Board
Of
Director
Project
Division
Project
ManagementQA / QC HSE MarketingHRGAFAD
Factory Electrical Mechanical Civil
INTRODUCTION
PT MULTI KARYA ENGINEERING
INTRODUCTION
In Billion – IDR
CASH & OTHER 4,90
ACCOUNT
RECEIVABLE6,89
FIXED ASSET 18,42
30,21
LONG TERM LIABILITIES 2,80
SHORT TERM LIABILITES
SHORT TERM LIABILITES
3,41
3,02
E Q U I T Y 20,80
30,21
PT MULTI KARYA ENGINEERING
INTRODUCTION
PT MULTI KARYA ENGINEERING
Head Office :
Jl. Synergy Building Lt.5 No.5 Jl. Jalur Sutera Barat
No.17
Alam Sutera – Tanggerang
Telp. : +62 – 21 – 3044 8286
Fax. : +62 – 21 – 3044 8285
Website : www.multikaryaengineering.com
E-mail : [email protected]
Factory :
Jln. Raya Trans Sumatera – Bakauheni
Km 12,5 Desa Pardasuka Kec. Katibung
Lampung Selatan – Lampung
Telp. : +62 – 721 – 370008, +62 – 721 –
370089
Fax. : +62 – 721 – 370099
Website : www.multikaryaengineering.com
E-mail : [email protected]
No Project Name Client Working Various Working Item Project Roles Scope Of Works Duration
1. L Project SK Coorporation Lub Base Oil Plant Steel Structure Sub Contractor Blasting Painting2007 March – 2007
Oct
2. Storage Tank Project PT Tunas Baru Lampung Palm Oil Plant Storage Tank Sub Contractor Blasting Painting2007 Aug – 2007
Dec
3. Shot Room Construction PT Tekniko Indonesia Semi Automatic Shoot Room Mechanical & Electrical Main ContractorCivil,Fabrication,Mechanic
al & Electrical
2007 Nov – 2008
Feb
4. Oil Storage Tank Project PT Oil Tanking Merak Oil Processing Plant Piping Sub Contractor Blasting Painting2008 Sept – 2009
Jan
5. Pelindo Workshop Pelindo Palembang Workshop Steel Structure Main Contractor
Civil,Fabrication,Mechanic
al & Electrical2008 Sept – 2008
Dec
6.Palembang Asphalt Bulk
Terminal
PT Wahyu Bitumen
GrahaAsphalt Bulk Terminal Asphalt Storage Tank Main Contractor
Fabrication,Mechanical &
Electrical2008 Feb – 2008
Dec
7.Aceh Asphalt Bulk
TerminalPT Aspal Bangun Sarana Asphalt Bulk Terminal Asphalt Storage Tank Main Contractor
Fabrication,Mechanical &
Electrical
2008 Oct – 2009
March
8. SP-PSA RTGC PT Hanjung Indonesia Gantry Cane (TT Crane) Mechanical Sub Contractor Fabrication2008 Dec – 2009
March
9. Pasir Coal Project PT Cranetech Service Cnveyor, Chute & Coal Silo Steel Structure Sub Contractor Fabrication2008 Dec – 2009
May
10. Cirebon Power PlantPT Whisan Teknik
PerdanaChimney Platform Steel Structure Sub Contractor Fabrication & Erection
2009 Aug – 2010
March
11. Cirebon Power Plant PT Tekniko IndonesiaTransfer Tower For Coal
HandlingSteel Structure Sub Contractor Fabrication & Erection
2009 Sept – 2010
Sept
12. Cirebon Power Plant Doosan Heavy Industries Coal Fired Power Plant Electrical Sub Contractor Erection & Installation2009 Jan – 2010
Dec
13. PLTU 3 Bangka PT Teknik Lancar MandiriPlatform & Inner Flue
ChimneySteel Structure Sub Contractor Fabrication & Erection
2010 April – 2010
Sept
14. PLTU Lampung Doshion Veolia Co Ltd Water Treatment Plant Water Storage Tank Sub Contractor Fabrication & Erection2010 June – 2010
Nov
15.Medan Asphalt Bulk
TerminalPT Aspal Bangun Sarana Asphalt Bulk Terminal Asphalt Storage Tank Main Contractor
Fabrication,Mechanical &
Electrical
2010 Aug - 2011
March
16. PLTU Lampung PT Adhi Karya Shelter Building Steel Structure Sub Contractor Fabrication & Erection2010 Aug – 2010
Nov
17. PLTU Lampung PT Adhi Karya Ducting Steel Structure Sub Contractor Fabrication 2010 Sept – 2010
Dec
18. PLTU Lampung PT Adhi Karya Turbin Auxiliary Steel Structure Sub Contractor Fabrication & Erection2010 Oct – 2011
Jan
19. PLTU Sumbar PT Teknik Lancar MandiriPlatform & Inner Flue
ChimneySteel Structure Sub Contractor Fabrication & Erection
2010 Oct – 2011
Jan
20. PLTU 3 Bangka PT Truba Alam (TAME) Ducting Steel Structure Sub Contractor Fabrication & Erection2010 Oct - 2010
Dec
21. PLTU Lampung Doshion Veolia Co Ltd Water Treatment Plant M,E & Instrument Sub Contractor Erection & Installation2010 June – 2010
Sept
22. PLTU Lampung PT Adhi Karya Structure Shelter Steel Structure Sub Contractor Fabrication & Erection2010 Sept – 2010
Nov
23. PLTU Lampung PT Adhi Karya Ducting Steel Structure Sub Contractor Fabrication 2010 Sept – 2011
Jan
24. Cirebon Power Plant Doosan Heavy Industries Ship Unloader Electrical Sub Contractor Erection & Installation2010 Sept – 2011
Feb
PT MULTI KARYA ENGINEERING
PERFORMANCE
No Project Name Clien Working Various Working Item Project Roles Scope Of Work Duration
25. Merak Power Plant Daewoo EngineeringTemporary
FacilitiesCivil Sub Contractor EPC 2010 Sept – 2011 Feb
26. Krakatau – Posco Project Posco E & CTemporary
FacilitiesElectrical Sub Contractor Installation 2011 Feb – 2011 March
27. HTM – Factory KS KMK Global Factory
Steel Structure, Civil
& Temporary
Facilities
Sub Contractor EPC 2011 June – 2011 May
28.Jembatan Jalur Khusus
Batubara
PT Nugraha Adi Taruna
Jo. PT Bakrie Metal
Industries
BridgeCivil & Steel
StructureSub Contractor PC 2011 June – 2011 Nov
29. PLTU LampungPT Gaka Karya
EngineeringInsulation Mechanical Sub Contractor Installation 2011 July – 2011 Sept
30. PLTU Lampung PT Adhi Karya Architecture Work Civil Sub Contractor Erection 2011 July – 2011 Oct
31. PLTU Lampung PT Adhi Karya Drainage System Civil Sub Contractor EPC 2011 July – 2011 Oct
32. Merak Power Plant PT Wijaya Karya Turbine Erection Steel Structure Sub Contractor Erection/Installation 2011 Aug – 2011 Nov
33. Merak Power Plant PT Wijaya Karya Coal Bunker Steel Structure Sub Contractor Erection/Installation 2011 Dec – 2012 Feb
34. POSCO KS Project POSCO Co. Ltd Conveyor Steel StructureJo. With Top
BridgeFabricatin & Erection 2012 Jan – 2012 Dec
35.Jembatan Khusus Jalur
BatubaraPT Servo Lintas Raya Bridge Steel Structure Sub Contractor Erection 2012 Jan – 2012 March
36.Simple Part Fabrication
WorkPT Tekniko Indonesia Fabrication Steel structure Sub Contractor Blashting Furnace Des 2012 – April 2013
37.Prepare Damage Part Of
Hana
PT Sejahtera Karunia
LinesOver Haul Steel structure Main contractor
Preparation, Demolition,
Fabrication & Install Work2013 Jan – 2013 Mar ch
38. Additional Mechanical WorkBut Posc Engineering
Co.Ltd
Fabrication
ErectionSteel Structure Main contractor
Modification site, touch-
up, Safety Equipment2013 Jan –2013 Mar ch
39. Building Workshop Seyoung E&C Co. Ltd Office & Workshop Civil Main contractorBuilding workshop &
include steam coil tank2012 Des –2013 Mar ch
40.
EPC of Tarahan Port
Expansion Phase 5
(Package 10-183) PT Bukit
Asam Tbk.
PT Krakatau Engineering
– China Huadian
Engineering Co .Ltd
Fabrication RCD
indexerSteel Structure Main contractor
Upper Structure RCD
Building (RCD 4)2013 Jan –2013 Mei
41.
Fabrikasi & Instalasi
Platform & inner Flue PLTU
Tenayan Riau
PT Teknik Lancar MandiriFabrication &
InstalationSteel Structure Sub Contractor
Fabrikasi & Instalasi
Platform & inner Flue2013 Jan –2013 Jul
42.
Job Creation Stair Tower
Handrail Fabrication Issue
Material
PT Tekniko Indonesia Fabrication Steel Structure Sub Contractor
Structural Steel, Stair
Stringer & Support,
Staired, Handrail, Grating
Material A36 - estimated
2013 Mar ch –2013 April
43.
EPC of Tarahan Port
Expansion Phase 5
(Package 10-183) PT Bukit
Asam Tbk.
PT Krakatau Engineering
– China Huadian
Engineering Co .Ltd
Fabrication Steel Structure Main contractorPengadaan SS Conveyor
& Mechanical2013 Mar ch – Juli 2013
44.
EPC of Tarahan Port
Expansion Phase 5
(Package 10-183) PT Bukit
Asam Tbk.
PT Krakatau Engineering
– China Huadian
Engineering Co .Ltd
Erection Steel Structure Main contractorErection SS Conveyor &
Mechanical2013 Mar ch –2013 May
PT MULTI KARYA ENGINEERING
PERFORMANCE
Project Name : Cirebon Coal Steam Fired
Power Plant Project 1 x 660 MW
Item Work : Electrical (Construction)
Scope Of Work : Installation
Client : PT Doosan Indonesia
Location : PLTU Cirebon, West Java
Periode : 2009 June – 2011 Maret
PT MULTI KARYA ENGINEERING
Project Name : Cirebon Coal Steam Fired
Power Plant Project 1 x 660 MW
Item Work : Chimney Mechanical
Cool Handling Tower
Scope Of Work : Fabrication & Installation
Client : PT Doosan Indonesia
Location : PLTU Cirebon, West Java
Periode : 2009 September – 2010 April
PT MULTI KARYA ENGINEERING
PT MULTI KARYA ENGINEERING
Project Name : Cirebon Coal Steam Fired
Power Plant Project 1 x 660 MW
Item Work : Turbin & WTP Roofing & Siding
Scope Of Work : Installation (Construction)
Client : PT Doosan Indonesia
Location : PLTU Cirebon, West Java
Periode : 2010 September – 2012 March
Project Name : Aceh Asphalt Bulk Terminal
Item Work : Civil, Mechanical & Electrical
Scope Of Work : Engineering, Procurement &
Cunstruction
Client : PT Aspal Bangun Sarana
Location : Aceh
Periode : 2008 October – 2009 March
PT MULTI KARYA ENGINEERING
Project Name : PLTU Bangka Belitung 2 x 30 MV
Item Work : Chimney Mechanical
Scope Of Work : Fabrication & Installation
Client : PT Teknik Lancar Mandiri
Location : PLTU Bangka Belitung
Periode : 2010 April – 2010 September
PT MULTI KARYA ENGINEERING
Project Name : SP-PSA RTGC
Item Work : Rubber Tired Gantry Crane
Scope Of Work : Fabrication
Client : PT Hanjung
Location : Lampung
Periode : 2008 December – 2009 March
PT MULTI KARYA ENGINEERING
Project Name : PLTU Lampung 2 x 100 MW
Item Work : Water Treatment Plant Mechanical
Electrical & Instrument
Scope Of Work : Fabrication & Installation
Client : Doshin Veolia Water Solution PTE LTD
Location : PLTU Lampung
Periode : 2010 August – 2011 August
PT MULTI KARYA ENGINEERING
PT MULTI KARYA ENGINEERING
Project Name : Asphalt Plant Project
Item Work : Civil, Mechanical & Electrical
Scope Of Work : Engineering, Procurement &
Construction
Client : PT Bitumen Graha
Location : Palembang, South Sumatera
Periode : 2008 February – 2008 November
PT MULTI KARYA ENGINEERING
Project Name : Temporary Office & Facility
Item Work : Civil, Mechanical & Electrical
Scope Of Work : Engineering, Procurement &
Cuntruction
Client : PT ABS, PT Whisan, Daewoo
Engineering
Location : Aceh, PLTU Cirebon, PLTU
Merak
Periode : 2008 November – 2010 February
Project Name : PLTU Lampung
2 x 110 MW
Item Work : Boiler & Chimney
Ducting
Scope Of Work : Fabrication
(Procurement)
Client : PT Adhi Karya
Location : PLTU Lampung
Periode : 2010 October –
2011 February
PT MULTI KARYA ENGINEERING
PT MULTI KARYA ENGINEERING
Project Name : PLTU Lampung
Item Work : BOP Shelter
Scope Of Work : Fabrication &
Installation
Client : PT Adhi Karya
Location : PLTU Lampung
Periode : 2010 October –
2011 January
Project Name : HTM Factory Project-K5
Item Work : Civil & Architecture
Scope Of Work : Engineering, Procurement & Construction
Client : PT KMK Global Sport
Location : Tangerang
Periode : 2011 January – 2011 May
PT MULTI KARYA ENGINEERING
PT MULTI KARYA ENGINEERING
Project Name : Indonesia Integrated Steel Mill Plant
Temporary Office
Item Work : Electrical
Scope Of Work : Procurement & Construction
Client : PT POSCO E & C
Location : Cilegon, Banten
Periode : 2011 February – 2011 March
PT MULTI KARYA ENGINEERING
Project Name : Instalasi Jembatan Jalur Khusus Batubara
Item Work : Civil & Steel Structure
Scope Of Work : Installation & Construction
Client : PT Nugraha Adi Taruna Jo.
PT Bakrie Metal Industries
Location : Muara Enim, South Sumatera
Periode : 2011 June – 2011 November
PT MULTI KARYA ENGINEERING
Project Name : PLTU Lampung
Item Work : Insulation
Scope Of Work : Installation &
Construction
Client : PT Gaka Karya
Engineering
Location : PLTU Lampung
Periode : 2011 June –
2011 December
PT MULTI KARYA ENGINEERING
Project Name : PLTU Lampung
Item Work : Main Drainage System
Scope Of Work : Procurement & Construction
Client : PT Adhi Karya
Location : PLTU Lampung
Periode : 2011 June – 2011 December
PT MULTI KARYA ENGINEERING
Project Name : Merak Power Plant 2 x 60 MW
Item Work : Turbin, Cool Bungker, BOP Structure
Scope Of Work : Installation ( Construction )
Client : PT Waskita Karya
Location : Merak, Banten
Periode : 2011 August – 2012 April
PT MULTI KARYA ENGINEERING
Project Name : Indonesia Intergrated Steel Mill Plant,
Steel Making Plant & Continuos Casting Plant
Item Work : Steel Structure
Scope Of Work : Fabrication, Installation & Construction
Client : PT POSCO E&C Indonesia
Location : Cilegon, Banten
Periode : 2012 – Present
PT MULTI KARYA ENGINEERING
Project Name : Indonesia Intergrated Steel Mill Plant,
Steel Making Plant & Continuos Casting Plant
Item Work : Steel Structure
Scope Of Work : Fabrication, Installation & Construction
Client : PT POSCO E&C Indonesia
Location : Cilegon, Banten
Periode : 2012 – Present
PT MULTI KARYA ENGINEERING
Project Name : Indonesia Intergrated Steel Mill Plant,
Steel Making Plant & Continuos Casting Plant
Item Work : Raw Material Blasting & Painting
Scope Of Work : Blasting & Painting
Client : PT POSCO E&C Indonesia
Location : Cilegon, Banten
Periode : 2012 – Present
PT MULTI KARYA ENGINEERING
Project Name : Biomas Carbonization Plant
Item Work : Mechanical
Scope Of Work : Fabrication
Client : PT Sico Techno
Location : Bandar Lamung
Periode : 2012 August – 2012 November
PT MULTI KARYA ENGINEERING
Project Name : PLTU Tenayan 2 x 110 MW Riau
Item Work : Chimney mechanical
Scope Of Work : Fabrication & Instalation
Client : PT. Teknik Lancar Mandiri
Location : Riau
Periode : 2013 Jan –2013 Juli
PT MULTI KARYA ENGINEERING
Project Name : Tarahan Port Expansion Phase 5
(Package 10-183) PT Bukit Asam Tbk.
Item Work : Coal Handling transfer tower & Conveyor
Scope Of Work : Fabrication & Installation
Client : Join PT. Krakatau Engineering – China Huadian
Engineering CO.LTD
Location : Lampung
Periode : 2013 Jan –2013 Mei
PT MULTI KARYA ENGINEERING
Project Name : Indonesia Integrated steel Mill
Plant
Item Work : Small building of blast furnace
Scope Of Work : Fabrication
Client : PT. TEKNIKO INDONESIA
Location : Lampung
Periode : Des 2012 – April 2013
PT MULTI KARYA ENGINEERING
PT MULTI KARYA ENGINEERING
PT MULTI KARYA ENGINEERING
No Equipment Name Qty Unit Model & Type
1 Compresor 100 Hp 2 Unit DRE 100, AT AIR CECCATO ARIA COMP. 7.5 Bar, 75 KW,400V
2 Tank Compressor 1 Unit Capacity 2000 liter, Working Pres 10 kg/CM2, Efficiency 0.85
3 Compressor 50 HP 1 Unit CSC 50, CECCATO ARIA COMP. 8 Bar, 37 KW, 00V, 110A
4 Enginee Compressor 2 Unit Capacity 75 HP
5 Tank Compressor 1 Unit Capacity 986 liter, Working Press 8 Bar, Press Max 12 Bar
6 Compressor 2 Hp 1 Unit Multipro, BC-200 DMBW, 2.0 HP, 1.5 KW K9.27, 24 L15.29, IP 4 SI
7 Tank Compressor 4 Set Standard Tank
8 Pot Blashting 6 Set A-BEC‖ 600 LBS Cap, with 1-1/4‖ Mattering Ball Valve Complete
9 Hemet 2 Set Astro PT Maribaya Part No. 0132-001/P
10 Helmet 4 Set Clemco‖ Apollo 100
11 Nozlle 6 Set ClemiteSXR – No.6
12 Hose 5 Unit Various
13 Airline Breathing Filter 1 Set Clemco Nova 2000
14 Airless 2 Set GRACO Airless XtremeKing 45:1 C/W, Silver Plus Gun Tip 517,
15 Pot Painting 6 Set Krisbow 20 Ltr / Agitator & 10 Ltr
16 Spray Gun 9 Set Star S-770
17 Electro Phisic 1 Ea KDLN
18 Infrared Thermometer 1 Ea Krisbow Merk
19 Minitest 1 Set 600 B
20 Elcometer 1 Ea Asia PTE.LTD
21 Hygro-Thermometer 1 Ea
PT MULTI KARYA ENGINEERING
PT MULTI KARYA ENGINEERING
PT MULTI KARYA ENGINEERING
No Equipment Name Qty Unit Model & Type
1 Power Press 1 set Capacity 110 ton, 1200 mm x 900 mm
2 Hydraulic Press Break 1 set Capacity 50 ton
3 Hydraulic Roll Bending Machine 2 set Dia. 6-30 mm t. 2700 mm Bending lengt
4 Shearing Machine 1 set 25 mm t. 2550 mm Cutting Length
5 ARS Welding Machine / SMAW 20 set Capacity 400 A
6 DC Welding Machine / GTAW 5 set Capacity 500 A
7 CO2 Welding Machine 2 set Capacity 500 A
8 Generator 2 set Capacity 250 KW Caterpillar
9 Grending/DrillMachine 10 Unit Bosch Professional GWS 6—100
10 Drilling Machine 1 Unit Makita HP 1620
11 Hammer Drill 2 Unit Bosch Hammer GSH 388
12 Chain Block 20 set Various
13 Lever Blok 10 set Various
14 Cutting Torch 30 set Various
15 Heating Torch 20 set Various
16 Portable Grinder 10 set Various
17 Baby Grinder 6 set Small –Large
18 Expander Machine 5 set Various
19 Fork Lift 2 Unit Capacity 7.5 ton
20 Over Head Hoist Crane 5 set Capacity 7 ton& 5 ton
21 Hydraulic Truck Crane 1 Unit Capacity 50 ton
22 Loading Truck 1 Unit Capacity 20 ton
23 Wire Type Winch Machine 4 set Capacity 7 ton
24 Impact Machine 4 Unit Dia. 0.75 ―
25 SockrtWrench 6 set Size 40 -80 mm
26 Tool Box 10 set Various
PT MULTI KARYA ENGINEERING
LEGALITY
PT MULTI KARYA ENGINEERING
PT MULTI KARYA ENGINEERING
PT MULTI KARYA ENGINEERING
PT MULTI KARYA ENGINEERING
PT MULTI KARYA ENGINEERING
PT MULTI KARYA ENGINEERING
PT MULTI KARYA ENGINEERING
PT MULTI KARYA ENGINEERING
PT MULTI KARYA ENGINEERINGCONSTRUCTION & STEEL FABRICATION