References Civil Engineering

Transcript of Civil Engineering - MEVA Formwork Systems, formwork ... · PDF fileSolutions in Civil...

Page 1: Civil Engineering - MEVA Formwork Systems, formwork ... · PDF fileSolutions in Civil Engineering ... Wall formwork Mammut All-plastic facing alkus Support frame STB 450 Consortium

ReferencesCivil Engineering

Page 2: Civil Engineering - MEVA Formwork Systems, formwork ... · PDF fileSolutions in Civil Engineering ... Wall formwork Mammut All-plastic facing alkus Support frame STB 450 Consortium

DIN 18218

BE

TO

N

E R S TA

RR

UN

G

C

ON

CR

ET

E

SETTING

SO

LID

IF

IC

AT

IO

N

2

Leading the way in concrete standardsMEVA has been instrumental in redefining the European DIN 18218 Standard for concrete pressure to take account of new concrete mixtures such as self-compacting and flowable concrete. A new procedure to determine how concrete pressure will develop during each pour is based on MEVA know-how and will be part of the new standard.

Replacing the knead-bag test: Measuring device SolidCheck calculates concrete setting timeWhen has the concrete set? When can the formwork be stripped? These questions, up to now, had to be answered literally by rule of thumb using a knead-bag and pushing a thumb into the concrete. This uncertain technique is now redundant, replaced by a computer-aided ultrasonic measuring technology that ascertains the exact setting time as required for instance by the German standard DIN 18218. This allows the site to safely and fully utilise the formwork’s load capacity.

MEVA Formwork Systems is once again enhanc-ing its portfolio of expertise and know-how by offering this technology to the contractor community. In addition calculation tools for fresh concrete pressure are available online. Go to www.meva-international.com to download them.

Benefit also from the mobile app.

Page 3: Civil Engineering - MEVA Formwork Systems, formwork ... · PDF fileSolutions in Civil Engineering ... Wall formwork Mammut All-plastic facing alkus Support frame STB 450 Consortium

MEVA MEVA

3

Civil Engineering: Contents

More than just FormworkKnow-how for your building successFrom the beginning, it has been MEVA‘s philosophy to offer added value in the form of know-how and expertise – beyond supply-ing high-quality formwork. This far-reaching promise has been redeemed impressively for many years.

Leaders in the fieldCommittee and industry standards work has a high priority because it is essential to further expertise in concrete works. This is where qual-ity and safety standards are defined and imple-mented. The German quality control association (GSV) nominated MEVA to chair the technology committee; MEVA ist part of the influential, internationally active American Concrete Institute and its formwork committee and we´re a member of the ASCC (American Society of Concrete Contractors) to name only a few.

MEVA is acclaimed as an innovative leader in the formwork industry, underlined by several awards, distinctions and commendations for quality and service.

MEVA

MEVA: More than just formwork .................................................................................................... 2Solutions in Civil Engineering .......................................................................................................... 4Technology in Civil Engineering ....................................................................................................... 6Quality Concrete Finish ................................................................................................................... 8MEVA International / Addresses and contacts ................................................................................ 26

REFERENCES

Power PlantsMoorburg power plant, Hamburg, Germany ................................................................................. 10 Hydropower plant Linthal 2015, Switzerland ................................................................................. 11

WaterworksLauenburg watergate, Germany .................................................................................................... 12Deurganckdok, Antwerpen, Belgium ............................................................................................. 13Dam and Tunnel, St. Petersburg, Russia ......................................................................................... 14Klingenberg Dam, Germany .......................................................................................................... 15

TransportBjorvika/Sorenga Tunnel, Oslo, Norway ......................................................................................... 16 Canal crossing, Minden, Germany ................................................................................................. 17TGV rail link, Mulhouse, France ..................................................................................................... 18Henndorf tunnel, Austria .............................................................................................................. 19

InfrastructureDultenaugraben bridge, Rheinfeldn, Germany ............................................................................... 20M6 motorway bridge, Budapest, Hungary ..................................................................................... 21Al Saadiyat Island, Abu Dhabi, United Arab Emirates ..................................................................... 22National enrichment facility, Eunice, New Mexico, USA ................................................................. 23Tunnel for connecting canal, Senftenberg, Germany ..................................................................... 24Bradford College, Great Britain ..................................................................................................... 25

Page 4: Civil Engineering - MEVA Formwork Systems, formwork ... · PDF fileSolutions in Civil Engineering ... Wall formwork Mammut All-plastic facing alkus Support frame STB 450 Consortium

4

Cost Efficiency, Safety, QualityCivil engineering construction: A welcome challengeBeing special makes them special. Their size or span, their height or volume: Large industrial facilities, bridges, tunnels, reservoirs, waterworks or power plants are a challenge to the formwork engineer. Without their inventiveness and the endeavour to make possible what seemed impossi-ble, many a structure would not have been poured or differently so. As in other cases too, it is the

search for the technically feasible, economi-cally viable and practically sensible solution that makes the difference

Based on MEVA’s comprehensive product range for civil engineering construction, the best solution for your project will be found. We are at your side to develop clever answers and support you in all formwork challenges.

Engineering

Work flow planning

Formwork design

Page 5: Civil Engineering - MEVA Formwork Systems, formwork ... · PDF fileSolutions in Civil Engineering ... Wall formwork Mammut All-plastic facing alkus Support frame STB 450 Consortium

MEVA MEVAMEVA

© L

TV

Unternehmensprofil & Überblick

5

Solutions in Civil Engineering

Contractor Benefit through ExpertiseKnow-how and services Engineering services Formwork design and application Support in structural planning Special and customised designs Calculation of fresh concrete pressure and

pour rates Support in optimising work flow and pour

cycles

On-site support Assembly service and support Supervision and training of forming teams Support in supervising work flow Project engineers on site Support during critical concrete pours

Project management

Customised designs

Logistics

On-site support

Page 6: Civil Engineering - MEVA Formwork Systems, formwork ... · PDF fileSolutions in Civil Engineering ... Wall formwork Mammut All-plastic facing alkus Support frame STB 450 Consortium

1

2 3

4

6

Page 7: Civil Engineering - MEVA Formwork Systems, formwork ... · PDF fileSolutions in Civil Engineering ... Wall formwork Mammut All-plastic facing alkus Support frame STB 450 Consortium

MEVA

5 6

7

7

Technology in Civil Engineering

Leading the WayHigh performance formworkMEVA’s product and technology portfolio has a dominant position in civil engineering construc-tion. The world’s largest panelised wall form-work system Mammut 350 with the highest concrete load capacity of 100 kN/m² stands for high-end construction performance. The STB 450 is the only support frame whose exten-sions come on top and require no dismantling. It allows pours up to and beyond 12 m and being only 4.50 m deep at the base fits on a truck, no special haulage needed. The 100 % wood-free, all-plastic facing handles hundreds of tough pours and high demands on concrete finish. Or take the shoring tower Space with which hun-dreds of very high columns have been formed at exceptional speed. Or the working scaffold KLK 230, trusted for its robustness, safety and comfortable work on the 2.30 m wide platform. And the shoring system MEP guarantees maxi-mum worker safety thanks to its easy assembly and optimum flexibility at different heights and varying loads.

Mammut 350: heavy-duty wall formwork Shoring tower Space Shoring System MEP Special formwork carriages Special forms Climbing Scaffold KLK 230 Support Frame STB: single-sided forming

over 12 m

1

32

4567

Page 8: Civil Engineering - MEVA Formwork Systems, formwork ... · PDF fileSolutions in Civil Engineering ... Wall formwork Mammut All-plastic facing alkus Support frame STB 450 Consortium

12321

1 2

3

21

8

Warranty against rotting

Warranty against warping

Warranty on �exural rigidity

Warranty against discoloration

Warranty on UV resistance

7 Year unlimited usage

The patented all-plastic facing sheet is made of polypropylene (1 and 3), reinforced by an aluminium foil (2). The facing is resistant to UV rays, shrinking, swelling, rotting, building chemicals or fungal decay. It remains stable in any climate or temperature.

The All-Plastic Facing for Unlimited Cycles

The all-plastic facing puts an end to plywood waste in formworkThe introduction of the world´s first 100% wood-free facing started a new age in form-work. Replacing worn-out plywood sheets is now a thing of the past. No more waste. Get your job done without interruptions. No more unnecessary freight costs, no down-times and no hassles in work flow. No more chemical coat-ings that make disposal dangerous and expen-sive. Less waste means fewer C02 emissions. Besides offering better quality, the all-plastic innovation saves time and money.

Your advantages No swelling and shrinking Nailable like plywood No re-facing – no hidden costs Easy and quick to clean Repairable using the same material Better concrete finish

Page 9: Civil Engineering - MEVA Formwork Systems, formwork ... · PDF fileSolutions in Civil Engineering ... Wall formwork Mammut All-plastic facing alkus Support frame STB 450 Consortium

MEVA MEVAMEVA

9

Quality Concrete Finish

A superior concrete finish, architectural standards for high demands, constant results from the first pour to the last, stability in very high, fast pours: The all-plastic facing alkus has achieved a prominent position in engineering construction. Easy cleaning with a high pressure washer or rotation cleaner contributes to a high-quality pour result even in tough on-site conditions.

Page 10: Civil Engineering - MEVA Formwork Systems, formwork ... · PDF fileSolutions in Civil Engineering ... Wall formwork Mammut All-plastic facing alkus Support frame STB 450 Consortium

10

Moorburg Power Plant, Hamburg, Germany

Complete formwork solution with planning and logistics plus work flow support.

ProjectGermany´s largest coal power plant project Moorburg in Hamburg.

MEVA Systems Wall formwork Mammut 350 Shoring tower MEP

ContractorWayss & Freytag Ingenieurbau AG

Page 11: Civil Engineering - MEVA Formwork Systems, formwork ... · PDF fileSolutions in Civil Engineering ... Wall formwork Mammut All-plastic facing alkus Support frame STB 450 Consortium

Mammut 350, STB 450, MEP©

Axp

o

© A

xpo

11

Hydropower Plant Linthal 2015, Switzerland

Power Plants

ProjectSwitzerland’s largest hydropower plant with underground pumped-storage power plant including inlet and outlet gallery in the Alps.

MEVA Systems Wall formwork Mammut 350 Support frame STB 450 Climbing scaffold KLK 230 Working scaffold KAB 190

Consortium Marti AG Kraftwerk Linth-Limmern AG Axpo AG

Formwork engineeringMEVA Schalungs-Systeme, Seon

Cramped alpine site conditions, logistics, exceptional concrete pressure, work flow.

Page 12: Civil Engineering - MEVA Formwork Systems, formwork ... · PDF fileSolutions in Civil Engineering ... Wall formwork Mammut All-plastic facing alkus Support frame STB 450 Consortium

12

Lauenburg Watergate, Germany

Project Construction of a new reinforced concrete watergate to replace the old facilities in Lauen-burg on the Elbe-Luebeck canal. Work during normal watergate operation.

MEVA Systems Wall formwork Mammut All-plastic facing alkus Support frame STB 450

Consortium Hochtief Construction AG Moelders Baugesellschaft mbH Bauer Spezialtiefbau GmbH

Formwork engineeringMEVA Schalungs-Systeme, Haiterbach

Flowable concrete, 10 m high single-sided pours with very high concrete pressure.

Page 13: Civil Engineering - MEVA Formwork Systems, formwork ... · PDF fileSolutions in Civil Engineering ... Wall formwork Mammut All-plastic facing alkus Support frame STB 450 Consortium

Mammut, STB 450

13

Deurganckdok, Antwerp, Belgium

Waterworks

Project Construction of a new 1,360 m quay wall, 29.70 m high for the Deurganckdok (tidal dock) in Antwerp´s container harbour, with no ties and no joints, applying a unique pilgrim step method. Foundation base 24 m wide, 6 m high 23.70 m high, 1,360 m long quay wall 17.15 m hohe ankerlose Wand

MEVA Solution Wall formwork Mammut with its load capac-

ity of 97 kN/m² and all-plastic facing alkus Special construction: mobile gantry crane

Consortium Cordeel & Aertssen MBG CFG van Laere Dredging International

Formwork engineeringMEVA Schalungs-Systeme, Haiterbach, Germany

Gantry crane reduced labour costs by 75 % from 0.8 h/m² to 0.2 h/m².

Page 14: Civil Engineering - MEVA Formwork Systems, formwork ... · PDF fileSolutions in Civil Engineering ... Wall formwork Mammut All-plastic facing alkus Support frame STB 450 Consortium

RussiaGulf of Finland

Dam

Kronstadt

(Island of Kotlin)

St. Petersburg

14

Dam and Tunnel, St. Petersburg, Russia

Formwork planning and logistics, high concrete pressure, work flow.

Project 25.4 km flood dam in the Gulf of Finland out-side St. Petersburg. Construction of 2 locks and a 1.2 km tunnel to the locks. 52,500 sq.metres with reinforced concrete. Walls up to 1.30 m high and 7.55 m thick.

MEVA SystemWall formwork Mammut

Formwork engineeringZAO MosMeva, St. Petersburg

Page 15: Civil Engineering - MEVA Formwork Systems, formwork ... · PDF fileSolutions in Civil Engineering ... Wall formwork Mammut All-plastic facing alkus Support frame STB 450 Consortium

MEVAMammut, STB 450, alkus

15

Klingenberg Dam, Germany

Waterworks

Special forming frames and climbing solution using the pro-truding wall anchors as climbing support.

ProjectComplete renovation of the dam for the drinking water reservoir Klingenberg near Dresden. Special climbing solution allowing up to 4 jobs to be done simultaneously.

MEVA Systems Special formwork frames Climbing scaffold KLK 230 All-plastic facing alkus Support frame STB 450

ContractorEd. Zueblin AG

Formwork engineeringMEVA Schalungs-Systeme, Haiterbach

Page 16: Civil Engineering - MEVA Formwork Systems, formwork ... · PDF fileSolutions in Civil Engineering ... Wall formwork Mammut All-plastic facing alkus Support frame STB 450 Consortium

16

Bjorvika/Sorenga, Oslo, Norway

ProjectThe largest traffic infrastructure project in Norway‘s history. In a tunnel under Oslo‘s city center and harbour, the new European road E18 will connect the western and eastern part of the Oslo bay and thus alleviate the traffic conges-tion on Oslo‘s roads.

MEVA Systems Special formwork design with support frame

STB 450 extended to 7.50 m Wall formwork Mammut 350 Wall formwork StarTec

Formwork engineeringTeknikk AS, Vøyenenga

Complete formwork tunnel engineering, single-sided solutions in cramped conditions.

Page 17: Civil Engineering - MEVA Formwork Systems, formwork ... · PDF fileSolutions in Civil Engineering ... Wall formwork Mammut All-plastic facing alkus Support frame STB 450 Consortium

STB 450, Mammut 350, StarTec

17

Canal Crossing, Minden, Germany

Transport

Intricate formwork planning with flex-ible use of panels for walls, slabs, haunches.

ProjectConstruction of a road and railway tunnel under the Mittellandkanal canal as a rectangular reinforced concrete frame, 15 m wide and 39 m long.

MEVA Systems Wall formwork Mammut Wall formwork StarTec Girder formwork MevaFlex Shoring tower MEP

ContractorsArge H. F. Wiebe GmbH Co & KG, Achim, and Heinrich Hecker GmbH & Co KG, Bremen

Page 18: Civil Engineering - MEVA Formwork Systems, formwork ... · PDF fileSolutions in Civil Engineering ... Wall formwork Mammut All-plastic facing alkus Support frame STB 450 Consortium

18

TGV Rail Link, Mulhouse, France

ProjectInner-city rail link with aboveground tunnel and bridges over the Rhine-Rhone canal. Mobile formwork units saved 15 working days.

ClientFrench Railway SNCF, Paris

ContractorMaïa Sonnier S.A., Lyons, France

MEVA Systems Wall formwork Mammut 350 Hand formwork EcoAs Climbing platform KAB 190 Support frame STB 450 Shoring tower MEP MEP heavy duty props H20 beams

Formwork engineeringMEVA Systèmes de Coffrage, Alsace

Complex project with tunnel, bridges and 25 ton load transfer per runnig meter.

Page 19: Civil Engineering - MEVA Formwork Systems, formwork ... · PDF fileSolutions in Civil Engineering ... Wall formwork Mammut All-plastic facing alkus Support frame STB 450 Consortium

Mammut 350, EcoAs, KAB, STB 450

19

Henndorf Tunnel, Austria

Transport

Quick, effective con-crete works: standard panels combined with special forms.

ProjectConstruction of the new Henndorf tunnel including ventilation shaft, near Salzburg.

MEVA SolutionSpecial formwork design with support frame STB 450 and shoring tower MEP

Contractors Wayss & Freytag Ingenieurbau AG Held und Francke Baugesellschaft mbH

Formwork engineeringMEVA Schalungs-Systeme, Pfaffstaetten

Page 20: Civil Engineering - MEVA Formwork Systems, formwork ... · PDF fileSolutions in Civil Engineering ... Wall formwork Mammut All-plastic facing alkus Support frame STB 450 Consortium

20

Dultenaugraben Bridge, Rheinfelden, Germany

Project Construction of a parallel bridge over the Dultenaugraben valley along the motorway A 98 in south-western Germany

MEVA Systems Climbing platform KLK 230 Wall formwork Mammut Mammut frames with special facing

ContractorPorr Deutschland GmbH

Formwork engineeringMEVA Schalungs-Systeme, Munich

Column head

Footprint

Cross-section

Tapering columns formed with standard formwork panels plus adaptable inlays – a cost-effective solution.

Page 21: Civil Engineering - MEVA Formwork Systems, formwork ... · PDF fileSolutions in Civil Engineering ... Wall formwork Mammut All-plastic facing alkus Support frame STB 450 Consortium

Mammut 3540, KLK 230, Circo

21

M6 Motorway Bridge, Budapest, Hungary

Infrastructure

Project New construction of a bridge for the M6 motorway around Budapest.

MEVA Systems Climbing platform KLK 230 Circular column formwork Circo

ContractorP.A.M. Invest Kft.

Formwork engineeringMEVA Zsalurendszerek, Budapest

Cost-effective form-ing solution, quick, safe climbing, superior concrete finish.

Page 22: Civil Engineering - MEVA Formwork Systems, formwork ... · PDF fileSolutions in Civil Engineering ... Wall formwork Mammut All-plastic facing alkus Support frame STB 450 Consortium

22

Al Saayidat Island, Abu Dhabi, United Arab Emirates

ProjectInfrastructure project on Saadiyat island, 500 m offshore from Abu Dhabi, with water treatment plants, pumping stations, biological treatment facilities etc.

MEVA Systems 3,500 m² wall formwork Mammut 350 for

walls up to 9 m high and 80 cm thick 6.60 m high columns poured using the

column formwork CaroFalt

Contractors Kharafi National LLC Civiltech General Contracting Co. LLC Fourth Dimension General Contracting

Formwork engineeringMEVA KHK, Dubai

Changing geometries, great heights, high concrete pressure, special forms.

Page 23: Civil Engineering - MEVA Formwork Systems, formwork ... · PDF fileSolutions in Civil Engineering ... Wall formwork Mammut All-plastic facing alkus Support frame STB 450 Consortium

Mammut 350, KLK

23

Infrastructure

National Enrichment Facility, Eunice, New Mexico, USA

Project Uranium enrichment facility in Eunice, New Mexico

MEVA Systems 12,000 m² wall formwork Imperial

(US version of Mammut 350) 4,000 m² wall formwork MevaLite

(US twin to the AluFix system) More than 700 climbing scaffolds KLK 230

with slide carriage

Project managementWashington Group

ContractorRust Contractors

Formwork engineeringMEVA Formwork Systems, Springfield, OH

Planning and logis-tics for 16,000 m² of formwork and 700 KLK climbing scaffolds.

Page 24: Civil Engineering - MEVA Formwork Systems, formwork ... · PDF fileSolutions in Civil Engineering ... Wall formwork Mammut All-plastic facing alkus Support frame STB 450 Consortium

Tunnel for Connecting Canal, Senftenberg, Germany

ProjectTunnel for a canal that connects Lake Senften-berg to Lake Geierswalder in the Lausitz region, eastern Germany.

MEVA Systems Wall formwork 350 with all-plastic facing

alkus Push-pull props SRL Slab forming carriage table with MEP H20 beams Mobile table forms

ContractorEd. Zueblin AG, Dresden

Tapering walls, archi-tectural finish: stand-ard formwork with special inlays.

Page 25: Civil Engineering - MEVA Formwork Systems, formwork ... · PDF fileSolutions in Civil Engineering ... Wall formwork Mammut All-plastic facing alkus Support frame STB 450 Consortium

MEVAMammut 350, MEP

25

Infrastructure

Bradford College, Great Britain

Cramped inner-city construction site, work flow, logistics, safe climbing.

ProjectBuilding site on the campus of Bradford College

MEVA Systems Wall formwork Mammut 350 with all-plastic

facing alkus Climbing platform KLK 230

ContractorGRKC LLP, Bradford

Formwork engineeringMEVA Formwork Systems, Tamworth

Page 26: Civil Engineering - MEVA Formwork Systems, formwork ... · PDF fileSolutions in Civil Engineering ... Wall formwork Mammut All-plastic facing alkus Support frame STB 450 Consortium

MEVA SchalungsSysteme Pfaffstätten, A - Österreich

Novatec Construction SystemsAdelaide, AUS - Australia

N.V. van HautKruibeke, B - België/Belgique

MEVA Formwork SystemsToronto, CDN - Canada

MEVA SchalungsSystemeSeon, CH - Schweiz/Suisse/Svizzera

MEVA Sistemas de EncofradoBogotá, CO - Colombia

MEVA SchalungsSystemeHaiterbach, D - Deutschland

MEVA Systèmes de CoffrageSarreguemines, F - France

MEVA Formwork SystemsTamworth, GB - United Kingdom

MEVA Zsalurendszerek Budapest, H - Magyarország

VIBAU Gradevinska TehnikaBestovje, HR - Hrvatska

MEVA Formwork SystemsMumbai, IND - India

MEVA Schalungs-Systeme, Seon, Schweiz

MEVA Formwork Systems, Mumbai, India

MEVA Bekistingssystemen, Gouda, Nederland MEVA Sisteme de Cofraje, Bucuresti, Romania

MEVA Formwork Systems, Tamworth, Great Britain

26

MEVA in Haiterbach in the Black Forest, Ger-many. It is the home of the MEVA group of companies with its 40 locations in around 30 countries and 10 logistics centers all over the world. The headquarters are also home to research and development, engineering, produc-tion, rental logistics, detailing and sales. Cost-effective, lean logistics, transparent work flow, cost-saving rental concepts, technical support for better concrete results: Client benefit is in focus, everywhere. All the time. All over the world.

Page 27: Civil Engineering - MEVA Formwork Systems, formwork ... · PDF fileSolutions in Civil Engineering ... Wall formwork Mammut All-plastic facing alkus Support frame STB 450 Consortium

MEVA

MEVA Asia PacificSingapore, SGP - Singapore

VIBAPetrovce, SLO - Slovenija

MEVA KHKDubai, UAE - United Arab Emirates

MEVA Formwork SystemsSpringfield, Ohio USA - United States of America

UAB MuramedaKaunas, LT - Lietuva

Waiko Engineering WorksPerak, MAL - Malaysia

TeknikkOslo, N - Norge

MEVA BekistingssystemenGouda, NL - Nederland

CorpinsaCuidad de Panamá, PA - Panamá

PPU PalisanderBialystok, PL - Polska

MEVA Sisteme de cofrajeBucuresti, RO - Romania

ZAO MosMevaMoskva, Sankt-Peterburg, RUS - Rossija

MEVA

MEVA Schalungs-Systeme, Haiterbach, Deutschland

MEVA Formwork Systems, Springfield, Ohio, USA

27

International

Page 28: Civil Engineering - MEVA Formwork Systems, formwork ... · PDF fileSolutions in Civil Engineering ... Wall formwork Mammut All-plastic facing alkus Support frame STB 450 Consortium

Headquarters (Germany) International Sales & ServiceLogistic Centers

2444

GB

1000

3/1

3 M

, Prin

ted

in G

erm

any

MEVA Schalungs-Systeme GmbH

Industriestrasse 5

D-72221 Haiterbach

Tel. +49 7456 692-01

Fax +49 7456 692-66

[email protected]

www.meva-international.com

A-Pfaffstätten, Tel. 02252 20900-0

D-Berlin, Tel. 03375 90300

D-Haiterbach, Tel. 07456 692-01

D-Hannover, Tel. 0511 949930

GB-Tamworth, Tel. 01827 60217

H-Budapest, Tel. 01 2722222

RO-Bucuresti, Tel. 021 2066460

RUS-Moskva, Tel. 495 7813737

USA-Springfield, Tel. 937 3280022

A-Pfaffstätten, Tel. 02252 20900-0

AUS-Adelaide 08 82634377

B-Kruibeke, Tel. 03 250 11 11

CHSeon, Tel. 062 7697100

CDN-Toronto, Tel. 416 5766397

CO-Bogotá, Tel. 01 5204236

FSarreguemines, Tel. 0387 959938

GBTamworth, Tel. 01827 60217

HBudapest, Tel. 01 2722222

HR-Bestovje, Tel 013 323 666

IND-Mumbai, Tel. 022 27563430

LT-Kaunas, Tel. 0684 82795

MAL-Perak, Tel. 12 5209337

N-Oslo, Tel. 067 154200

NLGouda, Tel. 0182 570770

PA-Panama City 507 2372222

PL-Bialystok, Tel. 085 6768159

ROBucuresti, Tel. 0 21 2066460

RUSMoskva, Tel. 495 7813737

RUSSankt-Peterburg, Tel. 812 6802890

SGP-Singapore, Tel. 67354459

SLO-Petrovce, Tel. 03 7131500

UAEDubai, Tel. 04 3411180

USASpringfield, Tel. 937 3280022