CIVIC CAMPUS MASTER PLAN Economic Development & Innovation Committee May 22, 2018

Transcript of CIVIC CAMPUS MASTER PLAN...Oct 06, 2020  · (RMB) 1983 • 110 McDowell-Vacant (Old Police HQ) 1963...

  • CIVIC CAMPUS MASTER PLANEconomic Development &Innovation CommitteeMay 22, 2018

  • CURRENT STATE OF DOWNTOWN FACILITIES

  • FUTURE OF DOWNTOWN FACILITIESAvery B. Upchurch Complex (RMB Block)• Raleigh Municipal Bldg.

    (RMB) 1983• 110 McDowell-Vacant (Old

    Police HQ) 1963

    11

    234

    5

    6

    2

    Professional Bldg.

    310 West Martin Bldg. (Dillon Bldg.) 1993

    34

    One Exchange Plaza (OEP) 2004

    56

    Briggs Building

    One City Plaza

    CURRENT DOWNTOWN CAMPUS

    1

    2

    3

    4

    5

    6

  • FUTURE OF DOWNTOWN FACILITIESAvery B. Upchurch Complex (RMB Block)• Raleigh Municipal Bldg.

    (RMB) 1983• 110 McDowell-Vacant (Old

    Police HQ) 1963

    11

    234

    5

    6

    2

    Professional Bldg.

    310 West Martin Bldg. (Dillon Bldg.) 1993

    34

    One Exchange Plaza (OEP) 2004

    56

    Briggs Building

    One City Plaza

    ADDING FACILITIES OVER TIME

    1 1983147,000population

    64square miles

  • FUTURE OF DOWNTOWN FACILITIESAvery B. Upchurch Complex (RMB Block)• Raleigh Municipal Bldg.

    (RMB) 1983• 110 McDowell-Vacant (Old

    Police HQ) 1963

    11

    234

    5

    6

    2

    Professional Bldg.

    310 West Martin Bldg. (Dillon Bldg.) 1993

    34

    One Exchange Plaza (OEP) 2004

    56

    Briggs Building

    One City Plaza

    1

    2

    3

    4

    5

    6

    2018460,000population

    147square miles

    ADDING FACILITIES OVER TIME

  • SECURITY CHALLENGES

    Multiple building ENTRANCES

    Unsecured PARKING

    Lack of site PERIMETER security (bollards)

    Lack of security SCREENING (turnstiles, metal detectors)

    INCONSISTENT level of security between facilites (owned vs. leased)

  • INFRASTRUCTURE COST

    • SERVERS• FIBER OPTIC LINES• NETWORKS

    INFORMATION TECHNOLOGY (IT)

    • FIRE• ACCESS• EMERGENCY BACKUP (GENERATORS)

    BUILDING SYSTEMS

    • ADDITIONAL PERSONNEL REQUIREDMAINTENANCE AND OPERATIONS

  • INEFFICIENT USE OF SPACE

    DUPLICATION of resources

    UNIQUE layouts for each building we occupy

    Increased cost of providing INFRASTRUCTURE

    Loss of time and cost due to CHURN

  • ADA + CUSTOMER SERVICE

    City-owned facilites need ADA RENOVATIONS

    2 of 3 Leased facilities DO NOT MEET ADA requirements

    9 service locations spread across 3 buildings

    Public meeting spaces are UNDERSIZED

    A FRAGMENTED organization is CONFUSING for citizens

  • ACCESS

    PROXIMITY TO AVAILABLE PARKING

    PROXIMITY TO PUBLIC TRANSIT HUBS

    SOCIAL EQUITY

  • FUTURE OF DOWNTOWN FACILITIESAvery B. Upchurch Complex (RMB Block)• Raleigh Municipal Bldg.

    (RMB) 1983• 110 McDowell-Vacant (Old

    Police HQ) 1963

    11

    234

    5

    6

    2

    Professional Bldg.

    310 West Martin Bldg. (Dillon Bldg.) 1993

    34

    One Exchange Plaza (OEP) 2004

    56

    Briggs Building

    One City Plaza

    CHALLENGES OF A FRAGMENTEDCAMPUS

    SECURITY

    INFRASTRUCTURE

    USE OF SPACE

    ADA + CUSTOMER SERVICE

    ACCESS

  • CITY OWNED BUILDINGS

    BUILDING SQFT

    AGE OF BUILDING

    10 YEAR CAPITALMAINTENANCE

    EMPLOYEES

    RALEIGH MUNICIPALBUILDING

    DILLON BUILDING

    ONE EXCHANGE

    PLAZA

    110 MCDOWELL

    35 YEARS(1983)

    $2,146,000

    120,000 SQFT

    379

    53 YEARS(1965)

    $1,050,000

    45,000 SQFT

    110

    33 YEARS(1985)

    $3,003,000

    130,000 SQFT

    331

    59 YEARS(1959)

    57,000 SQFT

    VACANT

    $100,000

    CITY-OWNEDBUILDINGS

  • CITY LEASED BUILDINGS

    BUILDING SQFT

    LEASING COSTS

    EMPLOYEES

    PROFESSIONAL BUILDING

    BRIGGS BUILDING

    $189,000

    15,000 SQFT 16,000 SQFT11,000 SQFT

    51

    $300,000

    15

    $574,000

    80

    ONECITY PLAZA

    LEASEDSPACE

  • Dawson

    Harge

    tt Stre

    et

    McDowell

    Nash Square

    Morga

    n Stre

    et

    Renovate & later Replace Municipal Deck

    Renovate RMB

    Demolish Old Police HQ

    RenovateOEP

    REQUIRED MAINTENANCECURRENT FACILITIES

  • Dawson

    Harge

    tt Stre

    et

    McDowell

    Nash Square

    Morga

    n Stre

    et

    REQUIRED MAINTENANCECURRENT FACILITIES

    Demo Police HQ(5 Years)$171,360

    RMB & OEP Security(5 Years) $2,500,000

    RMB ADA Upgrades(5 Years) $3,000,000

    Demo Municipal Deck(10-15 Years)$261,600

    Replace Municipal Deck(10-15 Years)$14,030,000

    RMB Systems Upgrade(15 Years)$32,000,000

    OEP Systems Upgrade(20 Years) $19,500,000

    Soft Cost$8,750,000

    COST ESTIMATES

    $80,000,000+Cost estimate in today’s dollars.

    TOTAL

  • Dawson

    Harge

    tt Stre

    et

    McDowell

    Nash Square

    Morga

    n Stre

    et

    COST ESTIMATES

    Demo Police HQ(5 Years)$171,360

    RMB & OEP Security(5 Years) $2,500,000

    RMB ADA Upgrades(5 Years) $3,000,000

    Demo Municipal Deck(10-15 Years)$261,600

    Replace Municipal Deck(10-15 Years)$14,030,000

    RMB Systems Upgrade(15 Years)$32,000,000

    OEP Systems Upgrade(20 Years) $19,500,000

    Soft Cost$8,750,000

    Total

    $80,000,000**Cost estimates in today’s dollars.

    HVAC / MechanicalLife SafetyPlumbingElectricalElevators

    RoofWindows

    SYSTEMS UPGRADE

    REQUIRED MAINTENANCECURRENT FACILITIES

  • FISCAL RESPONSIBILITY

    • Over $1,000,000 in leasing cost per year, and RISING INCREASED LEASING COSTS

    • 45 years is the average age of City-owned buildings downtown MAINTENANCE + ENERGY CONSUMPTION OF AGING FACILITIES

    • DUPLICATION of resources• Increased cost of INFRASTRUCTURE

    INEFFICIENCIES AND COSTS OF A FRAGMENTED WORKFORCE

  • INVESTING IN OUR FACILITIESPRESENTS AN OPPORTUNITY

  • ?Duke PerformingArts Center Convention Center& Red Hat Amphitheater Raleigh Union Station

  • WHAT VISION, PRIORITIES & GOALS HAVE BEEN ESTABLISHED?

  • DECISION POINT - IMPLEMENTATION

  • NO-BUILD(STATUS QUO)

    BUILD

    MASTER PLAN

  • MASTER PLAN

    BUILDNO-BUILD(STATUS QUO)

  • • SYSTEMS UPGRADE• STRUCTURAL REMEDIATION• ADA • SECURITY

    MAINTAIN OUR CURRENT FACILITIES

    NO-BUILD(STATUS QUO)

  • Dawson

    Harge

    tt Stre

    et

    McDowell

    Nash Square

    Morga

    n Stre

    et

    Demo Police HQ(5 Years)$171,360

    RMB & OEP Security(5 Years) $2,500,000

    RMB ADA Upgrades(5 Years) $3,000,000

    Demo Municipal Deck(10-15 Years)$261,600

    Replace Municipal Deck(10-15 Years)$14,030,000

    RMB Systems Upgrade(15 Years)$32,000,000

    OEP Systems Upgrade(20 Years) $19,500,000

    Soft Cost$8,750,000

    COST ESTIMATES

    NO-BUILD OPTIONMAINTAINING CURRENT FACILITIES

    $80,000,000+Cost estimate in today’s dollars.

    TOTAL

  • • SYSTEMS UPGRADE• STRUCTURAL REMEDIATION• ADA • SECURITY

    MAINTAIN OUR CURRENT FACILITIES

    • ONE EXCHANGE PLAZA• 310 W MARTIN STREET

    LOSS OF TAXABLE REAL ESTATENO-BUILD(STATUS QUO)

  • 2016 Wake County Assessment $4,068,202

    Wake County $25,019 per year

    City of Raleigh $17,302 per year

    Downtown MSD $2,559 per year

    TAX ESTIMATE

    310 West Martin Street

    = $19,861 per year~5% inflation per year.Improvements to property will increase value.

  • One Exchange Plaza

    2016 Wake County Assessment $15,752,356

    Wake County $96,877 per year

    City of Raleigh $66,995 per year

    Downtown MSD $9,908 per year

    TAX ESTIMATE

    = $76,903 per year~5% inflation per year.Improvements to property will increase value.

  • 310 West Martin Street

    One Exchange Plaza +

    $5 million +REVENUE

    30 YEAR PERIOD

    =

  • • SYSTEMS UPGRADE• STRUCTURAL REMEDIATION• ADA • SECURITY

    MAINTAIN OUR CURRENT FACILITIES

    • ONE EXCHANGE PLAZA• 310 W MARTIN STREET

    LOSS OF TAXABLE REAL ESTATE

    • LIMITED OFFICE SUPPLY DOWNTOWN• LEASE RATES CONTINUE TO RISE

    LEASING COSTS AS STAFF GROWS

    NO-BUILD(STATUS QUO)

  • DOWNTOWN STAFF - PROJECTIONS

    2023 2033 2048

    1,130 - 1,160staff

    YEAR 5 YEAR 15 YEAR 30

    1,050 +/- staff

    2018YEAR 0

    1,310 - 1,420staff

    1,640 - 1,910staff

    1.5% - 2.0% historic growth rate

  • NEW POSITIONSAT 1.5%-2% GROWTH

    2023

    80 - 110

    ADDITIONAL SPACE NEEDEDAT 300 GSF/ PERSON

    24,000 SF - 33,000 SF

    YEAR 5

    CUMULATIVE* LEASE COST

    $23/SF at 1.5% INFLATION RATE

    $8.0 million - $8.5 million

    *Includes existing leased space

    DOWNTOWN STAFF - LEASING COSTS

  • NEW POSITIONSAT 1.5%-2% GROWTH

    2023 2033

    80 - 110 260 - 365

    ADDITIONAL SPACE NEEDEDAT 300 GSF/ PERSON

    24,000 SF - 33,000 SF

    YEAR 5 YEAR 15

    79,000 SF - 109,000 SF

    $8.0 million - $8.5 million

    $35 million - $41 million

    *Includes existing leased space

    DOWNTOWN STAFF - LEASING COSTS

    CUMULATIVE* LEASE COST

    $23/SF at 1.5% INFLATION RATE

  • NEW POSITIONSAT 1.5%-2% GROWTH

    2023 2033 2048

    590 - 855

    ADDITIONAL SPACE NEEDEDAT 300 GSF/ PERSON

    24,000 SF - 33,000 SF

    YEAR 5 YEAR 15 YEAR 30

    79,000 SF - 109,000 SF

    177,000 SF - 256,000 SF

    $8.0 million - $8.5 million

    $35 million - $41 million

    $120 million - $160 million

    *Includes existing leased space

    80 - 110 260 - 365

    DOWNTOWN STAFF - LEASING COSTS

    CUMULATIVE* LEASE COST

    $23/SF at 1.5% INFLATION RATE

  • MAINTAIN OUR CURRENT FACILITIES

    LOSS OF TAXABLE REAL ESTATE

    $80 million +

    $120-160 million

    $5 million +

    30 YEAR OUTLOOK

    LEASING COSTS AS STAFF GROWS

    NO-BUILD(STATUS QUO)

    Estimate in today’s dollars, not at time of renovations.

    $200-300MEstimated Total

  • MASTER PLAN

    BUILD

    ?NO-BUILD

    (STATUS QUO)

  • Dawson

    Harge

    tt Stre

    et

    McDowell

    Nash Square

    Morga

    n Stre

    et

    PHASE I

    Does not disrupt RMB or Municpal Deck

    BUILD OPTIONNEW CITY HALL - PHASE 1

  • Dawson

    Harge

    tt Stre

    et

    McDowell

    Nash Square

    Morga

    n Stre

    et

    NEW CITY HALL

    VAR

    IES

    BUILD OPTIONNEW CITY HALL - PHASE 1

    YEAR 2023-2024

  • Dawson

    Harge

    tt Stre

    et

    McDowell

    Nash Square

    Morga

    n Stre

    et

    DEPARTMENTALOFFICE SPACE

    VAR

    IES

    BUILD OPTIONNEW CITY HALL - PHASE 1

    PUBLIC FACING FUNCTIONS

    BELOW-GRADE PARKING GARAGE

  • 20 STORIES 17 STORIES +/- 14 STORIES +/-

    OPTION 1ABOVE CAPACITY

    OPTION 2AT CAPACITY

    OPTION 3BELOW CAPACITY

    20 17 14

  • 20 STORIES

    OPTION 1ABOVE CAPACITY

    SIZE

    1,400 ppl

    420,000 SF

    CAPACITYAT 300 GSF/ PERSON

    Year 203714 YEAR CAPACITY

    1.5%GROWTH RATE

    Year 20329 YEAR CAPACITY

    2.0%GROWTH RATE

    CAPACITY DOES NOT INCLUDE PHASE II (RMB or NEW FACILITY)

    20

  • 20 STORIES

    SIZE

    1,400 ppl

    420,000 SF

    CAPACITYAT 300 GSF/ PERSON

    ~$190 millionESTIMATED COST

    $15.08 / SFEFFECTIVE RENTOVER 30 YEARS

    CAPACITY DOES NOT INCLUDE PHASE II (RMB or NEW FACILITY)

    OPTION 1ABOVE CAPACITY

    20

  • 17+/- STORIES

    OPTION 2AT CAPACITY

    SIZE

    1,200 ppl

    360,000 SF

    CAPACITYAT 300 GSF/ PERSON

    Year 20274 YEAR CAPACITY

    1.5%GROWTH RATE

    Year 20241 YEAR CAPACITY

    2.0%GROWTH RATE

    CAPACITY DOES NOT INCLUDE PHASE II (RMB or NEW FACILITY)

    17

  • 17+/- STORIES

    SIZE

    1,200 ppl

    360,000 SF

    CAPACITYAT 300 GSF/ PERSON

    ~$165 millionESTIMATED COST

    $15.27 / SFEFFECTIVE RENTOVER 30 YEARS

    CAPACITY DOES NOT INCLUDE PHASE II (RMB or NEW FACILITY)

    OPTION 2AT CAPACITY

    17

  • 14+/- STORIES

    OPTION 3BELOW CAPACITY

    SIZE

    1,000 ppl

    300,000 SF

    CAPACITYAT 300 GSF/ PERSON

    -40,000 sf DEFICIT AT MOVE IN

    1.5%GROWTH RATE

    2.0%GROWTH RATE

    -50,000 sf DEFICIT AT MOVE IN

    CAPACITY DOES NOT INCLUDE PHASE II (RMB or NEW FACILITY)

    14

  • 14+/- STORIES

    OPTION 3BELOW CAPACITY

    SIZE

    1,000 ppl

    300,000 SF

    CAPACITYAT 300 GSF/ PERSON

    ~$140 millionESTIMATED COST

    $15.55 / SFEFFECTIVE RENTOVER 30 YEARS

    CAPACITY DOES NOT INCLUDE PHASE II (RMB or NEW FACILITY)

    14

  • Dawson

    Harge

    tt Stre

    et

    McDowell

    Nash Square

    Morga

    n Stre

    etCAPACITY OF NEW CITY HALL HAS IMPLICATIONS FOR PHASING RMB

    VAR

    IES

    PHASE II/III

    PHASING IMPLICATIONSPHASE 1

    RMBPHASE II

  • Dawson

    Harge

    tt Stre

    et

    McDowell

    Nash Square

    Morga

    n Stre

    et

    Consolidates all downtown staff:

    - RMB - OEP - 310 W Martin - Professional Bldg - Briggs Bldg - One City Plaza - new leases

    10-15 years of capacity from move in date, 5-6 years from today.

    Municipal Deck + new parking provides required spaces.

    Uses all floors allowed by zoning.

    20 STORIES

    OPTION 1 - ABOVE CAPACITY20 STORIES420,000 SF

    RMBPHASE II

    20

  • Dawson

    Harge

    tt Stre

    et

    McDowell

    Nash Square

    Morga

    n Stre

    et

    Can be entirely vacated.

    Reaches end of life ~10 years after Phase I completed.

    Systems upgrade, renovations required ifRMB is to be maintained.

    Phase I + RMB provides 20-30 years of capacity after Phase I is completed.

    Phase I + Phase II tower could provide capacity for 45-61 Years.

    Allows flexibilty for use, timeline for starting Phase II.

    RMBW/ ABOVE CAPACITY OPTION

    Consolidates all downtown staff:

    - RMB - OEP - 310 W Martin - Professional Bldg - Briggs Bldg - One City Plaza - new leases

    10-15 years of capacity from move in date, 5-6 years from today.

    Municipal Deck + new parking provides required spaces.

    Uses all floors allowed by zoning.

    20 STORIES

    OPTION 1 - ABOVE CAPACITY20 STORIES420,000 SF

    20

  • Dawson

    Harge

    tt Stre

    et

    McDowell

    Nash Square

    Morga

    n Stre

    et

    Consolidates all downtown staff:

    - RMB - OEP - 310 W Martin - Professional Bldg - Briggs Bldg - One City Plaza - new leases

    1-4 years of capacity from move in date, 5-6 years from today.

    Municipal Deck + new parking provides required spaces.

    17 STORIES

    OPTION 2 - AT CAPACITY17 STORIES +/-360,000 SF

    RMBPHASE II

    17

  • Dawson

    Harge

    tt Stre

    et

    McDowell

    Nash Square

    Morga

    n Stre

    et

    Can be entirely vacated.

    Phase I + RMB provides 15-25 years of capacity after Phase I is completed.

    Phase I + Phase II tower could provide capacity for 45-55 Years.

    Phase II would need to start immediately after Phase I.

    RMBW/ AT CAPACITY OPTION

    Consolidates all downtown staff:

    - RMB - OEP - 310 W Martin - Professional Bldg - Briggs Bldg - One City Plaza - new leases

    1-4 years of capacity from move in date, 5-6 years from today.

    Municipal Deck + new parking provides required spaces.

    17 STORIES

    OPTION 2 - AT CAPACITY17 STORIES +/-360,000 SF

    17

  • Dawson

    Harge

    tt Stre

    et

    McDowell

    Nash Square

    Morga

    n Stre

    et

    50,000 SF short of space needed

    Explore alternatives for Phase I consolidation:

    RMBPHASE I

    DECISION

    OPTION 3 - BELOW CAPACITY14 STORIES +/-300,000 SF 14 STORIES

    14

  • OPTION 3 - BELOW CAPACITY14 STORIES +/-300,000 SF

    BUILDINGSVACATED

    IMPACT

    Consolidate all staff on Municpal Block GOAL

    All owned and leased except RMB

    • Committed to RMB long term.

    • Site capacity limited to 9-14 Years

    USE RMB

    ADDITIONALCOST

    $40M RMB Renovations

  • BUILDINGSVACATED

    IMPACT

    Consolidate all staff on Municpal Block GOAL

    All owned and leased except RMB

    • Committed to RMB long term.

    • Site capacity limited to 9-14 Years

    USE RMB

    Maintain flexibility for Phase II.

    Only owned property.(RMB, OEP, 310 Martin)

    • Staff not fully consolidated in Phase I

    • Site capacity to 35-45 Years with Phase II Tower

    VACATE RMB

    OPTION 3 - BELOW CAPACITY14 STORIES +/-300,000 SF

    ADDITIONALCOST

    $40M RMB Renovations

    Leasing Costs until Phase II Complete

  • MASTER PLAN

    BUILDNO-BUILD(STATUS QUO)

  • MASTER PLAN

    PHASE INO-BUILD(STATUS QUO)

  • PHASE I HOW MUCH?

    ~$190M

    ~$165M

    ~$140M

    ABOVE CAPACITY

    AT CAPACITY

    BELOW CAPACITY

  • ABOVE CAPACITY

    AT CAPACITY

    BELOW CAPACITY

    PHASE I HOW MUCH?

    ~$190M

    ~$165M

    ~$140M

    9-14 YEARS OF CAPACITY BEFORE PHASE II NEEDED.

    1-4 YEARS OF CAPACITY BEFORE PHASE II NEEDED.

    USE RMB (+40M Renovations)

    VACATE RMB (+ Leasing Costs)

    IMPACTS TO CAPACITY

  • RENOVATE RMB?NOW / LATER?

    HOW MUCH?

    IMPACTS TO PHASE IIPHASE I

    ~$190M

    ~$165M

    ~$140M

    ABOVE CAPACITY

    AT CAPACITY

    BELOW CAPACITY

    PROVIDE GROWTH SPACE?

    PHASE I OR II?

  • CIVIC CAMPUS

    PHASE I-II

    CITY-OWNED DEVELOPMENT

    LEVERAGE PARTNERSHIPS

    FULL SITE DEVELOPMENTVISION OF THE MASTER PLAN

  • Dawson

    Harge

    tt Stre

    et

    Morga

    n Stre

    et McDowell

    Nash Square

    SITE VALUEPARTNERSHIP OPPORTUNITY

    CITY OF RALEIGHDEVELOPMENT

    PHASEII

    PHASE I

    PHASE II

  • Dawson

    Morga

    n Stre

    et McDowell

    Nash SquareH

    argett

    Street

    SITE VALUE - RETURN ON INVESTMENTPARTNERSHIP OPPORTUNITY

    PARTNERSHIPDEVELOPMENT

  • Dawson

    Harge

    tt Stre

    et

    McDowell

    Nash Square

    Morga

    n Stre

    et

    BUILDING VALUE - RETURN ON INVESTMENTEXCESS OFFICE SPACE INCOME

    Year 2023 Need

    Year 2023 Excess Space

    Year 2033 Need

    Year 2033 Excess Space

  • PHASE I - FUNDING SOURCES

    SOLD301 Hillsborough St $5,800,000Residence Inn Marriott Site $1,100,000Charter Square $12,800,000

    ESTIMATESOne Exchange Plaza ~$13,900,000310 W Martin St ~$4,600,000

    $38,200,000

    ASSET SALES$38M

    SOLD PROPERTY + FUTURE SALES

  • DEBT CAPACITY$127M

    NO IMPACT ONTAX RATE

    PHASE I - FUNDING SOURCES

    $165MASSET SALES

    $38M SOLD PROPERTY +

    FUTURE SALES

    + =

  • DEBT CAPACITY$127M

    NO IMPACT ONTAX RATE

    PHASE I - FUNDING SOURCES

    $165MASSET SALES

    $38M SOLD PROPERTY +

    FUTURE SALES

    + =

    LEASE SAVINGS$35-50M

    NEXT 15 YEARS

    Projected to fund maintenance costs

  • COST

    BUILDNO-BUILD(STATUS QUO)

    $200-300MINCREASES OVER TIME

    30 YEAR PERIOD

  • COST

    PHASE I NO-BUILD(STATUS QUO)

    $200-300MINCREASES OVER TIME

    30 YEAR PERIOD

    ~$140-190MONE TIME COST

    50 YEAR PROJECT

  • WHAT ARE OUR FIRST STEPS?

  • DIRECTION FOR PHASE I

    AT CAPACITY

    ~$190M20 STORIES

    ~$165M17 STORIES +/-

    20 17

    ABOVE CAPACITY

  • COMMITTEE ACTIONS

    1. Direct Staff of Phase I Implementation Strategy

    2. Amend and Approve Master Plan

    3. Direct Staff to develop a Public and Employee Engagement Plan

    4. Authorize Staff to move forward with Design Services for Phase I

  • DISCUSSION

  • Consolidates Downtown staffinto Phase I Building with room for 9-14 years of growth.

    Allows RMB to be renovated or redeveloped within a 10 year time frame.

    Uses all floors allowed by zoning.

    PROS

    Consolidates Downtown staffinto Phase I Building with room for 1-4 years of growth.

    RMB can be immediately renovated or redeveloped before Phase I meets capacity.

    Cost less than Option 1 (any renovations to RMB not included).

    PROS

    20

    17

    Highest upfront cost.

    Doesn’t use remainder of RMB life (10 years) for core City functions.

    CONS

    Growth capacity is limited.

    RMB or leasing space would be needed soon after Phase I (1-4 years).

    Decision and funding for Phase II must follow closely behind Phase I.

    CONS

    ~$190M

    ABOVE CAPACITY

    OPTION 1

    ~$165M

    AT CAPACITY

    OPTION 2