Aktuelle Immobilienangebote Engel & Völkers Bad Tölz 01.09.2014
City Plan Commission (CPC) 01.09.2014 Agenda Item 9
5
-
Upload
epdevelopment -
Category
News & Politics
-
view
102 -
download
0
Transcript of City Plan Commission (CPC) 01.09.2014 Agenda Item 9
![Page 1: City Plan Commission (CPC) 01.09.2014 Agenda Item 9](https://reader033.fdocuments.us/reader033/viewer/2022051502/58edf6c31a28abd17b8b46b1/html5/thumbnails/1.jpg)
![Page 2: City Plan Commission (CPC) 01.09.2014 Agenda Item 9](https://reader033.fdocuments.us/reader033/viewer/2022051502/58edf6c31a28abd17b8b46b1/html5/thumbnails/2.jpg)
![Page 3: City Plan Commission (CPC) 01.09.2014 Agenda Item 9](https://reader033.fdocuments.us/reader033/viewer/2022051502/58edf6c31a28abd17b8b46b1/html5/thumbnails/3.jpg)
![Page 4: City Plan Commission (CPC) 01.09.2014 Agenda Item 9](https://reader033.fdocuments.us/reader033/viewer/2022051502/58edf6c31a28abd17b8b46b1/html5/thumbnails/4.jpg)
![Page 5: City Plan Commission (CPC) 01.09.2014 Agenda Item 9](https://reader033.fdocuments.us/reader033/viewer/2022051502/58edf6c31a28abd17b8b46b1/html5/thumbnails/5.jpg)
Condition and Requirement:DCC recommends Approval with the modification. Staff requests the following requirement:
1.As per section 19.16.020.C (Stub Streets), “a paved turnaround shall be provided having a minimum outside radius of forty-five feet” at the end of Nirvan Court.