City of TennilleMemory Lane Assisted Living Facility
EIP Loan – Building Renovation
![Page 2: City of Tennille Memory Lane Assisted Living Facility EIP Loan – Building Renovation.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e535503460f94b48a56/html5/thumbnails/2.jpg)
Overview
• Recipient – City of Tennille• Sub-Recipient – Memory Lane Assisted Living
Facility
• Grant Amount - $500,000 • Private Investment - $530,000• Jobs – create 50, 100% L/M
• Building renovation of the former D.D. Crawford Primary School (built in 1957) and convert it into an assisted living facility
City of Tennille–Memory Lane Assisted Living
![Page 3: City of Tennille Memory Lane Assisted Living Facility EIP Loan – Building Renovation.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e535503460f94b48a56/html5/thumbnails/3.jpg)
City of Tennille–Memory Lane Assisted Living
![Page 4: City of Tennille Memory Lane Assisted Living Facility EIP Loan – Building Renovation.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e535503460f94b48a56/html5/thumbnails/4.jpg)
Source and Use – City of TennilleSource Amount Use Amount
EIP $ 500,000 Building Renovation $ 470,000
Grant Administration $ 30,000
Owner’s Equity $ 530,000 Building Renovation $ 285,000
FF&E $ 135,000
Contingencies $ 50,000
Architectural $ 30,000
Project Mgmt $ 30,000
City of Tennille $ 404,840 Land/Project Site $ 396,840
Grant Consulting $ 7,000
City Audit $ 1,000
Total $ 1,434,840 Total $ 1,434,840
![Page 5: City of Tennille Memory Lane Assisted Living Facility EIP Loan – Building Renovation.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e535503460f94b48a56/html5/thumbnails/5.jpg)
The previous school cafeteria has been transformed into a new dining facility for Memory Lane’s residents.
City of Tennille–Memory Lane Assisted Living
![Page 6: City of Tennille Memory Lane Assisted Living Facility EIP Loan – Building Renovation.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e535503460f94b48a56/html5/thumbnails/6.jpg)
As part of Phase 1 of the project, hallways have been updated throughout the building.
City of Tennille–Memory Lane Assisted Living
![Page 7: City of Tennille Memory Lane Assisted Living Facility EIP Loan – Building Renovation.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e535503460f94b48a56/html5/thumbnails/7.jpg)
As part of the first phase, an activity room for games and television was designed for the residents. Open House in August 2012
City of Tennille–Memory Lane Assisted Living
![Page 8: City of Tennille Memory Lane Assisted Living Facility EIP Loan – Building Renovation.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e535503460f94b48a56/html5/thumbnails/8.jpg)
Former classrooms have been redesigned to accommodate potential residents room. Private bathrooms were added to each room.
City of Tennille–Memory Lane Assisted Living
![Page 9: City of Tennille Memory Lane Assisted Living Facility EIP Loan – Building Renovation.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e535503460f94b48a56/html5/thumbnails/9.jpg)
• Phase 1 Complete. Up to 16 beds can be accommodated for assisted living
• Phase II will be complete in January 2013. Up to 45 beds can be accommodated for assisted living
• Phase III will be complete by March 2013. Phase III will be an Alzheimer’s Unit and will accommodate up to 30 beds.
• The Company is working towards obtaining their state operating license. They hope to have this by late February early March so citizens can start moving in..
• The Grand Opening will be in April 2013.
Project Updates