City of Shellman Sewer Improvements Cassie Renfrow River Valley Regional Commission.

18
City of Shellman Sewer Improvements Cassie Renfrow River Valley Regional Commission

Transcript of City of Shellman Sewer Improvements Cassie Renfrow River Valley Regional Commission.

Page 1: City of Shellman Sewer Improvements Cassie Renfrow River Valley Regional Commission.

City of ShellmanSewer Improvements

Cassie Renfrow

River Valley Regional Commission

Page 2: City of Shellman Sewer Improvements Cassie Renfrow River Valley Regional Commission.

Project LocationCity of Shellman

Randolph County

Page 3: City of Shellman Sewer Improvements Cassie Renfrow River Valley Regional Commission.
Page 4: City of Shellman Sewer Improvements Cassie Renfrow River Valley Regional Commission.
Page 5: City of Shellman Sewer Improvements Cassie Renfrow River Valley Regional Commission.
Page 6: City of Shellman Sewer Improvements Cassie Renfrow River Valley Regional Commission.

Project Specifics• Alternatives fully explored• 2 phases to adequately address the problem• Completely solving the issue = $835,817.00• Phase I (FY14):

-Construction of 4,600 linear feet of main trunk line

-12 new manholes

-New duplex lift station

-$436,000.00

Page 7: City of Shellman Sewer Improvements Cassie Renfrow River Valley Regional Commission.

Survey Methodology

• Universe of 437 occupied households within the city (U.S. Census 2010) = 250 surveys needed

• Randomly started within the city limits

• Skipped every third house

• If no one was home, survey left at door

• Repeat attempts to survey those selected houses were made

• If unit was vacant, the next occupied house was surveyed

• Guide to Acceptable Survey Methodology was used to extrapolate total number of residents, low-moderate income residents, and minority residents

Page 8: City of Shellman Sewer Improvements Cassie Renfrow River Valley Regional Commission.

Survey Tips

• Use the help of local government employees• Be sure to include demographic questions• Ask appropriate questions for better local

information• Leave a comment section • If resident is hesitant, explain their help is

needed and tell how the project will benefit the area

Page 9: City of Shellman Sewer Improvements Cassie Renfrow River Valley Regional Commission.
Page 10: City of Shellman Sewer Improvements Cassie Renfrow River Valley Regional Commission.
Page 11: City of Shellman Sewer Improvements Cassie Renfrow River Valley Regional Commission.
Page 12: City of Shellman Sewer Improvements Cassie Renfrow River Valley Regional Commission.
Page 13: City of Shellman Sewer Improvements Cassie Renfrow River Valley Regional Commission.
Page 14: City of Shellman Sewer Improvements Cassie Renfrow River Valley Regional Commission.
Page 15: City of Shellman Sewer Improvements Cassie Renfrow River Valley Regional Commission.
Page 16: City of Shellman Sewer Improvements Cassie Renfrow River Valley Regional Commission.

Competitiveness

• Project Readiness– Engineer and Administration Procurement– Environmental Review completed

• Low Match– Average Match/Leverage FY14 = $132,155.17– Shellman Match/Leverage = $27,000.00

• Low Cost per Person– Average Cost/Person FY14 = $4,265.27– Shellman Cost/Person = $524

Page 17: City of Shellman Sewer Improvements Cassie Renfrow River Valley Regional Commission.

Things to Consider

• The Numbers– Should be checked and rechecked– Not just budget – houses, beneficiaries,

engineering/architecture fees– Should be the same on every form

• Documentation– Not only citizen support and pictures– Letters of Support with specific match/leverage amounts– These amounts should be attainable and easily documented

when completed

Page 18: City of Shellman Sewer Improvements Cassie Renfrow River Valley Regional Commission.

City of ShellmanSewer Improvements

Cassie Renfrow

[email protected]

River Valley Regional Commission