2014/ 2015 CITY OF SANTA ANA Fisher Park Butterfly Garden Improvements MacArthur Rehabilitation/Bristol to Flower Broadway: Anahurst to First Madison Park Community Garden First Street Bridge Replacement

Transcript of CITY OF SANTA ANA 2014/ 2015 · CITY OF SANTA ANA Fisher Park Butterfly Garden ... OCTA coordinates...

2014/ 2015

CITY OF SANTA ANA

Fisher Park Butterfly Garden Improvements MacArthur Rehabilitation/Bristol to Flower

Broadway: Anahurst to First

Madison Park Community Garden

First Street Bridge Replacement

First Street Bridge Replacement

Fiscal Year Fisher Park Butterfly Garden

Improvements

Broadway: Anahurst to First

Madison Park Community Garden

MacArthur Rehabilitation: Bristol to Flower

McFadden Rehabilitation: WCL to Newhope

5/14/2014

- 1 -

DESCRIPTION OF FUNDING SOURCES

BICYCLE CORRIDOR IMPROVEMENT PROGRAM (BCIP) – The Bicycle Corridor Improvement (BCI) Program is funded using federal Congestion Mitigation and Air Quality (CMAQ) funds, first authorized under the Intermodal Surface Transportation Efficiency Act (ISTEA) of 1991 and subsequently reauthorized under the Transportation Equity Act for the 21st Century (TEA-21) in 1998, and the Safe, Accountable, Flexible, Efficient Transportation Equity Act: a Legacy for Users (SAFETEA-LU) and extended through several continuing resolutions. The CMAQ program provides funding through annual appropriations to Orange County to be used for bicycle facilities and bicycle safety/outreach projects and transportation-related projects that reduce congestion and improve air quality. COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG) – The Housing and Community Development Act of 1974 returns income tax funds to cities and counties to develop viable urban communities, primarily for the benefit of low and moderate income people. This U.S. Department of Housing and Urban Development program gives priority to activities that help to eliminate blight, with emphasis on residential areas. CDBG projects are carried out by several operating departments with the City and by sub-agents. Public hearings are held to plan projects for the next fiscal year. The selected projects are recommended by citizens, commissioners, and staff. DONATION BY AOT – America On Track is a nonprofit organization who focus on the fields of mentoring, fitness &

nutrition, youth leadership development, drug use prevention, academic achievement and community collaboration. They have donated funds to purchase recreation and fitness equipment to address the nation’s obesity problem. FEDERAL CLEAN WATER ENTERPRISE (FCWE) – This enterprise is responsible for storm drain systems operation and maintenance and pollution reduction under the new National Pollutant Discharge Elimination System permit issued by the Santa Ana Region of Water Quality Control Board in January 2002. FEDERAL DEMONSTRATION FUNDS (FED DEMO) – From 1970 until passage of the Intermodal Surface Transportation Efficiency Act of 1991 (1991 ISTEA, Public Law 102-240), Congress authorized more than 450 demonstration, priority, pilot, or special interest projects in various Federal-aid highway and appropriations acts. These projects were generically referred to as "demonstration" or "demo" projects, because Congress initiated this practice of providing special funding for these projects to demonstrate some new or innovative construction, financing, or other techniques on specific projects.

DEMO CA257 –The DEMO 257 funds are derived from unobligated funds from the Surface Transportation Program. These funds were appropriated to the Bristol Multi Modal Corridor in Section 117 Appropriations Act, 2005 (Public Law 108-447) for preliminary engineering.

5/14/2014

- 2 -

DESCRIPTION OF FUNDING SOURCES

These funds are available until expended, and the Federal share is 100 percent.

DEMO CA756 – The DEMO 756 funds are derived from previously unobligated funds from the Surface Transportation Program. These funds were appropriated to the Bristol Multi Modal Corridor in Section 112 of Division A of the Transportation, Treasury, Housing and Urban Development, the Judiciary, the District of Columbia, and Independent Agencies Appropriations Act, 2006 (Public Law 109¬115). These funds are available until expended, and the Federal share is 100 percent. HIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP) – Federal funds for highway related traffic safety improvements replaces HES funds. HIGHWAY BRIDGE REHABILITATION & REPLACEMENT PROGRAM (HBRR) – This is a federally funded program administered by Caltrans for the purpose of bridge replacement, rehabilitation, painting, low water crossing, barrier rail, and seismic retrofit. Projects are selected based on ratings given on the Federal Eligible Bridge List and lists of eligible bridges established by Caltrans. HOUSING RELATED PARKS PROGRAM (HRPP) – The HRPP provides funds for parks and recreation projects that benefit the community and add to the quality of life. The program awards funds on a per-bedroom basis for residential units, affordable to

very low-and low-income households, created or converted during the designated program year. LOCAL STREET BOND FUND – Interest earned from local bond funding provided for “Project Restore” to repair and rehabilitate neighborhood streets citywide. MEASURE M2 – On November 7, 2006, voters approved the renewal of the Measure M half-cent sales tax (Measure M2), extending the program over a 30-year period beginning in 2011. In addition to the original three program components, this generation of the Measure M Transportation Plan expands the program to include Environmental Cleanup and Taxpayer Safeguards and Audits. To receive revenues from the one-half-cent sales tax, cities and the County of Orange must coordinate their land use and transportation decisions, establish cooperative transportation planning programs with neighboring jurisdictions, develop Growth Management programs, and guarantee that transportation funds are used for transportation purposes only. MEASURE M2 COMPETITIVE – The competitive portion of the Measure M2 consists of the following programs: Regional Capacity Program (RCP), Regional Traffic Signal Synchronization Program (RTSSP), and several transit programs.

5/14/2014

- 3 -

DESCRIPTION OF FUNDING SOURCES

Regional Capacity Program (Project O) – Project O is a competitive program that replaces the Measure M Local and Regional streets and roads competitive programs. Project O is made up of three individual program categories which provide improvements to the network. Funding is FY 14/15 comes from one of these programs:

- Arterial Capacity Enhancements (ACE) – Complements freeway improvement initiatives underway and supplements development mitigation opportunities on arterials throughout the Master Plan of Arterial Highways (MPAH).

Regional Traffic Signal Synchronization Program (Project P) (RTSSP) (TSSP) – Project P Includes competitive capital funding for the coordination of traffic signals across jurisdictional boundaries in addition to operational and maintenance funding.

MEASURE M2 - FAIRSHARE – This local fair share program returns a portion of the Measure M2 Streets and Roads revenues to the cities and the County of Orange once specific program requirements are met. Disbursement amounts are based on a formula that accounts for population, street mileage, and sales tax collected.

ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) GAS TAX ALLOCATION – OCTA coordinates the distribution of federal and state funding to the cities and the county within its jurisdiction. $125 million from the regional Gas Tax funding allocation has been budgeted for the completion of the Bristol Street Widening project. SEWER CONNECTION FEES – The Sewer Connection Fee is collected from various types of development based on the number of fixture units and the cost per lineal foot of construction of a main sewer line. All monies received by the City as a fee for connection to the public sewers are deposited into the Sewer Connection Fee Fund and used for the construction of sewers. Fees are paid at the time of application for a sewer connection permit, and no connection permit is issued until such fees are paid. SEWER SERVICE FEES – In 2001, the City adopted ordinance NS-2479 establishing a user fee for providing sewer services to residents and businesses in Santa Ana. The sewer service fee provides for the proper cleaning, repair, and operation of the sanitary sewer system facilities and ensures compliance with the Regional Water Quality Control Board Fats, Oils, and Grease Control Program. All monies are used to fund operating and maintenance costs, as well as capital improvements of the City’s sewer collection system.

5/14/2014

- 4 -

DESCRIPTION OF FUNDING SOURCES

WATER CAPITAL FUND – The City charges a user fee for providing water services to residents and businesses in Santa Ana. All monies are used to fund operating and maintenance costs, as well as capital improvements of the City’s water system. Approximately 10% to 20% of these funds are allocated to water system capital improvements each year.  

CHESTNUT AVE.

FIRST STFIRST STFIRST ST

Resurfacing

Street Reconstruction/

Arterial Widening

Traffic Improvements

Neighborhood Street

Legend

CITY OF SANTA ANA

FY 09/10

CITY OF SANTA ANACITY OF SANTA ANA

F F

CITY OF SANTA ANA

F

Bikeway/Park Improvements

Y 14/15

City Facility Improvements

Infrastructure Improvements

Improvements

CIVIC CENTER DR.

.E

VE

RG

RE

EN S

T

VD.

BLANA ASANT

VE.SEGERSTROM A

VD.MacARTHUR BL

VE.HAZARD A

LANEYMEMOR

.FIRST ST

VE.TAL

VE.SUNFLOWER A

ONTAL

DYER RD.

VE.ARNER AW

DR.MALL

OAUT

. ANDREW PLST

VE.EDINGER A

.FIRST ST

VE.AMc ADDEN

F

VE.ADDEN AMcF

.FOURTH ST

.FIFTH ST.FIFTH ST

VE.ASHINGTW

VE.WESTMINSTER A

VD.GARDEN GROVE BL

VE. A CLARAASANT

.SEVENTEENTH ST

VE. A CLARAASANT

VE.VEN AAIRHAF

VE. AA VETLA

.R

AIT

T S

T

. S

TRIT

CH

EY

.VIE

W S

TAIR

F

.G

RE

EN

VIL

LE S

T

VD.

HA

RB

OR B

LV

D.

HA

RB

OR B

L

.E

UC

LID S

T

.N

EW

HO

PE S

T

.R

AIT

T S

T .W

RIG

HT S

T

VE.

AN

DA

RD A

ST

.M

AIN S

T

YA

BR

OA

DW

.R

OS

S S

T

.F

LO

WE

R S

T

. S

TO

LB

RIS

T

VE.

TU

STIN A

VE.

LIN

CO

LN A

.S

AN

TIA

GO S

T

.VIE

W S

TAIR

F

SANTIAGO

SCALE: NONE

GR

AN

D

VE.

A

405

405

55

55

55

55

22

22

ON A

ON A

05/28/14

CDBG AREAFEES

CAPITALOUTLAY

GASTAX

MEASUREM2

OTHERTOTALPROJECTS

CITY OF SANTA ANAONE-YEAR CAPITAL IMPROVEMENT PROGRAM

FY 14/15

SEWERWATERCAPITAL

05/28/14

A & D FUNDS

TAX INC.

I. NEIGHBORHOOD IMPROVEMENTS

FY 14/15 CURB, GUTTER, SIDEWALK IMPROVEMENTS

Omnibus Concrete 292,886 292,8861.

Subtotal FY 14/15 Curb, Gutter, Sidewalk: 292,886 292,886

FY 14/15 NEIGHBORHOOD STREET IMPROVEMENTS

Local Street Preventative Maintenance 152,628 1,847,372 2,000,0002.

Residential Street Repair Program 1,053,4433. 1,053,443

3,054,331 3,054,331(1)

176,270 176,270(2)(PY)

Subtotal FY 14/15 Neighborhood Streets: 152,628 1,847,372 3,230,601 6,284,0441,053,443

FY 14/15 ALLEYS

Alley Improvement Program 100,000 100,0004.

Subtotal FY 14/15 Alleys: 100,000 100,000

TOTAL NEIGHBORHOOD IMPROVEMENTS: 545,514 1,847,372 3,230,601 6,676,9301,053,443

II. ARTERIAL IMPROVEMENTS

FY 14/15 ARTERIAL WIDENING

Bristol Street Widening: Phase IIIA - Civic Center to Washington

330,126 330,126(3)5.

- 1 -PY = Funding approved in Multiple Prior Fiscal Years

CDBG AREAFEES

CAPITALOUTLAY

GASTAX

MEASUREM2

OTHERTOTALPROJECTS

CITY OF SANTA ANAONE-YEAR CAPITAL IMPROVEMENT PROGRAM

FY 14/15

SEWERWATERCAPITAL

05/28/14

A & D FUNDS

TAX INC.

Bristol Street Widening: Phase IIIA - Civic Center to Washington

6,656,000 6,656,000(4)5.

6,134,500 6,134,500(5)

Bristol Street Widening: Phase IIIB - Washington to Seventeenth

2,616,432 2,616,432(4)6.

Bristol Street Widening: Phase IV - Warner to St. Andrew

3,909,382 3,909,382(3)7.

9,468,000 9,468,000(4)

Fairview Avenue Bridge over Santa Ana River 71,604 71,6048.

552,670 552,670(6)

Project Development 100,000 100,0009.

Right-of-Way Management 100,000 100,00010.

Santa Ana Bridge Maintenance Inventory 3,240 3,24011.

25,000 25,000(6)

Subtotal FY 14/15 Arterial Widening: 71,604 203,240 29,692,110 29,966,954

FY 14/15 STREET RECONSTRUCTION/RESURFACING

Arterial Street Preventative Maintenance 1,400,000 1,400,00012.

Pavement Management 200,000 200,00013.

- 2 -PY = Funding approved in Multiple Prior Fiscal Years

CDBG AREAFEES

CAPITALOUTLAY

GASTAX

MEASUREM2

OTHERTOTALPROJECTS

CITY OF SANTA ANAONE-YEAR CAPITAL IMPROVEMENT PROGRAM

FY 14/15

SEWERWATERCAPITAL

05/28/14

A & D FUNDS

TAX INC.

Westminster Avenue Rehabilitation: Harbor to Clinton

174,969 174,96914.

Subtotal FY 14/15 Reconstruction/Resurfacing: 1,774,969 1,774,969

TOTAL ARTERIAL IMPROVEMENTS: 71,604 1,978,209 29,692,110 31,741,923

III. TRAFFIC IMPROVEMENTS

FY 14/15 TRAFFIC IMPROVEMENTS

17th Street at English Street - Traffic Signal Modification

27,700 27,70015.

247,300 247,300(7)

Bike Lanes - Newhope, Civic Center and Grand 248,886 248,886(8)16.

Bristol Street Corridor Traffic Synchronization 10,000 10,00017.

Count Down Pedestrian Heads - Citywide 989,700 989,700(7)18.

Crosswalk Upgrades - Various Locations 21,600 21,60019.

194,400 194,400(7)

Edinger Avenue at Sullivan Street - Traffic Signal Modification

25,100 25,10020.

224,500 224,500(7)

Fixed Guideway 194,000 194,00021.

- 3 -PY = Funding approved in Multiple Prior Fiscal Years

CDBG AREAFEES

CAPITALOUTLAY

GASTAX

MEASUREM2

OTHERTOTALPROJECTS

CITY OF SANTA ANAONE-YEAR CAPITAL IMPROVEMENT PROGRAM

FY 14/15

SEWERWATERCAPITAL

05/28/14

A & D FUNDS

TAX INC.

Harbor Boulevard Corridor Traffic Signal Synchronization

150,000 150,00022.

260,680 260,680(10)

1,852,080 1,852,080(9)

MacArthur Boulevard at Plaza Drive - Traffic Signal Modification

27,600 27,60023.

246,600 246,600(7)

Signage Upgrade - Citywide 33,100 33,10024.

296,900 296,900(7)

Traffic Management Plans 30,000 30,00025.

Traffic Safety Project Development 100,000 100,00026.

Traffic Signal Equipment Replacement 100,000 100,00027.

Westminster Avenue at Clinton Street - Traffic Signal Modification

33,100 33,10028.

296,700 296,700(7)

Subtotal FY 14/15 Traffic Improvements: 194,000 558,200 4,857,746 5,609,946

TOTAL TRAFFIC IMPROVEMENTS: 194,000 558,200 4,857,746 5,609,946

- 4 -PY = Funding approved in Multiple Prior Fiscal Years

CDBG AREAFEES

CAPITALOUTLAY

GASTAX

MEASUREM2

OTHERTOTALPROJECTS

CITY OF SANTA ANAONE-YEAR CAPITAL IMPROVEMENT PROGRAM

FY 14/15

SEWERWATERCAPITAL

05/28/14

A & D FUNDS

TAX INC.

IV. INFRASTRUCTURE IMPROVEMENTS

FY 14/15 SEWER

Segerstrom Sewer Lift Station Reconstruction 500,000500,00029.

Sewer Main Repairs and Replacements 1,100,0001,100,00030.

Subtotal FY 14/15 Sewer: 1,600,0001,600,000

FY 14/15 WATER

Walnut Pump Station 500,000500,00031.

Water Main Replacements 2,250,0002,250,00032.

Well No. 32 - Rehabilitation 250,000250,00033.

Subtotal FY 14/15 Water: 3,000,0003,000,000

TOTAL INFRASTRUCTURE IMPROVEMENTS: 4,600,0003,000,000 1,600,000

V. CITY FACILITY IMPROVEMENTS

FY 14/15 STORM DRAIN/WATER QUALITY

Arterial Catch Basin Connector Pipe Screen (CPS) Installation

200,000 200,000(11)34. (PY)

55,200 55,200(12)(PY)

First Street Undercrossing Storm Drain Lift Station

100,000 100,000(12)35.

Subtotal FY 14/15 Storm Drain/Water Quality: 355,200 355,200

- 5 -PY = Funding approved in Multiple Prior Fiscal Years

CDBG AREAFEES

CAPITALOUTLAY

GASTAX

MEASUREM2

OTHERTOTALPROJECTS

CITY OF SANTA ANAONE-YEAR CAPITAL IMPROVEMENT PROGRAM

FY 14/15

SEWERWATERCAPITAL

05/28/14

A & D FUNDS

TAX INC.

TOTAL CITY FACILITY IMPROVEMENTS: 355,200 355,200

VI. BIKEWAY/PARK IMPROVEMENTS

FY 14/15 PARK IMPROVEMENTS/RENOVATION

Bike Lane Project Development 50,000 50,00036.

Memorial Park Exercise Area 45,000 45,000(13)37.

Memory Lane & Santa Ana River Park Site 714,450 714,450(14)38.

Pacific Electric Park 1,066,91839. 1,066,918

Subtotal FY 14/15 Park Facility Improvements: 50,000 759,450 1,876,3681,066,918

TOTAL BIKEWAY/PARK IMPROVEMENTS: 50,000 759,450 1,876,3681,066,918

GRAND TOTAL ONE-YEAR CIP PROJECTS: 2,120,361 811,118 4,433,781 38,895,107 50,860,3671,600,0003,000,0000 0 00

- 6 -PY = Funding approved in Multiple Prior Fiscal Years

"OTHER" FUNDING SOURCES:

05/28/14CITY OF SANTA ANAONE-YEAR CAPITAL IMPROVEMENT PROGRAM

FY 14/15

(1) Local Street Bond Fund

(2) Local Street Bond Fund (PY)

(3) Federal Demonstration Funds (FED DEMO)

(4) Measure M2 Arterial Capacity Enhancements (ACE)

(5) Orange County Transportation Authority Gas Tax Allocation

(6) Highway Bridge Rehabilitation & Replacement Program (HBRR)

(7) Highway Safety Improvement Program (HSIP)

(8) Bicycle Corridor Improvement Program (BCIP)

(9) Measure M2 Transportation Signal Synchronization Program (TSSP)

(10) Matching Funds From Participating Agencies§

(11) Measure M2 - Environmental Cleanup Program (ECP)

(12) Federal Clean Water Enterprise (FCWE)

(13) Donation by America On Track

(14) Housing Related Parks Program (HRPP)

- 7 -

§ Funding from Participating Agencies (Garden Grove, Fountain Valley and Costa Mesa)

CITY OF SANTA ANA FY 08/09 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

CITY OF SANTA ANA FY 14/15 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

PROJECT TITLE:Omnibus Concrete

PROJECT CATEGORY:NEIGHBORHOOD IMPROVEMENTS -

CURB, GUTTER, SIDEWALK IMPROVEMENTS

PROJECT DESCRIPTION:Replacement of defective sidewalk, curb, and gutter, and the installation of wheelchair ramps.

PROJECT NEED:Curbs, gutters, and sidewalks throughout the City have deteriorated and need replacement to reduce potential liability and improve the City's image.

LOCATION MAP

CITYWIDE

FY 15/16 FY 16/17 FY 17/18 FY 18/19PROJECT COSTS FY 19/20 FY 20/21FY 14/15

21,700 22,600 18,500 18,500 18,500Engineering 18,500 18,500271,186 282,421 231,500 231,500 231,500Construction 231,500 231,500

TOTAL 292,886 305,021 250,000 250,000 250,000 250,000 250,000

FY 15/16 FY 16/17 FY 17/18 FY 18/19SOURCE OF FUNDS FY 19/20 FY 20/21FY 14/15

Gas Tax 292,886 305,021 250,000 250,000 250,000 250,000 250,000

TOTAL 292,886 305,021 250,000 250,000 250,000 250,000 250,000

CONTACT:Jason Gabriel, Principal Civil Engineer

DATE:14-May-14

AGENCY:Public Works Agency

DIVISION:Design Engineering

- 1 -

CITY OF SANTA ANA FY 08/09 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

CITY OF SANTA ANA FY 14/15 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

PROJECT TITLE:Local Street Preventative Maintenance

PROJECT CATEGORY:NEIGHBORHOOD IMPROVEMENTS -

NEIGHBORHOOD STREET IMPROVEMENTS

PROJECT DESCRIPTION:This project provides for the application of crack seal and slurry seal to various streets Citywide.

PROJECT NEED:The City's Pavement Management Program has been developed to identify the preventative maintenance requirements for the City's street network. The application of a surface seal to streets with improvements constructed in the last 10 years will ensure a high level of service for years to come.

LOCATION MAP

CITYWIDE

FY 15/16 FY 16/17 FY 17/18 FY 18/19PROJECT COSTS FY 19/20 FY 20/21FY 14/15

150,000 150,000 150,000 150,000 150,000Engineering 150,000 150,0001,850,000 1,850,000 1,850,000 1,850,000 1,850,000Construction 1,850,000 1,850,000

TOTAL 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000

FY 15/16 FY 16/17 FY 17/18 FY 18/19SOURCE OF FUNDS FY 19/20 FY 20/21FY 14/15

Measure M2 Fairshare 1,847,372 1,674,639 1,674,639 1,674,639 1,674,639 1,674,639 1,674,639Gas Tax 152,628 325,361 325,361 325,361 325,361 325,361 325,361

TOTAL 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000

CONTACT:Jason Gabriel, Principal Civil Engineer

DATE:14-May-14

AGENCY:Public Works Agency

DIVISION:Design Engineering

- 2 -

CITY OF SANTA ANA FY 08/09 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

CITY OF SANTA ANA FY 14/15 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

PROJECT TITLE:Residential Street Repair Program

PROJECT CATEGORY:NEIGHBORHOOD IMPROVEMENTS -

NEIGHBORHOOD STREET IMPROVEMENTS

PROJECT DESCRIPTION:This project entails the rehabilitation of existing roadway pavement for local streets. The project will include the removal and replacement of existing concrete streets. Various replacement pavement strategies will be investigated to determine the most cost effective and maintainable treatment. Minor concrete repair to severely damaged or missing curbs, gutters, sidewalks and wheelchair ramps will also be included. Work in FY 14/15 will focus on the Pico Lowell, Wilshire Square and Washington Square neighborhoods.

PROJECT NEED:The local street network has 316 miles. In 2007, the City embarked on an extensive citywide improvement plan to rehabilitate the majority of the network. 228 miles of asphalt residential streets and 4.5 miles of concrete residential streets have been improved.

LOCATION MAP

FY 15/16 FY 16/17 FY 17/18 FY 18/19PROJECT COSTS FY 19/20 FY 20/21FY 14/15

290,000 70,000 70,000 70,000 70,000Engineering 70,000 70,0003,994,044 983,443 983,443 983,443 983,443Construction 983,443 983,443

TOTAL 4,284,044 1,053,443 1,053,443 1,053,443 1,053,443 1,053,443 1,053,443

FY 15/16 FY 16/17 FY 17/18 FY 18/19SOURCE OF FUNDS FY 19/20 FY 20/21FY 14/15

CDBG 1,053,443 1,053,443 1,053,443 1,053,443 1,053,443 1,053,443 1,053,443Local Bond Fund 3,054,331Local Bond Fund PY 176,270(PY)

TOTAL 4,284,044 1,053,443 1,053,443 1,053,443 1,053,443 1,053,443 1,053,443

PY = Funds awarded in Multiple Prior Fiscal Years

CONTACT:Jason Gabriel, Principal Civil Engineer

DATE:15-May-14

AGENCY:Public Works Agency

DIVISION:Design Engineering

- 3 -

CITY OF SANTA ANA FY 08/09 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

CITY OF SANTA ANA FY 14/15 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

PROJECT TITLE:Alley Improvement Program

PROJECT CATEGORY:NEIGHBORHOOD IMPROVEMENTS -

ALLEYS

PROJECT DESCRIPTION:This project will provide for the removal of existing damaged pavement and reconstruction with Portland Cement Concrete (PCC) for alleys citywide.

PROJECT NEED:The Citywide network of Portland Cement Concrete (PCC) and asphalt alleys is in extreme state of deterioration with the presence of numerous potholes, cracking, spalling and uplifting. PCC pavement will eliminate the drainage problems associated with the asphalt pavement and provide a longer life for the alleys.

LOCATION MAP

CITYWIDE

FY 15/16 FY 16/17 FY 17/18 FY 18/19PROJECT COSTS FY 19/20 FY 20/21FY 14/15

7,400 11,100 10,200 12,000 11,800Engineering 11,600 11,10092,600 138,900 127,733 149,632 147,228Construction 144,845 138,900

TOTAL 100,000 150,000 137,933 161,632 159,028 156,445 150,000

FY 15/16 FY 16/17 FY 17/18 FY 18/19SOURCE OF FUNDS FY 19/20 FY 20/21FY 14/15

Gas Tax 100,000 150,000 137,933 161,632 159,028 156,445 150,000

TOTAL 100,000 150,000 137,933 161,632 159,028 156,445 150,000

CONTACT:Jason Gabriel, Principal Civil Engineer

DATE:14-May-14

AGENCY:Public Works Agency

DIVISION:Design Engineering

- 4 -

CITY OF SANTA ANA FY 08/09 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

CITY OF SANTA ANA FY 14/15 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

PROJECT TITLE:Bristol Street Widening: Phase IIIA - Civic Center to Washington

PROJECT CATEGORY:ARTERIAL IMPROVEMENTS -

ARTERIAL WIDENING

PROJECT DESCRIPTION:The environmental documents for the Bristol Corridor were approved in 1990 and this project segment is currently in the final design phase. Improvements include widening Bristol Street from 2 to 3 lanes in each direction with bike lanes as well as landscaped medians and parkways. The total cost for Phase IIIA is estimated at $22.2 million for design, right of way and construction phases.

PROJECT NEED:Bristol Street from Civic Center Drive to Washington Avenue (Phase IIIA) is part of the City's plan to widen Bristol Street from Warner Avenue to Memory Lane, which was approved by City Council in 1990. Existing roadway has only 2 lanes in each direction and is operating at a LOS F. This widening is needed to improve traffic flow and increase capacity.

LOCATION MAP

FY 15/16 FY 16/17 FY 17/18 FY 18/19PROJECT COSTS FY 19/20 FY 20/21FY 14/15

13,120,626Land Acquisition

TOTAL 13,120,626

FY 15/16 FY 16/17 FY 17/18 FY 18/19SOURCE OF FUNDS FY 19/20 FY 20/21FY 14/15

FED DEMO 330,126MM2: ACE 6,656,000OCTA Gas Tax 6,134,500

TOTAL 13,120,626

CONTACT:Jason Gabriel, Principal Civil Engineer

DATE:29-May-14

AGENCY:Public Works Agency

DIVISION:Design Engineering

- 5 -

CITY OF SANTA ANA FY 08/09 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

CITY OF SANTA ANA FY 14/15 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

PROJECT TITLE:Bristol Street Widening: Phase IIIB - Washington to Seventeenth

PROJECT CATEGORY:ARTERIAL IMPROVEMENTS -

ARTERIAL WIDENING

PROJECT DESCRIPTION:The environmental documents for the Bristol Corridor were approved in 1990 and this project segment is currently in the right-of-way acquisition phase. Improvements include widening Bristol Street from 2 to 3 lanes in each direction with bike lanes as well as landscaped medians and parkways. The total cost for Phase IIIB is estimated at $18.0 million for design, right of way and construction phases.

PROJECT NEED:Bristol Street from Washington Avenue to 17th Street (Phase IIIB) is part of the City's plan to widen Bristol Street from Warner Avenue to Memory Lane, which was approved by City Council in 1990. Existing roadway has only 2 lanes in each direction and is operating at a LOS F. This widening is needed to improve traffic flow and increase capacity.

LOCATION MAP

FY 15/16 FY 16/17 FY 17/18 FY 18/19PROJECT COSTS FY 19/20 FY 20/21FY 14/15

2,616,432Construction

TOTAL 2,616,432

FY 15/16 FY 16/17 FY 17/18 FY 18/19SOURCE OF FUNDS FY 19/20 FY 20/21FY 14/15

MM2: ACE 2,616,432

TOTAL 2,616,432

CONTACT:Jason Gabriel, Principal Civil Engineer

DATE:29-May-14

AGENCY:Public Works Agency

DIVISION:Design Engineering

- 6 -

CITY OF SANTA ANA FY 08/09 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

CITY OF SANTA ANA FY 14/15 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

PROJECT TITLE:Bristol Street Widening: Phase IV - Warner to St. Andrew

PROJECT CATEGORY:ARTERIAL IMPROVEMENTS -

ARTERIAL WIDENING

PROJECT DESCRIPTION:The environmental documents for the Bristol Corridor were approved in 1990 and this project segment is currently in the final design phase. Improvements include widening Bristol Street from 2 to 3 lanes in each direction with bike lanes as well as landscaped medians and parkways. The total cost for Phase IV is estimated at $27.9 million for design, right of way and construction phases.

PROJECT NEED:Bristol Street from Warner Avenue to Saint Andrew Place (Phase IV) is part of the City's plan to widen Bristol Street from Warner Avenue to Memory Lane, which was approved by City Council in 1990. Existing roadway has only 2 lanes in each direction and is operating at a LOS F. This widening is needed to improve traffic flow and increase capacity.

LOCATION MAP

FY 15/16 FY 16/17 FY 17/18 FY 18/19PROJECT COSTS FY 19/20 FY 20/21FY 14/15

13,377,382Land Acquisition

TOTAL 13,377,382

FY 15/16 FY 16/17 FY 17/18 FY 18/19SOURCE OF FUNDS FY 19/20 FY 20/21FY 14/15

FED DEMO 3,909,382MM2: ACE 9,468,000

TOTAL 13,377,382

CONTACT:Jason Gabriel, Principal Civil Engineer

DATE:29-May-14

AGENCY:Public Works Agency

DIVISION:Design Engineering

- 7 -

CITY OF SANTA ANA FY 08/09 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

CITY OF SANTA ANA FY 14/15 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

PROJECT TITLE:Fairview Avenue Bridge over Santa Ana River

PROJECT CATEGORY:ARTERIAL IMPROVEMENTS -

ARTERIAL WIDENING

PROJECT DESCRIPTION:Bridge rehabilitation includes incidental widening in order to construct new sidewalk, Type 26 (modified) barrier rails, deck overlay, curb and gutter, driveway, and roadway approaches.

PROJECT NEED:Fairview bridge currently does not have sidewalk on each side of the roadway bridge. The roadway is striped with two lanes in each direction and 3.5' striped shoulder. The shoulder is being used as "sidewalk". The improvement is needed to widen the bridge to accommodate new sidewalk, curb, and gutter.

LOCATION MAP

FY 15/16 FY 16/17 FY 17/18 FY 18/19PROJECT COSTS FY 19/20 FY 20/21FY 14/15

624,274Engineering

TOTAL 624,274

FY 15/16 FY 16/17 FY 17/18 FY 18/19SOURCE OF FUNDS FY 19/20 FY 20/21FY 14/15

Gas Tax 71,604HBRR 552,670

TOTAL 624,274

CONTACT:Jason Gabriel, Principal Civil Engineer

DATE:28-May-14

AGENCY:Public Works Agency

DIVISION:Design Engineering

- 8 -

CITY OF SANTA ANA FY 08/09 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

CITY OF SANTA ANA FY 14/15 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

PROJECT TITLE:Project Development

PROJECT CATEGORY:ARTERIAL IMPROVEMENTS -

ARTERIAL WIDENING

PROJECT DESCRIPTION:Includes staff coordination related to grant application preparation and submittal. Project Development also entails staff response to City Council, resident, and business inquiries. This includes planning, environmental, preliminary engineering, and right-of-way.

PROJECT NEED:Staff consistently applies for grant funding to implement the Capital Improvement Program. A significant amount of staff effort is expended in analyzing a project to determine its feasibility and competitiveness. In addition, staff participates in various regional inter-agency forums and responds to Council, resident, and business inquiries.

LOCATION MAP

CITYWIDE

FY 15/16 FY 16/17 FY 17/18 FY 18/19PROJECT COSTS FY 19/20 FY 20/21FY 14/15

100,000 100,000 100,000 100,000 100,000Other 100,000 100,000

TOTAL 100,000 100,000 100,000 100,000 100,000 100,000 100,000

FY 15/16 FY 16/17 FY 17/18 FY 18/19SOURCE OF FUNDS FY 19/20 FY 20/21FY 14/15

Measure M2 Fairshare 100,000 100,000 100,000 100,000 100,000 100,000 100,000

TOTAL 100,000 100,000 100,000 100,000 100,000 100,000 100,000

CONTACT:Jason Gabriel, Principal Civil Engineer

DATE:19-Mar-14

AGENCY:Public Works Agency

DIVISION:Design Engineering

- 9 -

CITY OF SANTA ANA FY 08/09 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

CITY OF SANTA ANA FY 14/15 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

PROJECT TITLE:Right-of-Way Management

PROJECT CATEGORY:ARTERIAL IMPROVEMENTS -

ARTERIAL WIDENING

PROJECT DESCRIPTION:This project provides for the management and administration of right-of-way acquisitions/real estate transactions, which requires coordination of activities with the City Attorney's Office and other agencies.

PROJECT NEED:Each fiscal year, the Public Works Agency undertakes several roadway widening projects which require right-of-way acquisitions. Additionally, the Public Works Agency is responsible for maintaining and coordinating all real estate activities (i.e., City-owned properties, easements, etc.).

LOCATION MAP

CITYWIDE

FY 15/16 FY 16/17 FY 17/18 FY 18/19PROJECT COSTS FY 19/20 FY 20/21FY 14/15

100,000 100,000 100,000 100,000 100,000Other 100,000 100,000

TOTAL 100,000 100,000 100,000 100,000 100,000 100,000 100,000

FY 15/16 FY 16/17 FY 17/18 FY 18/19SOURCE OF FUNDS FY 19/20 FY 20/21FY 14/15

Measure M2 Fairshare 100,000 100,000 100,000 100,000 100,000 100,000 100,000

TOTAL 100,000 100,000 100,000 100,000 100,000 100,000 100,000

CONTACT:Jason Gabriel, Principal Civil Engineer

DATE:19-Mar-14

AGENCY:Public Works Agency

DIVISION:Design Engineering

- 10 -

CITY OF SANTA ANA FY 08/09 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

CITY OF SANTA ANA FY 14/15 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

PROJECT TITLE:Santa Ana Bridge Maintenance Inventory

PROJECT CATEGORY:ARTERIAL IMPROVEMENTS -

ARTERIAL WIDENING

PROJECT DESCRIPTION:Project entails the development and implementation of a comprehensive bridge preventative maintenance program.

PROJECT NEED:Caltrans performs bridge inspections and provides the Bridge Inspection Report to the City. The inspection report identifies the deficiencies of each bridge that needs maintenance. A bridge maintenance inventory is needed to submit to Caltrans in order to receive Federal HBRR funding for maintenance.

LOCATION MAP

CITYWIDE

FY 15/16 FY 16/17 FY 17/18 FY 18/19PROJECT COSTS FY 19/20 FY 20/21FY 14/15

28,240Engineering

TOTAL 28,240

FY 15/16 FY 16/17 FY 17/18 FY 18/19SOURCE OF FUNDS FY 19/20 FY 20/21FY 14/15

Measure M2 Fairshare 3,240HBRR 25,000

TOTAL 28,240

CONTACT:Jason Gabriel, Principal Civil Engineer

DATE:22-May-14

AGENCY:Public Works Agency

DIVISION:Design Engineering

- 11 -

CITY OF SANTA ANA FY 08/09 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

CITY OF SANTA ANA FY 14/15 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

PROJECT TITLE:Arterial Street Preventative Maintenance

PROJECT CATEGORY:ARTERIAL IMPROVEMENTS -

STREET RECONSTRUCTION/RESURFACING

PROJECT DESCRIPTION:This project provides for the application of crack seal and slurry seal to various streets Citywide.

PROJECT NEED:The City's Pavement Management Program has been developed to identify the preventative maintenance requirements for the City's street network. The application of a surface seal to streets with improvements constructed in the last 10 years will ensure a high level of service for years to come.

LOCATION MAP

CITYWIDE

FY 15/16 FY 16/17 FY 17/18 FY 18/19PROJECT COSTS FY 19/20 FY 20/21FY 14/15

100,000 100,000 100,000 100,000 100,000Engineering 100,000 100,0001,300,000 1,300,000 1,300,000 1,300,000 1,300,000Construction 1,300,000 1,300,000

TOTAL 1,400,000 1,400,000 1,400,000 1,400,000 1,400,000 1,400,000 1,400,000

FY 15/16 FY 16/17 FY 17/18 FY 18/19SOURCE OF FUNDS FY 19/20 FY 20/21FY 14/15

Measure M2 Fairshare 1,400,000 1,400,000 1,400,000 1,400,000 1,400,000 1,400,000 1,400,000

TOTAL 1,400,000 1,400,000 1,400,000 1,400,000 1,400,000 1,400,000 1,400,000

CONTACT:Jason Gabriel, Principal Civil Engineer

DATE:19-Mar-14

AGENCY:Public Works Agency

DIVISION:Design Engineering

- 12 -

CITY OF SANTA ANA FY 08/09 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

CITY OF SANTA ANA FY 14/15 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

PROJECT TITLE:Pavement Management

PROJECT CATEGORY:ARTERIAL IMPROVEMENTS -

STREET RECONSTRUCTION/RESURFACING

PROJECT DESCRIPTION:The City's Pavement Management System was first prepared in 1992. This project provides for a Citywide inventory of street pavement to identify any changes in condition and record any damage.

PROJECT NEED:The Pavement Management System (PMS) should be current and updated in order to better program projects for the City's CIP and to understand the total deferred maintenance of the network for budgeting purposes. Also, OCTA requires updated PMS reports to continue the City's eligibility for Measure M funds.

LOCATION MAP

CITYWIDE

FY 15/16 FY 16/17 FY 17/18 FY 18/19PROJECT COSTS FY 19/20 FY 20/21FY 14/15

200,000 200,000 200,000 200,000 200,000Engineering 200,000 200,000

TOTAL 200,000 200,000 200,000 200,000 200,000 200,000 200,000

FY 15/16 FY 16/17 FY 17/18 FY 18/19SOURCE OF FUNDS FY 19/20 FY 20/21FY 14/15

Measure M2 Fairshare 200,000 200,000 200,000 200,000 200,000 200,000 200,000

TOTAL 200,000 200,000 200,000 200,000 200,000 200,000 200,000

CONTACT:Jason Gabriel, Principal Civil Engineer

DATE:02-Apr-14

AGENCY:Public Works Agency

DIVISION:Design Engineering

- 13 -

CITY OF SANTA ANA FY 08/09 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

CITY OF SANTA ANA FY 14/15 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

PROJECT TITLE:Westminster Avenue Rehabilitation: Harbor to Clinton

PROJECT CATEGORY:ARTERIAL IMPROVEMENTS -

STREET RECONSTRUCTION/RESURFACING

PROJECT DESCRIPTION:Reconstruction/resurfacing of existing pavement and replacement/installation of missing or damaged, curbs, gutters, sidewalks, driveway approaches, and wheelchair ramps along Westminster Avenue between Harbor Boulevard and Clinton Street

PROJECT NEED:The segment of Westminster Avenue from Harbor Boulevard to Clinton Street has been identified as a high priority by the City’s Pavement Management System. The pavement is deteriorating due to weather, age, and heavy usage. Some of the adjacent curbs, gutters, driveway approaches, curb ramps, and sidewalks are also in various states of disrepair and require replacement.

LOCATION MAP

FY 15/16 FY 16/17 FY 17/18 FY 18/19PROJECT COSTS FY 19/20 FY 20/21FY 14/15

51,000Engineering123,969Construction

TOTAL 174,969

FY 15/16 FY 16/17 FY 17/18 FY 18/19SOURCE OF FUNDS FY 19/20 FY 20/21FY 14/15

Measure M2 Fairshare 174,969

TOTAL 174,969

CONTACT:Jason Gabriel, Principal Civil Engineer

DATE:22-May-14

AGENCY:Public Works Agency

DIVISION:Design Engineering

- 14 -

CITY OF SANTA ANA FY 08/09 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

CITY OF SANTA ANA FY 14/15 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

PROJECT TITLE:17th Street at English Street - Traffic Signal Modification

PROJECT CATEGORY:TRAFFIC IMPROVEMENTS -

TRAFFIC IMPROVEMENTS

PROJECT DESCRIPTION:Design and installation of a signal modification on 17th Street at English Street to provide left turns arrows.

PROJECT NEED:This project is designed to enhance safety by providing protected left turns.

LOCATION MAP

FY 15/16 FY 16/17 FY 17/18 FY 18/19PROJECT COSTS FY 19/20 FY 20/21FY 14/15

20,400Engineering254,600Construction

TOTAL 275,000

FY 15/16 FY 16/17 FY 17/18 FY 18/19SOURCE OF FUNDS FY 19/20 FY 20/21FY 14/15

Measure M2 Fairshare 27,700HSIP 247,300

TOTAL 275,000

CONTACT:Zdenek Kekula, Acting Principal Civil Engineer

DATE:22-May-14

AGENCY:Public Works Agency

DIVISION:Traffic Engineering

- 15 -

CITY OF SANTA ANA FY 08/09 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

CITY OF SANTA ANA FY 14/15 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

PROJECT TITLE:Bike Lanes - Newhope, Civic Center and Grand

PROJECT CATEGORY:TRAFFIC IMPROVEMENTS -

TRAFFIC IMPROVEMENTS

PROJECT DESCRIPTION:Design and installation of a class II bike lane on Newhope Street between First Street and McFadden Avenue, Civic Center Drive between Bristol Street and Broadway, Grand Avenue between 21st Street and Fairhaven Avenue.

PROJECT NEED:This project is designed to increase bicyclists' safety and mobility.

LOCATION MAP

FY 15/16 FY 16/17 FY 17/18 FY 18/19PROJECT COSTS FY 19/20 FY 20/21FY 14/15

248,886Construction

TOTAL 248,886

FY 15/16 FY 16/17 FY 17/18 FY 18/19SOURCE OF FUNDS FY 19/20 FY 20/21FY 14/15

BCIP 248,886

TOTAL 248,886

CONTACT:Zdenek Kekula, Acting Principal Civil Engineer

DATE:04-Apr-14

AGENCY:Public Works Agency

DIVISION:Traffic Engineering

- 16 -

CITY OF SANTA ANA FY 08/09 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

CITY OF SANTA ANA FY 14/15 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

PROJECT TITLE:Bristol Street Corridor Traffic Synchronization

PROJECT CATEGORY:TRAFFIC IMPROVEMENTS -

TRAFFIC IMPROVEMENTS

PROJECT DESCRIPTION:To provide inter-agency traffic signal synchronization and traffic signal infrastructure upgrades on Bristol St from SR-22 Ramp to Jamboree Rd. This is a multi-agency project with participation from the Cities of Costa Mesa and Newport Beach. OCTA will be the lead agency.

PROJECT NEED:Bristol St corridor is a part of OCTA Traffic Signal Synchronization Master Plan and is eligible for funding from OCTA Measure M2 TSSP program. Bristol St corridor traffic signal timing was last updated in 2009 and need to be retimed for the current traffic conditions. The project will provide new traffic signal synchronization throughout the corridor, necessary traffic signal upgrades and funds to maintain the synchronization for an additional 2 years.

LOCATION MAP

FY 15/16 FY 16/17 FY 17/18 FY 18/19PROJECT COSTS FY 19/20 FY 20/21FY 14/15

10,000Construction

TOTAL 10,000

FY 15/16 FY 16/17 FY 17/18 FY 18/19SOURCE OF FUNDS FY 19/20 FY 20/21FY 14/15

Measure M2 Fairshare 10,000

TOTAL 10,000

CONTACT:Vinh Nguyen, Senior Civil Engineer

DATE:22-May-14

AGENCY:Public Works Agency

DIVISION:Transportation & Traffic Engineering

- 17 -

CITY OF SANTA ANA FY 08/09 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

CITY OF SANTA ANA FY 14/15 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

PROJECT TITLE:Count Down Pedestrian Heads - Citywide

PROJECT CATEGORY:TRAFFIC IMPROVEMENTS -

TRAFFIC IMPROVEMENTS

PROJECT DESCRIPTION:Installation of pedestrian count down heads at signalized intersections citywide.

PROJECT NEED:This project is designed to enhance pedestrian safety by providing rapid flashing beacons.

LOCATION MAP

CITYWIDE

FY 15/16 FY 16/17 FY 17/18 FY 18/19PROJECT COSTS FY 19/20 FY 20/21FY 14/15

989,700Construction

TOTAL 989,700

FY 15/16 FY 16/17 FY 17/18 FY 18/19SOURCE OF FUNDS FY 19/20 FY 20/21FY 14/15

HSIP 989,700

TOTAL 989,700

CONTACT:Zdenek Kekula, Acting Principal Civil Engineer

DATE:11-Mar-14

AGENCY:Public Works Agency

DIVISION:Traffic Engineering

- 18 -

CITY OF SANTA ANA FY 08/09 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

CITY OF SANTA ANA FY 14/15 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

PROJECT TITLE:Crosswalk Upgrades - Various Locations

PROJECT CATEGORY:TRAFFIC IMPROVEMENTS -

TRAFFIC IMPROVEMENTS

PROJECT DESCRIPTION:Design and installation of rapid rectangular flashing beacons at several crosswalks: Broadway-Walnut, Main-Walnut, Greenville-Pomona, Lyon-Bryan, Lacy-Santa Ana, Lacy-Civic Center, Fourth-Minter and Edinger-Towner.

PROJECT NEED:This project is designed to enhance pedestrian safety by providing rapid flashing beacons.

LOCATION MAP

FY 15/16 FY 16/17 FY 17/18 FY 18/19PROJECT COSTS FY 19/20 FY 20/21FY 14/15

16,000Engineering200,000Construction

TOTAL 216,000

FY 15/16 FY 16/17 FY 17/18 FY 18/19SOURCE OF FUNDS FY 19/20 FY 20/21FY 14/15

Measure M2 Fairshare 21,600HSIP 194,400

TOTAL 216,000

CONTACT:Zdenek Kekula, Acting Principal Civil Engineer

DATE:07-Apr-14

AGENCY:Public Works Agency

DIVISION:Traffic Engineering

- 19 -

CITY OF SANTA ANA FY 08/09 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

CITY OF SANTA ANA FY 14/15 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

PROJECT TITLE:Edinger Avenue at Sullivan Street - Traffic Signal Modification

PROJECT CATEGORY:TRAFFIC IMPROVEMENTS -

TRAFFIC IMPROVEMENTS

PROJECT DESCRIPTION:Design and installation of a signal modification on Edinger Avenue at Sullivan Street to provide left turn arrows.

PROJECT NEED:This project is designed to enhance safety by providing protected left turns.

LOCATION MAP

FY 15/16 FY 16/17 FY 17/18 FY 18/19PROJECT COSTS FY 19/20 FY 20/21FY 14/15

18,500Engineering231,100Construction

TOTAL 249,600

FY 15/16 FY 16/17 FY 17/18 FY 18/19SOURCE OF FUNDS FY 19/20 FY 20/21FY 14/15

Measure M2 Fairshare 25,100HSIP 224,500

TOTAL 249,600

CONTACT:Zdenek Kekula, Acting Principal Civil Engineer

DATE:04-Apr-14

AGENCY:Public Works Agency

DIVISION:Traffic Engineering

- 20 -

CITY OF SANTA ANA FY 08/09 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

CITY OF SANTA ANA FY 14/15 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

PROJECT TITLE:Fixed Guideway

PROJECT CATEGORY:TRAFFIC IMPROVEMENTS -

TRAFFIC IMPROVEMENTS

PROJECT DESCRIPTION:The cities of Santa Ana and Garden Grove are jointly developing a modern streetcar system. The streetcar will travel from the Santa Ana Regional Transportation Center (SARTC) through downtown Santa Ana, the Civic Center area, and the Willowick site. The system will terminate at a new transit hub at the corner of Harbor Blvd. and Westminster Ave.

PROJECT NEED:The project will enhance transit service and support economic development along the proposed streetcar corridor.

LOCATION MAP

FY 15/16 FY 16/17 FY 17/18 FY 18/19PROJECT COSTS FY 19/20 FY 20/21FY 14/15

194,000Engineering

TOTAL 194,000

FY 15/16 FY 16/17 FY 17/18 FY 18/19SOURCE OF FUNDS FY 19/20 FY 20/21FY 14/15

Gas Tax 194,000

TOTAL 194,000

CONTACT:Jason Gabriel, Principal Civil Engineer

DATE:22-May-14

AGENCY:Public Works Agency

DIVISION:Design Engineering

- 21 -

CITY OF SANTA ANA FY 08/09 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

CITY OF SANTA ANA FY 14/15 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

PROJECT TITLE:Harbor Boulevard Corridor Traffic Signal Synchronization

PROJECT CATEGORY:TRAFFIC IMPROVEMENTS -

TRAFFIC IMPROVEMENTS

PROJECT DESCRIPTION:To provide inter-agency traffic signal synchronization and traffic signal infrastructure upgrade on Harbor Blvd from Chapman Ave to Newport Blvd. This is a multi-agency project with participation from Cities of Garden Grove, Fountain Valley and Costa Mesa. Santa Ana will be the lead agency. The participating Cities will provide $260,680.

PROJECT NEED:Harbor Blvd corridor is a part of OCTA traffic Signal Synchronization Master Plan and is eligible for funding from OCTA Measure M2 TSSP program. The corridor traffic signal timing was last updated in 2009 and need to be retimed for the current traffic conditions. The project will provide new traffic signal synchronization throughout the corridor, necessary traffic signal upgrades and funds to maintain the synchronization for an additional 2 years.

LOCATION MAP

FY 15/16 FY 16/17 FY 17/18 FY 18/19PROJECT COSTS FY 19/20 FY 20/21FY 14/15

375,900Engineering1,886,860Construction

TOTAL 2,262,760

FY 15/16 FY 16/17 FY 17/18 FY 18/19SOURCE OF FUNDS FY 19/20 FY 20/21FY 14/15

Measure M2 Fairshare 150,000§Participating Agencies 260,680MM2: TSSP 1,852,080

TOTAL 2,262,760

CONTACT:Vinh Nguyen, Senior Civil Engineer

DATE:22-May-14

AGENCY:Public Works Agency

DIVISION:Transportation & Traffic Engineering

- 22 -

§Funding from Participating Agencies (Garden Grove, Fountain Valley and Costa Mesa)

CITY OF SANTA ANA FY 08/09 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

CITY OF SANTA ANA FY 14/15 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

PROJECT TITLE:MacArthur Boulevard at Plaza Drive - Traffic Signal Modification

PROJECT CATEGORY:TRAFFIC IMPROVEMENTS -

TRAFFIC IMPROVEMENTS

PROJECT DESCRIPTION:Design and installation of a signal modification on MacArthur Blvd at Plaza Drive to provide left turn arrows.

PROJECT NEED:This project is designed to enhance safety by providing protected left turns.

LOCATION MAP

FY 15/16 FY 16/17 FY 17/18 FY 18/19PROJECT COSTS FY 19/20 FY 20/21FY 14/15

20,300Engineering253,900Construction

TOTAL 274,200

FY 15/16 FY 16/17 FY 17/18 FY 18/19SOURCE OF FUNDS FY 19/20 FY 20/21FY 14/15

Measure M2 Fairshare 27,600HSIP 246,600

TOTAL 274,200

CONTACT:Zdenek Kekula, Acting Principal Civil Engineer

DATE:22-May-14

AGENCY:Public Works Agency

DIVISION:Traffic Engineering

- 23 -

CITY OF SANTA ANA FY 08/09 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

CITY OF SANTA ANA FY 14/15 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

PROJECT TITLE:Signage Upgrade - Citywide

PROJECT CATEGORY:TRAFFIC IMPROVEMENTS -

TRAFFIC IMPROVEMENTS

PROJECT DESCRIPTION:Signage upgrade of regulatory and warning signs Citywide.

PROJECT NEED:This project is designed to enhance safety by enhancing signage visibility.

LOCATION MAP

CITYWIDE

FY 15/16 FY 16/17 FY 17/18 FY 18/19PROJECT COSTS FY 19/20 FY 20/21FY 14/15

24,400Engineering305,600Construction

TOTAL 330,000

FY 15/16 FY 16/17 FY 17/18 FY 18/19SOURCE OF FUNDS FY 19/20 FY 20/21FY 14/15

Measure M2 Fairshare 33,100HSIP 296,900

TOTAL 330,000

CONTACT:Zdenek Kekula, Acting Principal Civil Engineer

DATE:07-Mar-14

AGENCY:Public Works Agency

DIVISION:Traffic Engineering

- 24 -

CITY OF SANTA ANA FY 08/09 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

CITY OF SANTA ANA FY 14/15 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

PROJECT TITLE:Traffic Management Plans

PROJECT CATEGORY:TRAFFIC IMPROVEMENTS -

TRAFFIC IMPROVEMENTS

PROJECT DESCRIPTION:Conduct a variety of traffic counts at various locations Citywide to collect data needed for traffic management planning, signal priority studies, signal timing, etc., preparation of aerial maps, and to maintain the storage and management of accident and traffic investigation records.

PROJECT NEED:1) To collect traffic data for traffic signal timing, arterial traffic studies, preparation of traffic flow maps, and to conduct new traffic signal and left-turn signal needs analyses to request state and federal grants.2) To reduce the City's liability related to traffic safety issues by maintaining the storage of and access to traffic investigation records in the computer database.

LOCATION MAP

CITYWIDE

FY 15/16 FY 16/17 FY 17/18 FY 18/19PROJECT COSTS FY 19/20 FY 20/21FY 14/15

30,000 50,000 50,000 50,000 50,000Other 50,000 50,000

TOTAL 30,000 50,000 50,000 50,000 50,000 50,000 50,000

FY 15/16 FY 16/17 FY 17/18 FY 18/19SOURCE OF FUNDS FY 19/20 FY 20/21FY 14/15

Measure M2 Fairshare 30,000 50,000 50,000 50,000 50,000 50,000 50,000

TOTAL 30,000 50,000 50,000 50,000 50,000 50,000 50,000

CONTACT:Zdenek Kekula, Acting Principal Civil Engineer

DATE:07-Mar-14

AGENCY:Public Works Agency

DIVISION:Transportation & Traffic Engineering

- 25 -

CITY OF SANTA ANA FY 08/09 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

CITY OF SANTA ANA FY 14/15 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

PROJECT TITLE:Traffic Safety Project Development

PROJECT CATEGORY:TRAFFIC IMPROVEMENTS -

TRAFFIC IMPROVEMENTS

PROJECT DESCRIPTION:Provides for the engineering design services that are necessary for grant applications, development / preparation of plans, specification and estimates related to traffic safety improvement projects. In addition, provides city matching funds for grant funded traffic safety projects.

PROJECT NEED:This project is designed to increase traffic safety for all users in the City.

LOCATION MAP

CITYWIDE

FY 15/16 FY 16/17 FY 17/18 FY 18/19PROJECT COSTS FY 19/20 FY 20/21FY 14/15

100,000 100,000 100,000 100,000 100,000Engineering 100,000 100,000

TOTAL 100,000 100,000 100,000 100,000 100,000 100,000 100,000

FY 15/16 FY 16/17 FY 17/18 FY 18/19SOURCE OF FUNDS FY 19/20 FY 20/21FY 14/15

Measure M2 Fairshare 100,000 100,000 100,000 100,000 100,000 100,000 100,000

TOTAL 100,000 100,000 100,000 100,000 100,000 100,000 100,000

CONTACT:Zdenek Kekula, Acting Principal Civil Engineer

DATE:07-Apr-14

AGENCY:Public Works Agency

DIVISION:Traffic Engineering

- 26 -

CITY OF SANTA ANA FY 08/09 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

CITY OF SANTA ANA FY 14/15 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

PROJECT TITLE:Traffic Signal Equipment Replacement

PROJECT CATEGORY:TRAFFIC IMPROVEMENTS -

TRAFFIC IMPROVEMENTS

PROJECT DESCRIPTION:Replace outdated traffic signal and monitoring equipment, such as cabinets, conflict monitors, controllers, CCTV, and communication equipment, both in the field and in the traffic management center.

PROJECT NEED:Much of the traffic signal, pedestrian and monitoring equipment in the City is old and no longer supported by the manufacturers. This equipment needs to be upgraded to maintain operations and to meet current standards.

LOCATION MAP

CITYWIDE

FY 15/16 FY 16/17 FY 17/18 FY 18/19PROJECT COSTS FY 19/20 FY 20/21FY 14/15

100,000 100,000 100,000 100,000 100,000Construction 100,000 100,000

TOTAL 100,000 100,000 100,000 100,000 100,000 100,000 100,000

FY 15/16 FY 16/17 FY 17/18 FY 18/19SOURCE OF FUNDS FY 19/20 FY 20/21FY 14/15

Measure M2 Fairshare 100,000 100,000 100,000 100,000 100,000 100,000 100,000

TOTAL 100,000 100,000 100,000 100,000 100,000 100,000 100,000

CONTACT:Vinh Nguyen, Senior Civil Engineer

DATE:07-Mar-14

AGENCY:Public Works Agency

DIVISION:Transportation & Traffic Engineering

- 27 -

CITY OF SANTA ANA FY 08/09 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

CITY OF SANTA ANA FY 14/15 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

PROJECT TITLE:Westminster Avenue at Clinton Street - Traffic Signal Modification

PROJECT CATEGORY:TRAFFIC IMPROVEMENTS -

TRAFFIC IMPROVEMENTS

PROJECT DESCRIPTION:Design and installation of a signal modification on Westminster Avenue at Clinton Street to provide left turn arrows.

PROJECT NEED:This project is designed to enhance safety by providing protected left turns.

LOCATION MAP

FY 15/16 FY 16/17 FY 17/18 FY 18/19PROJECT COSTS FY 19/20 FY 20/21FY 14/15

24,400Engineering305,400Construction

TOTAL 329,800

FY 15/16 FY 16/17 FY 17/18 FY 18/19SOURCE OF FUNDS FY 19/20 FY 20/21FY 14/15

Measure M2 Fairshare 33,100HSIP 296,700

TOTAL 329,800

CONTACT:Zdenek Kekula, Acting Principal Civil Engineer

DATE:04-Apr-14

AGENCY:Public Works Agency

DIVISION:Traffic Engineering

- 28 -

CITY OF SANTA ANA FY 08/09 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

CITY OF SANTA ANA FY 14/15 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

PROJECT TITLE:Segerstrom Sewer Lift Station Reconstruction

PROJECT CATEGORY:INFRASTRUCTURE IMPROVEMENTS -

SEWER

PROJECT DESCRIPTION:Reconstruct existing sewer lift station.

PROJECT NEED:The existing wet well is too shallow, resulting in surcharging of incoming sewer mains. This project is required to prevent sewer mains from plugging and to prevent spills.

LOCATION MAP

FY 15/16 FY 16/17 FY 17/18 FY 18/19PROJECT COSTS FY 19/20 FY 20/21FY 14/15

500,000Construction

TOTAL 500,000

FY 15/16 FY 16/17 FY 17/18 FY 18/19SOURCE OF FUNDS FY 19/20 FY 20/21FY 14/15

Sewer Funds 500,000

TOTAL 500,000

CONTACT:Rudy Rosas, Senior Civil Engineer

DATE:27-Mar-14

AGENCY:Public Works Agency

DIVISION:Water Resources

- 29 -

CITY OF SANTA ANA FY 08/09 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

CITY OF SANTA ANA FY 14/15 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

PROJECT TITLE:Sewer Main Repairs and Replacements

PROJECT CATEGORY:INFRASTRUCTURE IMPROVEMENTS -

SEWER

PROJECT DESCRIPTION:Construction of sanitary sewer pipelines to replace obsolete and/or undersized facilities. Project also includes spot repairs of damaged sewer mains.

PROJECT NEED:This project is required to maintain effective operation of the City's sanitary sewer system, eliminate sewer main obstructions, reduce sewer maintenance requirements, and prevent sewer spills.

LOCATION MAP

CITYWIDE

FY 15/16 FY 16/17 FY 17/18 FY 18/19PROJECT COSTS FY 19/20 FY 20/21FY 14/15

1,100,000 500,000 500,000 500,000 500,000Construction 500,000 500,000

TOTAL 1,100,000 500,000 500,000 500,000 500,000 500,000 500,000

FY 15/16 FY 16/17 FY 17/18 FY 18/19SOURCE OF FUNDS FY 19/20 FY 20/21FY 14/15

Sewer Funds 1,100,000 500,000 500,000 500,000 500,000 500,000 500,000

TOTAL 1,100,000 500,000 500,000 500,000 500,000 500,000 500,000

CONTACT:Rudy Rosas, Senior Civil Engineer

DATE:25-Mar-14

AGENCY:Public Works Agency

DIVISION:Water Resources

- 30 -

CITY OF SANTA ANA FY 08/09 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

CITY OF SANTA ANA FY 14/15 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

PROJECT TITLE:Walnut Pump Station

PROJECT CATEGORY:INFRASTRUCTURE IMPROVEMENTS -

WATER

PROJECT DESCRIPTION:This project will replace the existing Walnut Station pump control building, upgrade the existing Motor Control Center (MCC) and upgrade communications capabilities at the facility. Site upgrades, such as, replacement of the perimeter wall and landscape improvements are included as part of this work. The pump station improvements will result in a new modern and more energy efficient pump station facility.

PROJECT NEED:This project is required to maintain effective operation of the City's water system and to provide reliability to the City water supply.

LOCATION MAP

FY 15/16 FY 16/17 FY 17/18 FY 18/19PROJECT COSTS FY 19/20 FY 20/21FY 14/15

500,000Construction

TOTAL 500,000

FY 15/16 FY 16/17 FY 17/18 FY 18/19SOURCE OF FUNDS FY 19/20 FY 20/21FY 14/15

Water Capital 500,000

TOTAL 500,000

CONTACT:Rudy Rosas, Senior Civil Engineer

DATE:22-May-14

AGENCY:Public Works Agency

DIVISION:Water Resources

- 31 -

CITY OF SANTA ANA FY 08/09 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

CITY OF SANTA ANA FY 14/15 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

PROJECT TITLE:Water Main Replacements

PROJECT CATEGORY:INFRASTRUCTURE IMPROVEMENTS -

WATER

PROJECT DESCRIPTION:Replacement of water mains in coordination with street resurfacing projects.

PROJECT NEED:Coordination of street resurfacing projects with the replacement of obsolete water mains is the most cost-effective and efficient use of City funds and resources.

LOCATION MAP

CITYWIDE

FY 15/16 FY 16/17 FY 17/18 FY 18/19PROJECT COSTS FY 19/20 FY 20/21FY 14/15

2,250,000 4,000,000 4,500,000 4,500,000 5,000,000Construction 5,000,000 5,000,000

TOTAL 2,250,000 4,000,000 4,500,000 4,500,000 5,000,000 5,000,000 5,000,000

FY 15/16 FY 16/17 FY 17/18 FY 18/19SOURCE OF FUNDS FY 19/20 FY 20/21FY 14/15

Water Capital 2,250,000 4,000,000 4,500,000 4,500,000 5,000,000 5,000,000 5,000,000

TOTAL 2,250,000 4,000,000 4,500,000 4,500,000 5,000,000 5,000,000 5,000,000

CONTACT:Rudy Rosas, Senior Civil Engineer

DATE:19-Mar-14

AGENCY:Public Works Agency

DIVISION:Water Resources

- 32 -

CITY OF SANTA ANA FY 08/09 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

CITY OF SANTA ANA FY 14/15 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

PROJECT TITLE:Well No. 32 - Rehabilitation

PROJECT CATEGORY:INFRASTRUCTURE IMPROVEMENTS -

WATER

PROJECT DESCRIPTION:Rehabilitate the well and bring facility up to current codes and standards. Improvements include upgrading the power supply, motor control systems, Supervisory Control and Data Acquisition (SCADA) system and constructing new discharge pipeline.

PROJECT NEED:This project is required to maintain effective operation of the City's water system and to provide reliability to the City water supply.

LOCATION MAP

FY 15/16 FY 16/17 FY 17/18 FY 18/19PROJECT COSTS FY 19/20 FY 20/21FY 14/15

250,000Engineering3,000,000Construction

TOTAL 250,000 3,000,000

FY 15/16 FY 16/17 FY 17/18 FY 18/19SOURCE OF FUNDS FY 19/20 FY 20/21FY 14/15

Water Capital 250,000 3,000,000

TOTAL 250,000 3,000,000

CONTACT:Rudy Rosas, Senior Civil Engineer

DATE:19-Mar-14

AGENCY:Public Works Agency

DIVISION:Water Resources

- 33 -

CITY OF SANTA ANA FY 08/09 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

CITY OF SANTA ANA FY 14/15 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

PROJECT TITLE:Arterial Catch Basin Connector Pipe Screen (CPS) Installation

PROJECT CATEGORY:CITY FACILITY IMPROVEMENTS -

STORM DRAIN/WATER QUALITY

PROJECT DESCRIPTION:Installation of Connector Pipe Screens (CPS) at catch basins with an ongoing operations and maintenance program.

PROJECT NEED:Trash Reduction Program to meet Federal Clean Water Act water quality standards related to urban runoff.

LOCATION MAP

FY 15/16 FY 16/17 FY 17/18 FY 18/19PROJECT COSTS FY 19/20 FY 20/21FY 14/15

23,200Engineering232,000Construction

TOTAL 255,200

FY 15/16 FY 16/17 FY 17/18 FY 18/19SOURCE OF FUNDS FY 19/20 FY 20/21FY 14/15

Fed. Clean Water 55,200(PY)Measure M2 ECP 200,000(PY)

TOTAL 255,200

PY = Funds awarded in Multiple Prior Fiscal Years

CONTACT:Tyrone Chesanek, Principal Civil Engineer

DATE:28-May-14

AGENCY:Public Works Agency

DIVISION:Construction Engineering

- 34 -

CITY OF SANTA ANA FY 08/09 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

CITY OF SANTA ANA FY 14/15 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

PROJECT TITLE:First Street Undercrossing Storm Drain Lift Station

PROJECT CATEGORY:CITY FACILITY IMPROVEMENTS -

STORM DRAIN/WATER QUALITY

PROJECT DESCRIPTION:Reconstruction of existing storm drain lift station. Improvements include upgrading the power supply, motor control systems and Supervisory Control and Data Acquisition System (SCADA).

PROJECT NEED:Reconstruction required to maintain effective operations and improve reliability.

LOCATION MAP

FY 15/16 FY 16/17 FY 17/18 FY 18/19PROJECT COSTS FY 19/20 FY 20/21FY 14/15

100,000Engineering1,250,000Construction

TOTAL 100,000 1,250,000

FY 15/16 FY 16/17 FY 17/18 FY 18/19SOURCE OF FUNDS FY 19/20 FY 20/21FY 14/15

Fed. Clean Water 100,000 1,250,000

TOTAL 100,000 1,250,000

CONTACT:Tyrone Chesanek, Principal Civil Engineer

DATE:28-May-14

AGENCY:Public Works Agency

DIVISION:Construction Engineering

- 35 -

CITY OF SANTA ANA FY 08/09 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

CITY OF SANTA ANA FY 14/15 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

PROJECT TITLE:Bike Lane Project Development

PROJECT CATEGORY:BIKEWAY/PARK IMPROVEMENTS -

PARK IMPROVEMENTS/RENOVATION

PROJECT DESCRIPTION:Provides for the engineering services that are necessary for grant applications, development / preparation of plans, specifications and estimates related to bike lane projects. In addition, provides city matching funds for grant funded bicycle facilities projects.

PROJECT NEED:This project is designed to increase bicyclists' safety and mobility.

LOCATION MAP

CITYWIDE

FY 15/16 FY 16/17 FY 17/18 FY 18/19PROJECT COSTS FY 19/20 FY 20/21FY 14/15

50,000 50,000 50,000 50,000 50,000Engineering 50,000 50,000

TOTAL 50,000 50,000 50,000 50,000 50,000 50,000 50,000

FY 15/16 FY 16/17 FY 17/18 FY 18/19SOURCE OF FUNDS FY 19/20 FY 20/21FY 14/15

Measure M2 Fairshare 50,000 50,000 50,000 50,000 50,000 50,000 50,000

TOTAL 50,000 50,000 50,000 50,000 50,000 50,000 50,000

CONTACT:Zdenek Kekula, Acting Principal Civil Engineer

DATE:22-Mar-14

AGENCY:Public Works Agency

DIVISION:Transportation & Traffic Engineering

- 36 -

CITY OF SANTA ANA FY 08/09 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

CITY OF SANTA ANA FY 14/15 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

PROJECT TITLE:Memorial Park Exercise Area

PROJECT CATEGORY:BIKEWAY/PARK IMPROVEMENTS -

PARK IMPROVEMENTS/RENOVATION

PROJECT DESCRIPTION:Removal of the existing picnic shelter and barbeque equipment. Area to be redesigned and reconstructed with exercise equipment, rubber surfacing, and shade structure.

PROJECT NEED:Exercise equipment are being installed in various park sites throughout the city to help address the nations obesity problem. Exercise equipment were installed at Maple & Occidental, Birch Park and Garfield Exercise Park. The old deteriorated picnic shelter will be removed and America On Track has donated $45,000 to purchase the exercise equipment and shade structure to be installed in the picnic shelter location. This project will remove any safety concerns, improve appearance and usefulness of the area.

LOCATION MAP

FY 15/16 FY 16/17 FY 17/18 FY 18/19PROJECT COSTS FY 19/20 FY 20/21FY 14/15

45,000Construction

TOTAL 45,000

FY 15/16 FY 16/17 FY 17/18 FY 18/19SOURCE OF FUNDS FY 19/20 FY 20/21FY 14/15

Donation by AOT 45,000

TOTAL 45,000

CONTACT:Ron Ono, Administrative Services Manager

DATE:22-May-14

AGENCY:Parks, Rec. & Community Services

DIVISION:Administration

- 37 -

CITY OF SANTA ANA FY 08/09 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

CITY OF SANTA ANA FY 14/15 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

PROJECT TITLE:Memory Lane & Santa Ana River Park Site

PROJECT CATEGORY:BIKEWAY/PARK IMPROVEMENTS -

PARK IMPROVEMENTS/RENOVATION

PROJECT DESCRIPTION:A new half acre park site will be developed on the southwest corner of Memory Lane and the Santa Ana River, adjacent to the Vista Del Rio development. The park will be designed as a bike & equestrian rest stop with exercise equipment, play equipment, shade structure, drinking fountain, picnic tables and signage.

PROJECT NEED:The Santa Ana River Bike Trail and the Santiago/Memory Lane Bike Trail connects at this location. The site is an ideal location for a Bike rest stop and informational signage for the Santa Ana River Trail and the City of Santa Ana Bike Trail System. The site will also include an exercise and play equipment area for families on the trail and the adjacent development project.

LOCATION MAP

FY 15/16 FY 16/17 FY 17/18 FY 18/19PROJECT COSTS FY 19/20 FY 20/21FY 14/15

714,450Construction

TOTAL 714,450

FY 15/16 FY 16/17 FY 17/18 FY 18/19SOURCE OF FUNDS FY 19/20 FY 20/21FY 14/15

HRPP 714,450

TOTAL 714,450

CONTACT:Ron Ono, Administrative Services Manager

DATE:04-Apr-14

AGENCY:Parks, Rec. & Community Services

DIVISION:Administration

- 38 -

CITY OF SANTA ANA FY 08/09 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

CITY OF SANTA ANA FY 14/15 CIPCAPITAL IMPROVEMENT PROJECT WORKSHEET

PROJECT TITLE:Pacific Electric Park

PROJECT CATEGORY:BIKEWAY/PARK IMPROVEMENTS -

PARK IMPROVEMENTS/RENOVATION

PROJECT DESCRIPTION:Funding for design of this project was approved in FY 2013/14. This new 1.4 acre park site is at the corner of Orange and McFadden (known as Pacific Electric Park). The site is next to the Pacific Electric Bike Trail on Maple Street and is designed as a bike rest stop, passive neighborhood park with tot lot, community garden, seating area for gardening classes, security lighting, dry stream/native planting and decomposed granite walking trail.

PROJECT NEED:There is no park within a 1/2 mile radius of this property. The 1.4 acre site is excess property from the realignment of McFadden Ave and is owned by the City of Santa Ana. The community has requested a park be develop in this site and was involved with the preparation of the concept plan. In FY 2013/14 the city approved a budget of $250,000 for design of this park. Approx. $2,040,000 is needed to complete the development of this site. Funding available will complete Phase 1 of this projectLOCATION MAP

FY 15/16 FY 16/17 FY 17/18 FY 18/19PROJECT COSTS FY 19/20 FY 20/21FY 14/15

1,066,918Construction

TOTAL 1,066,918

FY 15/16 FY 16/17 FY 17/18 FY 18/19SOURCE OF FUNDS FY 19/20 FY 20/21FY 14/15

CDBG 1,066,918

TOTAL 1,066,918

CONTACT:Ron Ono, Administrative Services Manager

DATE:22-May-14

AGENCY:Parks, Rec. & Community Services

DIVISION:Administration

- 39 -

CDBG AREAFEES

CAPITALOUTLAY

GASTAX

MEASUREM2

OTHERTOTAL

CITY OF SANTA ANASEVEN-YEAR CAPITAL IMPROVEMENT PROGRAM

FY 14/15 to FY 20/21

SEWERWATERCAPITAL

05/28/14

A & D FUNDS

TAX INC.

FY 14/15 TOTAL: 811,118 4,433,781 38,895,107 50,860,3673,000,000 1,600,0002,120,361

FY 15/16 TOTAL: 816,315 4,720,706 2,050,000 16,140,4647,000,000 500,0001,053,443

FY 16/17 TOTAL: 816,315 4,972,618 11,842,3764,500,000 500,0001,053,443

FY 17/18 TOTAL: 816,315 5,198,317 12,068,0754,500,000 500,0001,053,443

FY 18/19 TOTAL: 816,315 5,412,713 12,782,4715,000,000 500,0001,053,443

FY 19/20 TOTAL: 816,315 5,625,130 12,994,8885,000,000 500,0001,053,443

FY 20/21 TOTAL: 816,315 5,824,265 13,194,0235,000,000 500,0001,053,443

GRAND TOTAL SEVEN-YEAR CIP: 8,441,019 5,709,008 36,187,530 40,945,107 129,882,6644,600,00034,000,0000 0 00

CDBG * AREAFEES

CAPITAL OUTLAY

GASTAX

MEASUREM2

OTHERTOTALPROJECTS

CITY OF SANTA ANASEVEN-YEAR CAPITAL IMPROVEMENT PROGRAM

FY 14/15 to FY 20/21

SEWERWATERCAPITAL

05/28/14

A & D FUNDS

TAX INC.

I. NEIGHBORHOOD IMPROVEMENTS

FY 14/15 CURB, GUTTER, SIDEWALK IMPROVEMENTS

Omnibus Concrete 292,886 292,8861.

Subtotal FY 14/15 Curb, Gutter, Sidewalk: 292,886 292,886

FY 15/16 CURB, GUTTER, SIDEWALK IMPROVEMENTS

Omnibus Concrete 305,021 305,0211.

Subtotal FY 15/16 Curb, Gutter, Sidewalk: 305,021 305,021

FY 16/17 CURB, GUTTER, SIDEWALK IMPROVEMENTS

Omnibus Concrete 250,000 250,0001.

Subtotal FY 16/17 Curb, Gutter, Sidewalk: 250,000 250,000

FY 17/18 CURB, GUTTER, SIDEWALK IMPROVEMENTS

Omnibus Concrete 250,000 250,0001.

Subtotal FY 17/18 Curb, Gutter, Sidewalk: 250,000 250,000

FY 18/19 CURB, GUTTER, SIDEWALK IMPROVEMENTS

Omnibus Concrete 250,000 250,0001.

Subtotal FY 18/19 Curb, Gutter, Sidewalk: 250,000 250,000

FY 19/20 CURB, GUTTER, SIDEWALK IMPROVEMENTS

Omnibus Concrete 250,000 250,0001.

Subtotal FY 19/20 Curb, Gutter, Sidewalk: 250,000 250,000

FY 20/21 CURB, GUTTER, SIDEWALK IMPROVEMENTS

Omnibus Concrete 250,000 250,0001.

- 1 -PY = Funding approved in Multiple Prior Fiscal Years

CDBG * AREAFEES

CAPITAL OUTLAY

GASTAX

MEASUREM2

OTHERTOTALPROJECTS

CITY OF SANTA ANASEVEN-YEAR CAPITAL IMPROVEMENT PROGRAM

FY 14/15 to FY 20/21

SEWERWATERCAPITAL

05/28/14

A & D FUNDS

TAX INC.

Subtotal FY 20/21 Curb, Gutter, Sidewalk: 250,000 250,000

FY 14/15 NEIGHBORHOOD STREET IMPROVEMENTS

Local Street Preventative Maintenance 152,628 1,847,372 2,000,0002.

Residential Street Repair Program 1,053,4433. 1,053,443

3,054,331 3,054,331(1)

176,270 176,270(2)(PY)

Subtotal FY 14/15 Neighborhood Streets: 152,628 1,847,372 3,230,601 6,284,0441,053,443

FY 15/16 NEIGHBORHOOD STREET IMPROVEMENTS

Local Street Preventative Maintenance 325,361 1,674,639 2,000,0002.

Residential Street Repair Program 1,053,4433. 1,053,443

Subtotal FY 15/16 Neighborhood Streets: 325,361 1,674,639 3,053,4431,053,443

FY 16/17 NEIGHBORHOOD STREET IMPROVEMENTS

Local Street Preventative Maintenance 325,361 1,674,639 2,000,0002.

Residential Street Repair Program 1,053,4433. 1,053,443

Subtotal FY 16/17 Neighborhood Streets: 325,361 1,674,639 3,053,4431,053,443

FY 17/18 NEIGHBORHOOD STREET IMPROVEMENTS

Local Street Preventative Maintenance 325,361 1,674,639 2,000,0002.

Residential Street Repair Program 1,053,4433. 1,053,443

Subtotal FY 17/18 Neighborhood Streets: 325,361 1,674,639 3,053,4431,053,443

FY 18/19 NEIGHBORHOOD STREET IMPROVEMENTS

Local Street Preventative Maintenance 325,361 1,674,639 2,000,0002.

- 2 -PY = Funding approved in Multiple Prior Fiscal Years

CDBG * AREAFEES

CAPITAL OUTLAY

GASTAX

MEASUREM2

OTHERTOTALPROJECTS

CITY OF SANTA ANASEVEN-YEAR CAPITAL IMPROVEMENT PROGRAM

FY 14/15 to FY 20/21

SEWERWATERCAPITAL

05/28/14

A & D FUNDS

TAX INC.

Residential Street Repair Program 1,053,4433. 1,053,443

Subtotal FY 18/19 Neighborhood Streets: 325,361 1,674,639 3,053,4431,053,443

FY 19/20 NEIGHBORHOOD STREET IMPROVEMENTS

Local Street Preventative Maintenance 325,361 1,674,639 2,000,0002.

Residential Street Repair Program 1,053,4433. 1,053,443

Subtotal FY 19/20 Neighborhood Streets: 325,361 1,674,639 3,053,4431,053,443

FY 20/21 NEIGHBORHOOD STREET IMPROVEMENTS

Local Street Preventative Maintenance 325,361 1,674,639 2,000,0002.

Residential Street Repair Program 1,053,4433. 1,053,443

Subtotal FY 20/21 Neighborhood Streets: 325,361 1,674,639 3,053,4431,053,443

FY 14/15 ALLEYS

Alley Improvement Program 100,000 100,0004.

Subtotal FY 14/15 Alleys: 100,000 100,000

FY 15/16 ALLEYS

Alley Improvement Program 150,000 150,0004.

Subtotal FY 15/16 Alleys: 150,000 150,000

FY 16/17 ALLEYS

Alley Improvement Program 137,933 137,9334.

Subtotal FY 16/17 Alleys: 137,933 137,933

FY 17/18 ALLEYS

Alley Improvement Program 161,632 161,6324.

- 3 -PY = Funding approved in Multiple Prior Fiscal Years

CDBG * AREAFEES

CAPITAL OUTLAY

GASTAX

MEASUREM2

OTHERTOTALPROJECTS

CITY OF SANTA ANASEVEN-YEAR CAPITAL IMPROVEMENT PROGRAM

FY 14/15 to FY 20/21

SEWERWATERCAPITAL

05/28/14

A & D FUNDS

TAX INC.

Subtotal FY 17/18 Alleys: 161,632 161,632

FY 18/19 ALLEYS

Alley Improvement Program 159,028 159,0284.

Subtotal FY 18/19 Alleys: 159,028 159,028

FY 19/20 ALLEYS

Alley Improvement Program 156,445 156,4454.

Subtotal FY 19/20 Alleys: 156,445 156,445

FY 20/21 ALLEYS

Alley Improvement Program 150,000 150,0004.

Subtotal FY 20/21 Alleys: 150,000 150,000

TOTAL NEIGHBORHOOD IMPROVEMENTS: 4,967,739 11,895,206 3,230,601 27,467,6477,374,101

II. ARTERIAL IMPROVEMENTS

FY 14/15 ARTERIAL WIDENING

Bristol Street Widening: Phase IIIA - Civic Center to Washington

330,126 330,126(3)5.

6,656,000 6,656,000(4)

6,134,500 6,134,500(5)

Bristol Street Widening: Phase IIIB - Washington to Seventeenth

2,616,432 2,616,432(4)6.

Bristol Street Widening: Phase IV - Warner to St. Andrew

3,909,382 3,909,382(3)7.

9,468,000 9,468,000(4)

- 4 -PY = Funding approved in Multiple Prior Fiscal Years

CDBG * AREAFEES

CAPITAL OUTLAY

GASTAX

MEASUREM2

OTHERTOTALPROJECTS

CITY OF SANTA ANASEVEN-YEAR CAPITAL IMPROVEMENT PROGRAM

FY 14/15 to FY 20/21

SEWERWATERCAPITAL

05/28/14

A & D FUNDS

TAX INC.

Fairview Avenue Bridge over Santa Ana River 71,604 71,6048.

552,670 552,670(6)

Project Development 100,000 100,0009.

Right-of-Way Management 100,000 100,00010.

Santa Ana Bridge Maintenance Inventory 3,240 3,24011.

25,000 25,000(6)

Subtotal FY 14/15 Arterial Widening: 71,604 203,240 29,692,110 29,966,954

FY 15/16 ARTERIAL WIDENING

Project Development 100,000 100,0009.

Right-of-Way Management 100,000 100,00010.

Subtotal FY 15/16 Arterial Widening: 200,000 200,000

FY 16/17 ARTERIAL WIDENING

Project Development 100,000 100,0009.

Right-of-Way Management 100,000 100,00010.

Subtotal FY 16/17 Arterial Widening: 200,000 200,000

FY 17/18 ARTERIAL WIDENING

Project Development 100,000 100,0009.

Right-of-Way Management 100,000 100,00010.

Subtotal FY 17/18 Arterial Widening: 200,000 200,000

FY 18/19 ARTERIAL WIDENING

Project Development 100,000 100,0009.

Right-of-Way Management 100,000 100,00010.

- 5 -PY = Funding approved in Multiple Prior Fiscal Years

CDBG * AREAFEES

CAPITAL OUTLAY

GASTAX

MEASUREM2

OTHERTOTALPROJECTS

CITY OF SANTA ANASEVEN-YEAR CAPITAL IMPROVEMENT PROGRAM

FY 14/15 to FY 20/21

SEWERWATERCAPITAL

05/28/14

A & D FUNDS

TAX INC.

Subtotal FY 18/19 Arterial Widening: 200,000 200,000

FY 19/20 ARTERIAL WIDENING

Project Development 100,000 100,0009.

Right-of-Way Management 100,000 100,00010.

Subtotal FY 19/20 Arterial Widening: 200,000 200,000

FY 20/21 ARTERIAL WIDENING

Project Development 100,000 100,0009.

Right-of-Way Management 100,000 100,00010.

Subtotal FY 20/21 Arterial Widening: 200,000 200,000

FY 14/15 STREET RECONSTRUCTION/RESURFACING

Arterial Street Preventative Maintenance 1,400,000 1,400,00012.

Pavement Management 200,000 200,00013.

Westminster Avenue Rehabilitation: Harbor to Clinton

174,969 174,96914.

Subtotal FY 14/15 Reconstruction/Resurfacing: 1,774,969 1,774,969

FY 15/16 STREET RECONSTRUCTION/RESURFACING

Arterial Street Preventative Maintenance 1,400,000 1,400,00012.

Bristol Street Rehabiliation: 17th to 19th 158,000 158,000

Bristol Street Rehabilitation: 19th to Santa Clara

35,933 328,067 364,000

Pavement Management 200,000 200,00013.

Subtotal FY 15/16 Reconstruction/Resurfacing: 35,933 2,086,067 2,122,000

- 6 -PY = Funding approved in Multiple Prior Fiscal Years

CDBG * AREAFEES

CAPITAL OUTLAY

GASTAX

MEASUREM2

OTHERTOTALPROJECTS

CITY OF SANTA ANASEVEN-YEAR CAPITAL IMPROVEMENT PROGRAM

FY 14/15 to FY 20/21

SEWERWATERCAPITAL

05/28/14

A & D FUNDS

TAX INC.

FY 16/17 STREET RECONSTRUCTION/RESURFACING

Arterial Street Preventative Maintenance 1,400,000 1,400,00012.

Euclid Street Rehabilitation: Fifth to Hazard 44,000 44,000

Euclid Street Rehabilitation: First to Fifth 103,021 382,979 486,000

Pavement Management 200,000 200,00013.

Raitt Street Rehabilitation: First to Santa Ana 421,000 421,000

Subtotal FY 16/17 Reconstruction/Resurfacing: 103,021 2,447,979 2,551,000

FY 17/18 STREET RECONSTRUCTION/RESURFACING

Alton Avenue Rehabilitation: Main to Standard 77,000 77,000

Arterial Street Preventative Maintenance 1,400,000 1,400,00012.

Euclid Street Rehabilitation: Fifth to Hazard 550,000 550,000

Euclid Street Rehabilitation: McFadden to First 79,322 446,678 526,000

Pavement Management 200,000 200,00013.

Subtotal FY 17/18 Reconstruction/Resurfacing: 79,322 2,673,678 2,753,000

FY 18/19 STREET RECONSTRUCTION/RESURFACING

Alton Avenue Rehabilitation: Main to Standard 81,926 881,074 963,000

Arterial Street Preventative Maintenance 1,400,000 1,400,00012.

Euclid Street Rehabilitation: Hazard to Westminster

74,000 74,000

Euclid Street Rehabilitation: McFadden to First 292,000 292,000

Fairview Street Rehabilitation: South City Limit to MacArthur

41,000 41,000

Pavement Management 200,000 200,00013.

- 7 -PY = Funding approved in Multiple Prior Fiscal Years

CDBG * AREAFEES

CAPITAL OUTLAY

GASTAX

MEASUREM2

OTHERTOTALPROJECTS

CITY OF SANTA ANASEVEN-YEAR CAPITAL IMPROVEMENT PROGRAM

FY 14/15 to FY 20/21

SEWERWATERCAPITAL

05/28/14

A & D FUNDS

TAX INC.

Subtotal FY 18/19 Reconstruction/Resurfacing: 81,926 2,888,074 2,970,000

FY 19/20 STREET RECONSTRUCTION/RESURFACING

Arterial Street Preventative Maintenance 1,400,000 1,400,00012.

Euclid Street Rehabilitation: Hazard to Westminster

919,000 919,000

Fairview Street Rehabilitation: Alton to Segerstrom

11,509 35,491 47,000

Fairview Street Rehabilitation: MacArthur to Alton

36,000 36,000

Fairview Street Rehabilitation: South City Limit to MacArthur

510,000 510,000

First Street Rehabilitation: Newhope to Harbor 73,000 73,000

Pavement Management 200,000 200,00013.

Subtotal FY 19/20 Reconstruction/Resurfacing: 84,509 3,100,491 3,185,000

FY 20/21 STREET RECONSTRUCTION/RESURFACING

Arterial Street Preventative Maintenance 1,400,000 1,400,00012.

Fairview Street Rehabilitation: Alton to Segerstrom

90,954 491,046 582,000

Fairview Street Rehabilitation: MacArthur to Alton

450,000 450,000

First Street Rehabilitation: Newhope to Harbor 758,580 758,580

Pavement Management 200,000 200,00013.

Subtotal FY 20/21 Reconstruction/Resurfacing: 90,954 3,299,626 3,390,580

TOTAL ARTERIAL IMPROVEMENTS: 547,269 19,674,124 29,692,110 49,913,503

- 8 -PY = Funding approved in Multiple Prior Fiscal Years

CDBG * AREAFEES

CAPITAL OUTLAY

GASTAX

MEASUREM2

OTHERTOTALPROJECTS

CITY OF SANTA ANASEVEN-YEAR CAPITAL IMPROVEMENT PROGRAM

FY 14/15 to FY 20/21

SEWERWATERCAPITAL

05/28/14

A & D FUNDS

TAX INC.

III. TRAFFIC IMPROVEMENTS

FY 14/15 TRAFFIC IMPROVEMENTS

17th Street at English Street - Traffic Signal Modification

27,700 27,70015.

247,300 247,300(7)

Bike Lanes - Newhope, Civic Center and Grand 248,886 248,886(8)16.

Bristol Street Corridor Traffic Synchronization 10,000 10,00017.

Count Down Pedestrian Heads - Citywide 989,700 989,700(7)18.

Crosswalk Upgrades - Various Locations 21,600 21,60019.

194,400 194,400(7)

Edinger Avenue at Sullivan Street - Traffic Signal Modification

25,100 25,10020.

224,500 224,500(7)

Fixed Guideway 194,000 194,00021.

Harbor Boulevard Corridor Traffic Signal Synchronization

150,000 150,00022.

260,680 260,680(10)

1,852,080 1,852,080(9)

MacArthur Boulevard at Plaza Drive - Traffic Signal Modification

27,600 27,60023.

246,600 246,600(7)

Signage Upgrade - Citywide 33,100 33,10024.

296,900 296,900(7)

Traffic Management Plans 30,000 30,00025.

- 9 -PY = Funding approved in Multiple Prior Fiscal Years

CDBG * AREAFEES

CAPITAL OUTLAY

GASTAX

MEASUREM2

OTHERTOTALPROJECTS

CITY OF SANTA ANASEVEN-YEAR CAPITAL IMPROVEMENT PROGRAM

FY 14/15 to FY 20/21

SEWERWATERCAPITAL

05/28/14

A & D FUNDS

TAX INC.

Traffic Safety Project Development 100,000 100,00026.

Traffic Signal Equipment Replacement 100,000 100,00027.

Westminster Avenue at Clinton Street - Traffic Signal Modification

33,100 33,10028.

296,700 296,700(7)

Subtotal FY 14/15 Traffic Improvements: 194,000 558,200 4,857,746 5,609,946

FY 15/16 TRAFFIC IMPROVEMENTS

17th St Corridor Traffic Signal Synchronization 160,000 160,000

800,000 800,000(9)

Traffic Management Plans 50,000 50,00025.

Traffic Safety Project Development 100,000 100,00026.

Traffic Signal Equipment Replacement 100,000 100,00027.

Traffic Signal Modification - Citywide 300,000 300,000

Subtotal FY 15/16 Traffic Improvements: 710,000 800,000 1,510,000

FY 16/17 TRAFFIC IMPROVEMENTS

Traffic Management Plans 50,000 50,00025.

Traffic Safety Project Development 100,000 100,00026.

Traffic Signal Equipment Replacement 100,000 100,00027.

Traffic Signal Modification - Citywide 350,000 350,000

Subtotal FY 16/17 Traffic Improvements: 600,000 600,000

FY 17/18 TRAFFIC IMPROVEMENTS

Traffic Management Plans 50,000 50,00025.

- 10 -PY = Funding approved in Multiple Prior Fiscal Years

CDBG * AREAFEES

CAPITAL OUTLAY

GASTAX

MEASUREM2

OTHERTOTALPROJECTS

CITY OF SANTA ANASEVEN-YEAR CAPITAL IMPROVEMENT PROGRAM

FY 14/15 to FY 20/21

SEWERWATERCAPITAL

05/28/14

A & D FUNDS

TAX INC.

Traffic Safety Project Development 100,000 100,00026.

Traffic Signal Equipment Replacement 100,000 100,00027.

Traffic Signal Modification - Citywide 350,000 350,000

Subtotal FY 17/18 Traffic Improvements: 600,000 600,000

FY 18/19 TRAFFIC IMPROVEMENTS

Traffic Management Plans 50,000 50,00025.

Traffic Safety Project Development 100,000 100,00026.

Traffic Signal Equipment Replacement 100,000 100,00027.

Traffic Signal Modification - Citywide 350,000 350,000

Subtotal FY 18/19 Traffic Improvements: 600,000 600,000

FY 19/20 TRAFFIC IMPROVEMENTS

Traffic Management Plans 50,000 50,00025.

Traffic Safety Project Development 100,000 100,00026.

Traffic Signal Equipment Replacement 100,000 100,00027.

Traffic Signal Modification - Citywide 350,000 350,000

Subtotal FY 19/20 Traffic Improvements: 600,000 600,000

FY 20/21 TRAFFIC IMPROVEMENTS

Traffic Management Plans 50,000 50,00025.

Traffic Safety Project Development 100,000 100,00026.

Traffic Signal Equipment Replacement 100,000 100,00027.

Traffic Signal Modification - Citywide 350,000 350,000

- 11 -PY = Funding approved in Multiple Prior Fiscal Years

CDBG * AREAFEES

CAPITAL OUTLAY

GASTAX

MEASUREM2

OTHERTOTALPROJECTS

CITY OF SANTA ANASEVEN-YEAR CAPITAL IMPROVEMENT PROGRAM

FY 14/15 to FY 20/21

SEWERWATERCAPITAL

05/28/14

A & D FUNDS

TAX INC.

Subtotal FY 20/21 Traffic Improvements: 600,000 600,000

TOTAL TRAFFIC IMPROVEMENTS: 194,000 4,268,200 5,657,746 10,119,946

IV. INFRASTRUCTURE IMPROVEMENTS

FY 14/15 SEWER

Segerstrom Sewer Lift Station Reconstruction 500,000500,00029.

Sewer Main Repairs and Replacements 1,100,0001,100,00030.

Subtotal FY 14/15 Sewer: 1,600,0001,600,000

FY 15/16 SEWER

Sewer Main Repairs and Replacements 500,000500,00030.

Subtotal FY 15/16 Sewer: 500,000500,000

FY 16/17 SEWER

Sewer Main Repairs and Replacements 500,000500,00030.

Subtotal FY 16/17 Sewer: 500,000500,000

FY 17/18 SEWER

Sewer Main Repairs and Replacements 500,000500,00030.

Subtotal FY 17/18 Sewer: 500,000500,000

FY 18/19 SEWER

Sewer Main Repairs and Replacements 500,000500,00030.

Subtotal FY 18/19 Sewer: 500,000500,000

FY 19/20 SEWER

Sewer Main Repairs and Replacements 500,000500,00030.

- 12 -PY = Funding approved in Multiple Prior Fiscal Years

CDBG * AREAFEES

CAPITAL OUTLAY

GASTAX

MEASUREM2

OTHERTOTALPROJECTS

CITY OF SANTA ANASEVEN-YEAR CAPITAL IMPROVEMENT PROGRAM

FY 14/15 to FY 20/21

SEWERWATERCAPITAL

05/28/14

A & D FUNDS

TAX INC.

Subtotal FY 19/20 Sewer: 500,000500,000

FY 20/21 SEWER

Sewer Main Repairs and Replacements 500,000500,00030.

Subtotal FY 20/21 Sewer: 500,000500,000

FY 14/15 WATER

Walnut Pump Station 500,000500,00031.

Water Main Replacements 2,250,0002,250,00032.

Well No. 32 - Rehabilitation 250,000250,00033.

Subtotal FY 14/15 Water: 3,000,0003,000,000

FY 15/16 WATER

Water Main Replacements 4,000,0004,000,00032.

Well No. 32 - Rehabilitation 3,000,0003,000,00033.

Subtotal FY 15/16 Water: 7,000,0007,000,000

FY 16/17 WATER

Water Main Replacements 4,500,0004,500,00032.

Subtotal FY 16/17 Water: 4,500,0004,500,000

FY 17/18 WATER

Water Main Replacements 4,500,0004,500,00032.

Subtotal FY 17/18 Water: 4,500,0004,500,000

FY 18/19 WATER

Water Main Replacements 5,000,0005,000,00032.

- 13 -PY = Funding approved in Multiple Prior Fiscal Years

CDBG * AREAFEES

CAPITAL OUTLAY

GASTAX

MEASUREM2

OTHERTOTALPROJECTS

CITY OF SANTA ANASEVEN-YEAR CAPITAL IMPROVEMENT PROGRAM

FY 14/15 to FY 20/21

SEWERWATERCAPITAL

05/28/14

A & D FUNDS

TAX INC.

Subtotal FY 18/19 Water: 5,000,0005,000,000

FY 19/20 WATER

Water Main Replacements 5,000,0005,000,00032.

Subtotal FY 19/20 Water: 5,000,0005,000,000

FY 20/21 WATER

Water Main Replacements 5,000,0005,000,00032.

Subtotal FY 20/21 Water: 5,000,0005,000,000

TOTAL INFRASTRUCTURE IMPROVEMENTS: 38,600,00034,000,000 4,600,000

V. CITY FACILITY IMPROVEMENTS

FY 14/15 STORM DRAIN/WATER QUALITY

Arterial Catch Basin Connector Pipe Screen (CPS) Installation

200,000 200,000(11)34. (PY)

55,200 55,200(12)(PY)

First Street Undercrossing Storm Drain Lift Station

100,000 100,000(12)35.

Subtotal FY 14/15 Storm Drain/Water Quality: 355,200 355,200

FY 15/16 STORM DRAIN/WATER QUALITY

First Street Undercrossing Storm Drain Lift Station

1,250,000 1,250,000(12)35.

Subtotal FY 15/16 Storm Drain/Water Quality: 1,250,000 1,250,000

TOTAL CITY FACILITY IMPROVEMENTS: 1,605,200 1,605,200

- 14 -PY = Funding approved in Multiple Prior Fiscal Years

CDBG * AREAFEES

CAPITAL OUTLAY

GASTAX

MEASUREM2

OTHERTOTALPROJECTS

CITY OF SANTA ANASEVEN-YEAR CAPITAL IMPROVEMENT PROGRAM

FY 14/15 to FY 20/21

SEWERWATERCAPITAL

05/28/14

A & D FUNDS

TAX INC.

VI. BIKEWAY/PARK IMPROVEMENTS

FY 14/15 PARK IMPROVEMENTS/RENOVATION

Bike Lane Project Development 50,000 50,00036.

Memorial Park Exercise Area 45,000 45,000(13)37.

Memory Lane & Santa Ana River Park Site 714,450 714,450(14)38.

Pacific Electric Park 1,066,91839. 1,066,918

Subtotal FY 14/15 Park Facility Improvements: 50,000 759,450 1,876,3681,066,918

FY 15/16 PARK IMPROVEMENTS/RENOVATION

Bike Lane Project Development 50,000 50,00036.

Subtotal FY 15/16 Park Facility Improvements: 50,000 50,000

FY 16/17 PARK IMPROVEMENTS/RENOVATION

Bike Lane Project Development 50,000 50,00036.

Subtotal FY 16/17 Park Facility Improvements: 50,000 50,000

FY 17/18 PARK IMPROVEMENTS/RENOVATION

Bike Lane Project Development 50,000 50,00036.

Subtotal FY 17/18 Park Facility Improvements: 50,000 50,000

FY 18/19 PARK IMPROVEMENTS/RENOVATION

Bike Lane Project Development 50,000 50,00036.

Subtotal FY 18/19 Park Facility Improvements: 50,000 50,000

FY 19/20 PARK IMPROVEMENTS/RENOVATION

Bike Lane Project Development 50,000 50,00036.

Subtotal FY 19/20 Park Facility Improvements: 50,000 50,000

- 15 -PY = Funding approved in Multiple Prior Fiscal Years

CDBG * AREAFEES

CAPITAL OUTLAY

GASTAX

MEASUREM2

OTHERTOTALPROJECTS

CITY OF SANTA ANASEVEN-YEAR CAPITAL IMPROVEMENT PROGRAM

FY 14/15 to FY 20/21

SEWERWATERCAPITAL

05/28/14

A & D FUNDS

TAX INC.

FY 20/21 PARK IMPROVEMENTS/RENOVATION

Bike Lane Project Development 50,000 50,00036.

Subtotal FY 20/21 Park Facility Improvements: 50,000 50,000

TOTAL BIKEWAY/PARK IMPROVEMENTS: 350,000 759,450 2,176,3681,066,918

GRAND TOTAL SEVEN-YEAR CIP PROJECTS: 8,441,019 5,709,008 36,187,530 40,945,107 129,882,6644,600,00034,000,000 000 0

- 16 -PY = Funding approved in Multiple Prior Fiscal Years

"OTHER" FUNDING SOURCES:

05/28/14CITY OF SANTA ANASEVEN-YEAR CAPITAL IMPROVEMENT PROGRAM

FY 14/15 - FY 20/21

(1) Local Street Bond Fund

(2) Local Street Bond Fund (PY)

(3) Federal Demonstration Funds (FED DEMO)

(4) Measure M2 Arterial Capacity Enhancements (ACE)

(5) Orange County Transportation Authority Gas Tax Allocation

(6) Highway Bridge Rehabilitation & Replacement Program (HBRR)

(7) Highway Safety Improvement Program (HSIP)

(8) Bicycle Corridor Improvement Program (BCIP)

(9) Measure M2 Transportation Signal Synchronization Program (TSSP)

(10) Matching Funds From Participating Agencies§

(11) Measure M2 - Environmental Cleanup Program (ECP)

(12) Federal Clean Water Enterprise (FCWE)

(13) Donation by America On Track

(14) Housing Related Parks Program (HRPP)

- 17 -

§ Funding from Participating Agencies (Garden Grove, Fountain Valley and Costa Mesa)

SEVEN-YEAR CAPITAL IMPROVEMENT PROGRAM UNFUNDED PROJECTS  

  FY 14/15  FY 15/16  FY 16/17  FY 17/18  FY 18/19  FY 19/20  FY 20/21  Total  I. NEIGHBORHOOD IMPROVEMENTS

 Reconstruction/Resurfacing

 Backlog: Alleys    $20,000,000 $20,000,000 

Backlog: Local Streets (Non‐Residential)    $22,400,000 $22,400,000 

Backlog: Local Streets (Residential AC)    $3,500,000 $3,500,000 

Backlog: Local Streets (Residential PCC)    $43,100,000 $43,100,000 

Total:    $89,000,000 $89,000,000 

 II. ARTERIAL IMPROVEMENTS

 Arterial Widening

 

 

 Warner Avenue Widening ‐ Main to Oak    $11,700,000 $3,915,000 $15,615,000 

Bristol Street Widening: 17th to Santiago Creek    $33,158,000 $8,956,000 $42,114,000 

Santa Ana Boulevard Grade Separation    $72,115,000  $72,115,000 

Grand Avenue Widening: Fourth to Seventeenth    $28,000,000 $8,800,000 $36,800,000 

Grand Avenue Grade Separation    $12,330,000 $64,430,000 $76,760,000 

Total:    $11,700,000 $65,073,000 $72,115,000  $17,756,000 $12,330,000 $64,430,000 $243,404,000 

 Reconstruction/Resurfacing

 

 Backlog: Arterial Streets    $35,200,000 $35,200,000 

Total:    $35,200,000 $35,200,000 

 III. TRAFFIC IMPROVEMENTS

 Traffic Improvements

 

 

 

 

 

 

 

    

Maintenance for Railroad Grade Crossing Safety Enhancement 

$37,000 $38,000 $40,000 $42,000  $43,000 $45,000 $47,000 $292,000 

Bike and Pedestrian Educational Campaign    $300,000 $300,000 

Bike Lanes Various Locations    $600,000 $600,000 $600,000  $1,800,000 

Complete Street Corridors    $1,200,000 $1,200,000 

Traffic Signals Improvements    $2,000,000 $2,000,000  $2,000,000 $6,000,000 

  FY 14/15  FY 15/16  FY 16/17  FY 17/18  FY 18/19  FY 19/20  FY 20/21  Total  

Fixed Guideway    $257,000,000  $257,000,000 

Total:  $37,000 $2,138,000 $2,640,000 $259,642,000  $2,043,000 $45,000 $47,000 $266,592,000 

 IV. INFRASTRUCTURE IMPROVEMENTS

 Sewer

 Columbine Street Sewer Main Improvements  $900,000 $900,000 

Maxine Sewer Lift Station  $2,500,000 $2,500,000 

Warner Avenue Sewer Main Improvements  $1,000,000 $1,000,000 

Total:  $4,400,000 $4,400,000 

 Storm Drain/Water Quality

 Citywide Storm Drain Improvements     $80,000,000 $80,000,000 

Total:    $80,000,000 $80,000,000 

  Water

 Automated Meter Infrastructure (AMI)  $14,000,000              $14,000,000 

Centennial Park Neighborhood Water Main Improvements 

$2,500,000              $2,500,000 

Well #32‐ Rehabilitation  $4,500,000                    $4,500,000 

Total:  $21,000,000              $21,000,000 

  

Grand Total:  $25,437,000 $13,838,000 $67,713,000 $331,757,000  $19,799,000 $12,375,000 $268,677,000 $739,596,000