City of San Mateo
Flood Control Efforts & Needs
Preliminary FIRM (2008)
Completed Capital Projects ($22.7M)
• SM Creek South Levee Wall – ($1.2M) Completed 2001
• Raising of Norfolk Bridge – ($1.9M) Completed 2002
• Caltrans Culvert – US101/3rd Ave– ($10M) Completed 2004
• SM Creek North Levee Wall – ($730k) Completed 2005
• O’Neill Slough Tide Gate & Levee – ($1.5M) Completed 2007
• South Bayfront Levee Project– ($7.4M) Completed 2011
South Levee Project Creek Floodwall and Railing
Seal Slough hydro-seeding/erosion control
Resultant FIRM (2012)
Remaining Capital Projects ($22.35M)
Raise North Levee at Coyote Point Beach ($7.35M)
Rehabilitate Pump Stations at
Poplar Avenue($7.5M)
Coyote Point($7.5M)
If areas were re-mapped to reflect rising sea level…..
City of San Mateo
Flood Control Efforts & Needs