City of Baltimore Sanitary Sewer Overflow

Consent Decree

Civil Action No. JFM-02-1524

Calendar Quarterly Report No. 41 For Calendar Quarter ending December 31, 2012

Submitted: January 30, 2013

Submitted To: United States Environmental Protection Agency

United States Department of Justice Maryland Department of the Environment

Prepared By: City of Baltimore

Department of Public Works, Bureau of Water and Wastewater

Civil Action No. JFM-02-1524 1 Calendar Quarterly Report No. 41 For Calendar Quarter Ending December 31, 2012

Table of Contents

Section

Page

A. INTRODUCTION

2

B. PROGRESS OF IMPLEMENTATION OF SECTION VI REQUIREMENTS

3

Paragraph 8: Elimination of Sanitary Sewer Overflow and Combined Sewer Overflow Discharges

3

Paragraph 9: Collection System Evaluation and Sewershed Plans

6

Paragraph 10: Illegal Sewer Connections

10

Paragraph 11: Pumping Station Inspection, Rehabilitation, and Repair

12

Paragraph 12: Collection and Transmission System Model

13

Paragraph 13: Collection System Operation and Maintenance

14

Paragraph 14: Information Management System Program

15

Paragraph 15: Valve Inspection and Repair Program

15

Paragraph 16: Emergency Response Plan – Un-permitted Discharges

16

Paragraph 17: Reporting of Discharge Events and Recordkeeping

16

C. DESCRIPTION OF ANTICIPATED PROBLEMS WITH SECTION VI REQUIREMENTS

17

D. DESCRIPTION OF SEP ACTIVITIES

17

E. ADDITIONAL MATTERS FOR THE ATTENTION OF THE EPA AND MDE

18

Appendix 1 – Status of Paragraph 8 Construction Projects

Appendix 2 – Status of Paragraph 9 Construction Projects Appendix 3 – List of Illegal Connections

Appendix 4 – Pumping Station Work Orders Appendix 5 – Summary of Reported Overflows

Civil Action No. JFM-02-1524 2 Calendar Quarterly Report No. 41 For Calendar Quarter Ending December 31, 2012

A. INTRODUCTION This Calendar Quarterly Report is submitted pursuant to the requirements of a Consent Decree entered on September 30, 2002 in the United States District Court for the District of Maryland as part of the response to Civil Action No. JFM-02-1524. This Calendar Quarterly Report is intended to provide an update on the progress of remedial measures required by the Consent Decree and the status of various programs to be implemented. The requirements for the Calendar Quarterly Report are specified in Paragraph 18 of the Consent Decree, which reads as follows:

“Beginning with the first full calendar quarter after the Date of Entry of the Consent Decree, Baltimore shall submit to EPA and MDE within thirty (30) days after the end of each calendar quarter until termination of this Consent Decree a Calendar Quarterly Progress Report (“Calendar Quarterly Report”) covering the subject of this Consent Decree. This Calendar Quarterly Report shall contain the following:

i. Progress reports on the implementation of the requirements of Section VII (Remedial Measures) as described in Paragraphs 8 through 15;

ii. A description of any problems anticipated with respect to meeting the

requirements of Section VII (Remedial Measures) of this Consent Decree; and

iii. A description of all environmentally beneficial projects and SEP implementation activity in accordance with Paragraphs 29-33 of the Consent Decree; and

iv. Any such additional matters as Baltimore believes should be brought to the

attention of EPA and MDE.” It was noted that Paragraph 18 contained a typographical error. The Remedial Measures described in Paragraphs 8 through 15 comprise Section VI of the Consent Decree, and not Section VII. Accordingly, this Calendar Quarterly Report refers to Paragraphs 8 through 17 of the Consent Decree as Section VI.

Civil Action No. JFM-02-1524 3 Calendar Quarterly Report No. 41 For Calendar Quarter Ending December 31, 2012

B. PROGRESS OF IMPLEMENTATION OF SECTION VI REQUIREMENTS

For reference purposes, this Section B is organized so that the item numbers correspond directly to Paragraphs and subparagraphs in the Consent Decree. Paragraph 8: Elimination of Sanitary Sewer Overflow and Combined Sewer Overflow Discharges

A. General Requirements: During the calendar quarter ending December 31, 2012, the City of Baltimore was in general compliance with the Clean Water Act and Title 9, Subtitle 3 of the Environment Article, Annotated Code of Maryland. Episodes of non-compliance include un-permitted sanitary sewer overflows (SSOs), as reported during the quarter in accordance with Paragraph 17 of the Consent Decree and as summarized in Appendix 5 herein.

B. Construction Projects: Appendix 1 to this Calendar Quarterly Report provides a

status update for each of the construction projects listed in Appendix D of the Consent Decree.

1. Practical Completion

As design and construction progress, concerns and issues have arisen that may impact the schedule for some of the Paragraph 8 projects, are as follows: Project No. 8: Stony Run Interceptor and Pumping Station: Due to significant public opposition to the proposed pumping station site in Wyman Park, additional pumping station locations were investigated. A new location at the Department of Public Works Solid Waste Site, near the intersection of Sisson Street and 29th Street had been selected and approved by MDE and EPA. To expedite the project, this project was split into 3 phases: • SC 819 (Phase 1) is an upper portion of Stony Run interceptor and consists of rehabilitation, and partial replacement of pipelines and manholes located north of Wyndhurst Avenue. Practical completion of this project was complete as of October 14, 2006. • SC 838 (Phase 2) is the middle portion of Stony Run interceptor and consists of rehabilitation and partial replacement of pipelines located between Cold Spring Lane and Wyndhurst Avenue. Practical completion of this project was complete as of March 21, 2007. • SC 839 and SC 847 (Phase 3) consist of 20 mgd pumping station, force main and gravity sewer. Due to delay in siting the pump station, the City has requested and MDE has approved a 6-month extension for the project advertisement and completion dates. Both SC 839 and SC 847 were advertised on June 16, 2006. For Contract SC 839, the city received only one bid 65% above the engineers estimate. The city rejected this bid and had determined that the compressed construction schedule of one year is the primary reason for the unusually high bid amount and lack of competitive bidding. The

Civil Action No. JFM-02-1524 4 Calendar Quarterly Report No. 41 For Calendar Quarter Ending December 31, 2012

City re-advertised Contract SC 839 on October 27, 2006 and, anticipated that based on bids received in December, contract negotiations will begin. The City sent a letter on October 13, 2006 requesting an additional extension of fourteen (14) months to account for the additional time required for construction due to the increased scope of work. For SC 847 the city had awarded this contract to a successful bidder and the current duration was one year, however the full functionality and operation of the pumping station will depend on the progress of SC 839. Therefore, the City has requested to move the practical completion date for SC 839 and SC 847 from December 31, 2007 to February 28, 2009. A response from MDE was received on February 26, 2007, granting the requested extension. The Practical Completion deadline for both of these projects is now February 28, 2009. The extension letter request for the extension of SC 847 to May 31, 2009 was granted by EPA on June 22, 2009 and MDE on April 15, 2010. Practical Completion was achieved on May 29, 2009, for lower portion of project SC 839RR –Stony Run Interceptor. Conditional acceptance for SC 839RR was achieved on July 21, 2011. 2. SSO Structure Elimination SSO No. 132 is located at the intersection of Springdale Avenue and Hilton Street. It was proposed to monitor this SSO structure for a twelve-month period ending September 18, 2004. During the calendar quarter ending September 30, 2005, activity was observed at this SSO structure on March 23, and March 28, 2005. The City of Baltimore eliminated SSO No. 33 & No. 34 on December 10, 2008 and December 23, respectively. The City of Baltimore eliminated SSO No. 136 on January 21, 2009. SSO No. 132 is located at intersection of Hilton Street & Springdale Ave SSO No. 134 is located near the intersection of Liberty Heights and Elamont Road. SSO No. 135 is located one block away from SSO No. 134, at the intersection of Liberty Heights and Dennlyn Road. SSO No. 137 is located near the intersection of Shannon Drive and Brehms Lane. SSO No. 138 is located at the intersection of Cold Spring Lane & Ayrdale Ave. SSO No. 139 is located at the intersection of W Garrison Ave and Queensberry Ave. The City has engaged the services of an engineering firm to investigate and evaluate the collection system adjacent to SSO Nos. 132, 134 and 135. The design to eliminate these SSOs is complete and the contract was advertised on February 10, 2012, bids were opened on April 4, 2012, contract awarded on September 26, 2012, and Notice to Proceed is scheduled for February 4, 2013. The City will continue to monitor and evaluate activity at these SSO structures and will continue to keep EPA and MDE advised of progress in future Calendar Quarterly Reports. Other than the concerns and issues noted here, all Paragraph 8 projects are complete. The milestone dates specified in Appendix D of the Consent Decree have all been met.

Civil Action No. JFM-02-1524 5 Calendar Quarterly Report No. 41 For Calendar Quarter Ending December 31, 2012

C. Separate Sanitary Sewer Characterization Report: This requirement has been completed.

D. Elimination of Combined Sewer Overflows:

Walbrook: This project has been completed. Forest Park: During the calendar quarter ending June 30, 2006, combined sewer overflow (CSO) No. 13P was eliminated and the City reported that the Combined Sewer System has been separated and all CSO structures have been eliminated in the Forest Park neighborhood. On October 11, 2006, the City sent a letter to MDE/EPA that included a report dated March 2006 entitled “Confirmatory Testing for Final Separation of Combined Sewer System in Forest Park Area”. The letter also documented the elimination dates for the CSO structures associated with this area, including 10P, 11P, 13P, 18P, 19P, 21P, and 31P. Lastly, the City requested that post-construction monitoring be waived for these CSO structures since the eliminations were performed. MDE responded to this letter on December 11, 2006, and approved the waiving of post monitoring for the CSO structures, with the exception of 13P. For this structure 13P, MDE noted that a site inspection was performed by MDE on October 19, 2006 that revealed the discharge of raw sewage. Therefore, MDE disapproved the waiving of the post-monitoring requirements at this location. On January 16, 2007, the City submitted a letter of response that included additional sampling results indicating that the high bacterial levels are due to stagnant pooling water at the outfall in lieu of a sewage discharge. It is therefore believed by the City that post-monitoring can be waived at overflow structure 13P. EPA requested that the City provide additional clarification regarding CSO 13P. Sampling was carried out on February 8, 2012 and a report and laboratory results were sent to EPA on March 21, 2012.

E. Flow and Rainfall Monitoring for Paragraph 8 Construction Projects:

As of December 31, 2012, 3 flow meters are installed as indicated in Table 8-1 specifically for Paragraph 8 Projects.

Table 8-1: Flow Monitor Installations for Paragraph 8 Projects

Consent Decree Project ID No.

ADS Project ID No. Project

No. of Meters

October November December

7 4 Lower Jones Falls Interceptor 1 1 1

8 5 Stony Run Interceptor & P.S. 1 1 1

10 7 Greenmount Interceptor 1 1 1

Total 3 3 3

Civil Action No. JFM-02-1524 6 Calendar Quarterly Report No. 41 For Calendar Quarter Ending December 31, 2012

A summary of rainfall and flow monitoring data collected during September, October, and November 2012, prepared by ADS Environmental Services is submitted on a compact disk in the inside of the back cover of this Calendar Quarterly Report. The ADS report includes: • Meter location maps • Meter site reports • Rain gauge location maps • Tabular flow monitoring data • Tabular rain gauge data • Depth and velocity scattergraph plots • Flow and rainfall data in Excel format

All flow meters are ADS Model 4000 flow monitors. Each meter was calibrated by manually measuring depth and velocity to confirm that the flow meters are functioning properly. Multiple measurements were obtained for each flow meter. These measurements are shown on the depth-velocity scattergraphs provided for the flow monitoring sites.

F. Progress Reports:

Progress of work under Paragraph 8 is as reported herein.

Paragraph 9: Collection System Evaluation and Sewershed Plans

A. The milestone dates for completion of the Sewershed Study and Plan for each of the City’s eight sewersheds, as established by Paragraph 9.B of the Consent Decree, recognize that evaluation work will not begin in earnest until several years after the Date of Entry.

Sewershed Study and Plan: The City submitted Jones Falls, the first of the sewershed plans to MDE/EPA and DOJ on December 26, 2008 with an approach plan for prioritizing the capital improvements recommended by the Jones Falls team and the other sewersheds. MDE/EPA submitted comments on the Jones Falls Report in a letter dated June 4, 2009. The City responded within 30 days. The Herring Run sewershed plan was submitted to MDE/EPA and DOJ on June 26, 2009. The Low Level sewershed plan was submitted to MDE/EPA and DOJ on December 22, 2009. The High Level sewershed plan was submitted to MDE/EPA and DOJ on December 21, 2009. The Patapsco, Dundalk, Outfall and Gwynns Falls sewershed plan were submitted to MDE, EPA and DOJ on June 15, 2010, June 18, 2010, June 25, 2010 and June 28, 2010, respectively. All eight (8) Sewershed Plans/Reports were submitted by the milestone dates established in the Consent Decree.

In the Planning phase the Sewershed teams have completed quality control and the quantities below are provided as final inspection quantities. • A total of 33,227 manholes were inspected during Paragraph 9 sewershed studies

Civil Action No. JFM-02-1524 7 Calendar Quarterly Report No. 41 For Calendar Quarter Ending December 31, 2012

• A total of 5,994,171 linear feet of sewers were CCTV inspected during Paragraph 9 sewershed studies (~ 94%).

Any remaining assets will be inspected during Paragraph 9 rehabilitation projects. B. The Sewershed Study and Plan Elements: The Plan Elements in the Consent

Decree are to be followed for each sewershed. C. Collection System Inspections: Please refer to Section A above for a summary of

final inspection quantities.

In accordance with Paragraph 8 and 9 of the Consent Decree, many collection system components have been replaced, rehabilitated, and slip-lined. The City submitted to the EPA/MDE, under Paragraph 9 D (vii), a request for wavier of the Paragraph 9.D inspection requirements for these system components. In a letter dated September 04, 2007, MDE approved the request to waive inspection of selected portions of the collection system.

D. Infiltration and Inflow (“I/I”) Evaluation: Flow monitoring began on May 09,

2006. As of December 31, 2012, the flow monitoring continues at 9 meter locations throughout the City, including a long term monitoring program.

E. Long-Term Capacity/Peak Flow Management: During the calendar quarter ending

December 31, 2012, there was no capacity/flow management analysis activity related to the Sewershed Studies and Plans.

F. Sewershed Study and Plan(s) Approval and Implementation:

Sewershed Study and Plan(s): All eight (8) Sewershed Plans/Reports have been submitted by the milestone dates established in the Consent Decree. Approval The plans have been submitted. The City provided a technical workshop on February 26, 2009, addressed comments sent on June 4, 2009 for Jones Falls and met with MDE and EPA on May 3, 2010 to provide further justification on the use of the 2-year 24 hr design storm. In addition to other items such as an affordability analysis, MDE and EPA also requested that the City consider levels of improvement that would minimize SSOs in sensitive areas. Based on EPA’s definition of “sensitive areas” received on June 28, 2010, the City evaluated an approach that includes the sewershed studies recommended improvements and accounts for higher levels of controls for minimizing SSOs in identified sensitive areas. The City received a letter from United States Environmental Protection Agency (EPA) dated February 10, 2011, stating that it has reviewed the Final Sewershed Plans for Jones Falls, Herring Run, and High Level. Based on its review has concluded that after the City implements the proposed improvements (2-year 24-hour design storm) a significant number of overflows will remain during greater storm events,

Civil Action No. JFM-02-1524 8 Calendar Quarterly Report No. 41 For Calendar Quarter Ending December 31, 2012

including 5-year and 10-year 24-hour storm events. Therefore, EPA cannot approve these sewershed plans as submitted because the recommended improvements fall short from the goal of the CD in ensuring that Baltimore’s sewage collection system does not cause or contribute to SSOs. EPA’s response provides minimal direction on how the City should proceed with revising the plans. Therefore the City met with EPA and MDE on June 02, 2011, to better understand their expectations. During this meeting, the City presented a revised approach utilizing 64 years of historic rainfall data for determining the appropriate level of protection to be utilized as the basis of design for system improvements to reduce the number of SSOs. Based upon this meeting, EPA and MDE requested further clarification of the proposed methodology. The City submitted a white paper outlining the Continuous Simulation Methodology on June 30, 2011. On July 8, 2011, representatives from EPA, MDE and the City participated in a conference call and the City answered EPA and MDE’s questions regarding the white paper and the continuous simulation methodology. The City sent a follow-up letter to EPA and MDE on July 22, 2011 which further addressed EPA and MDE’s questions. On August 29, 2011, EPA submitted additional comments and questions to the City and MDE. EPA and the City participated in a second conference call on August 31, 2011 during which the City responded to EPA’s questions. In a letter dated November 22, 2011, EPA requested that the City, simultaneously submit a proposed plan of improvements based on the continuous simulation approach in addition to a revised implementation plan based on a 10-year, 24 hour design storm by the end of 2011. The City submitted the requested information to EPA and MDE on December 30, 2011. The City received comments from EPA on the continuous simulation report on March 6, 2012 and responded in a letter dated March 22, 2012. EPA, MDE and the City met on March 8, 2012 to discuss on-going consent decree activities, the appropriate level of protection and modification to the compliance schedule. The EPA, MDE, and the City all agreed that starting with a baseline 5 year level of protection (LOP) to be augmented with greater protection in some areas is the right approach. It was that a series of technical workshops would be coordinated to develop the criteria to be used in selecting the appropriate LOP. The first of these technical workshops was held on March 26, 2012, with representatives of the City, EPA Region 3 and MDE with other technical workshops to follow. During the workshop, EPA and MDE had some questions on the hybrid approach. The City provided the necessary clarification in a letter dated April 13, 2012. On May 10th, 2012, via e-mail, the City received preliminary guidance from EPA Region 3 on behalf of both EPA and MDE on the proposed continuous simulation methodology to address SSOs as follows: “1. Baltimore will submit a continuous simulation study and plan for each sewershed in its collection system to EPA and MDE by December 2012. Baltimore shall evaluate and propose hydraulic and capacity related improvements necessary to achieve a 5-year and 10-year SSO Level of Protection (LOP). 2. The decision on how to comply with the CD will remain with Baltimore. Based on modeling provided to date, the Agencies will not accept anything

Civil Action No. JFM-02-1524 9 Calendar Quarterly Report No. 41 For Calendar Quarter Ending December 31, 2012

less than a 5-year LOP. However, where the calibrated modeling shows that there are remaining overflows, Baltimore will prioritize these overflows based on volume and develop a plan that will achieve a LOP necessary to meet CD requirements. This plan may include up to a 15-year LOP in some areas. These areas prioritized by volume will be addressed prior to the post construction monitoring phase.” EPA and MDE have indicated that they would be meeting in the near future to discuss the details associated with any proposed modifications to the consent decree and that a letter would be forthcoming once those details have been agreed to. The City submitted a letter dated, June 8th, 2012, to EPA and MDE acknowledging receipt of their e-mail on May 10. Further, the City requested a meeting to discuss the schedule, clarification regarding EPA’s intentions, and regular coordination moving forward. To date the City still awaits a response from EPA and MDE. By letter dated September 10, 2012, the U.S. Department of Justice provided a proposal to modify the CD, extending the compliance deadline and addressing other issues. On October 19, 2012, the EPA sent a letter to the City that included comments on the Integrated Planning Framework (IPF) presentation conducted by the City on September 24, 2012. On December 7, 2012, the City sent a letter to the Regulators regarding among other things the Sewershed Report Revisions and Integrated Planning. The City submitted the Sewershed Study and Plan Amendment n on December 31, 2012. Implementation The sewershed studies and the system-wide hydraulic model clearly demonstrate how the sewage flows generated in the County will impact the recommended improvements within the City. Unfortunately, the timing of the City’s and County’s Consent Decrees limits the ability to best represent the planned improvements in the County. More importantly, County flows could be significant and could render a number of the recommended hydraulic improvements ineffective in eliminating SSOs. Conversely, we understand that the County is planning to reduce wet-weather flows which could result in over-sized hydraulic improvement projects and excessive costs for our downstream facilities. Since an estimate of the reduction in wet-weather flows from the County is not available at this time, the City cannot model this benefit. Therefore, we believe that implementing hydraulic improvements in the sewersheds that are impacted by County flows would be premature, may not result in the most fiscally responsible approach for the City, and may not achieve the Consent Decree goal of eliminating SSO’s. The Final Sewershed Plans as submitted outlined how the City plans to implement all of the identified structural repairs and hydraulic improvement rehabilitation projects by January 1, 2016. However, the City believes this project scheduling ignores the inherent problem of lack of reliable Baltimore County hydraulic flow data crucial to five (5) of the City’s sewersheds. The remaining three (3) sewersheds have no or minimal impacts from County flow. In addition to flow impacts from the County, the February

Civil Action No. JFM-02-1524 10 Calendar Quarterly Report No. 41 For Calendar Quarter Ending December 31, 2012

10, 2011, letter does not provide clear guidance for the City to evaluate all projects previously identified in the final sewershed plans. However, the City recognizes its responsibility to comply with the Clean Water Act and the Consent Decree, thus, the City is in good faith proceeding with some O&M related projects. These projects include designing other structural defect and hydraulic projects that will improve management of the collection system such as, cleaning and CIPP lining, point repairs, manhole rehabilitation, etc. The City plans on advancing executable projects that are not impacted by the design storm selection while the City and MDE/EPA determine how best to address the misaligned Baltimore County Consent Decree data and the appropriate level of protection selection approach for Baltimore City. The City will monitor the collection system and calibrate the model, perform additional hydraulic simulations and assess the impact of County flows on the City’s collection system, and determine the effectiveness of the selected construction projects and the effectiveness of projects implemented by the County. Doing so will allow the City to design and implement hydraulic improvements that more precisely comply with the intent of the Consent Decree, which is the elimination of SSOs. Appendix 2 of this Calendar Quarterly Report provides a status update for each of the construction projects being carried out under Paragraph 9 of the Consent Decree. The City will continue to coordinate with MDE and EPA to address the aforementioned issues and will revise the sewershed planning recommendations accordingly.

G. Progress Reports: Progress of work under Paragraph 9 is as reported herein.

Paragraph 10: Illegal Sewer Connections

A. Illegal Private Connections: During the calendar quarter ending December 31, 2012, Baltimore further addressed the list of suspected illegal connections to the collection system known to the City. The City had previously initiated enforcement actions for 14 suspected illegal connections by notifying the respective property owners of the suspected illegal connections and actions to be taken, as required by Paragraph 10.A of the Consent Decree. In accordance with the City’s enforcement plan, staff of Housing and Community Development (HCD) inspected these 14 properties and determined that two were not illegal connections, ten required dye/smoke testing for confirmation, and two required further evaluation. The City performed dye testing and determined that only 5 are illegal connections. Furthermore, the City has identified and confirmed 33 additional properties within the Western Run Sewershed with potential illegal storm water connections to the sanitary system.

The City has further researched the 38 illegal connections documented in the past Quarterly Reports and has determined that the results of the testing performed to date cannot differentiate between an illegal connection or a privately-owned portion of a customer service connection lateral. Dye testing performed did prove that sources of inflow are connected to the sewer; however, it was not determined whether the connections were via direct connections to the sewer pipe or via the privately owned portion of the lateral. As such, the City should not have positively identified these as

Civil Action No. JFM-02-1524 11 Calendar Quarterly Report No. 41 For Calendar Quarter Ending December 31, 2012

illegal connections and requests approval to remove the 38 connections from the list in Appendix 3 until further investigation can be performed. In February 2010, the City completed its illegal connections investigations in the Jones Falls Sewershed, including the 38 potential connections in the Western Run Area previously provided in Appendix 3, plus an additional 25 as identified in the Jones Falls Collection System Sewershed Study and Plan, utilizing dye-testing, smoke testing along with CCTV inspections. Based upon these investigations out of the 63 previously suspected illegal connections, only two illegal connections were confirmed. These locations are, 6309 Greenspring Ave and 4424 Marble Hall Rd. 6309 Greenspring Ave: A letter was sent to the property owner on August 08, 2011 and a follow up letter was sent on January 5, 2012. The second letter was returned unclaimed. Dye testing confirmed the location is abated. 4424 Marble Hall Road: On August 11, 2008 while performing dye testing as part of their field investigations, the Herring Run Sewershed team identified an illegal sewer connection at 4424 Marble Hall Road. Once an illegal connection is identified, the approved Illegal Connection Enforcement and Implementation Plan will be adhered to. This illegal connection has been found to be located on private property. The City has contacted its Housing Department (HCD) to send the owner a notice to eliminate this illegal connection. Additional dye-testing was carried out in March 2011 to satisfy HCD requirements and a letter was sent to HCD on May 25, 2011, for further action. A Violation Notice was issued in July 2011. A meeting was held on July 28, 2011, with Marble Hall Apartment management to discuss the progress of eliminating the illegal connection. Per the management of the apartment complex, the connection was re-routed in August 2011. Follow up testing was carried out in September which indicated that the fix did not prevent storm water from getting into the sanitary sewers. The City attempted to coordinate with the property owner to fix the problem permanently but the property owner is not responsive. This location has been referred to the Code Enforcement Legal Section of HCD (ID 28567)

The City plans to perform supplemental investigation as part of the Paragraph 9 Sewershed Studies. Under these studies, each of these connections and any additional connections will be investigated and a distinction will be made between the two types of connections as noted herein.

B. Updated List of Illegal Connections: Appendix 3 contains the updated list of known

illegal connections.

C. Illegal Connection Enforcement and Implementation Plan: This requirement has been completed as reported in Quarterly Report No. 7.

D. In a letter dated May 05, 2003, MDE stated that they had reviewed the draft plan for

implementation and enforcement with regard to illegal connections and found it to be acceptable. As requested by MDE, the City is considering the merits of adding a provision to the Plan that would enable the City Department of Public Works to actually do disconnections themselves and bill people for the materials and labor as a last resort

Civil Action No. JFM-02-1524 12 Calendar Quarterly Report No. 41 For Calendar Quarter Ending December 31, 2012

if they have a situation where flows may cause a SSO and there is no cooperation from the property owner. To date, the need for this has not occurred. EPA in its letter dated January 12, 2005 has approved the Illegal Sewer Connection Detection and Enforcement Plan.

E. Progress of work under Paragraph 10 is as reported herein.

F. Privately-Owned Portion of a Customer Service Connection Lateral: During the calendar quarter ending December 31, 2012, no privately-owned portion of a customer service connection was identified as a source of I/I that causes or contributes to an overflow from the collection system. During this same quarter, no owners of such laterals were notified of the need to repair, rehabilitate, replace or terminate their laterals, and no enforcement actions in regard to such laterals were pending.

Paragraph 11: Pumping Station Inspection, Rehabilitation, and Repair

A. Pumping Station Rehabilitation and Repair: As reported in Quarterly report No. 8,

all pumping station rehabilitation projects are complete. B. Pumping Station Inspection Procedures: During the calendar quarter ending

December 31, 2012, Baltimore inspected each of the eight pumping stations at least twice daily in accordance with Paragraph 11.B. All inspections were conducted in accordance with the inspection checklist attached as Appendix F to the Consent Decree, and completed inspection checklists are being maintained. All deficiencies noted during inspections were corrected within eight hours, or a work order was issued for correction. A listing of these work orders is attached as Appendix 4 to this Calendar Quarterly Report.

As reported in Quarterly Report No. 8, the project to upgrade the SCADA system for remote monitoring of pumping stations is completed. As such, the City of Baltimore recognizes that once daily pumping station inspections will satisfy the requirements of the Consent Decree in accordance with Paragraph 11.B.i.

C. Pumping Station Remote Monitoring: As of December 31, 2012, Baltimore continuously monitored pumping station data in accordance with Paragraph 11.C. of the Consent Decree. Alarm data was electronically archived.

D. Pumping Station Equipment Inventory: As of December 31, 2012, all pumps,

motors, bar screens, sensors and other critical components of Baltimore’s pumping stations had been assigned unique equipment identification numbers. These numbers are recorded in the maintenance information management system (“MIMS”) operated by Baltimore’s Wastewater Facilities Division.

E. Pumping Station Preventative Maintenance: The MIMS system operated by

Baltimore’s Wastewater Facilities Division automatically generates work orders for preventive maintenance at Baltimore’s eight pumping stations, including standard

Civil Action No. JFM-02-1524 13 Calendar Quarterly Report No. 41 For Calendar Quarter Ending December 31, 2012

operating procedures and parts lists. During the calendar quarter ending December 31, 2012, the MIMS system was used to initiate and track scheduled preventive maintenance activities at the pumping stations.

During the calendar quarter ending December 31, 2002, a procedure for determining the cause of equipment and/or system failures was submitted as required by Paragraph 11.E.ii of the Consent Decree.

F. Pumping Station Operation and Maintenance Manuals: As of December 31, 2012, operations and maintenance (“O&M”) manuals for each of Baltimore’s eight pumping stations were up to date, reflecting current station configuration, equipment, and characteristics. Operating parameter value ranges for each pumping station are available in the standard operating procedures (“SOPs”) for that pumping station, which are posted at the pumping station and considered part of the O&M manual. Pump run times are kept in the log books at each pumping station.

G. Progress Reports: Table 11-1 Summarizes the status of Baltimore’s pumping station

inspection and repair program during the calendar quarter ending December 31, 2012.

Table 11-1: Pumping Station Inspection and Repair Program

Pumping Station

Date of Inspection Completion

Date of Repair

Completion Repairs or

Improvements No. of

Overflows

Eastern Avenue

All Pumping Stations

inspected twice per day throughout reporting

period

See Appendix 4 See Appendix 4

None Brooklyn None Dundalk None Jones Falls None Locust Point None Quad Avenue None McComas None Westport None

Progress toward installation of the new SCADA system for remote monitoring of pumping stations is reported in item 11.C above

Paragraph 12: Collection and Transmission System Model

A. The hydraulic modeling task for each sewershed will be performed utilizing the previously-selected hydraulic modeling software package: InfoWorks, marketed by Wallingford Software.

B. Model Elements: The InfoWorks hydraulic modeling package is fully compliant with

the requirements listed in Paragraph 12.B.i of the Consent Decree.

Civil Action No. JFM-02-1524 14 Calendar Quarterly Report No. 41 For Calendar Quarter Ending December 31, 2012

C. Model Project Approach Report: This draft Report was submitted by the February 27, 2003 milestone date (150 days from the Date of Entry of the Consent Decree).

D. EPA in its letter dated January 12, 2005 has approved the Model Project Approach Report. Baltimore has initiated implementation of the Model Project Approach Report. The first phase of model implementation, involving the migration of the four models developed as part of previous sewershed studies into an InfoWorks environment, is underway.

E. Model Certification: Baltimore will complete implementation of the Model for each

sewershed on or before submission of the respective Sewershed Study and Plan required under Paragraph 9, and will certify the model for each sewershed at that time.

F. Progress Report: The City continued development and enhancement of the

model during this Quarterly period.

Paragraph 13: Collection System Operation and Maintenance

A. During the calendar quarter ending December 31, 2012, Baltimore continued to review current practices and procedures for collection system operation and maintenance, and to identify any changes that are needed for full compliance with the requirements of Paragraph 13.A. of the Consent Decree.

B. The draft Operations and Maintenance Program Report required under Paragraph 13.B.

of the Consent Decree was submitted in accordance with the milestone date of January 28, 2003 (120 days from the Date of Entry of the Consent Decree). MDE has indicated approval of this draft Report; EPA has also approved this report in its letter dated January 12, 2005.

C. The City of Baltimore has implemented root and grease control programs after approval

of chemical products that will be used as part of the cleaning for root and grease problem areas. Those pipes that are found to have root and grease problems are being treated under these programs and recorded/tracked in the GIS system.

D. Progress Reports: The implementation period of the Operations and Maintenance

Plan was completed in July 2006. The City submitted the Year 1 Annual Report on October 30, 2007, which covered the time period from July 2006 to July 2007. This report includes all elements as specified in this section of the Consent Decree. The Year 2 Annual Report was submitted on October 30, 2008 and it covers the time period from July 2008 to June 2009. The Year 3 Annual Report was submitted to EPA/MDE and DOJ on October 27, 2009. The City of Baltimore submitted the fourth annual progress report, on October 28, 2010. The fifth annual progress report was submitted to EPA/MDE on October 21, 2011.

Civil Action No. JFM-02-1524 15 Calendar Quarterly Report No. 41 For Calendar Quarter Ending December 31, 2012

Paragraph 14: Information Management System Program

A. During the calendar quarter ending December 31, 2012, Baltimore continued to develop an information management system that will facilitate engineering analysis, evaluation, operation and maintenance of the collection system.

B. Geographic Information System: On September 24, 2004, Baltimore demonstrated

to EPA and MDE that the GIS is fully functioning and capable of displaying the information described in Paragraph 14.B.i through iv.

C. 500 Scale Maps: This requirement has been completed as reported in Quarterly

Report No. 7. D. Global Positioning System: Water and Wastewater Maintenance crews are equipped

with eight global positioning system (“GPS”) units for use in collection system maintenance. A standard operating procedure (SOP) has been developed for the use of these units in locating collection system components. Maintenance crews have received appropriate training to use the GPS units.

E. Inventory of Collection System Components: On September 24, 2004, Baltimore

demonstrated to EPA and MDE that the GIS is fully functioning and capable of displaying the information described in Paragraph 14.E for each component.

F. Update Inventory of Collection System Components: Within ninety (90) days of

completion of inspection or rehabilitation of a collection system component as required under Paragraph 9, Baltimore will update the collection system inventory.

G. Progress Reports: Development of the Baltimore collection system inventory

database continued throughout the calendar quarter ending December 31, 2012. Most of the information currently in the database has been taken from record documents (for example, “as-built” drawings). This information will be verified and supplemented with field inspection data/information, and all required database fields are being populated, as part of the Sewershed Studies required under Paragraph 9 of the Consent Decree. Progress toward implementation of the GIS is reported in Item 14.B. above.

Paragraph 15: Valve Inspection and Repair Program

A. All requirements of Paragraph 15 have been completed as summarized in Quarterly Report No. 7.

B. Progress Reports: All requirements of Paragraph 15 have been completed as noted in

Appendix H of Consent Decree.

Civil Action No. JFM-02-1524 16 Calendar Quarterly Report No. 41 For Calendar Quarter Ending December 31, 2012

Paragraph 16: Emergency Response Plan – Un-permitted Discharges

A. Emergency Response Plan (ERP): Baltimore has developed and implemented an Emergency Response Plan for protection of public health and the environment in the event of an un-permitted discharge from the wastewater collection system.

B. This requirement has been completed as reported in Quarterly Report No. 7. C. The EPA and MDE reviewed the draft Emergency Response Plan, and review comments

were forwarded to Baltimore in a letter from EPA Region 3 received by Baltimore on July 23, 2002. The City of Baltimore revised the draft Emergency Response Plan accordingly by responding to the review comments within the 30-day requirement established by Paragraph 16.C. of the Consent Decree. MDE and EPA granted approval of the Plan in separate letters received by Baltimore on May 5, 2003, and May 14, 2003, respectively. As of the June 13, 2003 milestone date for implementation of the Plan (30 days from final approval), 70 copies of the Plan had been produced and distributed to appropriate staff.

D. Yearly Review and Update: During the Calendar Quarter ending September 30,

2007, the City submitted the Yearly Update for 2007. The 2008 update was submitted on December 26, 2008. The City of Baltimore submitted updates to the ERP for 2009 on December 28, 2009. The 2010 annual updates to the ERP were submitted to the Regulators on December 28, 2010. The 2011 annual updates to the ERP were submitted to the Regulators on December 23, 2011. The 2012 annual updates to the ERP were submitted to the Regulators on December 21, 2012.

E. No portion of the Emergency Response Plan is in dispute at this time, and Baltimore has implemented the Plan in its entirety.

Paragraph 17: Reporting of Discharge Events and Recordkeeping

A. During the calendar quarter ending December 31, 2012, Baltimore has complied with

the reporting requirements for overflows from the wastewater collection system as established by Paragraph 17 of the Consent Decree, by NPDES Permit Numbers 21555 and 21601, by State Discharge Permit Numbers 89-DP-0581 and 93-DP-0580A, and by State and Federal regulations. Oral notifications of overflows were made to MDE within 24 hours that Baltimore first became aware of them, and written reports were forwarded within 5 days. A summary of reported overflows for the calendar quarter ending December 31, 2012 is provided in Appendix 5.

B. During the calendar quarter ending December 31, 2012, Baltimore maintained a

monitoring, sampling, analysis and reporting program to monitor water quality in Baltimore surface water. This program is administered by the Water Quality Management Section of the Environmental Services Division in accordance with the requirements of the NPDES referenced in item 17.A. above. Monitoring results are published annually in Baltimore’s Water Quality Report.

Civil Action No. JFM-02-1524 17 Calendar Quarterly Report No. 41 For Calendar Quarter Ending December 31, 2012

C. Records of all sanitary sewer overflows from Baltimore’s collection system during the

calendar quarter ending December 31, 2012, are being maintained in accordance with the requirements of Paragraph 17.C.

D. Copies of all written reports prepared pursuant to Paragraph 17 will be maintained for a

minimum of 5 years, as required by Paragraph 17.D. C. DESCRIPTION OF ANTICIPATED PROBLEMS WITH SECTION

VI REQUIREMENTS

Issues and concerns related to Paragraph 8 construction projects are reported above in the Paragraph 8 section of this Calendar Quarterly Report. As of December 31, 2012, there were no other anticipated problems with Section VI requirements to report.

D. DESCRIPTION OF SEP ACTIVITIES

The study and 30% design for the Patapsco Wastewater Treatment Plant Enhanced Nutrient Removal (ENR) project was completed and submitted to Maryland Department of the Environment (MDE) and US EPA Region III (EPA) in September 2004. The MDE letter approving the 30% design for the Patapsco Wastewater Treatment Plant was on December 01, 2004. The EPA letter approving the 30% design was on received May 24, 2005. The consultant agreement for the design of the Patapsco Wastewater Treatment Plant ENR project was approved by the City’s Board of Estimates on December 21, 2005. As of the calendar quarter ending December 31, 2012, SC 845 - BAF and tertiary PS bids were rejected and the project was re-advertised in December 2011 and bids were received on February 15, 2012. Notice to Proceed (NTP) for construction was issued on August 1, 2012 and the estimated construction completion date is February 2015. SC 852 - Denitrification filters project was advertised on March 27, 2009 and the bids were rejected. This project was re-advertised on October 13, 2009 and the successful bidder was awarded the NTP on December 29, 2009. This project is currently in the construction phase. The estimated construction completion date is July 2013. In addition, the City has selected the consultant for engineering services for SC 855 - ENR Modifications to the Existing Facilities at the Patapsco Wastewater Treatment Plant. As of the calendar quarter ending December 31, 2012, this contract was advertised on April 30, 2010, and bids were due on September 30, 2010. The construction NTP was issued on February 22, 2011. This project is currently in the construction phase. The estimated construction completion date is May 2013.

Civil Action No. JFM-02-1524 18 Calendar Quarterly Report No. 41 For Calendar Quarter Ending December 31, 2012

E. ADDITIONAL MATTERS FOR THE ATTENTION OF THE EPA AND MDE

As of the calendar quarter ending December 31, 2012 the City of Baltimore has updated the Sanitary Discharges of Unknown Origin (SDUO) tracking sheet to the Quarterly Report per the requirements of the policy letter by EPA and MDE dated March 31, 2009. The details of these sites are located in the SDUO tracking sheets in Appendix 5. The City provided a response to MDE/EPA and requested additional time to research and develop possible methods of quantifying SDUOs in a letter dated April 30, 2009. The City submitted the SDUO Quantification Protocol to MDE and EPA for review, comments and approval on August 06, 2009. EPA/MDE issued a SDUO Quantification Protocol comment letter on December 21, 2009. The City of Baltimore issued a response letter to EPA/MDE on February 16, 2010. EPA/MDE approved the quantification protocol on October 12, 2010, and requested that the City apply the protocol to all resolved and outstanding SDUO sites since October 30, 2008, and to all future SDUOs. The City submitted a final approved copy of the SDUO Quantification Protocol to MDE/EPA on November 18, 2010 and sent in the application of the SDUO Protocol on December 28, 2010.

Civil Action No. JFM-02-1524 19 Calendar Quarterly Report No. 41 For Calendar Quarter Ending December 31, 2012

APPENDIX 1

STATUS OF PARAGRAPH 8

CONSTRUCTION PROJECTS

APPE

NDIX

1ST

ATUS

OF

PAR

AGR

APH

8 C

ONS

TRUC

TIO

N PR

OJE

CTS

As o

f Dec

embe

r 31,

201

2

App

endi

x 1

- 1N

ote:

Sha

ded

date

cel

ls in

dica

te c

ompl

etio

n.

PRO

J.

ID N

O.

PRO

JEC

TD

ESC

RIP

TIO

N A

ND

REM

ARK

S

DAT

E C

ON

STR

UC

TIO

N

CO

NTR

ACT

ADVE

RTI

SED

DAT

E O

F PR

ACTI

CAL

C

OM

PLET

ION

DAT

E SS

O

STR

UC

TUR

ES

ELIM

INAT

EDSS

O/C

SO S

TRU

CTU

RES

ELI

MIN

ATED

STAT

US

1W

este

rn R

un In

terc

epto

r (JP

I Bra

nch)

Sani

tary

Con

tract

Nos

. 760

& 7

89

1. In

stal

l app

roxi

mat

ely

880

linea

r fee

t of 3

0-in

ch p

aral

lel r

elie

f sew

er fr

om J

PIB4

9 to

JPI

10 (a

long

JPI

90A-

JPI9

4) (S

C76

0)2.

Inst

all a

ppro

xim

atel

y 9,

400

linea

r fee

t of 2

1- to

24-

inch

par

alle

l rel

ief s

ewer

from

JPI

20 to

JPI

65 (S

C78

9)3.

Reh

abili

tate

app

roxi

mat

ely

3,30

0 lin

ear f

eet o

f exi

stin

g 18

-inch

sew

er fr

om J

PI07

to J

PI20

(SC

789)

June

30,

200

2Ju

ne 3

0, 2

004

June

30,

200

5El

imin

ates

SSO

nos

. 21,

22,

23,

24

and

29C

ompl

ete

2U

pper

Jon

es F

alls

Inte

rcep

tor

(Nor

th &

Sou

th o

f Pep

si C

ola

Plan

t)Sa

nita

ry C

ontra

ct N

os. 7

72 &

824

1. R

ehab

ilita

tion

of a

ppro

xim

atel

y 1,

800

linea

r fee

t of e

xist

ing

42- t

o 48

-inch

sew

er lo

cate

d be

twee

n JP

01 (M

t. W

ashi

ngto

n Fl

ume)

and

JP1

0, a

nd a

ppro

xim

atel

y 6,

570

linea

r fee

t of 4

8- to

60-

inch

sew

er lo

cate

d be

twee

n JP

42 a

nd th

e JP

70.

Rep

lace

men

t of a

ppro

xim

atel

y 1,

900

linea

r fee

t of 4

8" s

ewer

bet

wee

n JP

10 a

nd J

P18,

and

ap

prox

imat

ely

1,55

0 lin

ear f

eet o

f 60"

sew

er b

etw

een

JP70

and

the

Jone

s Fa

lls P

umpi

ng S

tatio

n (S

C 7

72).

2. R

epla

cem

ent o

f app

roxi

mat

ely

7,08

0 lin

ear f

eet o

f 48-

inch

sew

er b

etw

een

JP18

and

JP4

2 (S

C 8

24).

3. M

anho

le a

nd s

tream

ban

k re

stor

atio

n.

June

30,

200

4D

ecem

ber 2

7, 2

006

12/3

0/20

08 *

*El

imin

ates

SSO

Nos

. 33

and

34

SC 7

72- P

ract

ical

Com

plet

ion

was

ach

ieve

on

June

30,

20

06.

S

C 8

24 -

Con

stru

ctio

n Ph

ase*

* Le

tter s

ent t

o M

DE

and

EPA

on 6

-25-

07 re

ques

ting

an

exte

nsio

n of

the

SSO

elim

inat

ion

date

to D

ecem

ber

2008

. MD

E re

spon

se le

tter a

ppro

ving

ext

ensi

on w

as

rece

ived

on

Sept

embe

r 5, 2

007.

Elim

inat

ed S

SO N

os

33 a

nd 3

4 on

12/

10 a

nd 1

2/23

/08,

resp

ectiv

ely.

3

New

Jon

es F

alls

For

ce M

ain/

Pres

sure

Se

wer

- Lo

wer

Sec

tion

and

Valv

es

impr

ovem

ents

of e

xist

ing

forc

e/pr

essu

re s

ewer

Sani

tary

Con

tract

Nos

. SC

779

& SC

805

1. R

epla

cem

ent o

f app

roxi

mat

ely

1600

line

ar fe

et o

f for

ce m

ain/

pres

sure

sew

er in

Bro

adw

ay fr

om O

liver

to E

ast

Cha

se S

treet

con

nect

ing

to H

igh

Leve

l sew

er (S

C 7

79)

2. Im

prov

emen

ts to

gat

e va

lves

, blo

w-o

ff va

lves

and

air

rele

ase

valv

es fo

r exi

stin

g fo

rce

mai

n/pr

essu

re s

ewer

(S

C 8

05)

Dec

embe

r 30,

200

2Ju

ne 3

0, 2

004

6/30

/200

5 - S

EE

STAT

US

Con

tribu

tes

to e

limin

atio

n of

SSO

No.

5SS

O N

o. 5

can

not b

e el

imin

ated

unt

il pr

ojec

ts 4

and

5

are

com

plet

ed.

4Jo

nes

Falls

Pum

ping

Sta

tion

Forc

e M

ain/

Pres

sure

Sew

erSa

nita

ry C

ontra

ct N

o. 8

00

Upg

rade

exi

stin

g fo

rce

mai

ns/p

ress

ure

sew

er to

han

dle

incr

ease

d flo

ws

from

reha

bilit

ated

/upg

rade

d Jo

nes

Falls

Pu

mpi

ng S

tatio

n as

wel

l as

addi

tiona

l flo

ws

from

pos

sibl

e fu

ture

pum

ping

sta

tions

in S

tony

Run

and

alo

ng th

e JG

A br

anch

June

30,

200

512

/29/

2007

**M

ay 2

,200

8C

ontri

bute

s to

elim

inat

ion

of S

SO N

o. 5

Con

stru

ctio

n Ph

ase*

* Le

tter s

ent t

o M

DE

and

EPA

on 6

-11

-07

requ

estin

g ad

ditio

nal 9

0 da

y pr

actic

al c

ompl

etio

n ex

tens

ion

to D

ecem

ber 2

007.

MD

E re

spon

se le

tter

appr

ovin

g ad

ditio

nal e

xten

sion

rece

ived

Sep

tem

ber 5

, 20

07.

Lette

r sen

t to

MD

E an

d EP

A o

n 12

/17/

07

requ

estin

g ad

ditio

nal 6

0 da

y ex

tens

ion

for p

ratic

al

com

plet

ion.

Pra

ctic

al c

ompl

etio

n oc

cure

d on

1/

23/0

8. E

xten

sion

requ

est a

ppro

val g

rant

ed b

y M

DE

in a

lette

r dat

ed A

pril

15, 2

010.

Aw

aitin

g re

spon

se fr

om E

PA.

5Jo

nes

Falls

Pum

ping

Sta

tion

Sani

tary

Con

tract

No.

822

Upg

rade

exi

stin

g pu

mpi

ng s

tatio

n to

han

dle

at le

ast 5

0 m

gdD

ecem

ber 3

0, 2

005

12/2

9/20

07**

June

30,

200

8El

imin

ates

SSO

No.

5

Con

stru

ctio

n Ph

ase*

* Le

tter s

ent t

o M

DE

and

EPA

on 6

-11

-07

requ

estin

g ad

ditio

nal 9

0 da

y pr

actic

al c

ompl

etio

n ex

tens

ion

to D

ecem

ber 2

007.

MD

E re

spon

se le

tter

appr

ovin

g ad

ditio

nal e

xten

sion

rece

ived

Sep

tem

ber 5

, 20

07.

Beni

ficia

l Occ

upan

cy a

chie

ved

11/1

6/07

.

6

Elim

inat

ion

of C

olle

ctio

n Sy

stem

O

verfl

ows

in U

pper

Jon

es F

alls

Se

wer

shed

Sani

tary

Con

tract

No.

876

Asse

ss h

ydra

ulic

s an

d de

sign

impr

ovem

ents

to a

reas

adj

acen

t to

over

flow

sEx

istin

g on

-cal

l co

ntra

ctJu

ne 3

0, 2

003

June

30,

200

4El

imin

ates

SSO

Nos

. 20,

31,

32

and

36C

ompl

ete

UPP

ER J

ON

ES F

ALLS

SEW

ERSH

ED

APPE

NDIX

1ST

ATUS

OF

PAR

AGR

APH

8 C

ONS

TRUC

TIO

N PR

OJE

CTS

As o

f Dec

embe

r 31,

201

2

App

endi

x 1

- 2N

ote:

Sha

ded

date

cel

ls in

dica

te c

ompl

etio

n.

PRO

J.

ID N

O.

PRO

JEC

TD

ESC

RIP

TIO

N A

ND

REM

ARK

S

DAT

E C

ON

STR

UC

TIO

N

CO

NTR

ACT

ADVE

RTI

SED

DAT

E O

F PR

ACTI

CAL

C

OM

PLET

ION

DAT

E SS

O

STR

UC

TUR

ES

ELIM

INAT

EDSS

O/C

SO S

TRU

CTU

RES

ELI

MIN

ATED

STAT

US

7Lo

wer

Jon

es F

alls

Inte

rcep

tor

(Upp

er P

ortio

n of

Gra

vity

Mai

nlin

e)Sa

nita

ry C

ontra

ct N

os. 7

73 &

818

1. In

stal

l app

roxi

mat

ely

7,90

0 lin

ear f

eet o

f 18-

to 2

4-in

ch p

aral

lel r

elie

f sew

er fr

om J

G03

0 (n

ear J

ones

Fal

ls

Pum

ping

Sta

tion)

to J

G06

1 (a

t the

con

nect

ion

of th

e JG

E br

anch

) (SC

818)

2. R

ehab

ilita

tion

of a

ppro

xim

atel

y 16

,500

line

ar fe

et o

f exi

stin

g se

wer

rang

ing

from

12-

to 5

0-in

ch (S

C77

3)3.

Inve

rted

siph

on re

habi

litat

ion

in F

alls

Roa

d (m

anho

le J

G06

2) (S

C77

3)4.

Stre

am b

ank

rest

orat

ion

alon

g U

nion

Ave

nue

near

Mea

dow

Mill

s at

Woo

dber

ry

July

31,

200

3Ju

ne 3

0, 2

006

2/28

/10*

**El

imin

ates

SSO

No.

67

Post

Con

stru

ctio

n M

onito

ring

Phas

e. M

onito

ring

perio

d is

ext

ende

d at

one

site

.

8

Ston

y R

un In

terc

epto

r and

Pum

ping

St

atio

n (J

GF

Bran

ch)*

*Sa

nita

ry C

ontra

ct N

o. 8

19, 8

38, 8

39 &

84

7

1. C

onst

ruct

a 2

0 m

gd c

apac

ity p

umpi

ng s

tatio

n ne

ar D

epar

tmen

t of P

ublic

Wor

ks S

olid

Was

te S

ite n

ear t

he

inte

rsec

tion

of 2

9th

Stre

et a

nd S

isso

n St

reet

.2.

Inst

all a

ppro

xim

atel

y 1,

200

linea

r fee

t of 2

4-in

ch fo

rce

mai

n fro

m n

ew p

umpi

ng s

tatio

n to

JFP

S pr

essu

re

sew

er [l

engt

h de

pend

s on

loca

tion

of p

umpi

ng s

tatio

n]3.

Par

alle

l app

roxi

mat

ely

10,8

00 li

near

feet

of e

xist

ing

sew

er fr

om s

outh

of C

olds

prin

g La

ne (J

GF4

8) to

the

new

pu

mpi

ng s

tatio

n w

ith 1

8 to

36-

inch

sew

er

Dec

embe

r 30,

200

5

(SC

-819

& 8

38)

Ju

ne 3

0, 2

006

*

(SC

-839

& 8

47)

5/31

/200

9***

2/28

/10*

**C

ontri

bute

s to

elim

inat

ion

of S

SO N

o. 7

2;

elim

inat

es S

SO N

o. 1

29

Pra

ctic

al c

ompl

etio

n w

as a

chei

ved

on M

ay 2

9,

2009

for t

he lo

wer

por

tion

of th

e St

ony

Run

in

terc

epto

r (SC

- 83

9).

Non

-CD

por

tion

of th

e pr

ojec

t is

near

ly c

ompl

ete.

Flo

w m

onito

r ins

talle

d at

new

Sto

ny R

un P

ump

Stat

ion

on A

ugus

t 26,

20

09.

The

City

sub

mitt

ed a

n ex

tens

ion

requ

est t

o EP

A a

nd M

DE

for S

SO 6

7 an

d 72

dat

ed F

ebru

ary

16, 2

010

requ

estin

g an

ext

ensi

on to

Feb

ruar

y 28

, 20

11.

The

City

furt

her s

ubm

itted

ano

ther

ext

ensi

on

lette

r dat

ed F

ebru

ary

15, 2

011

requ

estin

g an

ex

tens

ion

to J

une

29, 2

019

to a

llow

for a

dequ

ate

time

for t

he C

ity to

com

plet

e th

e h

ydra

ulic

re

stric

tion

proj

ect a

t the

BR

-WW

TP, w

hich

the

City

be

lieve

s is

a m

ajor

con

trib

utor

to n

ot b

eing

abl

e to

el

imin

ate

thes

e SS

Os.

9

Mar

ylan

d Av

enue

Inte

rcep

tor (

JGB

Bran

ch)

Sani

tary

Con

tract

No.

799

1. R

epla

ce (u

psiz

e) a

ppro

xim

atel

y 4,

400

linea

r fee

t of e

xist

ing

12- t

o 24

-inch

sew

er w

ith n

ew 2

1- to

36-

inch

se

wer

alo

ng b

ranc

h in

terc

epto

r, ex

clud

ing

prop

osed

901

N. H

owar

d pr

ojec

t are

a2.

Impr

ovem

ents

to s

ipho

n/SS

O N

o. 1

25 u

nder

I-83

(JG

B18-

JGB1

9)3.

Sew

er re

plac

emen

t may

requ

ire c

ross

ing

the

CLR

L

Dec

embe

r 30,

200

3Ju

ly 1

4, 2

005

*Ju

ne 3

0, 2

006

Elim

inat

es S

SO N

os. 6

9 &

125

Com

plet

e

10G

reen

mou

nt A

venu

e In

terc

epto

r (JG

A Br

anch

)*Sa

nita

ry C

ontra

ct N

o. 8

20, 8

33

1. In

stal

l app

roxi

mat

ely

7,32

5 lin

ear f

eet o

f 36

to 4

2-in

ch p

aral

lel r

elie

f sew

er fr

om B

onap

arte

Ave

nue

to th

e H

igh

leve

l Int

erce

ptor

on

Eage

r Stre

et.

2. L

ine

appr

oxim

atel

y 6,

000

linea

r fee

t of 1

5- to

33-

inch

exi

stin

g se

wer

.

Dec

embe

r 30,

200

512

/27/

07 *

*2/

28/1

0***

Con

tribu

tes

to e

limin

atio

n of

SSO

No.

72

Con

stru

ctio

n Ph

ase.

SC

833

-Ext

ensi

on le

tter w

as

sent

on

12-7

-07

for a

90

day

exte

nsio

n th

roug

h M

arch

29,

200

8. T

his

exte

nsio

n w

as a

ppro

ved

and

a su

bseq

uent

ext

ensi

on fo

r 90

days

, thr

ough

Jun

e 27

, 200

8 w

as s

ubm

itted

. A

wai

ting

resp

onse

from

M

DE/

EPA

. Pr

actic

al c

ompl

etio

n ac

heiv

ed o

n M

ay

27, 2

008.

Mon

itorin

g pe

riod

bega

n Ju

ly 2

5, 2

008.

In

a le

tter d

ated

11/

08/2

011,

EPA

app

rove

d th

e m

inor

sc

hedu

le m

odifi

catio

n.

11

Elim

inat

ion

of S

ipho

n Bl

owof

f (S

ipho

n N

o. 6

- so

uth

of N

orth

Ave

nue

Brid

ge,

wes

t of R

R tr

acks

)Sa

nita

ry C

ontra

ct N

o. 8

30

1. C

lean

ing

and

insp

ectio

n of

sip

hon

with

repa

irs a

s ne

cess

ary.

2. E

limin

atio

n of

blo

w-o

ff.O

n-ca

ll co

ntra

ctJu

ne 3

0, 2

004

June

30,

200

5El

imin

ates

SSO

No.

68

Com

plet

e

* App

rove

d by

MD

E\EP

A. *

* App

rove

d by

MD

E, **

*App

rove

d by

EPA

12

Moo

res

Run

Inte

rcep

tor -

Mid

dle

Sect

ion

Stor

m W

ater

Con

tract

Nos

. 774

6 an

d 77

51

Con

stru

ctio

n of

app

roxi

mat

ely

400

linea

r fee

t of 1

8-in

ch, a

ppro

xim

atel

y 60

0 lin

ear f

eet o

f 21-

inch

, app

roxi

mat

ely

4900

line

ar fe

et 2

4-in

ch, a

ppro

xim

atel

y 10

00 li

near

feet

of 2

7-in

ch, a

nd a

ppro

xim

atel

y 10

0 lin

ear f

eet o

f 30-

inch

se

wer

to re

plac

e ex

istin

g in

terc

epto

rJu

ne 3

0, 2

003

July

14,

and

Sep

t 2, 2

005*

*Ju

ne 3

0, 2

006

Con

tribu

tes

to e

limin

atio

n of

SSO

Nos

. 118

and

11

9C

ompl

ete

13M

oore

s R

un In

terc

epto

r - L

ower

Se

ctio

nSa

nita

ry C

ontra

ct N

o. 8

01 a

nd 8

43

Con

stru

ctio

n of

app

roxi

mat

ely

6900

line

ar fe

et o

f 42-

inch

, app

roxi

mat

ely

2700

line

ar fe

et o

f 36-

inch

sip

hon,

and

ap

prox

imat

ely

3700

line

ar fe

et o

f 54-

inch

sew

er to

repl

ace

the

exis

ting

inte

rcep

tor

June

30,

200

5Ju

ne 3

0, 2

007

June

30,

200

8El

imin

ates

SSO

No.

93

and

94C

onst

ruct

ion

Phas

e - C

ompl

ete

14M

oore

s R

un In

terc

epto

r - U

pper

Se

ctio

nSa

nita

ry C

ontra

ct N

o. 8

17

Con

stru

ctio

n of

app

roxi

mat

ely

1700

line

ar fe

et o

f 18-

inch

and

app

roxi

mat

ely

2200

line

ar fe

et o

f 21-

inch

sew

er to

re

plac

e th

e ex

istin

g in

terc

epto

rJu

ne 3

0, 2

004

June

30,

200

5Ju

ne 3

0, 2

006

Con

tribu

tes

to e

limin

atio

n of

SSO

Nos

. 118

and

11

9C

ompl

ete

15El

imin

atio

n of

Col

lect

ion

Syst

em

Ove

rflow

s in

Her

ring

Run

Sew

ersh

edAs

sess

hyd

raul

ics

and

desi

gn im

prov

emen

ts to

are

as a

djac

ent t

o ov

erflo

ws

Exis

ting

on-c

all

cont

ract

June

30,

200

3Ju

ne 3

0, 2

004

Elim

inat

es S

SO N

os. 8

8 an

d 10

9C

ompl

ete

16

Elim

inat

ion

of S

ipho

n Bl

owof

fs (S

ipho

n N

o. 2

- Ba

y Vi

ew Y

ard

sout

h of

RR

tra

cks;

Sip

hon

No.

4 -

Bow

leys

La

ne/M

orav

ia R

oad)

Sani

tary

Con

tract

No.

830

1. C

lean

ing

and

insp

ectio

n of

sip

hons

with

repa

irs a

s ne

cess

ary.

2. E

limin

atio

n of

blo

w-o

ffs.

On-

call

cont

ract

June

30,

200

4Ju

ne 3

0, 2

005

Elim

inat

es S

SO N

os. 9

2C

ompl

ete*

HER

RIN

G R

UN

SEW

ERSH

ED

LOW

ER J

ON

ES F

ALLS

SEW

ERSH

ED

APPE

NDIX

1ST

ATUS

OF

PAR

AGR

APH

8 C

ONS

TRUC

TIO

N PR

OJE

CTS

As o

f Dec

embe

r 31,

201

2

App

endi

x 1

- 3N

ote:

Sha

ded

date

cel

ls in

dica

te c

ompl

etio

n.

PRO

J.

ID N

O.

PRO

JEC

TD

ESC

RIP

TIO

N A

ND

REM

ARK

S

DAT

E C

ON

STR

UC

TIO

N

CO

NTR

ACT

ADVE

RTI

SED

DAT

E O

F PR

ACTI

CAL

C

OM

PLET

ION

DAT

E SS

O

STR

UC

TUR

ES

ELIM

INAT

EDSS

O/C

SO S

TRU

CTU

RES

ELI

MIN

ATED

STAT

US

17

Pow

der M

ill S

yste

m Im

prov

emen

ts

incl

udin

g G

FG b

ranc

h in

Gw

ynns

Fal

ls

Sew

ersh

edSa

nita

ry C

ontra

ct N

os. 7

77 &

804

Reh

abili

tatio

n of

app

roxi

mat

ely

12,0

00 li

near

feet

of 1

2- to

24-

inch

con

veya

nce

pipi

ng (S

C77

7) a

nd

appr

oxim

atel

y 33

,000

line

ar fe

et o

f 8- t

o 10

-inch

col

lect

ion

pipi

ng (S

C80

4)

June

30,

200

3Ju

ne 3

0, 2

006

June

30,

200

7El

imin

ates

SSO

Nos

. 28P

, 29P

and

33P

Com

plet

e

18D

ead

Run

Sys

tem

Impr

ovem

ents

DR

A Br

anch

Sani

tary

Con

tract

No.

788

, 825

Cle

an, i

nspe

ct a

nd re

habi

litat

e of

app

roxi

mat

ely

20,0

00 li

near

feet

of 1

2- to

24-

inch

con

veya

nce

pipi

ng (C

OE)

an

d ap

prox

imat

ely

11,0

00 li

near

feet

of 8

- to

12-in

ch c

olle

ctio

n pi

ping

(SC

788)

.Ju

ne 3

0, 2

003

June

30,

200

6Ju

ne 3

0, 2

007

Elim

inat

es S

SO N

os. 1

6P a

nd 1

7PC

ompl

ete

19M

aide

ns C

hoic

e In

terc

epto

rSa

nita

ry C

ontra

ct N

o. 8

26C

lean

, ins

pect

, and

reha

bilit

ate

12,4

00 li

near

feet

of 1

2- to

24-

inch

con

veya

nce

pipi

ng.

On-

call

cont

ract

June

30,

200

7Ju

ne 3

0, 2

008

Elim

inat

es S

SO N

os. 2

3P a

nd 2

4PC

onst

ruct

ion

Phas

e - C

ompl

ete

20

Elim

inat

ion

of S

ipho

n Bl

owof

fs (S

ipho

n N

o. 1

1 - A

nnap

olis

Roa

d an

d C

lare

St

reet

; Sip

hon

No.

12

- Che

shol

m R

d.

wes

t of F

rank

linto

wn

Rd.

) SC

No.

827

1. C

lean

ing

and

insp

ectio

n of

sip

hons

with

repa

irs a

s ne

cess

ary.

2. E

limin

atio

n of

blo

w-o

ffs.

On-

call

cont

ract

June

30,

200

4Ju

ne 3

0, 2

005

Elim

inat

es S

SO N

os. 8

4 an

d 22

PC

ompl

ete*

21

Wal

broo

kSa

nita

ry C

ontra

ct N

o. 7

80Im

plem

enta

tion

of L

ong

Term

Con

trol P

lan

and

com

bine

d se

wer

sep

arat

ion

desi

gn in

Wal

broo

k ar

eaJu

ne 3

0, 2

002

June

30,

200

3El

imin

ates

CSO

No.

21P

Com

plet

e

22Fo

rest

Par

kSa

nita

ry C

ontra

ct N

os. 7

80 a

nd 8

13Im

plem

enta

tion

of L

ong

Term

Con

trol P

lan

and

com

bine

d se

wer

sep

arat

ion

desi

gn in

For

est P

ark

are

aD

ecem

ber 3

0, 2

003

June

30,

200

5Ju

ne 3

0, 2

006

Elim

inat

es C

SO N

o. 1

3P a

nd S

SO N

os. 1

0P,

11P,

12P

, 18P

, 19P

, 25P

, 26P

, 27P

and

31P

.

SSO

Nos

. 10P

, 18P

, 19P

& 3

1P a

re e

limin

ated

.C

ompl

ete

23G

wyn

ns R

un In

terc

epto

rSa

nita

ry C

ontra

ct N

o. 8

12Im

prov

emen

ts to

the

Gw

ynns

Run

Inte

rcep

tor

Dec

embe

r 30,

200

4Fe

brua

ry 2

5, 2

007

12/2

7/20

07**

Elim

inat

es S

SO N

os. 1

06,1

07 a

nd 1

30C

ompl

ete

24G

wyn

ns R

un S

yste

m Im

prov

emen

tsSa

nita

ry C

ontra

ct N

o. 8

07As

sess

hyd

raul

ics

and

desi

gn im

prov

emen

ts to

are

as a

djac

ent t

o ov

erflo

ws

June

30,

200

3Ju

ne 3

0, 2

006

June

30,

200

7El

imin

ates

SSO

Nos

. 55,

56,

57,

60,

63,

103

, 12

6, 1

27, 1

28 a

nd 1

31C

ompl

ete

25

Elim

inat

ion

of S

ipho

n Bl

owof

fs (S

ipho

n N

os. 9

and

10

- eas

t of D

ukel

and

Stre

et, s

outh

of W

ilken

s Av

enue

) SC

N

o. 8

27

1. C

lean

ing

and

insp

ectio

n of

sip

hons

with

repa

irs a

s ne

cess

ary.

2. E

limin

atio

n of

blo

w-o

ffs.

On-

call

cont

ract

June

30,

200

4Ju

ne 3

0, 2

005

Elim

inat

es S

SO N

os. 7

9 an

d 81

Com

plet

e*

26El

imin

atio

n of

Sip

hon

Blow

off (

Siph

on

No.

8 -

rear

of 8

00 U

netta

Ave

nue)

Sani

tary

Con

tract

No.

827

1. C

lean

ing

and

insp

ectio

n of

sip

hon

with

repa

irs a

s ne

cess

ary.

2. E

limin

atio

n of

blo

w-o

ff.O

n-ca

ll co

ntra

ctJu

ne 3

0, 2

004

June

30,

200

5El

imin

ates

SSO

No.

32P

Com

plet

e

* App

rove

d by

MD

E\EP

A. *

* App

rove

d by

MD

E, **

*App

rove

d by

EPA

LOW

LEV

EL S

EWER

SHED

HIG

H L

EVEL

SEW

ERSH

ED

CO

MB

INED

SEW

ER A

REA

S

GW

YNN

S FA

LLS

SEW

ERSH

ED

Civil Action No. JFM-02-1524 20 Calendar Quarterly Report No. 41 For Calendar Quarter Ending December 31, 2012

APPENDIX 2

STATUS OF PARAGRAPH 9

CONSTRUCTION PROJECTS

STAT

US

OF

PAR

AGR

APH

9 C

ON

STR

UC

TIO

N P

RO

JEC

TSAs

of D

ecem

ber 3

1, 2

012

Ap

pend

ix 2

-1N

ote:

Sha

ded

date

cel

ls in

dica

te c

ompl

etio

n.

Proj

. No.

PRO

JEC

TD

ESC

RIP

TIO

N A

ND

REM

AR

KS

DA

TE

CO

NST

RU

CTI

ON

C

ON

TRA

CT

AD

VER

TISE

D

DA

TE O

F C

ON

STR

UC

TIO

N

CO

MPL

ETIO

N

DA

TE O

F EV

ALU

ATI

ON

C

OM

PLET

ION

STA

TUS

JF-3

Low

er J

ones

Fal

ls S

ewer

Cle

anin

g

SC

876

- Th

e w

ork

incl

udes

the

Low

er J

ones

Fal

ls In

terc

epto

r, lo

cate

d in

the

grav

ity s

ewag

e co

llect

ion

syst

em. T

ypic

al w

ork

incl

udes

initi

al S

ON

AR

ass

essm

ent o

f the

san

itary

sew

ers

to

quan

tify

sedi

men

t and

deb

ris le

vels

, cle

anin

g 8,

400

feet

of 1

0” to

75”

san

itary

sew

ers

betw

een

Falls

Rd

Sip

hon

to th

e H

igh

Leve

l Int

erce

ptor

, with

pro

per d

ispo

sal o

f rem

oved

mat

eria

l, an

d po

st c

lean

ing

CC

TV/S

ON

AR

/Las

er a

sses

smen

t to

docu

men

t the

inte

rnal

con

ditio

n of

the

pipe

s.

5/20

/200

9 (A

)1/

1/20

12 (P

)1/

1/20

13 (P

)

This

con

tract

was

aw

arde

d to

Vid

eo P

ipe

Ser

vice

s (V

PS

) on

Oct

ober

21,

200

9. T

he

Cle

anin

g of

the

Low

er J

ones

Fal

ls a

nd

Mar

ylan

d A

ve. S

ipho

n C

lean

ing

wer

e co

mbi

ned

into

one

Pro

ject

(SC

876

).

JF-5

Mar

ylan

d A

venu

e S

ewer

Sip

hon

Cle

anin

g

SC

876

- Th

e w

ork

incl

udes

Mar

ylan

d A

venu

e S

ipho

n, a

nd s

ewer

s up

stre

am o

f the

Mar

ylan

d A

venu

e S

ipho

n (1

8 an

d 24

-inch

sew

er s

ipho

n). T

ypic

al w

ork

incl

udes

initi

al S

ON

AR

ass

essm

ent

of th

e sa

nita

ry s

ewer

s to

qua

ntify

sed

imen

t and

deb

ris le

vels

, cle

anin

g of

Mar

ylan

d A

venu

e S

ipho

n, a

nd v

ario

us s

ewer

s up

stre

am o

f the

Mar

ylan

d A

venu

e S

ipho

n, w

ith p

rope

r dis

posa

l of

rem

oved

mat

eria

l, an

d po

st c

lean

ing

CC

TV/S

ON

AR

/Las

er a

sses

smen

t to

docu

men

t the

inte

rnal

co

nditi

on o

f the

pip

es.

5/20

/200

9 (A

)1/

1/20

13 (P

)1/

1/20

14 (P

)

This

con

tract

was

aw

arde

d to

Vid

eo P

ipe

Ser

vice

s (V

PS

) on

Oct

ober

21,

200

9. T

he

Cle

anin

g of

the

Low

er J

ones

Fal

ls a

nd

Mar

ylan

d A

ve. S

ipho

n C

lean

ing

wer

e co

mbi

ned

into

one

Pro

ject

(SC

876

).

JF-7

Upp

er J

ones

Fal

ls In

terc

epto

r R

eact

ivat

ion

Rea

ctiv

atio

n of

an

inac

tive

42-in

ch d

iam

eter

inte

rcep

tor s

ewer

alo

ng J

ones

Fal

ls fr

om N

orth

ern

Par

kway

(MH

S19

CC

_204

5MH

) to

Col

d S

prin

g La

ne (M

H S

19O

O_1

042M

H).

Prio

r to

reac

tivat

ion

of th

e 42

-inch

sew

er, a

n in

tern

al in

spec

tion

of th

e se

wer

was

nec

essa

ry to

find

the

actu

al c

ondi

tion

of th

e lin

e. T

he C

ity u

tiliz

ed it

s te

chni

cal s

uppo

rt co

nsul

tant

(KC

I) to

car

ry o

ut th

e in

spec

tion

proc

ess.

The

fiel

d w

ork

was

sta

rted

in S

epte

mbe

r 200

9 an

d th

eir f

indi

ngs

wer

e co

mpl

eted

and

a fi

nal r

epor

t was

del

iver

ed o

n Ju

ne 3

0, 2

010.

07/1

5/20

09 (A

)08

/08/

2010

(A)

N/A

Per

Con

sulta

nt's

(KC

I) ev

alua

tion

of th

e

insp

ectio

n an

d cl

eani

ng w

ork,

the

line

is in

fa

irly

good

con

ditio

n an

d ca

n be

re-a

ctiv

ated

w

ithou

t any

maj

or re

pair/

reha

bilit

atio

n w

ork.

Th

is p

roje

ct is

com

plet

e an

d th

e C

ity w

ill ut

ilize

this

line

in th

e fu

ture

as

deem

ed

nece

ssar

y a

Con

stru

ctio

n pr

ojec

t will

not b

e pu

rsue

d. A

ll Fu

ture

wor

k fo

r thi

s pi

pe w

ill be

tra

cked

inde

pend

ently

by

the

City

. C

ondi

tiona

l Acc

epta

nce

was

on

11/1

7/10

, an

d Fi

nal A

ccep

tanc

e w

as o

n 09

/22/

11.

JF-8

SC

895

- M

D A

ve S

ewer

Reh

abR

epai

r and

reha

bilit

atio

n of

san

itary

sew

er a

nd m

anho

les

in th

e M

aryl

and

Ave

sub

-sew

ersh

ed o

f th

e Jo

nes

Falls

Sew

ersh

ed.

11/0

4/11

(A)

04/3

0/13

(P)

10/3

0/14

(P)

Bid

s w

ere

open

ed o

n 12

/14/

11 a

nd A

M L

iner

w

as th

e lo

wes

t bid

der.

Con

tract

was

aw

arde

d to

AM

Lin

er o

n 03

/21/

2012

. Pre

-co

nstrc

utio

n m

eetin

g w

as h

eld

on M

ay 1

7,

2012

.

OF-

6S

edim

ent C

lean

ing

Trun

k S

ewer

s in

City

of B

altim

ore.

SC

894

- C

lean

ing

of O

utfa

ll S

ewer

shed

99-

Inch

and

Out

fall

Inte

rcep

tor (

From

N. B

ond

Stre

et to

63

00 B

lock

of E

. Lom

bard

Stre

et)

08/0

5/11

(A)

06/2

5/20

12 (A

)

te

rmin

ated

N/A

This

con

tract

was

aw

arde

d to

Met

ra

Indu

strie

s, w

ho w

as th

e lo

wes

t bid

der,

on

June

08,

201

1. N

otic

e-to

-Pro

ceed

was

is

sued

on

Aug

ust 0

8, 2

011.

Cle

anin

g of

the

outfa

ll st

oppe

d as

of J

une

25, 2

012.

HL-

8Li

berty

Hei

ghts

Rel

ief S

ewer

SC

879

- D

esig

n an

d co

nstru

ctio

n 18

” Rel

ief S

ewer

from

inte

rsec

tion

of S

prin

gdal

e R

d an

d N

H

ilton

St t

o in

ters

ectio

n of

Wab

ash

Ave

and

Lib

erty

Hei

ghts

Ave

. (S

09U

U_0

07M

H to

S

13U

U_0

08M

H).

Wor

k in

clud

es e

xcav

atio

n an

d re

mov

al o

f exi

stin

g 12

inch

sew

er li

ne,

inst

alla

tion

of 2

400

LF o

f new

18-

inch

sew

er li

ne a

nd re

loca

tion

of 7

20 L

F of

20-

inch

wat

er li

ne.

Eva

luat

ion

phas

e w

ill in

clud

e co

ntin

ual m

onito

ring

of e

xist

ing

engi

neer

ed S

SO

s 13

2, 1

34 a

nd

135

to e

nsur

e no

ove

rflow

s du

ring

a tw

o ye

ar e

vent

.

2/10

/201

2 (A

)12

/15/

2013

(P)

6/15

/201

5 (P

)

The

cont

ract

was

adv

ertis

ed o

n Fe

brua

ry 1

0,

2012

. Bid

s w

ere

due

by M

arch

21,

201

2, b

ut

date

was

ext

ende

d to

Apr

il 4,

201

2. T

he

cont

ract

was

aw

arde

d on

Sep

tem

ber 2

6,

2012

. NTP

will

be

issu

ed o

n 2/

4/20

13.

Key

: "S

S -

XX" =

Sew

ersh

ed N

ame

- CD

Pro

ject

No.

HIG

H L

EVEL

SEW

ERSH

ED

JON

ES F

ALL

S SE

WER

SHED

OU

TFA

LL S

EWER

SHED

Civil Action No. JFM-02-1524 21 Calendar Quarterly Report No. 41 For Calendar Quarter Ending December 31, 2012

APPENDIX 3

LIST OF ILLEGAL CONNECTIONS

Appe

ndix

3-1

Janu

ary-

13

List

of

Ille

gal C

onn

ecti

ons

Per

son

/En

tity

Res

pon

sibl

eS

ourc

e Ty

peD

ate

Iden

tifi

edD

ye R

esu

ltC

urr

ent

Sta

tus

Com

men

ts1.

5904

Berk

eley

Ave

.17

2B

2Pr

oper

ty O

wne

rD

owns

pout

6/20

/200

5N

ewly

Ide

ntifi

edCo

nfirm

ed N

ot I

llega

l2.

6203

Biltm

ore

Ave.

311

A2

Prop

erty

Ow

ner

Dow

nspo

ut6/

20/2

005

New

ly I

dent

ified

Conf

irmed

Not

Ille

gal

3.33

10Cl

arks

Ln.

212

B7

Prop

erty

Ow

ner

Dow

nspo

ut6/

20/2

005

New

ly I

dent

ified

Conf

irmed

Not

Ille

gal

4.33

12Cl

arks

Ln.

212

B6

Prop

erty

Ow

ner

Dow

nspo

ut6/

20/2

005

New

ly I

dent

ified

Conf

irmed

Not

Ille

gal

5.36

01Cl

arks

Ln.

256

B1

Prop

erty

Ow

ner

Area

Dra

in3/

21/2

005

Posi

tive

New

ly I

dent

ified

Conf

irmed

Not

Ille

gal

6.22

38Cr

est

Rd.

14A

2Pr

oper

ty O

wne

rD

owns

pout

6/20

/200

5N

ewly

Ide

ntifi

edCo

nfirm

ed N

ot I

llega

l7.

2302

Cres

t R

d.13

A5

Prop

erty

Ow

ner

Dow

nspo

ut6/

20/2

005

New

ly I

dent

ified

Conf

irmed

Not

Ille

gal

8.13

A6

Prop

erty

Ow

ner

Dow

nspo

ut6/

20/2

005

New

ly I

dent

ified

Conf

irmed

Not

Ille

gal

9.56

16Cr

oss

Coun

try

Blvd

.99

A2

Prop

erty

Ow

ner

Dow

nspo

ut6/

20/2

005

New

ly I

dent

ified

Conf

irmed

Not

Ille

gal

10.

6309

Fairl

ane

Dr.

154

B2

Prop

erty

Ow

ner

Dow

nspo

ut6/

20/2

005

New

ly I

dent

ified

Conf

irmed

Not

Ille

gal

11.

154

B1

Prop

erty

Ow

ner

Dow

nspo

ut C

onne

ctio

n6/

20/2

005

New

ly I

dent

ified

Conf

irmed

Not

Ille

gal

12.

6908

Fiel

dcre

st R

d.27

2B

3Pr

oper

ty O

wne

rD

owns

pout

Con

nect

ion

6/20

/200

5N

ewly

Ide

ntifi

edCo

nfirm

ed N

ot I

llega

l13

.38

00G

leng

yle

Ave.

275

B13

Prop

erty

Ow

ner

Dow

nspo

ut C

onne

ctio

n6/

20/2

005

New

ly I

dent

ified

Conf

irmed

Not

Ille

gal

14.

6309

.G

reen

sprin

g Av

e.15

3.B

5.Pr

oper

ty O

wne

rD

owns

pout

4034

7.Ill

egal

It w

as c

onfir

med

as

an il

lega

l con

nect

ion

in J

anua

ry

2011

aft

er c

arry

ing

out

mor

e dy

e-te

stin

g.

A le

tter

was

se

nt t

o th

e pr

oper

ty o

wne

r on

Aug

ust

08,

2011

. A

follo

w u

p le

tter

dat

ed 0

1/05

/201

2 w

as s

ent

to t

he

prop

erty

ow

ner

requ

estin

g th

at t

he d

rain

be

disc

onne

cted

. Co

rrec

tive

actio

n ha

s be

en t

aken

. Th

is

loca

tion

was

tes

ted

and

conf

irmed

tha

t th

e pr

oble

m

has

been

aba

ted.

15.

153

B4

Prop

erty

Ow

ner

Area

Dra

in3/

28/2

005

Posi

tive

New

ly I

dent

ified

Conf

irmed

Not

Ille

gal

16.

2212

Ken

Oak

Rd.

100

A1

Prop

erty

Ow

ner

Dow

nspo

ut6/

20/2

005

New

ly I

dent

ified

Conf

irmed

Not

Ille

gal

17.

100

A2

Prop

erty

Ow

ner

Dow

nspo

ut6/

20/2

005

New

ly I

dent

ified

Conf

irmed

Not

Ille

gal

18.

2416

Ken

Oak

Rd.

103

A1

Prop

erty

Ow

ner

Dow

nspo

ut6/

20/2

005

New

ly I

dent

ified

Conf

irmed

Not

Ille

gal

19.

5609

Key

Ave.

50B

4Pr

oper

ty O

wne

rD

owns

pout

6/20

/200

5N

ewly

Ide

ntifi

edCo

nfirm

ed N

ot I

llega

l20

.25

04La

rryv

ale

Rd.

154

B7

Prop

erty

Ow

ner

Dow

nspo

ut6/

20/2

005

New

ly I

dent

ified

Conf

irmed

Not

Ille

gal

21.

5815

Loch

lea

Rd.

116

B1

Prop

erty

Ow

ner

Dow

nspo

ut6/

20/2

005

New

ly I

dent

ified

Conf

irmed

Not

Ille

gal

22.

4424

Mar

ble

Hal

l Roa

dPr

oper

ty M

anag

erSt

orm

wat

er D

rain

4/13

/201

1Ill

egal

A le

tter

was

sen

t to

HCD

on

May

25,

201

1, f

or

furt

her

actio

n.

A vi

olat

ion

Not

ice

was

issu

ed in

Jul

y 20

11.

A m

eetin

g w

as h

eld

on J

uly

28,

2011

, w

ith

Mar

ble

Hal

l Apa

rtm

ent

man

agem

ent

to d

iscu

ss t

he

prog

ress

of

relo

catin

g th

e ill

egal

con

nect

ion.

Pe

r th

e m

anag

emen

t of

the

apa

rtm

ent

com

plex

, th

e co

nnec

tion

was

re-

rout

ed in

Aug

ust

2011

. F

ollo

w u

p te

stin

g w

as c

arrie

d ou

t in

Sep

tem

ber

whi

ch in

dica

ted

that

the

fix

has

not

pre

vent

ed s

torm

wat

er g

ettin

g in

to t

he s

anita

ry s

ewer

s. F

urth

er c

oord

inat

ion

is

bein

g do

ne t

o pe

rman

ently

res

olve

the

issu

e. A

lett

er

date

d 11

/28/

11 w

as s

ent

to H

CD t

o co

ntin

ue

enfo

rcem

ent.

Pro

pert

y ow

ner

is n

ot r

espo

nsiv

e. D

PW

will

coo

rdin

ate

with

HCD

for

enf

orce

men

t. H

CD

has

no

tifi

ed D

PW

tha

t th

ey’ll

con

tinu

e en

forc

ing

the

viol

atio

n no

tice

.

23.

3M

illbr

ook

Rd.

D1

Prop

erty

Ow

ner/

Trus

tee

Patio

Dra

in5/

19/2

011

Illeg

al

It w

as c

onfir

med

as

an il

lega

l con

nect

ion

in M

ay

2011

aft

er c

arry

ing

out

mor

e dy

e-te

stin

g.

A le

tter

w

as s

ent

to t

he p

rope

rty

owne

r on

Aug

ust

08,

2011

. A

follo

w u

p le

tter

dat

ed 1

1/28

/11

was

sen

t to

the

pr

oper

ty o

wne

r re

ques

ting

that

the

tem

pora

ry s

eal

beco

mes

per

man

ent.

24.

5806

Park

Hei

ghts

Ave

.78

B4

Prop

erty

Ow

ner

Dow

nspo

ut6/

20/2

005

New

ly I

dent

ified

Conf

irmed

Not

Ille

gal

25.

78B

2Pr

oper

ty O

wne

rD

owns

pout

6/20

/200

5N

ewly

Ide

ntifi

edCo

nfirm

ed N

ot I

llega

l26

.78

B3

Prop

erty

Ow

ner

Dow

nspo

ut6/

20/2

005

New

ly I

dent

ified

Conf

irmed

Not

Ille

gal

27.

78B

9Pr

oper

ty O

wne

rD

owns

pout

6/20

/200

5N

ewly

Ide

ntifi

edCo

nfirm

ed N

ot I

llega

l28

.78

B8

Prop

erty

Ow

ner

Dow

nspo

ut6/

20/2

005

New

ly I

dent

ified

Conf

irmed

Not

Ille

gal

29.

5905

Park

Hei

ghts

Ave

.95

B2

Prop

erty

Ow

ner

Dow

nspo

ut6/

20/2

005

New

ly I

dent

ified

Conf

irmed

Not

Ille

gal

30.

6414

Park

Hei

ghts

Ave

.31

5A

4Pr

oper

ty O

wne

rD

owns

pout

Con

nect

ion

6/20

/200

5N

ewly

Ide

ntifi

edCo

nfirm

ed N

ot I

llega

l31

.31

5A

3Pr

oper

ty O

wne

rAr

ea D

rain

3/22

/200

5Po

sitiv

eN

ewly

Ide

ntifi

edCo

nfirm

ed N

ot I

llega

l32

.71

26Pa

rk H

eigh

ts A

ve.

280

B16

Prop

erty

Ow

ner

Dow

nspo

ut C

onne

ctio

n6/

20/2

005

New

ly I

dent

ified

Conf

irmed

Not

Ille

gal

33.

6311

Pear

ce A

ve.

203

B5

Prop

erty

Ow

ner

Dow

nspo

ut6/

20/2

005

New

ly I

dent

ified

Conf

irmed

Not

Ille

gal

34.

203

B4

Prop

erty

Ow

ner

Dow

nspo

ut6/

20/2

005

New

ly I

dent

ified

Conf

irmed

Not

Ille

gal

35.

6106

Pim

lico

Rd.

135

A1

Prop

erty

Ow

ner

Driv

eway

Dra

in3/

28/2

005

Posi

tive

New

ly I

dent

ified

Conf

irmed

Not

Ille

gal

36.

6306

Pim

lico

Rd.

127

B1

Prop

erty

Ow

ner

D

owns

pout

6/20

/200

5N

ewly

Ide

ntifi

edCo

nfirm

ed N

ot I

llega

l37

.55

03R

usk

Ave.

30B

1Pr

oper

ty O

wne

rD

owns

pout

6/20

/200

5N

ewly

Ide

ntifi

edCo

nfirm

ed N

ot I

llega

l38

.32

08Sh

elbu

rne

Rd.

334

A1

Prop

erty

Ow

ner

Driv

eway

Dra

in3/

15/2

005

Posi

tive

New

ly I

dent

ified

Conf

irmed

Not

Ille

gal

39.

1702

Sout

h R

d.32

4A

2Pr

oper

ty O

wne

rD

owns

pout

6/20

/200

5N

ewly

Ide

ntifi

edCo

nfirm

ed N

ot I

llega

l40

.21

17Su

lgra

ve A

ve.

320

B6

Prop

erty

Ow

ner

Dow

nspo

ut6/

20/2

005

New

ly I

dent

ified

Conf

irmed

Not

Ille

gal

41.

2607

Tane

y R

d.18

3B

4Pr

oper

ty O

wne

rD

rivew

ay D

rain

3/23

/200

5Po

sitiv

eN

ewly

Ide

ntifi

edCo

nfirm

ed N

ot I

llega

l42

.26

15Ta

ney

Rd.

183

B2

Prop

erty

Ow

ner

Dow

nspo

ut6/

20/2

005

New

ly I

dent

ified

Conf

irmed

Not

Ille

gal

43.

2700

Tane

y R

d.18

3B

8Pr

oper

ty O

wne

rD

owns

pout

6/20

/200

5N

ewly

Ide

ntifi

edCo

nfirm

ed N

ot I

llega

l44

.28

08Ta

ney

Rd.

182

B6

Prop

erty

Ow

ner

Dow

nspo

ut6/

20/2

005

New

ly I

dent

ified

Conf

irmed

Not

Ille

gal

45.

182

B5

Prop

erty

Ow

ner

Dow

nspo

ut6/

20/2

005

New

ly I

dent

ified

Conf

irmed

Not

Ille

gal

46.

2810

W.

Stra

thm

ore

Ave.

180

A5

Prop

erty

Ow

ner

Dow

nspo

ut6/

20/2

005

New

ly I

dent

ified

Conf

irmed

Not

Ille

gal

47.

3602

Ches

holm

Rd.

Prop

erty

Ow

ner

Dow

nspo

ut5/

9/20

05Po

sitiv

eN

ewly

Ide

ntifi

edCo

nfirm

ed N

ot I

llega

l48

.67

08Pa

rk H

eigh

ts A

ve.

Prop

erty

Ow

ner

Dow

nspo

ut5/

9/20

05Po

sitiv

eN

ewly

Ide

ntifi

edCo

nfirm

ed N

ot I

llega

l49

.42

14G

rove

land

Ave

.Pr

oper

ty O

wne

rD

owns

pout

5/9/

2005

Posi

tive

New

ly I

dent

ified

Conf

irmed

Not

Ille

gal

50.

4414

Gro

vela

nd A

ve.

Prop

erty

Ow

ner

Dow

nspo

ut5/

9/20

05Po

sitiv

eN

ewly

Ide

ntifi

edCo

nfirm

ed N

ot I

llega

l51

.27

05Q

ueen

Ann

e Av

e.Pr

oper

ty O

wne

rD

owns

pout

5/9/

2005

Posi

tive

New

ly I

dent

ified

Conf

irmed

Not

Ille

gal

52.

5614

.Se

war

d Av

e Pr

oper

ty O

wne

r

Sw

imm

ing

Pool

4076

4.

Pos

itive

Illeg

al

A le

tter

dat

ed 1

2/9/

11 w

as s

ent

to t

he p

rope

rty

owne

r re

ques

ting

that

the

dra

in b

e di

scon

nect

ed f

rom

the

sa

nita

ry li

ne.

The

illeg

al c

onne

ctio

n w

as r

emov

ed b

y th

e ow

ner.

Test

ID

Full

Add

ress

Cit

y of

Bal

tim

ore

San

itar

y S

ewer

Ove

rflo

w C

onse

nt

Dec

ree

Civi

l Act

ion

No.

JFM

-02-

1524

Civil Action No. JFM-02-1524 22 Calendar Quarterly Report No. 41 For Calendar Quarter Ending December 31, 2012

APPENDIX 4

PUMPING STATION WORK ORDERS

Civil Action No. JFM-02-1524 23 Calendar Quarterly Report No. 41 For Calendar Quarter Ending December 31, 2012

APPENDIX 5

SUMMARY OF REPORTED OVERFLOWS

City of Baltimore Activity at Sanitary Sewer Overflow Structures

For Calendar Quarter Ending December 31, 2012

Civil Action No. JFM-02-1524 Appendix 5-1 Activity at SSO Structures Calendar Quarterly Report No. 41 For Calendar Quarter Ending December 31, 2012

SSO No. 67

Date Surcharge Depth (in)** Rainfall (in)

10/29/2012 Flow Meter in Place 6.15

10/30/2012 Flow Meter in Place 1.05

SSO No. 72

Date Surcharge Depth (in)** Rainfall (in)

10/29/2012 Flow Meter in Place 6.15

10/30/2012 Flow Meter in Place 1.05

SSO No. 132

Date Surcharge Depth (in)** Rainfall (in)

10/29/2012 Flow Meter in Place 6.58

10/30/2012 Flow Meter in Place 0.88

SSO No. 134

Date Surcharge Depth (in)** Rainfall (in)

10/29/2012 Flow Meter in Place 6.58

City of Baltimore Activity at Sanitary Sewer Overflow Structures

For Calendar Quarter Ending December 31, 2012

Civil Action No. JFM-02-1524 Appendix 5-2 Activity at SSO Structures Calendar Quarterly Report No. 41 For Calendar Quarter Ending December 31, 2012

10/30/2012 Flow Meter in Place 0.88

SSO No. 135

Date Surcharge Depth (in)** Rainfall (in)

10/29/2012 Flow Meter in Place 6.58

10/30/2012 Flow Meter in Place 0.88

SSO No. 137

Date Surcharge Depth (in)** Rainfall (in)

09/18/2012 Flow Meter in Place 1.58

10/19/2012 Flow Meter in Place 1.07

10/29/2012 Flow Meter in Place 5.92

10/30/2012 Flow Meter in Place 1.03

SSO No. 138

Date Surcharge Depth (in)** Rainfall (in)

10/29/2012 Flow Meter in Place 5.66

10/30/2012 Flow Meter in Place 0.83

City of Baltimore Activity at Sanitary Sewer Overflow Structures

For Calendar Quarter Ending December 31, 2012

Civil Action No. JFM-02-1524 Appendix 5-3 Activity at SSO Structures Calendar Quarterly Report No. 41 For Calendar Quarter Ending December 31, 2012

SSO No. 139

Date Surcharge Depth (in)** Rainfall (in)

10/29/2012 Flow Meter in Place 5.66

10/30/2012 Flow Meter in Place 0.83

Pumping Station Overflows

Pumping Station Date Volume Loss (gal) Rainfall (in)

None Reported this Quarter

Waste Water Treatment Plant Overflows

WWTP Date Volume Loss (gal) Rainfall (in)

None Reported this Quarter

Date Estimated Volume (Gal) Cause Rain Receiving Waters Location Zip

10/2/2012 Evidence of Overflow Rags, Grease & Debris 0.77 None 2601 Cannery Ave 21226

10/2/2012 Evidence of Overflow Rags 0.77 None 3907 W. Mulberry St 21229

10/4/2012 Evidence of Overflow Roots 0.01 None 2924 Fleetwood Ave 21214

10/6/2012 Evidence of Overflow N/A 0.00 None 1147 Monroe Cir 21225

10/6/2012 Evidence of Overflow Rags & Roots 0.00 None 309 Rossiter Ave 21212

10/6/2012 30 Rags & Grease 0.00 Gwynns Falls 1823 Eutaw Place 21217

10/8/2012 540 N/A 0.00 None/ Private Location 1100 Evans Way 21215

10/8/2012 Evidence of Overflow Rags 0.00 None 839 E. Chase St 21202

10/9/2012 Evidence of Overflow Rags 0.04 None 3517 Oakmont Ave 21215

10/9/2012 7375 N/A 0.04 Gwynns Falls 914 Wilmington Ave 21223

10/10/2012 105 Rags & Grease 0.02 Jones Falls 1008 Billy Holiday Ct 21205

10/10/2012 Evidence of Overflow Debris 0.02 None 1817 Penrose Ave 21223

10/11/2012 Evidence of Overflow Rags 0.00 None 2401 Harriet Ave 21230

10/11/2012 277 Rags, Roots & Grease 0.00 Gwynns Falls 4001 Clifton Ave 21216

10/12/2012 Evidence of Overflow Rags 0.00 None 104 S. Monastery Ave 21229

10/13/2012 325 Rags & Grease 0.00 Gwynns Falls 2850 Edmondson Ave 21223

10/14/2012 170 Grease 0.00 Jones Falls 1112 Wood Heights Ave 21211

10/16/2012 348 Rags & Grease 0.00 Gwynns Falls 851 Braddish Ave 21216

10/16/2012 500 Rags & Grease 0.00 Inner Harbor 3800 E. Baltimore St 21224

10/16/2012 Evidence of Overflow Rags 0.00 None 445 Kenneth Sq 21212

10/17/2012 399 Rags, Grease & Sand, Gravel, Rocks 0.00 Jones Falls 2231 Rogene Dr 21209

10/18/2012 1100 Rags, Grease & Trash 0.00 Gwynns Falls 137 W. North Ave 21217

10/18/2012 Evidence of Overflow Rags & Debris 0.00 None 5921 Western Run Dr 21209

10/18/2012 Evidence of Overflow N/A 0.00 None York Rd & Nicoll Ave 21212

10/18/2012 Evidence of Overflow Roots & Debris 0.00 None 2722 Sethlow Rd 21225

10/19/2012 Evidence of Overflow Roots 0.93 None 4 Millbrook Rd 21218

10/20/2012 Evidence of Overflow N/A 0.01 None 1108 N. Central Ave 21202

10/20/2012 Evidence of Overflow Rags 0.01 None 519 N. Streeper St 21205

10/20/2012 2241 N/A 0.01 Patapsco 1113 S. Charles St 21230

10/20/2012 1941 Roots & Sand, Gravel, Rocks 0.01 Gwynns Falls 5100 N. Franklintown Rd 21207

10/22/2012 Evidence of Overflow N/A 0.00 None 3500 Horton Ave 21225

10/22/2012 Evidence of Overflow Debris 0.00 None 4705 Kernwood Ave 21212

10/22/2012 945 Rags & Roots 0.00 Gwynns Falls 5003 Ashmans Hope 21207

10/24/2012 Evidence of Overflow Trash 0.00 None 2449 Shirley Ave 21215

10/26/2012 Evidence of Overflow Grease 0.00 None 725 Milyer Ln 21229

10/26/2012 770 N/A 0.00 Inner Harbor 5423 O'Donnell St 21224

10/27/2012 Evidence of Overflow Roots 0.00 None 717 Brinkwood Rd 21229

10/27/2012 93 N/A 0.00 Inner Harbor 708 Harvey St 21230

10/28/2012 510 Rags & Grease 0.20 Herring Run 1903 South Rd 21209

10/29/2012 Evidence of Overflow N/A 5.73 None 1801 Falls Rd 21201

City of BaltimoreUn-Permitted Sanitary Sewer Overflows

For Calendar Quarter Ending December 31, 2012

Civil Action No. JFM-02-1524 Overflow Occurrences Calendar Quarterly Report No. 41 For Calendar Quarter Ending December 31, 2012 Appendix 5 - 4

Date Estimated Volume (Gal) Cause Rain Receiving Waters Location Zip

City of BaltimoreUn-Permitted Sanitary Sewer Overflows

For Calendar Quarter Ending December 31, 2012

10/29/2012 224 Rags, Grease & Debris 5.73 Jones Falls 3615 Hillsdale Rd 21207

10/29/2012 4720 Rags & Grease 5.73 Jones Falls 413 N. Kenwood Ave 21224

10/29/2012 Evidence of Overflow Heavy Rain 5.73 None 5614 Pioneer Dr 21214

10/29/2012 Evidence of Overflow N/A 5.73 None 1429 E. Baltimore St 21231

10/29/2012 3417 Roots & Debris 5.73 Gwynns Falls 3907 Clarinth Rd 21215

10/29/2012 Evidence of Overflow Rags & Roots 5.73 None 307 Edgevale Rd 21210

10/30/2012 360 Rags & Grease 0.94 Inner Harbor 1300 E. Baltimore St 21202

10/30/2012 Evidence of Overflow Roots 0.94 None 4914 Westhills Rd 21229

10/31/2012 8100 N/A 0.00 Herring Run 2800 Chesterfield Ave 21213

10/31/2012 Evidence of Overflow N/A 0.00 None 825 E. Fort Ave 21230

10/31/2012 250 Rags & Grease 0.00 Jones Falls 1900 N. Howard St 21218

10/31/2012 1928 Rags, Roots & Grease 0.00 Patapsco 4213 Penhurst Ave 21215

Civil Action No. JFM-02-1524 Overflow Occurrences Calendar Quarterly Report No. 41 For Calendar Quarter Ending December 31, 2012 Appendix 5 - 5

Date Estimated Volume (Gal) Cause Rain Receiving Waters Location Zip

City of BaltimoreUn-Permitted Sanitary Sewer Overflows

For Calendar Quarter Ending December 31, 2012

11/1/2012 15 Rags & Grease 0.00 None 3034 Mathews St 21218

11/2/2012 60 Grease 0.00 Inner Harbor 402 Key Hwy 21230

11/3/2012 180 Rags, Roots & Grease 0.00 Gwynns Falls 511 S. Collins Ave 21229

11/3/2012 Evidence of Overflow N/A 0.00 None 2301 Windsor Ave 21216

11/4/2012 600 Rags & Grease 0.00 Herring Run Darley Ave. & N. Wolfe St 21213

11/5/2012 Evidence of Overflow Rags 0.00 None 1108 N. Central Ave 21202

11/5/2012 975 Heavy Debris 0.00 Inner Harbor 1651 Ceddox St 21226

11/6/2012 111 Rags 0.00 Jones Falls 1802 Mosher St 21217

11/7/2012 Evidence of Overflow Rags & Roots 0.02 None 1314 Cedarcroft Rd 21212

11/8/2012 51 Pipe Break & Sand, Gravel, Rocks 0.00 Jones Falls 1656 W. North Ave 21217

11/12/2012 Evidence of Overflow Roots 0.01 None 1903 South Rd 21209

11/12/2012 Evidence of Overflow Rags, Roots & Grease 0.01 None 214 Tunbridge Rd 21212

11/12/2012 Evidence of Overflow Rags & Roots 0.01 None 3205 Elmora Ave 21213

11/12/2012 Evidence of Overflow Roots & Grease 0.01 None 3603 Buena Vista Ave 21211

11/14/2012 Evidence of Overflow Rags, Roots & Grease 0.00 None 3710 Nortonia Rd 21216

11/14/2012 120 Rags & Grease 0.00 Patapsco 6200 O'Donnell St 21224

11/14/2012 500 Rags, Grease & Debris 0.00 Herring Run Darley Ave. & N. Wolfe St 21213

11/15/2012 870 Rags & Grease 0.00 Gwynns Falls Smallwood & North Ave 21217

11/15/2012 Evidence of Overflow Rags & Grease 0.00 None 2800 Rosalind Ave 21215

11/18/2012 Evidence of Overflow Rags & Debris 0.00 None 917 Seagull Ave 21225

11/19/2012 Evidence of Overflow Rags 0.00 None 6309 Eunice Ave 21214

11/19/2012 Evidence of Overflow N/A 0.00 None 1246 N. Broadway 21213

11/19/2012 Evidence of Overflow Rags & Grease 0.00 None 1326 N. Broadway 21213

11/19/2012 Evidence of Overflow Pipe Break 0.00 None 400 S. Augusta Ave 21229

11/19/2012 124 Rags 0.00 Low Level 805 W. Cross St 21230

11/21/2012 Evidence of Overflow N/A 0.00 None 412 S. Beechfield Ave 21229

11/21/2012 Evidence of Overflow Rags 0.00 None 2921 Stranden Rd 21230

11/23/2012 Evidence of Overflow N/A 0.00 None 803 E. 22nd St 21218

11/23/2012 60 N/A 0.00 None 1100 Elliott St & Urban Way 21224

11/23/2012 Evidence of Overflow Rags & Grease 0.00 None 5016 Frankford Ave 21206

11/23/2012 Evidence of Overflow Rags 0.00 None Urban Way 21224

11/23/2012 Evidence of Overflow Rags 0.00 None 1811 Bolton St 21217

11/24/2012 Evidence of Overflow Rags & Grease 0.00 None 3001 Erdman Ave 21213

11/25/2012 Evidence of Overflow Rags & Grease 0.00 None 307 Rossiter Ave 21212

11/26/2012 Evidence of Overflow Debris 0.00 None 412 S. Beechfield Ave 21229

Civil Action No. JFM-02-1524 Overflow Occurrences Calendar Quarterly Report No. 41 For Calendar Quarter Ending December 31, 2012 Appendix 5 - 6

Date Estimated Volume (Gal) Cause Rain Receiving Waters Location Zip

City of BaltimoreUn-Permitted Sanitary Sewer Overflows

For Calendar Quarter Ending December 31, 2012

11/26/2012 Evidence of Overflow Rags 0.00 None 916 N. Monroe St 21217

11/26/2012 Evidence of Overflow Roots 0.00 None 5736 Nasco Pl 21239

11/26/2012 330 Rags & Grease 0.00 Jones Falls Wolfe St & Fayette St 21287

11/26/2012 98 Rags, Grease & Rocks 0.00 Jones Falls W. Northern Pkwy & Falls Rd 21210

11/27/2012 Evidence of Overflow Debris 0.24 None 16 S. Monroe St 21223

11/27/2012 1491 Rags & Debris 0.24 Jones Falls 1823 Eutaw Pl 21217

11/27/2012 Evidence of Overflow Sand, Gravel, Rocks 0.24 None 400 S. Augusta Ave 21229

11/27/2012 Evidence of Overflow Roots & Debris 0.24 None 1809 Bolton St 21217

11/28/2012 Evidence of Overflow Roots 0.00 None 1011 Woodson Rd 21212

11/29/2012 Evidence of Overflow N/A 0.00 None 1122 Braddish Ave 21216

11/29/2012 180 Rags & Debris 0.00 Jones Falls 1823 Eutaw Pl 21217

11/29/2012 Evidence of Overflow Rags & Debris 0.00 None 2427 Etting St 21217

11/29/2012 143 Rags 0.00 Jones Falls Flaxter & Yellowwood Ave 21209

11/29/2012 216 Rags & Roots 0.00 Gwynns Falls 412 S. Beechfield Ave 21229

11/29/2012 Evidence of Overflow N/A 0.00 None 5216 Linden Heights Ave 21215

Civil Action No. JFM-02-1524 Overflow Occurrences Calendar Quarterly Report No. 41 For Calendar Quarter Ending December 31, 2012 Appendix 5 - 7

Date Estimated Volume (Gal) Cause Rain Receiving Waters Location Zip

City of BaltimoreUn-Permitted Sanitary Sewer Overflows

For Calendar Quarter Ending December 31, 2012

12/1/2012 Evidence of Overflow Rags N/A None 1036 Braddish Ave 21216

12/1/2012 Evidence of Overflow Roots N/A None 2548 Marbourne Ave 21230

12/1/2012 Evidence of Overflow N/A N/A None 4523 Pimlico Rd 21215

12/2/2012 1040 Roots N/A Gwynns Falls 4403 Wakefield Rd 21216

12/2/2012 Evidence of Overflow Pipe Break N/A None 5928 Glen Falls Ave 21206

12/3/2012 Evidence of Overflow

Pipe Break & Sand, Gravel, Rocks N/A Herring Run 2727 E. Strathmore Ave 21214

12/3/2012 Evidence of Overflow Pipe Break N/A Jones Falls 3001 Saint Paul St 21218

12/4/2012 Evidence of Overflow Rags N/A None 1028 N. Calvert St 21202

12/4/2012 300 Rags, Grease & Debris N/A Gwynns Falls 3700 Clifton Ave 21216

12/4/2012 Evidence of Overflow Rags & Roots N/A None 4909 Liberty Heights Ave 21207

12/4/2012 885 Roots & Grease N/A Herring Run 5101 Harford Rd 21214

12/5/2012 30 Rags & Grease N/A None 1318 N. Luzerne Ave 21213

12/5/2012 600 Rags & Debris N/A Inner Harbor Dundalk Ave & Gusryan St 21224

12/6/2012 200 Grease & Debris N/A Inner Harbor 921 E. Fort Ave 21230

12/6/2012 130 Rags & Grease N/A Jones Falls 2002 Greenmount Ave 21218

12/6/2012 630 Rags & Grease N/A Herring Run 2101 Pentland Drive 21239

12/6/2012 Evidence of Overflow N/A N/A None 2461 Perring Manor Rd 21234

12/6/2012 Evidence of Overflow Roots N/A None 3616 Hickory Ave 21211

12/6/2012 Evidence of Overflow Rags & Grease N/A None 5006 Litchfield Ave 21215

12/6/2012 210 Rags & Debris N/A Gwynns Falls Gwynns Falls Pkwy & Tioga Pkwy 21215

12/7/2012 Evidence of Overflow Roots N/A None 601 E. 34th St 21218

12/7/2012 Evidence of Overflow Roots N/A None 4909 Ross Rd 21216

12/8/2012 360 Rags & Grease N/A Jones Falls 112 Elmhurst Rd 21210

12/8/2012 138 Rags & Grease N/A Jones Falls 201 E. Pratt St 21202

12/10/2012 351 N/A N/A None 2629 Rayner Ave 21216

12/11/2012 4570 Rags & Grease N/A Patapsco 810 Glade Ct 21225

12/12/2012 Evidence of Overflow Rags & Roots N/A None 812 S. Sharp St 21230

12/13/2012 Evidence of Overflow Roots N/A Jones Falls 2509 Shellydale Dr 21209

12/14/2012 Evidence of Overflow N/A N/A None 214 Tunbridge Rd 21212

12/14/2012 Evidence of Overflow Rags N/A Jones Falls 831 Brooks Ln 21217

12/14/2012 Evidence of Overflow N/A N/A None 3533 Lucille Ave 21215

12/14/2012 Evidence of Overflow Rags & Roots N/A Gwynns Falls 4828 Pimlico Rd 21215

12/14/2012 Evidence of Overflow Grease N/A None 5600 Woodmont Ave 21239

12/15/2012 308 Rags & Grease N/A Jones Falls 102 E. 25th St 21202

12/15/2012 620 Rags & Grease N/A Jones Falls 102 E. 25th St 21202

12/15/2012 1101 Grease N/A Inner Harbor 502 S. Belnord Ave 21231

12/15/2012 Evidence of Overflow Rags & Grease N/A None 1051 Cameron St 21212

12/15/2012 Evidence of Overflow Rags & Grease N/A None 1638 Ruxton Ave 21216

12/15/2012 Evidence of Overflow Rags & Roots N/A None 4210 Nadine Dr 21215

12/15/2012 30 N/A N/A Inlet 4801 Lorelly Ave 21216

12/15/2012 Evidence of Overflow N/A N/A Patapsco 6608 Danville Ave 21224

Civil Action No. JFM-02-1524 Overflow Occurrences Calendar Quarterly Report No. 41 For Calendar Quarter Ending December 31, 2012 Appendix 5 - 8

Date Estimated Volume (Gal) Cause Rain Receiving Waters Location Zip

City of BaltimoreUn-Permitted Sanitary Sewer Overflows

For Calendar Quarter Ending December 31, 2012

12/16/2012 180 Rags & Grease N/A Gwynns Falls 4005 Carlisle Ave 21216

12/17/2012 1750 Grease & Debris N/A Inner Harbor 3250 E. Fayetter St 21224

12/18/2012 Evidence of Overflow N/A N/A None 3415 Clarks Ln 21215

12/18/2012 Evidence of Overflow N/A N/A None 3902 Hillsdale Rd 21207

12/18/2012 Evidence of Overflow Rags & Roots N/A None 5314 Wendley Rd 21229

12/19/2012 Evidence of Overflow Roots N/A None 103 Woodlawn Rd 21210

12/19/2012 Evidence of Overflow Roots N/A None 214 Tunbridge Rd 21212

12/19/2012 158 Rags & Dirt, Debris N/A Gwynns Falls 5807 Royal Oak Ave 21207

12/19/2012 Evidence of Overflow Rags & Roots N/A None 6608 Danville Ave 21222

12/20/2012 Evidence of Overflow Rags N/A None 4004 W. Strathmore Ave 21215

12/21/2012 850 Rags & Roots N/A Gwynns Falls Denison St & Walbrook Ave 21216

12/22/2012 360 Rags & Grease N/A Patapsco Bridgeview Rd & Round Rd 21225

12/23/2012 264 Roots N/A Herring Run 307 Rossiter Ave 21212

12/23/2012 Evidence of Overflow Grease N/A Herring Run 412 E. Cold Spring Ln 21212

12/26/2012 166 Rags, Grease & Debris N/A Jones Falls 2200 Kirk Ave 21218

12/26/2012 795 Roots N/A Herring Run 2706 E. Strathmore Ave 21214

12/27/2012 80 Roots & Trash N/A Herring Run 700 Belle Terre Ave 21218

12/27/2012 Evidence of Overflow N/A N/A None 817 Stoll St 21225

12/27/2012 Evidence of Overflow Rags N/A None 1322 W. Pratt St 21223

12/27/2012 Evidence of Overflow Rags & Roots N/A Gwynns Falls 2701 Mount Holly St 21216

12/27/2012 Evidence of Overflow Roots & Grease N/A None 4017 Kathland Ave 21207

12/27/2012 258 Rags & Grease N/A Gwynns Falls 4829 Reisterstown Rd 21215

12/27/2012 400 Rags & Roots N/A Herring Run 5713 Edgepark Rd 21239

12/28/2012 360 Rags & Roots N/A Jones Falls 700 W. University Pkwy 21211

12/28/2012 Evidence of Overflow N/A N/A None 2014 McCulloh St 21217

12/29/2012 780 Rags, Roots & Grease N/A Jones Falls Falls Rd & Hillside Rd 21210

12/29/2012 13635 Sand, Gravel, Rocks N/A Herring Run Harford Rd & Parkside Dr 21214

12/30/2012 Evidence of Overflow Rags & Debris N/A None 2949 Frederick Ave 21223

12/31/2012 48 Rags & Grease N/A High Level 900 Druid Hill Ave 21201

12/31/2012 165 Rags & Grease N/A Northwest Harbor 5701 O'Donnell St 21224

3. N/A- Not Available (December Rain Gauge data not available at time of this report.)

2. Traces of sewage were evident but SSO had subsided prior to arrival at the site.

1. Unknown Quantity - When DPW visited the site, the problem had already subsided, but the source of discharge was evident.

Notes:

Civil Action No. JFM-02-1524 Overflow Occurrences Calendar Quarterly Report No. 41 For Calendar Quarter Ending December 31, 2012 Appendix 5 - 9

Seria

l No.

D

ate

of

Occ

urre

nce

Loca

tion

Zip

Cod

eSt

ream

Affe

cted

Dat

e of

Res

olut

ion

(See

N

ote

6 B

elow

)D

urat

ion

(Day

s)

Est

. Qua

ntity

of

Dis

char

ge (g

allo

ns) 1

2 /3

1/20

12

Mea

sure

s Ta

ken

to Id

entif

y So

urce

or

Res

olve

Fu

ture

/Pla

nned

Wor

k

Prio

rity

#11/

3/20

02S

tony

Run

/Uni

vers

ity P

arkw

ay

H

opki

ns H

ouse

2121

8Jo

nes

Falls

Not

Res

olve

dR

esol

ved

31,1

04 (T

)Pr

oper

ty M

anag

er re

porte

d th

at w

ork

was

com

plet

ed

on M

arch

28,

201

2. C

ity c

lean

ed re

mai

ning

gre

ase

from

line

.

City

will

perfo

rm c

onfir

mat

ory

test

ing.

Tes

t ne

gativ

e. T

his

site

is a

bate

d.

111

/30/

2007

Man

naso

ta &

Sha

nnon

2121

3H

errin

g R

unN

ot R

esol

ved

On-

goin

g6,

256,

599

(T)

City

had

on-

call

cont

ract

or c

ap th

e un

derd

rain

to

reso

lve

the

SDU

O, b

ut th

e se

wag

e w

as h

ydra

ulic

ally

fo

rced

into

the

stor

m d

rain

pip

e. C

ap w

as re

mov

ed.

Inve

stig

atio

n on

goin

g. F

ield

wor

k w

as p

erfro

med

to

expo

se u

nder

drai

n at

two

loca

tions

Furth

er in

vest

igat

ion

with

dye

test

ing

and

amm

onia

te

stin

g is

requ

ired.

Inve

stig

atio

n sc

hedu

led

for n

ext

quar

ter

24/

11/2

007

6225

Yor

k R

d be

hind

Wal

ker M

ews

Apar

tmen

t Bu

ildin

g21

212

Her

ring

Run

Not

Res

olve

dO

n-go

ing

1,77

5,18

6 (T

)

Dye

and

am

mon

ia te

stin

g an

d C

CTV

insp

ectio

ns

perfo

rmed

prio

r to

CIP

P lin

ing.

CIP

P lin

ed s

ewer

, but

te

stin

g in

dica

ted

no re

solu

tion.

Afte

r fur

ther

test

ing,

ad

ditio

nal C

IPP

Lini

ng w

as re

com

men

ded/

inst

alle

d

Rec

omm

eden

ded

for l

inin

g/re

habi

litat

ion.

149/

18/2

007

JHU

Cam

pus

2121

8Jo

nes

Falls

Not

Res

olve

dO

n-go

ing

2,23

0,36

2 (T

)

City

lette

r sen

t to

JHU

on

3/30

/11

requ

iring

that

repa

irs

be m

ade.

JH

U c

ompl

eted

sig

nific

ant r

epai

r effo

rt.

Subs

eque

nt re

test

ing

by th

e C

ity d

eter

min

ed th

at th

e re

pairs

to d

ate

have

bee

n un

succ

essf

ul.

City

is c

lose

ly tr

acki

ng p

rogr

ess

in re

solv

ing

this

is

sue.

JH

U is

pro

ceed

ing.

207/

5/20

06W

. 24t

h &

Mor

ton

St.

2121

8Jo

nes

Falls

Not

Res

olve

dO

n-go

ing

2,19

3,12

0 (A

)

It w

as c

onfir

med

that

the

priv

ate

prop

ertie

s co

ntrib

utin

g to

the

prob

lem

wer

e 24

17 a

nd 2

433

Mar

ylan

d. A

ve .

A

viol

atio

n no

tice

was

issu

ed b

y H

CD

/HAB

C a

nd o

n

9/19

/11,

HC

D re

porte

d th

at 2

417

and

2433

Mar

ylan

d Av

e. h

ave

been

cor

rect

ed b

y a

priv

ate

plum

ber.

Test

ing

of 2

433

conf

irmed

that

they

had

reso

lved

thei

r pr

oble

m.

Loca

ted

addt

iona

l Lea

king

priv

ate

conn

ectio

n.

City

pur

suin

g pr

ivat

e ow

ners

.

249/

1/20

04C

ollin

s Av

e (e

nd o

f the

500

blo

ck)

2122

9G

wyn

ns F

alls

Not

Res

olve

dR

esol

ved

1,03

0,32

0 (T

)

Smok

e te

stin

g w

as p

erfo

rmed

on

8/24

/11.

The

on-

call

cons

ulta

nt is

cur

rent

ly c

oord

inat

ing

with

pro

perty

ow

ners

to c

ontin

ue fu

rther

inve

stig

atio

ns.

The

prop

erty

ow

ner a

t 421

S .

Augu

sta

Ave.

rem

ain

unco

oper

ativ

e an

d a

viol

atio

n no

tice

was

sen

t by

HC

D/H

ABC

. O

ne o

f th

e pr

oper

ty o

wne

rs re

-rou

ted

the

impr

oper

ly

conn

ecte

d ho

use

conn

ectio

n. B

ased

on

re-te

stin

g by

SW

MD

at t

he m

anho

le o

n Po

tter S

t., th

e SD

UO

has

st

ill no

t bee

n ab

ated

. D

ye te

st o

f 411

3 sh

owed

that

it is

pr

oper

ly c

onne

cted

to th

e se

wer

. H

CD

is p

roce

ssin

g a

viol

atio

n.

A Vi

olat

ion

Not

ice

will

not b

e is

sued

. Thi

s lo

catio

n ha

s be

en d

ry a

nd m

ore

test

ing

will

be d

one

to

abat

e. C

ontin

ues

to b

e dr

y. S

ite is

aba

ted.

Upd

ated

thro

ugh

Dec

embe

r 31,

201

2

Civ

il A

ctio

n N

o. J

FM

-02-

1524

SD

UO

Ove

rflo

w O

ccur

renc

es

Cal

enda

r Q

uart

erly

Rep

ort N

o. 4

1

For

Cal

enda

r Q

uart

er E

ndin

g D

ecem

ber

31, 2

012

App

endi

x 5-

10

Seria

l No.

D

ate

of

Occ

urre

nce

Loca

tion

Zip

Cod

eSt

ream

Affe

cted

Dat

e of

Res

olut

ion

(See

N

ote

6 B

elow

)D

urat

ion

(Day

s)

Est

. Qua

ntity

of

Dis

char

ge (g

allo

ns) 1

2 /3

1/20

12

Mea

sure

s Ta

ken

to Id

entif

y So

urce

or

Res

olve

Fu

ture

/Pla

nned

Wor

k

Upd

ated

thro

ugh

Dec

embe

r 31,

201

2

325/

19/2

009

4016

-401

8 R

oger

s Av

e. -

Rog

ers

Post

Apa

rtmen

ts

2120

7G

wyn

ns F

alls

Not

Res

olve

dO

n-go

ing

663,

487

(T)

Serie

s of

dye

and

am

mon

ia te

stin

g pe

rform

ed a

nd

CC

TV in

spec

tions

. Pro

blem

iden

tifie

d to

be

a pr

ivat

e pr

oper

ty is

sue.

Coo

rdin

ated

with

Bal

timor

e C

ity

Hou

sing

Dep

artm

ent t

o ad

dres

s th

is is

sue.

Ow

ner

hire

d a

plum

ber t

o cl

ean

the

lines

. C

onfir

mat

ory

test

ing

by th

e C

ity in

Mar

ch in

dica

tes

the

issu

es h

as n

ot b

een

reso

lved

. Fu

rthe

r tes

ting

conf

imre

d co

ntin

ued

prob

lem

.

City

sch

edul

ing

site

test

ing

with

pro

pert

y ow

ner.

336/

25/2

009

Cro

ss C

ount

ry B

lvd

& C

rest

Rd.

21

209

Jone

s Fa

llsN

ot R

esol

ved

On-

goin

g4,

017,

127

(T)

Con

firm

ator

y te

stin

g ha

s sh

own

that

this

SD

UO

is n

ot

reso

lved

. Fin

al s

ectio

n of

pip

e re

paire

d. F

low

and

co

ncen

trat

ion

redu

ced

sign

ifant

ly, b

ut n

ot

elm

inat

ed.

City

will

perfo

rm a

dditi

onal

test

ing.

347/

17/2

009

Pall

Mal

l Rd

& O

sweg

o Av

e21

215

Jone

s Fa

llsN

ot R

esol

ved

On-

goin

g63

6,55

2 (T

)Pr

oper

ty w

ith il

licit

conn

ectio

n to

sto

rm d

rain

has

bee

n id

entif

ied.

Not

ified

HC

D/H

AB

C o

f a v

iola

tion,

and

no

tice

was

issu

ed 0

1/10

/11.

Con

tinue

coo

rdin

atio

n w

ith H

CD

con

tinue

s to

che

ck

whe

n th

is c

onne

ctio

n w

ill be

re-r

oute

d by

the

owne

r.

Onc

e co

mpl

ete,

follo

w u

p te

stin

g w

ill be

car

ried

out.

3711

/6/2

009

Lake

woo

d Av

e &

Mad

ison

St

(6

6"

Stor

m D

rain

) 21

205

Inne

r Har

bor

Not

Res

olve

dR

esol

ved

2,33

6,65

8 (T

)

Each

pip

e w

as p

revi

ousl

y pl

ugge

d an

d ar

eas

arou

nd

plug

s gr

oute

d in

May

201

1. B

ased

on

test

ing

by

SWM

D, i

t app

eare

d th

at th

e pl

ugs

and

grou

ting

wor

ked

initi

ally

and

this

loca

tion

was

det

erm

ined

to b

e re

solv

ed. S

WM

D re

test

ed o

n 7/

26/2

011

and

foun

d th

at

grou

ting

has

not a

bate

d th

e pr

oble

m a

nd th

at s

ewag

e is

now

see

ping

into

the

drai

n th

roug

h its

bric

klin

ing.

Ex

tens

ive

dye

test

ing

perf

orm

ed.

Dye

test

ing

was

neg

ativ

e bu

t Am

mon

ia w

as

posi

tive.

City

eva

luat

ing

optio

ns. E

xten

sive

dye

te

stin

g ne

gativ

e.

3811

/6/2

009

3302

Est

her P

lace

(insi

de 5

4"st

orm

dra

in)

2121

2In

ner H

arbo

rN

ot R

esol

ved

On-

goin

g2,

154,

240

(T)

For n

orth

sid

e, le

tter t

o be

sen

t to

HC

D/H

ABC

. H

CD

is

sues

a v

iola

tion

notic

e on

01/

10/1

1. F

or s

outh

sid

e,

pipe

has

bee

n pl

ugge

d. S

WM

D c

heck

ed o

n th

e pl

ug o

n 12

/15/

10, a

nd it

con

tinue

s to

hol

d.

Follo

w u

p w

ith H

CD

to c

heck

whe

n th

is c

onne

ctio

n w

ill be

re-r

oute

d by

the

owne

r. O

nce

com

plet

e,

follo

w u

p te

stin

g w

ill be

car

ried

out.

405/

26/2

010

Cro

ss C

ount

ry &

Chi

llham

Rd

(300

ft n

orth

east

of i

nter

sect

ion

in a

m u

ncha

rted

15"

Sto

rm D

rain

)

2120

9W

este

rn R

un

Not

Res

olve

dO

n-go

ing

34,9

68 (T

)Ve

rifie

d as

SD

UO

site

by

amm

onia

fiel

d te

st a

nd d

ye

test

com

plet

ed o

n M

ay 2

6, 2

010.

U

ES is

add

ress

ing

this

site

as

part

of th

e ov

eral

l C

onse

nt D

ecre

e C

IP.

426/

3/20

10C

ross

Cou

ntry

& K

ey A

ve (

Stor

m D

rain

MH

with

se

wag

e in

bot

tom

) 21

215

Wes

tern

run

Not

Res

olve

dO

n-go

ing

135,

648

(T)

Verif

ied

as S

DU

O s

ite b

y am

mon

ia fi

eld

test

and

dye

te

st c

ompl

eted

on

June

3, 2

010.

Dye

test

ing

and

CC

TV

insp

ectio

n re

veal

ed C

IPP

Lini

ng is

reco

mm

ende

d.

UES

is a

ddre

ssin

g th

is s

ite a

s pa

rt of

the

over

all

Con

sent

Dec

ree

CIP

. Th

is s

ectio

n of

sew

er w

ill be

C

IPP

lined

as

reco

mm

ende

d in

the

Jone

s Fa

lls

Sew

ersh

ed P

lan

456/

23/2

010

5015

Gre

enle

af R

d.

2121

0St

oney

Run

to J

ones

Fal

ls

Not

Res

olve

dR

esol

ved

119,

520

(T)

Afte

r inv

estig

atio

n an

d co

nstru

ctio

n of

new

man

hole

, U

ES re

com

men

ds to

CIP

P lin

e th

e se

wer

dow

nstre

am

of th

e ne

wly

con

stru

cted

man

hole

.

Upo

n co

mpl

etio

n of

lini

ng, s

ite w

ill be

rete

sted

to

conf

irm s

ucce

ss o

f the

repa

ir. T

est i

s ne

gativ

e.

Site

is a

bate

d.

Civ

il A

ctio

n N

o. J

FM

-02-

1524

SD

UO

Ove

rflo

w O

ccur

renc

es

Cal

enda

r Q

uart

erly

Rep

ort N

o. 4

1

For

Cal

enda

r Q

uart

er E

ndin

g D

ecem

ber

31, 2

012

App

endi

x 5-

11

Seria

l No.

D

ate

of

Occ

urre

nce

Loca

tion

Zip

Cod

eSt

ream

Affe

cted

Dat

e of

Res

olut

ion

(See

N

ote

6 B

elow

)D

urat

ion

(Day

s)

Est

. Qua

ntity

of

Dis

char

ge (g

allo

ns) 1

2 /3

1/20

12

Mea

sure

s Ta

ken

to Id

entif

y So

urce

or

Res

olve

Fu

ture

/Pla

nned

Wor

k

Upd

ated

thro

ugh

Dec

embe

r 31,

201

2

488/

4/20

1034

12 -

3418

Gle

nmor

e Av

e21

214

Moo

res

Run

to H

errin

g R

unN

ot R

esol

ved

On-

goin

g44

3,52

0 (T

)

On

6/30

/201

1, th

e on

-cal

l con

tract

or re

plac

ed tw

o sa

nita

ry h

ouse

con

nect

ions

on

Gle

nmor

e Av

enue

. On

9/20

/201

1, te

st re

sults

rece

ived

from

SW

MD

indi

cate

th

at th

e Th

eodo

re A

ve d

rain

is a

targ

et. O

n-ca

ll co

ntra

ctor

inst

alle

d a

new

MH

on

the

unch

arte

d pi

pe

ente

ring

the

Theo

dore

Ave

. C

CTV

per

form

ed in

Apr

il 20

12.

Addi

tona

l ille

gal h

ouse

con

nect

ion

iden

tifie

d an

d re

paire

d, b

ut p

robl

em n

ot a

bate

d.

Inve

stig

atio

n on

goin

g.

519/

9/20

10Ba

rre

St. n

ear S

terr

ett

2120

3In

ner H

arbo

rN

ot R

esol

ved

On-

goin

g21

,833

(A)

Inve

stig

atio

n on

goin

g. U

ES in

the

proc

ess

of n

otify

ing

HC

D to

pro

cess

a V

iola

tion

Not

ice.

Con

tinue

to c

oord

inat

e an

d tra

ck p

rogr

ess

by H

CD

.

5211

/17/

2010

39th

& U

nive

rsity

Pkw

y21

218

Jone

s Fa

lls

Not

Res

olve

dO

n-go

ing

505,

358

(T)

Line

CC

TVed

in N

ov. 2

011,

but

deb

ris a

nd ro

ots

bloc

k pi

pe.

Coo

rdin

ated

with

con

tract

or to

inst

all n

ew M

H to

fa

cilit

ate

furth

er C

CTV

. Ad

ditio

nal c

lean

ing

perfo

rmed

. R

ecom

men

ded

for l

inin

g.

Ret

est u

pon

com

plet

ion

of re

linin

g.

535/

12/2

011

Dal

e R

d. a

t Cre

st R

d.

2120

9Jo

nes

Falls

Not

Res

olve

dO

n-go

ing

86,2

56 (T

)

Inle

t was

une

arth

ed o

n 7/

19/1

1 an

d un

iden

tifie

d pi

pe

was

dis

cove

red.

Atte

mpt

on

11/1

7/11

to C

CTV

was

un

succ

essf

ul.

Iden

tifie

d ho

use

conn

ectio

n fo

r dye

te

stin

g. D

ye te

stin

g co

nfirm

ed h

ouse

con

nect

ion

is

conn

ecte

d to

dra

in.

Prop

erty

ow

ner n

otifi

ed a

nd w

aitin

g fo

r res

pons

e.

546/

21/2

011

Cyl

burn

Ave

at N

. Par

kway

2121

0Jo

nes

Falls

Not

Res

olve

dR

esol

ved

672,

480

(T)

Sew

age

is in

filtra

ting

the

stor

m e

nter

ing

stor

m d

rain

at

Cyl

burn

Ave

. On

7/26

/201

1, o

n-ca

ll co

nsul

tant

re

com

men

ded

the

sew

er li

ne b

e C

IPP

lined

.

On

Cal

l Con

tract

or to

per

form

CIP

P lin

ing.

Ret

est

upon

com

plet

ion

of li

ning

to c

onfir

m s

ucce

ss. T

est

is n

egat

ive.

Site

is a

bate

d

558/

9/20

11M

anna

sota

Ave

. at P

arks

ide

Driv

e21

206

Her

ring

Run

Not

Res

olve

dR

esol

ved

15,4

45 (T

)Se

wag

e se

epin

g in

to s

torm

dra

in th

roug

h br

ick

mor

tar.

C

CTV

and

dye

test

ing

perfo

rmed

. R

esul

ts in

conc

lusi

ve

to d

ate.

Req

uest

ed C

IPP

linin

g 2/

16/1

2.

Ret

est u

pon

com

plet

ion

of li

ning

to c

onfir

m s

ucce

ss.

Test

is n

egat

ive.

Site

is a

bate

d

568/

23/2

011

Clif

ton

Roa

d be

twee

n Fa

irfax

and

Wes

tche

ster

R

oads

2121

6G

wyn

ns F

alls

Not

Res

olve

dO

n-go

ing

471,

668

(T)

Dur

ing

field

inve

stig

atio

n of

a 2

4" d

rain

, an

unid

entif

ied

pipe

(18"

dra

in) w

as fo

und

to b

e ca

rryi

ng fl

ow. A

new

m

anho

le w

as c

onst

ruct

ed o

n 9/

28/2

011

to p

rovi

de

acce

ss to

the

18" d

rain

. The

on-

call

cont

ract

or

atte

mpt

ed to

cle

an a

nd C

CTV

from

the

man

hole

to th

e 18

" dra

in b

ut d

isco

vere

d th

at th

e pi

pe w

as fu

ll of

deb

ris,

root

s an

d br

oken

. N

ew M

H in

stal

led.

Addi

tiona

l dye

test

ing

to b

e sc

hedu

led.

578/

31/2

011

Seab

ury

& H

illvie

w21

225

Pata

psco

Not

Res

olve

dO

n-go

ing

251,

918

(T)

CIP

P Li

ning

reco

mm

ende

d an

d ex

ecut

ed.

Addi

tiona

l lin

inig

reco

mm

edne

d.

Civ

il A

ctio

n N

o. J

FM

-02-

1524

SD

UO

Ove

rflo

w O

ccur

renc

es

Cal

enda

r Q

uart

erly

Rep

ort N

o. 4

1

For

Cal

enda

r Q

uart

er E

ndin

g D

ecem

ber

31, 2

012

App

endi

x 5-

12

Seria

l No.

D

ate

of

Occ

urre

nce

Loca

tion

Zip

Cod

eSt

ream

Affe

cted

Dat

e of

Res

olut

ion

(See

N

ote

6 B

elow

)D

urat

ion

(Day

s)

Est

. Qua

ntity

of

Dis

char

ge (g

allo

ns) 1

2 /3

1/20

12

Mea

sure

s Ta

ken

to Id

entif

y So

urce

or

Res

olve

Fu

ture

/Pla

nned

Wor

k

Upd

ated

thro

ugh

Dec

embe

r 31,

201

2

5911

/22/

2011

Fairm

ount

and

Bra

dfor

d21

224

Inne

r Har

bor

Not

Res

olve

dO

n-go

ing

50,6

37(A

)Pe

rform

ed d

ye te

st, e

xcav

ated

dra

in a

nd p

erfo

rmed

C

CTV

. N

ew m

anho

le b

uilt.

Furt

her i

nves

tigat

ion

and

deve

lopm

ent o

f re

com

men

datio

ns.

6011

/22/

2011

Milt

on &

Cha

se21

213

Inne

r Har

bor

Not

Res

olve

dR

esol

ved

112,

680

(T)

Lini

ng re

com

men

ded

1/19

/12.

Upo

n co

mpl

etio

n of

lini

ng, C

ity w

ill pe

rform

co

nfirm

ator

y te

stin

g. T

est i

s ne

gativ

e. S

ite is

ab

ated

6111

/30/

2011

Hilt

on S

t. N

ear P

iedm

ont

2121

6G

wyn

ns F

alls

Not

Res

olve

dR

esol

ved

139,

218

(T)

New

MH

inst

alle

d a

nd C

CTV

ed th

e lin

e.Sc

hedu

ling

addi

tiona

l CC

TV. T

est i

s ne

gativ

e. S

ite

is a

bate

d

621/

27/2

012

JHU

- R

emse

n H

all

2121

8Jo

hns

Falls

Not

Res

olve

dO

n-go

ing

113,

417

(A)

Met

with

repr

esen

tativ

es o

f Joh

ns H

opki

ns U

nive

rsity

to

disc

uss

issu

e.JH

U is

pro

ceed

ing

with

repa

irs w

ith re

pairs

.

6312

/2/2

011

Pink

ney

& W

inne

r21

215

John

s Fa

llsN

ot R

esol

ved

On-

goin

g61

,709

(T)

CIP

P Li

ning

reco

mm

ende

d.

Ret

est u

pon

com

plet

ion

of re

linin

g.

642/

8/20

12Kr

esso

n St

2122

4Ba

ltim

ore

Har

bor

Not

Res

olve

dR

esol

ved

16,6

20 (T

)Ill

icit

conn

ectio

n fo

und.

Ow

ner r

epor

tedl

y pr

ocee

ding

with

repa

ir.R

etes

t upo

n co

mpl

etio

n of

repa

irs. T

est i

s ne

gativ

e. S

ite is

aba

ted

653/

8/20

12Be

ntal

ou &

Pen

rose

2122

3G

wyn

ns F

alls

Not

Res

olve

dR

esol

ved

3,70

8 (T

)

Dye

test

ing

perfo

rmed

6/2

8/20

12 c

onfir

med

piv

ate

conn

ectio

n. A

lette

r was

sen

t to

the

prop

oerty

ow

ner

requ

estin

g a

corr

ectiv

e ac

tion

take

n. O

wne

r re

port

edly

pro

ceed

ing

with

repa

ir.

Rec

onta

ct o

wne

r and

test

to c

onfir

m. T

est i

s ne

gativ

e. S

ite is

aba

ted

6610

/11/

2012

McM

eche

n &

Jord

an21

217

Jone

s Fa

llsN

ot R

esol

ved

On-

goin

g76

5,64

3(T)

Dye

test

pro

gram

, and

CC

TV,

plan

ned.

Und

er In

vest

igat

ion

679/

26/2

012

McM

eche

n &

Brev

ard

2121

7Jo

nes

Falls

Not

Res

olve

dO

n-go

ing

483(

T)D

ye te

st p

rogr

am, a

nd C

CTV

, pl

anne

d.U

nder

Inve

stig

atio

n

6810

/11/

2012

Mas

on &

McM

eche

n21

217

Jone

s Fa

llsN

ot R

esol

ved

On-

goin

gTB

DD

ye te

st p

rogr

am, a

nd C

CTV

, pl

anne

d.U

nder

Inve

stig

atio

n

6912

/4/2

012

Fait

& G

rund

y21

224

Inne

r Har

bor

Not

Res

olve

dO

n-go

ing

1,22

7(A)

Dye

test

pro

gram

, and

CC

TV,

plan

ned.

Und

er In

vest

igat

ion

7012

/5/2

012

Hav

en &

Ban

k21

224

Inne

r Har

bor

Not

Res

olve

dO

n-go

ing

TBD

Dye

test

pro

gram

, and

CC

TV,

plan

ned.

Und

er In

vest

igat

ion

Civ

il A

ctio

n N

o. J

FM

-02-

1524

SD

UO

Ove

rflo

w O

ccur

renc

es

Cal

enda

r Q

uart

erly

Rep

ort N

o. 4

1

For

Cal

enda

r Q

uart

er E

ndin

g D

ecem

ber

31, 2

012

App

endi

x 5-

13

Seria

l No.

D

ate

of

Occ

urre

nce

Loca

tion

Zip

Cod

eSt

ream

Affe

cted

Dat

e of

Res

olut

ion

(See

N

ote

6 B

elow

)D

urat

ion

(Day

s)

Est

. Qua

ntity

of

Dis

char

ge (g

allo

ns) 1

2 /3

1/20

12

Mea

sure

s Ta

ken

to Id

entif

y So

urce

or

Res

olve

Fu

ture

/Pla

nned

Wor

k

Upd

ated

thro

ugh

Dec

embe

r 31,

201

2

SD

UO

Site

aba

ted

SD

UO

Site

on

Priv

ate

Prop

erty

4. T

otal

SD

UO

Site

s U

nres

olve

d: 2

4 (3

3% O

pen)

SDU

O S

umm

ary:

1. T

otal

SD

UO

Site

s D

ocum

ente

d: 7

22.

Tot

al S

DU

O S

ites

Res

olve

d: 4

8 (6

7% C

ompl

ete)

3. T

otal

SD

UO

Site

s on

Priv

ate

Prop

erty

: 8

8.

(T) -

Flo

w c

alcu

late

d ut

ilizin

g TK

N c

once

ntra

tion.

(A) -

Flo

w C

alcu

late

d ut

ilizin

g Am

mon

ia c

once

ntra

tion.

5. N

ew S

DU

O S

ites

docu

men

ted

in th

e la

st Q

uarte

r: 5

For a

ll ac

tive

site

s, th

e C

ity u

ltim

atel

y, p

lans

on

calc

ulat

ing

flow

s us

ing

TKN

- pe

r gui

delin

es o

f the

app

rove

d pr

otoc

ol b

y EP

A

6. U

nder

the

colu

mn

entit

led

"Dat

e of

Res

olut

ion"

, if t

he n

ote

read

s N

ot R

esol

ved

an e

nd d

ate

of 1

2/31

/201

2 w

as

used

to d

eter

min

e th

e qu

antit

y of

dis

char

ge u

p to

that

poi

nt.

7. A

ll of

the

Estim

ated

Qua

ntiti

es o

f Dis

char

ge li

sted

in th

e ab

ove

tabl

e ar

e ba

sed

on a

sta

rt da

te o

f Oct

ober

30,

20

08 in

acc

orda

nce

with

the

lette

r iss

ued

by E

PA d

ated

Nov

embe

r 12,

201

0. T

he a

ctua

l sta

rt da

te o

f the

sew

er

disc

harg

e ba

sed

on te

stin

g is

list

ed in

the

Dat

e of

Occ

urre

nce.

9. F

or s

ites

that

hav

e no

t yet

bee

n re

solv

ed,

"Est

. Qua

ntity

of D

isch

arge

(Gal

)" is

read

just

ed e

ach

quar

ter t

o re

flect

the

elap

se o

f tim

e an

d an

y re

cent

fiel

d in

form

atio

n (fl

ow, N

H3,

TKN

) tha

t may

hav

e be

en c

olle

cted

for a

gi

ven

site

.

Civ

il A

ctio

n N

o. J

FM

-02-

1524

SD

UO

Ove

rflo

w O

ccur

renc

es

Cal

enda

r Q

uart

erly

Rep

ort N

o. 4

1

For

Cal

enda

r Q

uart

er E

ndin

g D

ecem

ber

31, 2

012

App

endi

x 5-

14

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!!

! !!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

Updated: January 2013

Q41 SSOs! October 2012! November 2012! December 2012

µS a n i t a r y S e w e r O v e r f l o w sS a n i t a r y S e w e r O v e r f l o w s