CITY OF PROSSER, WASHINGTON AGENDA BILL

6
CITY OF PROSSER, WASHINGTON AGENDA BILL Agenda Title: Approve Change Order No. 1 for the Wastewater Treatment Plant Improvements Project and Authorize the Mayor to Sign the Documents Item Type: Consent Agenda Meeting Date: February 9, 2016 Regular City Council Meeting Department: Public Works Director: LJ DaCorsi Contact Person: LJ DaCorsi Phone Number: 509-786-2332 Cost of Proposal: $6,764,694.00 Original & Current Construction Contract Price ($9,231.00) Credit to the City $6,755,463.00 Adjusted Contract Price Due to Change Order No. 1 Amount Budgeted: $6,764,694.00 Original & Current Construction Contract Price Account Number: Name and Fund#: Reviewed by Finance Department: Attachments to Agenda Packet Item: 1. Letter from HLA, Inc., describing conditions that generated Change Order No. 1 2. Change Order No. 1 - dated January 18, 2016 (2 pages) 3. C/O No. 1 Drawing Summary Statement: During construction of the Geopier foundation for the new digester structure, the Contractor found large cobbles and boulders in some test piers. This did not allow the pier auger to reach required depths below the subgrade elevation for the new structure. Alternative options to complete the subgrade improvements were discussed with the geotechnical engineer. It was decided to delete the remaining geopiers and construct the foundation by open excavation with engineered aggregate base. This alternate method is less expensive than the Geopier method and results in a change in the original and current contract price. A change in conditions that affect the contract price generates the requirement for a Change Order.

Transcript of CITY OF PROSSER, WASHINGTON AGENDA BILL

Page 1: CITY OF PROSSER, WASHINGTON AGENDA BILL

CITY OF PROSSER, WASHINGTON

AGENDA BILL

Agenda Title:

Approve Change Order No. 1 for the Wastewater Treatment Plant Improvements Project and Authorize the Mayor to Sign the Documents

Item Type:

Consent Agenda

Meeting Date:

February 9, 2016

Regular City Council Meeting

Department:

Public Works

Director:

LJ DaCorsi

Contact Person:

LJ DaCorsi

Phone Number:

509-786-2332

Cost of Proposal:

$6,764,694.00 Original & Current Construction Contract Price ($9,231.00) Credit to the City $6,755,463.00 Adjusted Contract Price Due to Change Order No. 1

Amount Budgeted:

$6,764,694.00 Original & Current Construction Contract Price

Account Number:

Name and Fund#:

Reviewed by Finance Department:

Attachments to Agenda Packet Item:

1. Letter from HLA, Inc., describing conditions that generated Change Order No. 1 2. Change Order No. 1 - dated January 18, 2016 (2 pages) 3. C/O No. 1 Drawing

Summary Statement:

During construction of the Geopier foundation for the new digester structure, the Contractor found large cobbles and boulders in some test piers. This did not allow the pier auger to reach required depths below the subgrade elevation for the new structure. Alternative options to complete the subgrade improvements were discussed with the geotechnical engineer. It was decided to delete the remaining geopiers and construct the foundation by open excavation with engineered aggregate base. This alternate method is less expensive than the Geopier method and results in a change in the original and current contract price. A change in conditions that affect the contract price generates the requirement for a Change Order.

Page 2: CITY OF PROSSER, WASHINGTON AGENDA BILL

Consistent with or Comparison to:

Recommended City Council Action/Suggested Motion:

Approve Change Order No. 1 for the Wastewater Treatment Plant Improvements Project and authorize the Mayor to sign the documents.

Reviewed by Department Director:

LJ DaCorsi

Date: Feb 4, 2016

Reviewed by City Attorney:

Howard Saxton

Date: Feb 5, 2016

Approved by Mayor:

Date:

Approved By: Department: Status:

Page 3: CITY OF PROSSER, WASHINGTON AGENDA BILL

~+..+HLA • Engineering and Land Surveying, Inc.

January 28, 2016

City of Prosser 601 Seventh Street Prosser, WA 99350

Attn: L.J. DaCorsi Public Works Director

Re: City of Prosser 2015 WASTEWATER TREATMENT PLANT IMPROVEMENTS PWTF No.: PC12-951-068 HLA Project No.: 14084 Change Order No. 1

Dear L.J.:

f I r (} ' iJ t; '.

cnv OF;: HLlSC)fR

Attached, please find three copies of Change Order No. 1 for the above referenced project.

During construction of the Geopier foundation, the Contractor found large cobbles and boulders in some test piers which did not allow the pier auger to reach depths below the subgrade elevation of the new digester structure. After consulting with the geotechnical engineer about suitable options to complete the subgrade improvements, it was decided to delete the remaining geopiers and construct the foundation by open excavation with an engineered aggregate base. The Contractor has also requested additional contract time due to downtime related to evaluating excavation conditions and to complete the proposed change order work. This change order will result in a credit to the City of $9,231.00. However, the credit may need to be offset by engineering expenses incurred in the additional construction time.

When all three copies of the Change Order have been signed by the City of Prosser, please retain one copy for your records, and return the remaining two copies to us for distribution.

Should you have any questions regarding this summary or Change Order No. 1, please contact me at (509) 966-7000.

Very truly yours,

Steven C. Sziebert

SCS/crf

Enclosures

Copy: Correspondence File

G:\PROJECTS\2014114084C PR 2015 V\W TREATMENT PLANT - APOLLO. INCICHANGE ORDERS\CHANGE ORDER NO 112016-01-28 CITY CO No. 1 Ltr.docx

2803 River Road •!• Yakima, WA 98902 •!• 509.966.7000 •!• FAX 509.965.3800 •!• www.hlacivil.com

Page 4: CITY OF PROSSER, WASHINGTON AGENDA BILL

January 18, 2016

CHANGE ORDER NO. 1

OWNER: City of Prosser

PROJECT NAME:

PWTF PROJECT NO.:

2015 WASTEWATER TREATMENT PLANT IMPROVEMENTS

PC12-951-068

HLA PROJECT NO.: 13109C

CONTRACTOR: Apollo, Inc.

THE FOLLOWING CHANGES ARE HEREBY MADE TO THE CONTRACT DOCUMENT:

·- - ------Original Contract Price (Including State Sales Tax):

Current Contract Price Adjusted by Previous Change Order(s) (Including State Sales Tax) :

Change in Contract Price Due to This Change Order (Including State Sales):

·- -·~

Adjusted Contract Price Due to This Change Order (Including State Sales Tax):

Original Contract Completion Date:

Current Contract Completion Date Adjusted by Non-Working Days and/or Previous Change Order:

Change in Contract Completion Date Due to This Change Order:

Revised Contract Completion Date:

CONTRACTOR:

ENGINEER:

OWNER:

~~-~ ,fa~-611( 7

uJ:~ ~ Huibregts , Louman Associates, Inc.

City of Prosser

G \PROJECTS\2014\14084C PR 2015 WW TREATMENT PLANT · APOLLO, INC\CHANGE ORDERS\CHANGE ORDER NO '"(l16-01-1e CHANGE ORDER 1 xtsx

- · -·---$6, 764,694.00

$6, 764,694.00

($9,231.00)

$6, 755,463.00

August 17,2016

Augst 19, 2016 (Additional one and one half days)

Five (5) Additional Working Days

August 26, 20"17

Date:

Page 5: CITY OF PROSSER, WASHINGTON AGENDA BILL

ITEM

NO.

1-1

City of Prosser

2015 WASTEWATER TREATMENT PLANT IMPROVEMENTS

PWTF Project No.: PC12-951-068

HLA Project No. : 14084C

CHANGE ORDER NO. 1

UNIT

DESCRIPTION UNIT QTY PRICE

. Eliminate the Geopier method of constructing the subgrade of the Primary Digester. Replace

LS 1 ($8,500.00) with site excavation and engineered aggregate base, per attached drawing.

CHANGE ORDER NO. 1 SUBTOTAL

SALES TAX @ 8.6%

CHANGE ORDER NO. 1 TOTAL

January 18, 2016

AMOUNT

($8,500.00)

($8,500.00)

($731 .00)

($9,231 .00)

REASON: During construction of the Geopier foundation, the Contractor found large cobbles and boulders in some test piers which did not allow the pier auger to reach depths below the subgrade elevation of the new digester structure. After consulting with the geotechnical engineer about suitable options to complete the subgrade improvements, it was decided to delete the remaining geopiers and construct the foundation by open excavation with an engineered aggregate base. The Contractor has also requested additional contract time due to downtime related to evaluating excavation conditions and to complete the proposed change order work. This change order will result in a credit to the City of $9,231.00.

G \PROJECTS\201"4\14084C PR 2015 WN TREATMENT PLANT · APOLLO, INC\CHANGE ORDERS\CHANGE ORDER NO 1\2016-01-18 CHANGE ORDER 1 xtsx

Page 6: CITY OF PROSSER, WASHINGTON AGENDA BILL

I· · I ..... 825'

• pl •• i 11hr111hed l'CICll •nd qiary apal1 ID be cllunMd Ind 18118<1 by. 11JP..anb11Mi af llw eER

Nd/9 IU---(veiy dei!R gnMll/ cclllll• lllllD). Ulgmd• Clllldllon 11111 i. conttmed by• nipn119n!lllM afthe

BER priOt 10 Fl~ &y.llflY tpillt

..... 8111.D'

N.T.S.

Northern. Inc. Primary Digester - Bearing Support Zone lmprovementl Detail Prosser Was~ Treatment Plant lmprovrmen18

Prosser, Washington 5

Consultlng Engineers Envirorunental Scientists Geologists Constru.ction lv[aterials Testing Geophysic.al Services

Job No. 214-551 Dat.e

1/18/2016 DrawnBy

MYM Reviewed By

IM Drawing

1 Revision

0