ADDENDUM NO. 3
FOR THE
CITY OF PORT ALBERNI
TENDER No. 019-14 - BAINBRIDGE WATER TREATMENT PLANT
TO ALL TENDERERS: June 11, 2014
The following changes, additions, and/or deletions are hereby made a part of the Quotations for the City
of Port Alberni, Bainbridge Water Treatment Plant, as fully and completely as if the same were fully
set forth therein:
1. Instructions to Tenderers
Add the following Article:
“ARTICLE 46:
The Tenderer is advised that the City of Port Alberni reserves the right to delete the installation of the
Owner supplied energy recovery equipment, (Item 15.1.3 of the Tender Form), the supply and installation
of the inlet piping to the energy recovery equipment (Item 2.8 of the Tender Form), energy recovery
equipment pre commissioning assistance (Item 16.4 of the Tender Form) and the required electrical and
controls (Item 16.5 of the Tender Form) in the event that the required permits and agreements are not in
place prior to award of the Contract. The City will proceed with the supply and installation of the outlet
piping to the energy recovery equipment (Item 2.12) as part of this Contract. The Contractor shall ensure
all overhead and profit is allocated to the appropriate Tender Price.”
2. Tender Form
Delete Addendum No. 1 Tender form in its entirety and Replace with the attached Tender Form
Energy Recovery Equipment inlet and outlet piping and electrical components have been
separated for possible deletion from Contract.
3. Section 02315 Trenching and Backfill
Add Clause 3.12.4 “.4 Paved Roads: In travelled areas that are within in the road allowance, trench
backfill above the pipe zone shall be approved imported granular backfill material to subgrade level,
compacted to 95% of Modified Proctor Density (ASTM D1557). The remainder of the trench shall be
backfilled with the design depth of road subbase (250 mm), road base gravel (100 mm), and hot asphalt
mix (to match existing, minimum of 50 mm). This work shall include all required sawcutting and crack
sealing.”
4. Section 07540 Thermoplastic Polyolefin Roofing
Clause 2.2.2 Add: “Ultraply 60 mil TPO as manufactured by Firestone and distributed by Div7 Building
Systems of Surrey BC.” After the first sentence.
5. Section 11030 Onsite Hypochlorite Generation Equipment
Clause 2.8.3 Add: “.9 Seismic restraint or tie-down. OSHGS shall supply seismic restraint calculations
sealed by a Professional Engineer certified to practice in the province of British Columbia.”
6. Section 11101 Rubber Seated Butterfly Valves
Clause 2.3.1 Add: “Valve bodies shall be class 150B.”
ADDENDUM NO. 3
FOR THE
CITY OF PORT ALBERNI
TENDER No. 019-14 - BAINBRIDGE WATER TREATMENT PLANT
2 of 4
7. Section 16263 Variable Frequency Drive Equipment
Clause 2.1.2 Add: “Mitsubishi/MGI” to the list of acceptable manufacturer’s.
8. Section 16295 Process Instrumentation
Clause 2.3.3.3: Delete “100 m diameter, maximum line pressure, 2000 kPa” and Replace with “400 mm
diameter, maximum line pressure, 1034 kPa.”
Clause 2.4: Delete: “.3 Integral LCD display with process value and units”
9. Section 16445 Control Panel
Clause 2.1.1 Delete: “Canadian Process and Control Ltd., Port Moody” and Replace with “Celco
Automation, Port Coquitlam”.
Clause 2.7.1 Delete “SCADAPack P334” and Replace with “SCADAPack P357”
Clause 2.7.1.1 Delete “Qty 2 – P334 processor c/w model 5607 I/O board” and Replace with “Qty 1 –
P357 processor c/w model 5606 I/O board”
Clause 2.7.1.2 Delete “Qty 1 – Model 5506 8AI expansion module” and Replace with “Qty 2 – Model
5506 8AI expansion module”
10. Drawing 1218-102, Rev C
Add the following note to the 450 mm dia culvert replacement: “Contractor to reinstate existing asphalt
in accordance with the specifications.”
11. Drawing 1218-302, Rev C
Delete: “2-Ply SBS-Cold System c/w Primer” and Replace with “Thermoplastic polyolefin membrane
system”
12. Drawing 1218-306, Rev D
Detail G: Delete: “2-Ply SBS-Cold System c/w Primer” and Replace with “Thermoplastic polyolefin
membrane system”
13. Drawing 1218-307, Rev C
Detail L: Add: “Attach with 4x2 lagscrews, 8x0.75” installed perpendicular to the knee brace” After
“350 Wide Sawn Lumber Beam”
14. Drawing 1218-308, Rev C
Room Finish Schedule: Delete Notes 8, 9 and 10 in their entirety.
Louver Schedule: Delete Louver L5
ADDENDUM NO. 3
FOR THE
CITY OF PORT ALBERNI
TENDER No. 019-14 - BAINBRIDGE WATER TREATMENT PLANT
3 of 4
15. Drawing 1218-602, Rev E
Add the attached 1218-602 sketch 1
Add the following note:
“4. Clouded items are related to owner supplied energy recovery equipment installation and to be priced
separately.”
16. Drawing 1218-603, Rev D
See attached drawing mark up: Add new incoming wireway section to switchgear and divert conduits to
the new incoming wireway section. As per BC Hydro standards conduits are to stub up 2/3 of the depth
of the wireway section. The depth is expected to be 600mm, but this to be confirmed with equipment
supplied.
Add the attached 1218-603 sketch 1 and sketch 2
Add the following note:
“6. Clouded items are related to owner supplied energy recovery equipment installation and to be priced
separately. Conduits to be installed complete with pull ropes. The wiring, including one comm cable is
related to energy recovery equipment.”
17. Drawing 1218-604, Rev C
See attached drawing mark up: Add new incoming wireway section to switchgear and relocate receptacle
fed by circuit A2 as shown.
Add the attached 1218-604 sketch 1 and sketch 2
Add the following note:
“10. Clouded items are related to owner supplied energy recovery equipment installation and to be priced
separately.”
18. Drawing 1218-605, Rev C
Add the attached 1218-605 Detail A sketch 1
Add the attached 1218-605 Detail B sketch 1
Add the flowing note:
“9. Clouded items are related to owner supplied energy recovery equipment installation and to be priced
separately. Conduits to be installed complete with junction boxes in basement and pull ropes. Coring and
conduits up to the main floor and the wiring, including one comm cable is related to energy recovery
equipment. Pricing for Note 9 includes Notes 2, 3, and 6.”
19. Drawing 1218-606, Rev D
See attached drawing mark up: Add new incoming wireway section to switchgear. Extend all three phase
busses and neutral bus into new incoming wireway section as per BC Hydro standards. Main breaker to
now be located in top compartment and BC Hydro CT/PT compartment to be in bottom compartment and
to include locking provisions as per BC Hydro standards.
Add the attached 1218-606 sketch 1
CITY OF PORT ALBERNI
Bainbridge Water Treatment Plant ADDENDA No. 3 TENDER FORM
May 2014 Page 1 of 12
H:\6021 Port Alberni City\1218 Bainbridge WTP UV Facility\05 Tender\Treatment Plant\Addenda\1218 Addenda 3 Tender form.doc
TO: City of Port Alberni FROM: _____________________________ 4850 Argyle Street Name of Contractor
Port Alberni, B.C. V9Y 1V8
___________________________________
Business Address
___________________________________
City, Postal Code
Ladies and Gentlemen:
The undersigned Tenderer, having carefully examined the Contract Documents and the locality of the
proposed work, and having full knowledge of the work required and of the materials, to be furnished and
used, hereby agrees to provide all necessary materials, supervision, labour, and equipment and perform and
complete all work and fulfil everything as set forth and in strict accordance with the Contract Documents
and Addenda numbered *___________________for the prices stated in the Tender Form Schedule of Lump
Sum Prices.
Tender Summary
Subtotal of Tender (from page 5) $
Plus GST (5%) $
Total Tender Price (from page 5) $
The undersigned also agrees:
1. That the Owner is in no way obligated to accept this Tender.
2. That should the Tender Form be improperly completed or be incomplete, the Owner shall have the
right to disqualify and/or reject this Tender.
3. That this Tender is made without knowledge of the tender prices to be submitted for this work by any
other company, firm, or person.
4. That this Tender is made without any connection or arrangement with any company, firm, or person
submitting a tender for this work.
5. That this Tender is made without any undisclosed connection or arrangement with any other
company, firm, or person having an interest in this tender or in the proposed Contract.
6. That this Tender is irrevocable for sixty (60) days after the closing date for receipt of tenders and that
the Owner may at any time within such period accept this tender whether any other tender has
previously been awarded or not and whether notice of award of another tender has been given or not.
7. To execute the Contract Agreement and deposit with the Owner a Performance Bond and Labour and
Material Payment Bond on the forms provided in the documents and for the amounts specified in
Article 32 of the General Conditions, within ten (10) days of the date of the Notice of Award of the
Contract, such time limit being extended only on the written approval of the Owner:
* To be completed by Tenderer
CITY OF PORT ALBERNI
Bainbridge Water Treatment Plant ADDENDA No. 3 TENDER FORM
May 2014 Page 2 of 12
H:\6021 Port Alberni City\1218 Bainbridge WTP UV Facility\05 Tender\Treatment Plant\Addenda\1218 Addenda 3 Tender form.doc
8. To commence and proceed actively with the work within a period of seven (7) days of issuing of the
Notice to Proceed, and to complete all work under the Contract within a period of
________________* calendar days from the date of the Notice to Proceed, subject to the Provisions
of Article 41 of the General Conditions for extension of Contract time.
9. That should he fail to complete the work in the time specified above, he shall compensate the Owner
in accordance with Article 37 of the General Conditions.
10. To do all extra work not reasonably inferable from the specifications or drawings but called for in
writing by the Engineer and to accept as full compensation therefore payment in accordance with the
provisions of Article 39 of the General Conditions.
11. That payment for the work done will be made on the basis of the quantities measured by the Engineer
and at the prices shown in the Tender Form which shall be compensation in full for the work done
under the terms of the Contract.
* To be completed by Tenderer
CITY OF PORT ALBERNI
Bainbridge Water Treatment Plant ADDENDA No. 3 TENDER FORM
May 2014 Page 3 of 12
H:\6021 Port Alberni City\1218 Bainbridge WTP UV Facility\05 Tender\Treatment Plant\Addenda\1218 Addenda 3 Tender form.doc
CITY OF PORT ALBERNI
BAINBRIDGE WATER TREATMENT PLANT
SCHEDULE OF LUMP SUM PRICES
We certify that the following is an accurate and balanced breakdown of our lump sum prices. Work
required, but not specifically mentioned, is included in the item with which it is most closely associated.
Item Description Quantity Total
1 Division 1 - General Requirements
1.1 Bonding and Insurance Lump Sum
1.2 Mobilization and Demobilization Lump Sum
1.3 General Requirements Lump Sum
1.4 Cleaning and Disinfection Lump Sum
1.5 Pre-Start-up, Start-up, and Commissioning Lump Sum
2 Division 2 - Site Work
2.1 Site Grading Lump Sum
2.2 Hydro Seeding Lump Sum
2.3 Clearing and Grubbing Lump Sum
2.4 Excavation for Building Structures Lump Sum
2.5 Foundation Preparation for Structures Lump Sum
2.6 Raw Water Piping and Fittings Lump Sum
2.7 Treated Water Piping and Fittings Lump Sum
2.8 Energy Recovery Piping and Fittings (Inlet) Lump Sum
2.9 Site Drainage Lump Sum
2.10 Offsite Drainage Improvements Lump Sum
2.11 Building Drainage Lump Sum
2.12 Energy Recovery Piping and Fittings (Outlet) Lump Sum
3 Division 3 - Concrete
3.1 Slabs and Footings Lump Sum
3.2 Sidewalk Lump Sum
4 Division 4 – Masonry
4.1 Reinforced Masonry Lump Sum
CITY OF PORT ALBERNI
Bainbridge Water Treatment Plant ADDENDA No. 3 TENDER FORM
May 2014 Page 4 of 12
H:\6021 Port Alberni City\1218 Bainbridge WTP UV Facility\05 Tender\Treatment Plant\Addenda\1218 Addenda 3 Tender form.doc
Item Description Quantity Total
5 Division 5 – Metals
5.1 Pipe Supports Lump Sum
5.2 Beam and column connections Lump Sum
6 Division 6 – Woods, Plastics and Composites
6.1 Roof spine beam and Column Lump Sum
6.2 Carpentry Lump Sum
6.3 Fascia and Trim Lump Sum
7 Division 7 – Thermal and Moisture Protection
7.1 Building Roof Lump Sum
7.2 Insulation Lump Sum
7.3 Cultivated Green Roof Lump Sum
8 Division 8 – Doors and Windows
8.1 Doors and Frames Lump Sum
8.2 Roll Up Door Lump Sum
8.3 Windows Lump Sum
8.4 Door Hardware Lump Sum
9 Division 9 – Finishes
9.1 Painting and coatings Lump Sum
9.2 Cement board cladding Lump Sum
9.3 Green roof Lump Sum
11 Division 11 – Equipment
11.1 Onsite Hypochlorite Generation System Lump Sum
11.2 Injection Ports Lump Sum
11.3 Manual Actuated Butterfly Valves Lump Sum
11.4 Motorised Actuated Butterfly Valves Lump Sum
11.5 Process Piping, Valves, and Appurtenances Lump Sum
CITY OF PORT ALBERNI
Bainbridge Water Treatment Plant ADDENDA No. 3 TENDER FORM
May 2014 Page 5 of 12
H:\6021 Port Alberni City\1218 Bainbridge WTP UV Facility\05 Tender\Treatment Plant\Addenda\1218 Addenda 3 Tender form.doc
Item Description Quantity Total
15 Division 15 – Mechanical
15.1 Process Mechanical
15.1.1 Piping and Valves Lump Sum
15.1.2 UV Equipment Lump Sum
15.1.3 Energy Recovery Equipment Lump Sum
15.2 Building Mechanical
15.2.1 Heat Pump, Pump Controller, Heat Exchanger Lump Sum
15.2.2 Piping and fittings Lump Sum
15.2.3 Ducting Lump Sum
15.2.4 Temperature Stats Lump Sum
15.2.5 Exhaust, Ventilation, and Ceiling Fans Lump Sum
15.2.6 Electrical (Misc HVAC) Lump Sum
15.2.7 Louvers, Dampers, and Actuators Lump Sum
16 Division 16 – Electrical and Controls
16.1 Building Electrical, Fixtures Lump Sum
16.2 Control Panel, PLC and Instruments Lump Sum
16.3 Standby Generator Lump Sum
16.4 Energy Recovery Equipment pre-commissioning
assistance Lump Sum
16.5 Energy Recovery Electrical Components Lump Sum
17 Contingency Allowance* $300,000
18 UV Equipment Supply $340,154
SUBTOTAL
PLUS 5% GST
TOTAL TENDER
* Payment of the Contingency Allowance or portions thereof will only be made in the event that the
Engineer authorizes additional work, in which case the amount of the payment will be determined as
specified in the General Conditions. Any unused portion thereof will be retained by the Owner.
CITY OF PORT ALBERNI
Bainbridge Water Treatment Plant ADDENDA No. 3 TENDER FORM
May 2014 Page 6 of 12
H:\6021 Port Alberni City\1218 Bainbridge WTP UV Facility\05 Tender\Treatment Plant\Addenda\1218 Addenda 3 Tender form.doc
TENDERER'S QUESTIONNAIRE
We provide the following information in order that the Owner may judge our ability to fulfil the
Contract requirements.
1. The size, model, and make of the equipment which we will place on the project and use
during the course of the works is as follows:
EQUIPMENT SIZE MODEL MAKE
____________________ _______ __________ _________
____________________ _______ __________ _________
____________________ _______ __________ _________
____________________ _______ __________ _________
____________________ _______ __________ _________
2. The average number of workers we will employ and maintain on the project is .
3. The name of the superintendent that we propose to place on the project and his previous
experience on this type of construction is as follows:
_________________________________________________________________
_________________________________________________________________
_________________________________________________________________
_________________________________________________________________
_________________________________________________________________
_________________________________________________________________
_________________________________________________________________
_________________________________________________________________
_________________________________________________________________
CITY OF PORT ALBERNI
Bainbridge Water Treatment Plant ADDENDA No. 3 TENDER FORM
May 2014 Page 7 of 12
H:\6021 Port Alberni City\1218 Bainbridge WTP UV Facility\05 Tender\Treatment Plant\Addenda\1218 Addenda 3 Tender form.doc
PROPOSED ALTERNATE MATERIALS
We propose using the following materials as alternates to those specified and shown on the
drawings. Should any of these proposed alternates be accepted, we will adjust our Total Tender in
accordance with the price variation shown below. These prices will represent the total cost
difference to the Owner for supply and installation of the proposed alternate products in lieu of
those specified.
Product Brand Name Price Schedule
Item or Manufacturer Supplier Variation Variation
_____________ ___________________ __________ _________ _________
_____________ ___________________ __________ _________ _________
_____________ ___________________ __________ _________ _________
_____________ ___________________ __________ _________ _________
_____________ ___________________ __________ _________ _________
_____________ ___________________ __________ _________ _________
_____________ ___________________ __________ _________ _________
_____________ ___________________ __________ _________ _________
_____________ ___________________ __________ _________ _________
_____________ ___________________ __________ _________ _________
_____________ ___________________ __________ _________ _________
_____________ ___________________ __________ _________ _________
_____________ ___________________ __________ _________ _________
_____________ ___________________ __________ _________ _________
_____________ ___________________ __________ _________ _________
_____________ ___________________ __________ _________ _________
_____________ ___________________ __________ _________ _________
_____________ ___________________ __________ _________ _________
_____________ ___________________ __________ _________ _________
_____________ ___________________ __________ _________ _________
_____________ ___________________ __________ _________ _________
_____________ ___________________ __________ _________ _________
CITY OF PORT ALBERNI
Bainbridge Water Treatment Plant ADDENDA No. 3 TENDER FORM
May 2014 Page 8 of 12
H:\6021 Port Alberni City\1218 Bainbridge WTP UV Facility\05 Tender\Treatment Plant\Addenda\1218 Addenda 3 Tender form.doc
LIST OF MANUFACTURERS AND SUPPLIERS
The following is a list of suppliers from whom we intend to purchase the various items of material
indicated, together with the product brand name or the name of the manufacturer of each.
We will alter neither products nor suppliers from those listed below without the written
authorization of the Engineer.
Product Brand Name
Item or Manufacturer Supplier
Carbon Steel pipe and fittings ______________________ ______________
Stainless Steel pipe and fittings ______________________ ______________
Relief Valve ______________________ ______________
Butterfly Valves ______________________ ______________
Valve Actuators ______________________ ______________
Strainers ______________________ ______________
Chlorination Equipment ______________________ ______________
Others (specify) ______________________ ______________
______________________ ______________
______________________ ______________
______________________ ______________
______________________ ______________
______________________ ______________
______________________ ______________
______________________ ______________
______________________ ______________
______________________ ______________
______________________ ______________
______________________ ______________
______________________ ______________
______________________ ______________
CITY OF PORT ALBERNI
Bainbridge Water Treatment Plant ADDENDA No. 3 TENDER FORM
May 2014 Page 9 of 12
H:\6021 Port Alberni City\1218 Bainbridge WTP UV Facility\05 Tender\Treatment Plant\Addenda\1218 Addenda 3 Tender form.doc
LIST OF SUBCONTRACTORS
It is our intention that the following work will, subject to the Engineers approval, be subcontracted
to the firms indicated below. All other work will be performed by our own forces, except as
authorized by the Engineer.
Trade/Payment Method Name & Address of Subcontractor
_______________________________ _________________________________
_________________________________
_______________________________ _________________________________
_________________________________
_______________________________ _________________________________
_________________________________
_______________________________ _________________________________
_________________________________
_______________________________ _________________________________
_________________________________
_______________________________ _________________________________
_________________________________
_______________________________ _________________________________
_________________________________
_______________________________ _________________________________
_________________________________
_______________________________ _________________________________
_________________________________
_______________________________ _________________________________
_________________________________
CITY OF PORT ALBERNI
Bainbridge Water Treatment Plant ADDENDA No. 3 TENDER FORM
May 2014 Page 10 of 12
H:\6021 Port Alberni City\1218 Bainbridge WTP UV Facility\05 Tender\Treatment Plant\Addenda\1218 Addenda 3 Tender form.doc
SCHEDULE OF FORCE ACCOUNT RATES
The following personnel and equipment rates will form the basis of payment for force account
work carried out in accordance with Article 40 of the General Conditions.
PERSONNEL:
List By Occupation Hourly Rate Overtime
Superintendent _______________ ______________
Foreman _______________ ______________
Labourer _______________ ______________
Pipe layer _______________ ______________
Welder _______________ ______________
Electrician _______________ ______________
Others (specify)
_______________________ _______________ ______________
_______________________ _______________ ______________
_______________________ _______________ ______________
EQUIPMENT: (complete with Operator)
Description Hourly Rate Model & Size
Excavator ____________ ____________________
Rubber-tired Backhoe ____________ ____________________
Truck ____________ ____________________
Pick-up Truck ____________ ____________________
Compactor ____________ ____________________
Welding unit ____________ ____________________
Others (specify)
_________________________ ____________ ____________________
_________________________ ____________ ____________________
_________________________ ____________ ____________________
_________________________ ____________ ____________________
CITY OF PORT ALBERNI
Bainbridge Water Treatment Plant ADDENDA No. 3 TENDER FORM
May 2014 Page 11 of 12
H:\6021 Port Alberni City\1218 Bainbridge WTP UV Facility\05 Tender\Treatment Plant\Addenda\1218 Addenda 3 Tender form.doc
LOCAL GOVERNMENT REFERENCES
Local Government:
Contact Person and Telephone No.:
Total Contract Amount:
Project Description and date:
Local Government:
Contact Person and Telephone No.:
Total Contract Amount:
Project Description and date:
Local Government:
Contact Person and Telephone No.:
Total Contract Amount:
Project Description and date:
Local Government:
Contact Person and Telephone No.:
Total Contract Amount:
Project Description and date:
Contractor’s Signature Authorizing the Owner to Contact References Listed Above:
_______________________________________ Signature & Date
CITY OF PORT ALBERNI
Bainbridge Water Treatment Plant ADDENDA No. 3 TENDER FORM
May 2014 Page 12 of 12
H:\6021 Port Alberni City\1218 Bainbridge WTP UV Facility\05 Tender\Treatment Plant\Addenda\1218 Addenda 3 Tender form.doc
SIGNATURES
This Tender is executed at _______________________________
this____________day of_________________, 20____
____________________________________________
Name of Firm
________________________________________
Address
____________________________________________
FOR INDIVIDUAL OR PARTNERSHIP
SIGNED AND DELIVERED by
_______________________________ ______________________________
(Please Print) (Signature)
in the presence of:
________________________________________
Name
________________________________________
Address
________________________________________
Occupation
FOR A LIMITED COMPANY:
The Corporation of
________________________________________
(Please Print)
was hereunto affixed in the presence of:
________________________________________
Authorized Signing Officer and Title
________________________________________
Authorized Signing Officer and Title
125 A
S M
800 A, 600 V, 3Ø, 3W BUS, 35 kA I/C
SWGR-900 CONT'D
NOTES:
1. REMOVE EXISTING REDUCED VOLTAGE AUTOMATIC TRANSFORMER
TYPE STARTER (RVAT) AND REPLACE WITH NEW FLOOR-MOUNTED
VFDs. REPLACE EXISTING WIRING BETWEEN MOTORS AND NEW VFDs
IN EXISTING CONDUIT.
2. REPLACE EXISTING 600A FUSED DISCONNECT SWITCH WITH NEW 225A
FUSED DISCONNECT SWITCH. PROVIDE 3 SPARE FUSES. REMOVE
TRANSFER SWITCH, GENERATOR, AND BC HYDRO METERING
EQUIPMENT. COORDINATE WITH OWNER AND BC HYDRO.
3. PROVIDE 3 #12 + GROUND IN 25 RPVC CONDUIT TO EACH CAPACITOR.
A
606
3 #3/0 + GRD
IN CONDUIT
200 AF
200 AT
3P
150 kVA
600V-480 V
T-903
225 A
8
3
M
127 kW GEN
200 A ATS
P-DS908
3c #3/0 TECK
200 AF
200 AT
3P
200 A
200 A
ISOLATION SWITCH
DS-908
100 AF
100 AT
3P
TG-150
26 kW
SWGR-150
TG-160
26 kW
50
HP
P1
RVAT 1
125 A
S M
50
HP
P2
RVAT 2
... A
2P
T3
15 kVA
480-120/240 V
1Ø
... A
2P
T4
10 kVA
480-120/240 V
1Ø
60 A
2P
T2
25 kVA
480-7200 V
1Ø
... A
3P
TO
EXISTING
STEP-DOWN
TRANSFORMER
AT CHINA CREEK
DAM
NOT USED
SPL-910
EXISTING PUMP BUILDING SPLITTER
CONT'D FROM
DWG. 1218-601
SPL-909
200 A, 600 V SPLITTER
EXISTING EQUIPMENT
TO BE DECOMMISSIONED
& REMOVED
(NOTE 2)
63 RPVC, 4 # 4/0 AWG + GRD.
P-480
3c #4/0 TECK
CI T
Y OF PORT ALBERNI
www.ae.ca
Suite 300 - 4940 Canada Way, Burnaby, British Columbia, V5G 4M5
Ph: 604 293 1411 Fax: 604 291 6163
NOTE 2
3
3 #3/0 + GRD
IN CONDUIT
PROTECTION
AND
METERING
GCU
CAPACITOR
100 AF
100 AT
3P
SWGR-160
3
PROTECTION
AND
METERING
GCU
CAPACITOR
EXISTING PUMP BUILDING
P-150A
53 RPVC, 3 #2 + GRD.
P-160A
53 RPVC, 3 #2 + GRD.
P-150B
3c #6 TECK
P-160B
3c #6 TECK
NOTE 3
VFD P2
NOTE 3
EXISTING CONDUIT,
3 #4 AWG + GRD
NOTE 1
EXISTING CONDUIT,
3 #4 AWG + GRD
NOTE 1
NOTE 1
53 RPVC,
3 #4 AWG + GRD.
HZ
150 AF
150 AT
3P
VFD P1
P-P1 P-P2
HZ
53 RPVC,
3 #4 AWG + GRD.
150 AF
150 AT
3P
EXISTING
PUMP HOUSE
ELECTRICAL
EQUIPMENT
4. CLOUDED ITEMS ARE RELATED TO OWNER SUPPLIED ENERGY RECOVERY EQUIPMENT INSTALLATION AND TO BE PRICED SEPARATELY.
NOTE 4.
NOTE 4.
1 x 53 RPVC, 4 # 8 AWG + GRD ( GEN-905 )
1 x 63 RPVC, 3 # 3/0 AWG + GRD ( T-903 )
1 x 103 RPVC, 4 # 250 kcmil + GRD ( GEN-905 )
1 x 53 RPVC, 4 # 14 AWG + GRD (GEN-905)
ELECTRICAL PULL PIT
( 1.5m x 1.5m )
1 x 103 RPVC, 4 # 250 kcmil + GRD
1 x 53 RPVC, 4 # 8 + GRD
1 x 53 RPVC, 14 # 14 + GRD ( GEN-905 )
1 x 63 RPVC, 3 # 3/0 AWG + GRD ( SPL-909 )
1 x 53 RPVC, 16 # 14 AWG + GRD ( SWGR-150 & SWGR-160 )
1 x 53 RPVC, 8 # 14 AWG + GRD ( CP-151 & CP-161 )
1 x 53 RPVC, COMM CABLE ( COMM-150 )
1 x 53 RPVC, ( SPARE )
1 x 63 RPVC, 3 # 3/0 AWG + GRD ( T-903 )
BC HYDRO POLE
2 x 103 ORANGE DB2 ( C.O. )
( TELUS )
3 x 103 DB2 ( C.O. )
( BC HYDRO )
BCHYDRO
632 VAULT
W/ STEEL LID
NOTE 1
NOTE 2
NOTE 3
GENERATOR
GEN - 905
1 x 53 RPVC, 2 x COMM CABLES
1 x 53 RPVC, 20 # 14 AWG + GRD. ( GEN-905 & EX. CONTROL PNL )
1 x 53 RPVC, 16 # 14 AWG + GRD. ( SWGR-150 & SWGR-160 )
1 x 53 RPVC, 8 # 14 AWG + GRD. ( CP-151 & CP-161 )
1 x 53 RPVC, ( SPARE )
1 x 63 RPVC, 3 # 3/0 AWG + GRD ( SPL-909 )
#6 GRD
(TYP.)
GROUND ROD
& WELL,
DETAIL SEE
27 RPVC, #6 GRD
D
605
CI T
Y OF PORT ALBERNI
www.ae.ca
Suite 300 - 4940 Canada Way, Burnaby, British Columbia, V5G 4M5
Ph: 604 293 1411 Fax: 604 291 6163
www.ae.ca
Suite 300 - 4940 Canada Way, Burnaby, British Columbia, V5G 4M5
Ph: 604 293 1411 Fax: 604 291 6163
NOTES:
1. UNDERGROUND GENERATION EQUIPMENT CONDUITS AND NEW EXISTING
PUMP STATION POWER SUPPLY CONDUIT FROM PULL PIT ARE TO ENTER
BUILDING BELOW GRADE INTO BASEMENT. PENETRATIONS TO BE CORED
THROUGH WALL FOR CONTINUATION OF THE NEW CONDUITS INTO
BUILDING AND PROVIDE LB FITTINGS. AS REQUIRED, WITHIN BUILDING
FOR CONTINUATION TO EQUIPMENT. PENETRATIONS ARE TO BE
COMPLETELY WATER PROOF, SEAL AND/OR GROUT AROUND CONDUITS
AS REQUIRED.
2. UNDERGROUND CONDUITS TO EXISTING PUMP STATION CONTROL PANEL
FROM PULL PIT ARE TO TURN UP ABOVE GRADE AT EXTERIOR WALL UP
TO LB FITTINGS MOUNTED ON BUILDING WALL AT MINIMUM 1000 mm
ABOVE GRADE. PROVIDE PENETRATIONS CORED THROUGH WALL FOR
CONTINUATION OF THE NEW CONDUITS TO EXISTING CONTROL PANEL.
3. CONDUITS FROM PULL PIT FOR NEW GENERATOR ARE TO BE ROUTED
UNDERGROUND TO EXISTING GENERATOR CONCRETE PAD. SAW CUT
CONCRETE PAD TO MINIMUM 600 mm BELOW GRADE TO ROUTE NEW
CONDUITS TO NEW GENERATOR CONDUIT STUB UP LOCATION(S). FINAL
STUB UP LOCATION(S) ARE TO BE CONFIRMED UPON SELECTION OF
WEATHERPROOF GENERATOR.
4. CONDUITS ARE TO INCLUDE DRAINS AT LOW POINTS PRIOR TO ENTERING
BUILDINGS. AT UV BUILDING ALL UNDERGROUND CONDUITS THAT TURN
UP INTO EQUIPMENT ENCLOSURES OR TURN UP THROUGH FLOORS INTO
ROOMS ARE TO BE SEALED WITH REMOVABLE DUCT SEAL WHEN ALL
CONDUCTORS/CABLING INSTALLED.
5. REFER TO TRENCH DETAIL C ON DWG. 1218-605 FOR UNDERGROUND
WIRING REQUIREMENTS.
NOTE 6.
NOTE 6.
NOTE 6.
6. CLOUDED ITEMS ARE RELATED TO OWNER SUPPLIED ENERGY RECOVERY EQUIPMENT INSTALLATION AND TO BE PRICED SEPARATELY. CONDUITS TO BE INSTALLED COMPLETE WITH PULL ROPES. THE WIRING, INCLUDING ONE COMM CABLE IS RELATED TO ENERGY RECOVERY EQUIPMENT.
CP-710
UPS
T-901
SWGR-900
CP-315
PANEL 'A'
BC HYDRO
METER BOX
TX-315 & TX-325
NOTE 1
CP-325
CP-335
TX-335
& TX-345
NOTE 1
FUTURE
CP-345
1 x 53 RPVC, SPARE
1 x 53 RPVC, UV
1 x 53 RPVC, WIPER
(NOTE 5)
2 x 103 RPVC (NOTE 4)
1 x 53 RPVC, SPARE
1 x 53 RPVC, UV
1 x 53 RPVC, WIPER
(NOTE 5)
2 x 103 RPVC (NOTE 4)
1 x 53 RPVC, SPARE
1 x 53 RPVC, UV
1 x 53 RPVC, WIPER
(NOTE 5)
2 x 103 RPVC (NOTE 4)
A2
A2
A2A6
A4
A4
A4
P
44
TTB
A12
A10
A6
A6
4
4
A8
4
4
4
T
4
4
4
4 4
MV-318
A22, 24, 26
MV-328
A28, 30, 32
MV-338
A34, 36, 38
UV REACTOR
UV-335
UV REACTOR
UV-325
UV REACTOR
UV-315
53 RPVC, 3 #12 TECK
DS-908
A
606
EX
#1
EA
P-318
53 RPVC
LB
LBLB LB
LB
LB
LB
LB
LB
LB
LB
LB
EX
EX
EX
EX
EX
LA
LA
LA
LA
A9
JUNCTION BOX FOR
BLOWER FANS,
A39, 41, 43
A9
WALL MOUNTED @ EL 2500 mm AFF
(TYPICAL FOR 13)
HYPO - CHLORIDE
REACTOR PANEL
CP - 230,
WATER HEATER
HWT-230A
HWT-231
A45, 47, 49
A7A7
A7 A7
A1
A3
RECEPTACLES FOR
METERING PUMPS
P271 & P272
A7
EA
A9
A9
EB
#2 #2
DH - 721
A33, 35, 37
HP - 721
A27, 29, 31
EF - 751
A21
A3
A3
A1
EF - 752
A23, 25
NOTE 6
A5
A5
A5
A5
EF - 752 MOTOR STARTER
TS - 792
SUSPEND AT EL. 3000mm AFF (TYPICAL FOR 4)
A5
#2
A3
EB
#1
A3
A1
A3
A1
300mm TRAY MOUNTED FLAT ON WALL
EL. 3000 AFF
600mm TRAY C/W BARRIER
EL. 2850 AFF (NOTE 9)
600mm TRAY C/W BARRIER
EL. 3300 AFF (NOTE 9)
LC
A9
2 x 103 RPVC & 3 x 53
RPVC FOR FUTURE UV
REACTOR.
(STUB UP AND CAP)
FIT
316
FIT
326
FIT
336
EB
#2
#2
#2
#1
LB
A7
LB
A7
LB
A7
LB
A7
LB
A7
2 x 53 RPVC
2 x 27 RPVC
FUTURE
(STUB UP AND CAP, BOTH ENDS)
#1
#2
LC
A9
I-318
27 RPVC
C-316
I-316
27 RPVC
27 RPVC
C-326
I-326
27 RPVC
53 RPVC, 3 #12 TECK
P-328
53 RPVC
I-328
27 RPVC,
2 #12 TECK
53 RPVC, 3 #12 TECK
P-338
53 RPVC
I-338 27 RPVC
C-336
I-336
27 RPVC
MOUNT PHOTOCELL
@ 3600 AFF.
CF-711
A19
CF-712
A19
CF-711/712
SPEED SWITCH
EF-751
TIME SWITCH
CI T
Y OF PORT ALBERNI
www.ae.ca
Suite 300 - 4940 Canada Way, Burnaby, British Columbia, V5G 4M5
Ph: 604 293 1411 Fax: 604 291 6163
NOTES:
1. PROVIDE A C - CHANNEL / UNISTRUT MOUNTING STAND FOR TWO TRANSFORMERS. (TYPICAL FOR 2).
2. FINAL CONDUIT STUB LOCATIONS TO BE CONFIRMED BASED ON EQUIPMENT DIMENSIONS.
3. CONTRACTOR TO INSTALL XYLEM SUPPLIED POWER CONDUCTORS CONDUIT, FROM EACH REACTOR
TO RESPECTIVE CONTROL PANEL. CONTRACTOR TO LEAVE SUFFICIENT LENGTH OF EACH CONDUCTOR
AT EACH REACTOR FOR CONNECTION AT REACTOR AND LEAVE REMAINING LENGTH COILED BELOW
EACH CONTROL PANEL FOR CONTINUATION AND TERMINATION BY XYLEM.
4. 2 x 103 RPVC SLEEVES /W XYLEM SUPPLIED POWER CABLING.
5. 2 x 53 RPVC SLEEVES /W XYLEM SUPPLIED CONTROL PANEL.
6. "ON-OFF-AUTO" SWITCH, HUBBELL #1385 WITH ENGRAVED NAMEPLATE "EXTERIOR LIGHTS". WIRE
PHOTOCELL INTO "AUTO" LEG OF SWITCH.
7. UNLESS OTHERWISE NOTED, MOUNT EMERGENCY LIGHT BATTERY PACKS AND REMOTE HEADS SHOWN
ON THIS DRAWING WITH U/S @ 2.2m AFF. REMOTE HEADS AND EXIT SIGNS TO BE WIRED TO DC
CIRCUITS OF EMERGENCY BATTERY PACK WITH CORRESPONDING NUMBER ( #1).
8. REFER TO INSTRUMENTATION PLAN DRAWING 1218 - 703 AND INSTRUMENTATION CABLING BLOCK
DIAGRAM 1218 - 716 FOR INSTRUMENT WIRING REQUIREMENTS.
9. PROVIDE BARRIER IN CABLE TRAY TO SEPERATE POWER & CONTROL CABLING. POWER CABLES TO BE
SEPERATED BY CABLE DIAMETER. CONTROL CABLES CAN BE RANDOM FILL.
NOTE 10.
10. CLOUDED ITEMS ARE RELATED TO OWNER SUPPLIED ENERGY RECOVERY EQUIPMENT INSTALLATION AND TO BE PRICED SEPARATELY.
NEW 225 A
FUSED SWITCH
NEW (150KVA)
T-903
EXISTING ATS
NOTE 1
EXISTING
CONTROL
PANEL
EXISTING
CHLORINE PUMP
CONTROL
NOTE 4
VALVE ACTUATOR PANEL CP-161 NOTE 2
_ KVAR CAPACITOR (TBC)
SWGR-160 SWITCHGEAR PANEL
VALVE ACTUATOR PANEL CP-151 (NOTE 2)
_ KVAR CAPACITOR (TBC)
SWGR-150 SWITCHGEAR PANEL
EXISTING INCOMING CCT. BKR.
BC HYDRO PT/CT BOX & METER.
NOTE 1
NEW VFDS TO REPLACE
EXISTING SOFT STARTERS,
NOTE 7
EXISTING BREAKERS,
PANELS & TRANSFORMERS
SPLITTER SPL-909
M M
63 RPVC,
3 # 3/0 AWG + GRD.
NOTE 5
CONTINUED ON DWG. - 603
LB FITTING(S)
P1 P2
UP TO CP-161
21 RPVC,
4 #14 AWG + GRD
UP TO SWGR-160
VALVE TV-151
J. BOX
VALVE TV-161
J. BOX
TG-160
TG-150
UP TO SWGR-150
UP TO CP-151
21 RPVC,
4 #14 AWG + GRD
P-161
M
M
C-161
P-160B
I-160
P-151
C-151
P-150B
I-150
63 RPVC, 3 #3/0 + GRD
UP TO T-903
63 RPVC,
3 #3/0 AWG + GRD
CAP SPARE 53 RPVC
JUNCTION BOXES
AS REQUIRED.
(TYP.)
21 RPVC,
4 #14 AWG + GRD
63 RPVC, 3 #3/0 AWG + GRD (SPLITTER)
21 RPVC, 8 #14 AWG + GRD
NOTE 5 & 6
53 RPVC, COMM CABLE
21 RPVC, 8 #14 AWG + GRD
NOTE 5 & 6
CONTINUED ON
DWG. 1218-603
CI T
Y OF PORT ALBERNI
www.ae.ca
Suite 300 - 4940 Canada Way, Burnaby, British Columbia, V5G 4M5
Ph: 604 293 1411 Fax: 604 291 6163
NOTES:
1. COORDINATE WITH OWNER AND BC HYDRO FOR SHUTDOWN
OF EXISTING PUMP STATION TO REMOVE INCOMING
EQUIPMENT AND AUTOMATIC TRANSFER SWITCH. WHEN NEW
BC HYDRO POWER AVAILABLE FROM UV BUILDING, MANUALLY
TRANSFER TO EXISTING STANDBY GENERATOR, REMOVE
INCOMING EQUIPMENT AND INSTALL NEW TRANSFORMER AND
FUSED SWITCH, CONNECT POWER SUPPLY FROM UV BUILDING.
SHUT DOWN GENERATOR AND LOCK - OUT BREAKER THEN
REMOVE ATS, CONNECT NEW FEEDER AND ENERGIZE
EXISTING PUMP STATION.
2. PROVIDE 1 - 15 AMP SINGLE POLE CIRCUIT BREAKER (TO
MATCH EXISTING) IN EXISTING SQUARE 'D' QO LOAD CENTER.
3. FIELD SUPPORT CABLING FROM TURBINES AND VALVE
JUNCTION BOXES ALONG PIPING, THEN SUPPORTED UP WALLS.
CORE HOLES FOR CABLE PENETRATIONS AND UPON
COMPLETION OF CABLE(S) INSTALLATION SEAL OPENINGS
WITH REMOVAL SEALANT.
4. COORDINATE REMOVAL OF CHLORINE SYSTEM AND PUMP
CONTROL PANEL WITH OWNER.
5. CORE HOLES IN FLOOR SUITABLE FOR CONDUIT SIZES AS
SHOWN. RECOMMEND X-RAY SCANS AT PENETRATIONS TO
AVOID REBAR, ETC.. AFTER CONDUITS INSTALL SEAL AROUND
CONDUITS TO PROVIDE A VAPOUR AND WATER TIGHT BARRIER.
6. CONDUITS SHOWN ONLY TO REPRESENT QUANTITY TO
PENETRATE UP TO EQUIPMENT. CONDUITS TO COME UP INTO
NEW TURBINE SWITCHGEAR ROOM ALONG WALL, SO AS TO
SURFACE ROUTE AS REQUIRED.
7. PRELIMINARY VFD EQUIPMENT ENCLOSURE DIMENSIONS FOR
EACH OF THE TWO 50 Hp UNITS ARE 1220 mm (H) x 762 mm (W) x
305 mm (D). ENCLOSURES ARE TO BE FLOOR MOUNTED
COMPLETE WITH PLINTH BASE AS REQUIRED.
8. PROVIDE OPTIONAL COST TO RELOCATE THE EXISTING SINGLE
PHASE TRANSFORMER AND PANEL ABOVE THE EXISTING
STARTERS, IF VFD SIZES INCREASE.
605
A
UPPER LEVEL
SCALE 1:50 605
B
LOWER LEVEL
SCALE 1:50
BACKFILL, SEE SPECIFICATION
90
0 M
IN
.
300 MIN.100
PLASTIC WARNING TAPE,
SEE SPECIFICATION
MIN. 100 mm THOROUGHLY COMPACTED SAND
OR 6 mm MINUS GRAVEL AROUND CONDUITS
CONDUIT OR DIRECT BURIAL JACKETTED,
ARMOURED CABLES AS SPECIFIED
50
(TYP.)
OTHER SERVICES SUCH AS
INSTRUMENTATION, WATER,
SEWER & GAS
CRUSHED ROCKFINISHED GRADE
60
0 M
IN
.
TOP OF GROUND ROD
TO BE ACCESSIBLE AT
ALL TIME
EXOTHERMIC TYPE WELD. ROD AND
WELD TO BE SPRAYED WITH
GALVANIZING COMPOUND.
TO ADDITIONAL GROUND RODS AS
REQ'D TO OBTAIN GROUND
RESISTANCE OF 5 OHMS OR LESS
FOR CONTINUATION OF
GROUNDING, SEE
ELECTRICAL LAYOUT
DRAWING.
GROUND WIRE TO BE AN
UNCUT STRANDED BARE
COPPER WIRE CONNECTED
TO GROUND ROD FROM
ELECTRICAL EQUIPMENT.
USE 20 mm x 3000 mm COPPER CLAD STEEL
GROUND ROD WITH TOP OF ROD 150 mm
BELOW GRADE. IF GROUND CONDITIONS DO
NOT PERMIT INSTALLATION OF 3000 mm ROD,
REVIEW WITH ENGINEER FOR OTHER OPTIONS.
GROUND ELECTRODE BOX
SLACAN CAT No. 22109 SIZE
250 mm DIA. x 300 mm DEEP.
603
C
TYPICAL TRENCH DETAIL
N.T.S. 603
D
GROUND ROD INSTALLATION DETAIL (3 REQ'D)
N.T.S.
NOTE 9.
NOTE 9.
9. CLOUDED ITEMS ARE RELATED TO OWNER SUPPLIED ENERGY RECOVERY EQUIPMENT INSTALLATION AND TO BE PRICED SEPARATELY. CONDUITS TO BE INSTALLED COMPLETE WITH JUNCTION BOXES IN BASEMENT AND PULL ROPES. CORING AND CONDUITS UP TO MAIN FLOOR AND THE WIRING, INCLUDING ONE COMM CABLE, IS RELATED TO ENERGY RECOVERY EQUIPMENT.
NEW 225 A
FUSED SWITCH
NEW (150KVA)
T-903
EXISTING ATS
NOTE 1
EXISTING
CONTROL
PANEL
EXISTING
CHLORINE PUMP
CONTROL
NOTE 4
VALVE ACTUATOR PANEL CP-161 NOTE 2
_ KVAR CAPACITOR (TBC)
SWGR-160 SWITCHGEAR PANEL
VALVE ACTUATOR PANEL CP-151 (NOTE 2)
_ KVAR CAPACITOR (TBC)
SWGR-150 SWITCHGEAR PANEL
EXISTING INCOMING CCT. BKR.
BC HYDRO PT/CT BOX & METER.
NOTE 1
NEW VFDS TO REPLACE
EXISTING SOFT STARTERS,
NOTE 7
EXISTING BREAKERS,
PANELS & TRANSFORMERS
SPLITTER SPL-909
M M
63 RPVC,
3 # 3/0 AWG + GRD.
NOTE 5
CONTINUED ON DWG. - 603
LB FITTING(S)
P1 P2
UP TO CP-161
21 RPVC,
4 #14 AWG + GRD
UP TO SWGR-160
VALVE TV-151
J. BOX
VALVE TV-161
J. BOX
TG-160
TG-150
UP TO SWGR-150
UP TO CP-151
21 RPVC,
4 #14 AWG + GRD
P-161
M
M
C-161
P-160B
I-160
P-151
C-151
P-150B
I-150
63 RPVC, 3 #3/0 + GRD
UP TO T-903
63 RPVC,
3 #3/0 AWG + GRD
CAP SPARE 53 RPVC
JUNCTION BOXES
AS REQUIRED.
(TYP.)
21 RPVC,
4 #14 AWG + GRD
63 RPVC, 3 #3/0 AWG + GRD (SPLITTER)
21 RPVC, 8 #14 AWG + GRD
NOTE 5 & 6
53 RPVC, COMM CABLE
21 RPVC, 8 #14 AWG + GRD
NOTE 5 & 6
CONTINUED ON
DWG. 1218-603
CI T
Y OF PORT ALBERNI
www.ae.ca
Suite 300 - 4940 Canada Way, Burnaby, British Columbia, V5G 4M5
Ph: 604 293 1411 Fax: 604 291 6163
NOTES:
1. COORDINATE WITH OWNER AND BC HYDRO FOR SHUTDOWN
OF EXISTING PUMP STATION TO REMOVE INCOMING
EQUIPMENT AND AUTOMATIC TRANSFER SWITCH. WHEN NEW
BC HYDRO POWER AVAILABLE FROM UV BUILDING, MANUALLY
TRANSFER TO EXISTING STANDBY GENERATOR, REMOVE
INCOMING EQUIPMENT AND INSTALL NEW TRANSFORMER AND
FUSED SWITCH, CONNECT POWER SUPPLY FROM UV BUILDING.
SHUT DOWN GENERATOR AND LOCK - OUT BREAKER THEN
REMOVE ATS, CONNECT NEW FEEDER AND ENERGIZE
EXISTING PUMP STATION.
2. PROVIDE 1 - 15 AMP SINGLE POLE CIRCUIT BREAKER (TO
MATCH EXISTING) IN EXISTING SQUARE 'D' QO LOAD CENTER.
3. FIELD SUPPORT CABLING FROM TURBINES AND VALVE
JUNCTION BOXES ALONG PIPING, THEN SUPPORTED UP WALLS.
CORE HOLES FOR CABLE PENETRATIONS AND UPON
COMPLETION OF CABLE(S) INSTALLATION SEAL OPENINGS
WITH REMOVAL SEALANT.
4. COORDINATE REMOVAL OF CHLORINE SYSTEM AND PUMP
CONTROL PANEL WITH OWNER.
5. CORE HOLES IN FLOOR SUITABLE FOR CONDUIT SIZES AS
SHOWN. RECOMMEND X-RAY SCANS AT PENETRATIONS TO
AVOID REBAR, ETC.. AFTER CONDUITS INSTALL SEAL AROUND
CONDUITS TO PROVIDE A VAPOUR AND WATER TIGHT BARRIER.
6. CONDUITS SHOWN ONLY TO REPRESENT QUANTITY TO
PENETRATE UP TO EQUIPMENT. CONDUITS TO COME UP INTO
NEW TURBINE SWITCHGEAR ROOM ALONG WALL, SO AS TO
SURFACE ROUTE AS REQUIRED.
7. PRELIMINARY VFD EQUIPMENT ENCLOSURE DIMENSIONS FOR
EACH OF THE TWO 50 Hp UNITS ARE 1220 mm (H) x 762 mm (W) x
305 mm (D). ENCLOSURES ARE TO BE FLOOR MOUNTED
COMPLETE WITH PLINTH BASE AS REQUIRED.
8. PROVIDE OPTIONAL COST TO RELOCATE THE EXISTING SINGLE
PHASE TRANSFORMER AND PANEL ABOVE THE EXISTING
STARTERS, IF VFD SIZES INCREASE.
605
A
UPPER LEVEL
SCALE 1:50 605
B
LOWER LEVEL
SCALE 1:50
BACKFILL, SEE SPECIFICATION
90
0 M
IN
.
300 MIN.100
PLASTIC WARNING TAPE,
SEE SPECIFICATION
MIN. 100 mm THOROUGHLY COMPACTED SAND
OR 6 mm MINUS GRAVEL AROUND CONDUITS
CONDUIT OR DIRECT BURIAL JACKETTED,
ARMOURED CABLES AS SPECIFIED
50
(TYP.)
OTHER SERVICES SUCH AS
INSTRUMENTATION, WATER,
SEWER & GAS
CRUSHED ROCKFINISHED GRADE
60
0 M
IN
.
TOP OF GROUND ROD
TO BE ACCESSIBLE AT
ALL TIME
EXOTHERMIC TYPE WELD. ROD AND
WELD TO BE SPRAYED WITH
GALVANIZING COMPOUND.
TO ADDITIONAL GROUND RODS AS
REQ'D TO OBTAIN GROUND
RESISTANCE OF 5 OHMS OR LESS
FOR CONTINUATION OF
GROUNDING, SEE
ELECTRICAL LAYOUT
DRAWING.
GROUND WIRE TO BE AN
UNCUT STRANDED BARE
COPPER WIRE CONNECTED
TO GROUND ROD FROM
ELECTRICAL EQUIPMENT.
USE 20 mm x 3000 mm COPPER CLAD STEEL
GROUND ROD WITH TOP OF ROD 150 mm
BELOW GRADE. IF GROUND CONDITIONS DO
NOT PERMIT INSTALLATION OF 3000 mm ROD,
REVIEW WITH ENGINEER FOR OTHER OPTIONS.
GROUND ELECTRODE BOX
SLACAN CAT No. 22109 SIZE
250 mm DIA. x 300 mm DEEP.
603
C
TYPICAL TRENCH DETAIL
N.T.S. 603
D
GROUND ROD INSTALLATION DETAIL (3 REQ'D)
N.T.S.
NOTE 9.
NOTE 9.
9. CLOUDED ITEMS ARE RELATED TO OWNER SUPPLIED ENERGY RECOVERY EQUIPMENT INSTALLATION AND TO BE PRICED SEPARATELY. CONDUITS TO BE INSTALLED COMPLETE WITH JUNCTION BOXES IN BASEMENT AND PULL ROPES. CORING AND CONDUITS UP TO MAIN FLOOR AND THE WIRING, INCLUDING ONE COMM CABLE, IS RELATED TO ENERGY RECOVERY EQUIPMENT.
JUMPER/DIP SWITCH CONFIGURATION
EQUIPMENT
SCADAPACK 357 - CONTROLLER MODULE
SCADAPACK 357 - 5606 LOWER I/O MODULE (0)
SCADAPACK EXPANSION - 5506 ANALOG INPUT MODULE (2)
MAIN UPS - AP9613 DRY CONTACT I/O CARD *
* Item located outside of Main Control Panel
JUMPER/DIP SWITCH
J3 - Counter Input 1
J4 - Counter Input 2
J5 - Counter Input 1
J6 - Counter Input 2
J8 - COM1
Address 1
Address 2
Address 4
Address 8
Address 1
Address 2
Address 4
Address 8
1
2
3
4
POSITION
Ext. Amplifier
Ext. Amplifier
Not installed
Not installed
RS-232
OFF
OFF
OFF
OFF
OFF
ON
OFF
OFF
OFF
OFF
OFF
ON
A
B
D
+
SCADAPACK 357
CONTROLLER MODULE
-
PWR
IN
P3
COM1
P5
LAN
P4
5606 LOWER I/O MODULE (0)
+
-
CONTROL MICROSYSTEMS
SCADAPACK 5506 EXPANSION
ANALOG INPUT MODULE (2)
+
-
DC
PWR
P3
DC
PWR
P3
WEIDMULLER
ETHERNET SWITCH
1 2 3 4 5
24VDC
(SEE DWG. -707)
170+ COM
24V+ 24V-
24V+ 24V-
24VDC
(SEE DWG. -707)
171+ COM
LAN
MAPLE 12"
TOUCH SCREEN
OPERATOR INTERFACE
A
B
F
CONTROL
LAPTOP
(BY OTHERS)
ETHERNET
PORT
(DOOR OF
CABINET)
24VDC
(SEE DWG. -706)
158+ COM
CONTROL MICROSYSTEMS
SCADAPACK EXPANSION
5103 POWER SUPPLY MODULE
+
-
P3
24VDC
(SEE DWG. -706)
156+ COM
AC/DC
PG
ETHERNET
CAT5E
ETHERNET
CAT5E
+
-
DC
PWR
P3
G
24VDC
(SEE DWG. -706)
159+ COM
SCADAPACK EXPANSION - 5606 COMBINATION I/O MODULE (1) Address 1
Address 2
Address 4
Address 8
ON
OFF
OFF
OFF
C
24VDC
(SEE DWG.-706)
155+ COM
SCADAPACK 334
CONTROL MICROSYSTEMS
SCADAPACK 5506 EXPANSION
ANALOG INPUT MODULE (3)
CONTROL MICROSYSTEMS
SCADAPACK 5606 EXPANSION
COMBINATION I/O MODULE (1)
+
-
P3
24VDC
(SEE DWG. -706)
157+ COM
AC/DC
SCADAPACK EXPANSION - 5506 ANALOG INPUT MODULE (3) Address 1
Address 2
Address 4
Address 8
ON
ON
OFF
OFF
E
CO
MM
-150
TO
TURBINE
CONTROLS
D
CI T
Y OF PORT ALBERNI
www.ae.ca
Suite 300 - 4940 Canada Way, Burnaby, British Columbia, V5G 4M5
Ph: 604 293 1411 Fax: 604 291 6163
CONTROL MICROSYSTEMS
SCADAPACK 357
5606 LOWER I/O MODULE (0)
DIGITAL OUTPUTS (P5, P6)
24VDC
(SEE DWG. -706)
00001
ZCO-318
UV LINE 1
VALVE OPEN CMD.
162+ COM
0
1
2
3
4
00005
MO-271
CHLORINE PUMP 1
RUN CMD.
00006
...
00007
...
00008
...
00009
MO-150
TURBINE #1
RUN COMMAND
00010
MO-160
TURBINE #2
RUN COMMAND
5
6
7
8
9
4-7
COM
0-3
COM
00001
0.5A SB
00002
0.5A SB
00003
0.5A SB
00004
0.5A SB
00005
0.5A SB
00006
0.5A SB
00007
0.5A SB
00008
0.5A SB
00009
0.5A SB
00010
0.5A SB
R
100
00011
...
10
00011
0.5A SB
00012
...
11
00012
0.5A SB
00013
...
12
00013
0.5A SB
00014
...
13
00014
0.5A SB
00015
...
14
00015
0.5A SB
00016
...
15
00016
0.5A SB
8-11
COM
12-15
COM
CONTROL MICROSYSTEMS
SCADAPACK 357
5606 LOWER I/O MODULE (0)
ANALOG INPUTS (P4)
24 VDC
(SEE DWG. -705)
30015
AIT-280
CHLORINE RESIDUAL
30016
FIT-316
UV LINE 1 FLOW
30017
FIT-326
UV LINE 2 FLOW
30019
FIT-346
UV LINE 4 FLOW
30020
...
30018
FIT-336
UV LINE 3 FLOW
163+ COM
30015
30016
30017
30020
1
30021
30022
163+
30018
2
3
4
5
6
7
8
+
-
-
CHLORINE RESIDUAL ANALYZER
L
N
+
-
POWER
CURRENT
OUTPUT
120VAC
POWER FROM
DWG. -706
WEIDMULLER
WAVEPACK LOOP
SPLITTER
30022
PIT-350
UV OUTLET PRESSURE
FLOW TRANSMITTER
UV LINE 1
1(L+)
2(L-)
26(+)
27(-)
POWER
CURRENT
OUTPUT
120VAC
POWER FROM
DWG. -706
FLOW TRANSMITTER
UV LINE 2
1(L+)
2(L-)
26(+)
27(-)
POWER
CURRENT
OUTPUT
120VAC
POWER FROM
DWG. -706
FLOW TRANSMITTER
UV LINE 3
1(L+)
2(L-)
26(+)
27(-)
POWER
CURRENT
OUTPUT
120VAC
POWER FROM
DWG. -706
30019
30021
PIT-210
UV INLET PRESSURE
(DEVICE STATUS)
SENSOR
VENDOR
CABLE
0
1
2
3
4
5
6
7
COM
VENDOR
CABLE
VENDOR
CABLE
VENDOR
CABLE
+
-
+
-
FUTURE
R-100100A
R
101
R
102
R
103
R
104
162+
162+
162+
162+
100B
R-101101A
R
105
R
106
R
107
R
108
R
109
R
110
R
111
R
112
R
113
R
114
R
115
H120
N
H112
N
H113
N
H114
N
163+
163+
163+
163+
163+
163+
163+
FLOW TRANSMITTER
UV LINE 4
1(L+)
2(L-)
26(+)
27(-)
POWER
CURRENT
OUTPUT
120VAC
POWER FROM
DWG. -707
VENDOR
CABLE
H115
N
101B
R-102102A
100B
R-103103A
103B
R-104104A
104B
R-105105A
105B
R-106106A
106B
R-107107A
107B
R-108108A
108B
R-109109A
109B
R-110110A
110B
R-111111A
111B
R-112112A
112B
R-113113A
113B
R-114114A
114B
R-115115A
115B
00002
ZCC-318
UV LINE 1
VALVE CLOSE CMD.
00003
ZCO-328
UV LINE 2
VALVE OPEN CMD.
00004
ZCC-328
UV LINE 2
VALVE CLOSE CMD.
TO MV-318
TO MV-328
TO P-271
PIT
210
PIT
350
+
-
+
1
3
7
9
(+)
(-)
(+)
(-)
ANALOG
SIGNAL
ISOLATOR
TO UV-315
+
-
-
WEIDMULLER
WAVEPACK LOOP
SPLITTER
+
-
+
TO UV-325
+
-
-
WEIDMULLER
WAVEPACK LOOP
SPLITTER
+
-
+
TO UV-335
+
-
-
WEIDMULLER
WAVEPACK LOOP
SPLITTER
+
-
+
TO UV-345
(FUTURE)
D
RUN SIGNAL
SWGR-150
10
11
10
11
RUN SIGNAL
SWGR-160
D
CI T
Y OF PORT ALBERNI
www.ae.ca
Suite 300 - 4940 Canada Way, Burnaby, British Columbia, V5G 4M5
Ph: 604 293 1411 Fax: 604 291 6163
ZSC-160
ZSC-150
CONTROL MICROSYSTEMS
SCADAPACK EXPANSION
5606 COMBINATION I/O MODULE (1)
DIGITAL INPUTS (P7, P8, P9, P10)
(SEE DWG. -706)
164+
164+ COM
164+ 10078
10079
10080
10081
10082
10083
10084
10085
10086
10087
10088
10089
10090
10091
10092
10093
10093
...
10092
...
10091
...
10087
CHLORINE PUMP 1 OK
10088
CHLORINE PUMP 2 OK
COM
CLOSED
10089XA-250
CHLORINE TANK 1 LEVEL
LOSS OF ECHO
10090
XA-260
CHLORINE TANK 2 LEVEL
LOSS OF ECHO
OPEN
10109
ZSO-160
TURBINE #2
VALVE OPEN
10108
ZSC-160
TURBINE #2
VALVE CLOSE
10107
ZSO-150
TURBINE #1
VALVE OPEN
10103
MS-150
TURBINE #1
RUNNING
10104
MS-160
TURBINE #2
RUNNING
10105
...
10106
ZSC-150
TURBINE #1
VALVE CLOSE
MV-338
UV LINE 3 VALVE
COM
COM
COM
COM
164+ 10094
10095
10096
10097
10098
10099
10100
10101
9
COM
9
COM
9
COM
9
COM
10102
10103
10104
10105
10106
10107
10108
10109
CONTINUED ON RIGHT
CONTINUED FROM LEFT
164+
10079
ZSO-338
UV LINE 3 VALVE OPEN
10078
ZSC-338
UV LINE 3 VALVE CLOSED
CLOSED
OPEN
MV-348
UV LINE 4 VALVE
164+
10095
ZSO-348
UV LINE 4 VALVE OPEN
10094
ZSC-348
UV LINE 4 VALVE CLOSED
10084
XA-335B
REACTOR 3
HIGH PRIORITY ALARM
10083
XA-335A
REACTOR 3
LOW PRIORITY ALARM
10082
XR-335
REACTOR 3 RUNNING
UV-335
UV REACTOR 3
K13
K14
K15
K16
K17
10085
XI-335A
REACTOR 3
FLOW ENABLE
10086
XI-335B
REACTOR 3
AVAILABLE
10100
XA-345B
REACTOR 4
HIGH PRIORITY ALARM
10099
XA-345A
REACTOR 4
LOW PRIORITY ALARM
10098
XR-345
REACTOR 4 RUNNING
UV-345
UV REACTOR 4
K19
K20
K21
K22
K23
10101
XI-345A
REACTOR 4
FLOW ENABLE
10102
XI-345B
REACTOR 4
AVAILABLE
FUTURE
P7
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
P8
P9
16
17
18
19
20
21
22
23
24
25
26
28
30
31
27
29
1
2
3
4
5
6
7
8
1
3
4
5
6
7
2
8
1
2
3
4
5
6
7
8
1
3
4
5
6
7
2
8
P10
10080
HS-338
UV LINE 3 VALVE IN REMOTE
L/R10096
HS-348
UV LINE 4 VALVE IN REMOTE
L/R
10081
...
10097
...
FUTURE
164+
164+
164+
164+
CHLORINE PUMP 1
STATUS
CHLORINE PUMP 2
STATUS
CHLORINE TANK 1 LEVEL TRANSMITTER
L.O.E.
CHLORINE TANK 2 LEVEL TRANSMITTER
L.O.E.
SWGR-150
GCAUX1
GCAUX1
164+
164+
164+
164+
164+
164+
15 16
GENERATOR ON LINE
SWGR-160
15 16
GENERATOR ON LINE
TG-150
ZSO-150
20 21
18 1918 19
ZSO-160
20 21
18 1918 19
TG-160
D
CI T
Y OF PORT ALBERNI
www.ae.ca
Suite 300 - 4940 Canada Way, Burnaby, British Columbia, V5G 4M5
Ph: 604 293 1411 Fax: 604 291 6163