PENDING PROJECTS SUMMARY (June 26, 2018)
This update provides a summary of all proposed major developments within the City of Petaluma. The development summary tables are separated by Commercial Projects, Mixed Use
Projects, Residential Projects and Annexations. Please contact the developer directly for project details such as construction timing, cost and availability.
DEFINITIONS OF STATUS CATEGORIES
IN PLANNING PROCESS: Formal project application has been filed for one or more discretionary planning approvals. Residential projects of fewer than two units are not included unless
Planning Commission approval is required, nor are non-residential projects that do not result in new development.
ALL PLANNING APPROVALS: The project has received all discretionary approvals from the city, with no appeals pending.
IN PLAN CHECK: The project has received all planning approvals; construction drawings have been submitted to the Building Division.
UNDER CONSTRUCTION: The project has received all planning approvals; final plans approved; building and other permits have been issued; may be under construction.
INACTIVE: Action by applicant needed; more than six months passed since request for action made by staff.
NOTE: This list was prepared by the City of Petaluma Planning Division for informational purposes only. The City does not warrant the accuracy of the information provided.
PLANNER CONTACT INFORMATION HH – Heather Hines, Planning Manager, 707-778-4316, [email protected]
BAB – Brittany Ann Bendix, Deputy Planning Manager, 707-778-4314, [email protected]
EU – Emmanuel Ursu, Principal Planner, 707-778-4401, [email protected]
AH – Aaron Hollister, Senior Planner, [email protected]
BB – Brett Bollinger, Senior Planner, [email protected]
TR – Tiffany Robbe, Senior Planner, 707-778-4318, [email protected]
LB – Lilly Bianco, Associate Planner, 707-778-4315, [email protected]
MN – Milan Nevajda, Associate Planner, 707-778-4315, [email protected]
CN – Cailin Notch, Assistant Planner, 707-778-4317, [email protected]
Data source: Sonoma County, City of Petaluma
City Limit
Parcels
Rivers/StreamsRedwood Hwy/Hwy 101$ 0 0.75 1.50.375 Miles
City of Petaluma - Planning DivisionMap of Major Development Projects
June 26, 2018
Data source: Sonoma County, City of Petaluma
City Limit
Parcels
Rivers/StreamsRedwood Hwy/Hwy 101$ 0 0.75 1.50.375 Miles
13
15
17
26
34
4244
8
1416
20
2425
33 37
383940
4
56
31
1119
324345
229
23
47
3521
36
41
46
121810
Commercial Projects1. Adobe Road Winery2. Washington Square Sign Program3. 1395 N. McDowell SPAR4. Valero Gas Station5. Plaza North Sign Program6. McDonald’s Remodel7. Washington Square Façade Removal8. Chicken Town Mini Golf9. Riverfront Courtyard Marriott10. Cagwin & Dorward11. Spring Hill School12. Labcon Warehouse Addition13. 76 Gas Station Remodel14. Silk Mill15. Lagunitas16. Floathouse17. Hansel Toyota Expansion and Remodel18. Petaluma Poultry Expansion19. Petaluman Hotel20. Safeway Fuel Center
Mixed Use Projects21. Bay West - 500 Hopper Street Mixed Use22. Omahony Mixed Use Building23. Riverfront 201024. North River Apartments25. Haystack Pacifica26. Deer Creek Village
Residential Projects27. Baywood Apartments28. Campbell Family ADU29. Howard Garage Addition30. PEP Senior Housing31. Sepaher Residential Building32. Mohan Residence33. Williams Residential Historic SPAR34. Brody Ranch Subdivision35. Northbank at Riverfront (Phases I + II)36. Marina Apartments37. Burdell Building Condos38. East Washington Commons39. Keller Court Commons40. Riverbend Crossing PUD and Subdivision41. Altura Apartments42. Addison Ranch Apartments43. Davidon Homes44. Sid Commons45. Sunnyslope II46. Quarry Heights
Annexations47. South Petaluma Partners
2
3
7
28 29
30
1
27
Map # Applicant APN Project Location Status Date Filed Zoning Description Units/SQFT Planner
Commerical
1 Project: Adobe Road Winery - PLMA-18-0003
Kevin Buckler
707-939-7967008-069-002 1 C Street In Planning Process 3/26/2018 T-5
New construction of a two-story 15,848 square foot building
containing a winery, tasting room, private event space and a
motorsports gallery, collectively operated as the Adobe Road
Winery. The proposal also includes improvements to the
public frontages along C Street and First Street.
N/A BAB
2 Project: Washington Square Sign Program - PLSR-18-0003
Nick Carter
nickc
@fulcrumproperty.com
916-383-3333
007-280-055373 S. McDowell
Blvd. In Planning Process 2/1/2018 C2
Update to existing sign program to increase maxium letter
heights for major and junior achors.N/A BB
3 Project: 1395 N. McDowell Boulevard SPAR - PLSR-18-0002
Hank Malak
626-583-8348
007-411-0471395 N. McDowell
Blvd. In Planning Process 1/23/2018
PUD - Redwood
Technology Center
New 6,378 square foot commercial restaurant building.
6378 sq/ft BB
4 Project: Valero Gas Station - PLMA-18-0001
Ed Hale
760-884-7011
007-161-043523 E. Washington
StreetAll Planning Approvals 1/23/2018 MU1A
Demolition of existing gas station and consturction of new
one in its place. N/A CN
5 Project: Plaza North Sign Program - PLSR-17-0031
Barbara Cohen, Architectural
Design & Signs
951-278-0680
007-350-015259 N. McDowell
Blvd. In Planning Process 10/4/2017 C2
Update to existing sign program to allow freeway facing signs.
N/A AH
6 Project: McDonald's Remodel - PLSR-17-0030
Stantec Architecture, Inc.
zorah.mariano @stantec.com
916-669-5928
007-350-015259 N. McDowell
Blvd. In Planning Process 10/4/2017 C2
Demolish and reconstruct the existing McDonald's Restaurant
N/A AH
7 Project: Washington Square Façade Remodel - PLSR-17-0023
Nick Carter
nickc
@fulcrumproperty.com
916-383-3333
007-280-055373 S. McDowell
Blvd. All Planning Approvals 8/29/2017 C2
Façade remodel for a portion of the Washington Square
Shopping Center. 50,000 square feet
of the 200,000
square foot
shopping center
BB
8 Project: Chicken Town Mini Golf - PLMA-17-0007
Theresa Teuma
707-484-6774
007-421-0265101 Montero
WayAll Planning Approvals 8/22/2017 C2
New Miniature golf facility. Site improvements include new
parking lot, landscaping, indoor modifications and outdoor
miniature golf course.
AH
9 Project: Riverfront Courtyard Marriot - PLSR-16-0029
Riverfront, LLC
Frank Marinello
136-010-027 500 Hopper Street In Plan Check 7/21/2016 T5
122 room 4 story hotel and associated parking.
74,000 sq/ft EU
Page 1 7/18/2018
Map # Applicant APN Project Location Status Date Filed Zoning Description Units/SQFT Planner
10 Project: Cagwin and Dorward - PLMA-16-0013
Greg LeDoux & Associates
707-795-8855
005-040-0550 Lakeville
HighwayIn Plan Check 10/31/2016
PCD Park
Central/Park
Sqaure
New commercial building to accommodate Cagwin and
Dorward Landscaping. Project includes office and ladnscapr
maintenance operations for approx. 100 employees 22,727 sq/ft TR
11 Project: Spring Hill School - PLSR-17-0001, PLUP-17-0001
Chris Scerri
707-206-4041
006-441-020,
006-371-029, -
002
705, 709, 735 N.
Webster Street Under Construction 1/5/2017 CF/R2
New private school. Project includes demolition of existing
classrooms and construction of new 6,594 square foot
classroom
6,594 sq/ft TR
12 Project: Labcon Warehouse Addition - PLSR-16-0007
Greg LeDoux & Associates
707-795-8855
005-040-0393200 Lakeville
Highway Under Construction 2/16/2016 BP
Addition and associated site improvements including
landscaping, parking facilities, frontage improvements along
Cader Lane and Lakeville Highway. 40,000 sq/ft HH
13 Project: 76 Gas Station Remodel - PLSR-15-0013
Muthana Ibraim, MI Architects,
INC., 925-287-1174 x1 007-412-015
4998 Petaluma
Blvd. N In Plan Check 5/13/2015 C2
Demolition of gas station and construction of a convenience
store, self serve car wash and storage area. 2,179 sq/ft fueling
canopy MN
14 Project: Silk Mill - 07-SPC-0160-CR
Perry Patel
BPR Properties
650-223-6711
007-163-002 750 Jefferson St. Under Construction MU2
76 room hotel
HH
15 Project: Lagunitas PLSR-14-0025
Leon Sharyon, 707-769-
4495, [email protected] 007-582-009
1230, 1250 & 1340
N. McDowell Blvd. Under Construction 10/6/2014 BP
Tank Farm at existing site and truck turn around at vacant
Lagunitas lot. TR
16 Project: Floathouse - PLSR-14-0013
Petaluma Small Craft Center
Greg Sabourin007-142-018 150 Weller St. All Planning Approvals
Floating rental office and dock in the turning basin &
restroom facility in Cavanagh Landing Park. HH
17 Project: Hansel Toyota Expansion and Remodel - PLSR-14-0009
Henry Hansel hhansel
@hanselauto.com
150-020-033, -
034, -035
1125 Auto Center
Drive Under Construction 5/1/2014 PCD - Auto Center
Expansion to the north and wast for showroom, sales and
offices. HH
18 Project: Petaluma Poultry Expansion - PLSR-14-0004
Petaluma Poultry, Steve
Lafranchi, [email protected]
2700 Lakeville
Hwy. Under Construction 2/3/2014 BP
Addition for office space, parking, and site design
modifications and addition of second shift 4,000 sq/ft HH
19 Project: Petaluman Hotel - PLSR-13-0019
Ross Jones 707-
971-9400, rossjones
@hotmail.com
007-582-009 2 Petaluma Blvd. S Inactive 10/31/2013 MU2
Construction of a 54 room boutique hotel
TR
20 Project: Safeway Fuel Center - PLSR-13-0012
Santec Architecture
Gary Semling, 707-765-
1660, gary.semling
@stantec.com
007-280-046335 S McDowell
Blvd. In Planning Process 7/25/2013 C2
New gas station including 8 dispensers, 16 fuel stations,
canopy and convenience store. HH
Page 2 7/18/2018
Map # Applicant APN Project Location Status Date Filed Zoning Description Units/SQFT Planner
Mixed Use
21 Project: Bay West - Hopper Street Mixed Use - PLMA-17-0010
BWD Petaluma, LLC
2 Henry Adams, Suite 450
San Francisco, CA
136-010-024,
007-171-023500 Hopper Street In Planning Process 12/21/2017 D3/CS
General Plan Map Amendment, General Plan Text
Amendment, Tentative Subdivision Map, and Specific Plan for
mixed-use development on approx. 39.2 acre site on 2
parcels.
13.7 acres of
commerical and
23.6 acres of
residential with
145 units.
HH
22 Project: Omahony Mixed Use Building - PLMA-17-0009
Paul Foley/Mike Omahony
131 Liberty St LLC
415-451-4841
006-361-030 131 Liberty Street All Planning Approvals 11/14/2017 MU2
Tentative Subdivision Map/Site Plan and Architectural Review
for Mixed Use Development 1500 square feet
of commerical and
10 residential
units
AH
23 Project: Riverfront 2010 - 11-TSM-0130-CR
Riverfront, LLC
Frank Marinello
136-010-022 500 Hopper Street Under Construction 2/10/2011 T4/T5/CS
Tentative Subdivision Map for Mixed Use Development 273 Residential
units (134 single
family, 39 town
homes, 100
apartments) hotel
with 120 rooms,
60,000 sq.ft.
office, 30,000 sq/ft
EU
24 Project: North River Apartments - PLSR-15-0015
AG Spanos Corp
Karen Garrett
209-955-2574
006-163 -040, -
041
368 and 402
Petaluma Blvd. N All Planning Approvals 6/1/2015 T5
184 new residential units.
BAB
25 Project: Haystack Pacifica - PLMA-16-0001
Pacifica Companies contact:
Carey Algaze; 619-296-9000
007-143-003,
004, 007, 014,
015
215 Weller Street In Planning Process 1/7/2013 T5/T6
178 new residential units with 14,516 sq/ft of commercial at
corners. TR
26 Project: Deer Creek Village - 09-SPC-0091
Merlone Geier Management
Mike Grehl, 858-259-9909,
mgrehl
@merlonegeier.com
007-380-005,
027
N. McDowell Blvd.
between Lynch
Creek and Rainier
Ave.
Under Construction MU1B
345,000 sq/ft commercial center and associated site
improvements. 345,000 sq/ft HH
Page 3 7/18/2018
Map # Applicant APN Project Location Status Date Filed Zoning Description Units/SQFT Planner
Residential
27 Project: Baywood Apartments - PLSR-18-0016
Matt Taylor
707-579-3811005-060-042
2592 Casa Grande
Road In Planning Process 5/31/2018 R5
Proposal for 299 apartments in 27 different three-story
buildings. Project includes a recreation center and indoor
pool and all associated site improvements. 299 units BAB
28 Project: Campbell Family Accessory Dwelling Unit (ADU) - PLSR-18-0007
Bill Wolpert [email protected]
707-789-0822006-141-005 520 Howard Street In Plan Check 3/6/2018 R2
New two-story ADU in Oakhill-Brewster Historic District.
Proposed unit is attached to the existing residence by a
common deck. 720 sq/ft CN
29 Project: Howard Garage Addition - PLSR-18-0008
Bill Wolpert [email protected]
707-789-0822006-155-011 411 Keokuk Street All Planning Approvals 3/6/2018 R3
Addition of one-car garage and laundry room to an existing
residence in the Oakhill-Brewster Historic District. Proposed
addtition will add 320 sq/ft.N/A CN
30 Project: PEP Housing Senior Housing - PLSR-18-0006
Robert W. Hayes 415-332-
0999008-530-007
951 Petaluma Blvd
SIn Planning Process 2/26/2018 T5
Demolition of all existing buildings/site features and
construcion of affordable housing units in new two to three
story struncture with a manager's unit and one two-story
community building
53 units and 1
manager's unit.BAB
31 Project: Sepaher Residential Building - PLMA-17-0008
Nick Lee Architecture
415-378-4337
007-154-013315 Lakeville
Street All Planning Approvals 9/13/2017 MU1A
New building containing 4 residential units and associated
parking on site. Application includes a CUP to allow for
residential on the ground floor. N/A BB
32 Project: Mohan Residence PLSR-17-0011
Joseph Gorney; 925-939-0183,
jfgorny@ comcast.net 019-560-018
Ravenswood Court
(Between 109 and
125 Ravenswood)
In Plan Check 5/9/2017 PUD - Stone Ridge
Single family dwelling on vacant lot and associated site
improvements2,991 sq/ft CN
33 Project: Williams Residential Historic SPAR - PLSR-16-0039
Peter Williams, grenware
@gmail.com 006-214-014
331 Kentucky
Street All Planning Approvals 12/27/2016 R3
Modificantions to an existing single family residence including
a 1st floor rear addition and conversion of exiting attic space
into 2nd floor livingspace. CN
34 Project: Brody Ranch Subdivision - PLMA-15-0007DeNova Homes
Trent Sanson, 925-685-
0110, trent@ denovahomes
.com
137-061-042 360 Corona RoadIn Plan Check/Under
Construction11/30/2015 PUD - Brody Ranch
Development of 199 units consisting of 59 detached single
family residences, one duplex and 138 condominiums 15.92 acres EU
35 Project: Northbank at Riverfront (Phases I and II SPAR) PLSR-16-0026, PLSR-17-0019
Riverfront, LLC
Frank Marinello
136-010-022 500 Hopper Street In Plan Check
7/11/2016 (Phase
I), 8/15/2017
(Phase II)
D-4
91 single family homes.
EU
Page 4 7/18/2018
Map # Applicant APN Project Location Status Date Filed Zoning Description Units/SQFT Planner
36 Project: Marina Apartments - PLSR-15-0011, PLZT-15-0001
Steve Lafranchi
707-762-3122
005-060-089 0 Marina Ave. Under Construction 5/7/2015 PCD - Marina
Amend the Marina PCD to allow residential uses and increase
in building stories. SPAR for 80 unit residential apartment
building TR
37 Project: Burdell Building Condos PLMA-15-0006
David Martin, Creedence Corp.
707-217-2983
007-132-033 405 E. D Street All Planning Approvals 12/29/2014 MU1A
Convert existing attic space of the Burdell Building to 9
residential condominiums and construct a new three story
building to include 15 residential condos at the existing gravel
parking lot nehind the Burdell Building. TR
38 Project: East Washington Commons - PLSR-15-0036
Jerry Kler Architects, 415-332-
3868
007-022-033,
055, 058
817, 822, 825 E.
Washington Street All Planning Approvals 12/21/2015 MU1A
SPAR and CUP for a new 3 story, 24-unit residential project on
3 parcels, ncluding 2 floors of residential over ground floor
parking and street level tenant amenities. HH
39 Project: Keller Court Commons - PLMA-14-0002
Jim Soules, Keller Court, LLC
jimesoulescompany.com
206-579-8731
006-083-054West Street at
Keller Under Construction 4/10/2014
PUD -Keller Court
Commons
8 new single family homes in a pocket neighborhood
HH
40 Project: Riverbend Crossing PUD and Subdivision - PLMA-15-0008
River Bend, LLC
Kevin Skiles
415-572-4159
116-051-065,
066, 079, 007-
041-006
1 & 16 Cedar
Grove Parkway,
529 Madison
Inactive 12/17/2015 R3/R4
New single family subdivision including 117 lots, new bridge
over the Petaluma River, two pulic park, relocation of the
Bloom-Tunstall House to one of the proposed public parks. HH
41 Project: Altura Apartments - PLSR-14-0024
The Reliant Group
Robert Lawler
415-501-9603
Property Manager: Laura
Puccinelli -
lpuccinelli@reliantpropertymg
mt.com 707-380-6724
005-201-001
Northeast corner
of Baywood Drive
and Perry Lane.
Under Construction 9/30/2014 R5
150 apartment units and associated site improvements.
BAB
42 Project: Addison Ranch Apartments - 13-SPC-0122
GALA Construction
Gary Whitesides
916-719-5902
007-610-005,
007-610-006,
007-610-029,
007-610-019
and 007-610-
031
200 Greenbriar
Circle Under Construction R4
Add an additional 100 multi-family units in an existing
apartment complex.
HH
43 Project: Davidon Homes - 03-TSM-0396-CR
Davidon Homes
Steve Abbs
019-120-040,
041
Windsor and D
Street Inactive R1
66 new single family homes HH
Page 5 7/18/2018
Map # Applicant APN Project Location Status Date Filed Zoning Description Units/SQFT Planner
44 Project: Sid Commons 03-GPA-0379-CR
Mark Johnson 019-010-006,
007, 008, 009End of Graylawn In Planning Process R4
New 278 unit apartment complex TR
45 Project: Sunnyslope II / the Oaks at Sunnyslope 03-TSM-0460-CR
Lafferty Communities 019-203-008 Sunnyslope Road In Planning ProcessPUD - Sunnyslope
II
18 single family pacrcel in multiple phases. SPAR required for
17 lots with 1 existing historic house. Lots 3+ 5 of Phase I
received SPAR approval on 1/9/18.BB/TR
46 Project: Quarry Heights (Lomas) 09-GPA-0560-CR, 06-SPC-0615-CR
KB Homes
Donna Vingo, 925-983-
4522,
019-210-010,
019-210-011,
019-220-027,
019-220-012
Petaluma Blvd. S
(Dutra Quarry) Under Construction
PUD- Quarry
Heights
272 new single family homes.
TR
Annexations
47 Project: South Petaluma Partners 7-ANX-0623-CR
South Petaluma Partners, LLC
Thomas Grabiel
714-904-5948
019-210-010,
038, 039, 005,
006, 007, 008,
009,013, 014,
021, 022, 025,
029, 032, 033,
034, 035, 036
North and south
of Petaluma Blvd.
S, and west of
Hwy. 101
All Planning Approvals
Annexation of 19 parcels within the City of Petaluma Sphere