CITY OF PALO ALOTO MATADERO CREEK RENATURALIZATION

25
1 CITY OF PALO ALOTO MATADERO CREEK RENATURALIZATION December 5, 2019 // NVCAP Working Group Meeting

Transcript of CITY OF PALO ALOTO MATADERO CREEK RENATURALIZATION

Page 1: CITY OF PALO ALOTO MATADERO CREEK RENATURALIZATION

1

CITY OF PALO ALOTO

MATADERO CREEK RENATURALIZATION

December 5, 2019 // NVCAP Working Group Meeting

Page 2: CITY OF PALO ALOTO MATADERO CREEK RENATURALIZATION

2

Presentation Overview

• Project Status Update • Planning Outcomes • Design Alternatives • Discussion • Aesthetics

Page 3: CITY OF PALO ALOTO MATADERO CREEK RENATURALIZATION

3

Project Completion

• Design Planning – 90%

• Site Assessment – 100%

• Define Alternatives – 80%

• Hydraulic Modeling – 60%

• Site Concept Design – 35%

• Coordination - Ongoing

Page 4: CITY OF PALO ALOTO MATADERO CREEK RENATURALIZATION

4

• Poor habitat • Poor aesthetics • No public access • No geomorphic function

Problems

Page 5: CITY OF PALO ALOTO MATADERO CREEK RENATURALIZATION

5

• NVCAP • Redevelopment of 340 Portage • City acquisition of 3350 Birch

Opportunities

Page 6: CITY OF PALO ALOTO MATADERO CREEK RENATURALIZATION

6

• Beautify the creek corridor • Create public access and

connection to the creek • Create habitat • Provide mitigation planting

Objectives

Page 7: CITY OF PALO ALOTO MATADERO CREEK RENATURALIZATION

7

• Real estate • Flood conveyance • Public safety • Groundwater plume • Valley Water easement • Maintenance access • Maintenance cost • Channel stability • Bridge conveyance • Provide mitigation planting • Other city and public intereste

Constraints

Page 8: CITY OF PALO ALOTO MATADERO CREEK RENATURALIZATION

8

Alternative #0: No Action

• Lowest cost • No improvement

Page 9: CITY OF PALO ALOTO MATADERO CREEK RENATURALIZATION

9

Alternative #1:

• Work within boundaries of current SCVWD easement (60 ft)

• Lambert Ave to Park Blvd • Earthen channel bottom • Vertical sheet pile or concrete walls • Riparian plantings • Floodwalls to mitigate increase in

100-year flood WSEL • Public access

Page 10: CITY OF PALO ALOTO MATADERO CREEK RENATURALIZATION

10

Alternative #1

Page 11: CITY OF PALO ALOTO MATADERO CREEK RENATURALIZATION

11

Alternative #2:

• Provide access, form and function, with limited scope

• Lay left bank back, transitioning from vertical to 3:1 (H:V)

• Add walking paths and public access • Same bottom width as existing • Ornamental plantings • Low-flow channel meanders • Earthen channel bottom • Floodwalls to manage flood risk

Page 12: CITY OF PALO ALOTO MATADERO CREEK RENATURALIZATION

12

Alternative #2

Page 13: CITY OF PALO ALOTO MATADERO CREEK RENATURALIZATION

13

Alternative #2A

• Same as Concept #2, but expand to include same approach in Boulware Park

Page 14: CITY OF PALO ALOTO MATADERO CREEK RENATURALIZATION

14

Alternative #2A

Page 15: CITY OF PALO ALOTO MATADERO CREEK RENATURALIZATION

15

Alternative #3

• Maximum ecological function • Vertical walls • Roughly 3.5 times existing width • Geomorphic bankfull meanders

from wall to wall • New maintenance access ramps • Public walking trail • Replace Lambert Bridge and Park

Blvd Bridge • Acquire properties between Lambert

and Park

Page 16: CITY OF PALO ALOTO MATADERO CREEK RENATURALIZATION

16

Alternative #3

Page 17: CITY OF PALO ALOTO MATADERO CREEK RENATURALIZATION

17

Alternative 1: Hydraulic Modeling, 1% Chance Event

Railroad

Park Blvd. Lambert Ave.

El Camino Real

Page 18: CITY OF PALO ALOTO MATADERO CREEK RENATURALIZATION

18

Next Steps

• Refinement of alternatives • Hydraulic modeling of refined

alternatives • Coordination with Valley Water and

Resource Agencies • Documentation

Page 19: CITY OF PALO ALOTO MATADERO CREEK RENATURALIZATION

Plan View of All Concepts

Page 20: CITY OF PALO ALOTO MATADERO CREEK RENATURALIZATION

EXISTING ESTIMATED GROUNDWATERTOXIC PLUME BOUNDARYNOTE: DATA TAKEN FROM

WHATSDOWN.TERRADEX.COM

PROPOSEDSHEET PILE WALL EXISTING CONCRETE

WALL

EXISTINGSCVWD ACCESSRAMP

PROPOSED SHEET PILE WALL

EXISTING CONCRETEWALL

MATADERO CREEKCENTERLINE WITH

EARTHEN BOTTOM

PROPOSED PEDESTRIAN/BIKE PATH

PROPOSED PLANTINGS

MATADERO CREEKCENTERLINE WITH

CONCRETE BOTTOM

MATADERO CREEKCENTERLINE WITH

CONCRETE BOTTOM

PROPOSED SCVWDMAINTENANCEACCESS

EL C

AMIN

O R

EAL

LAMBERT AVENUE

PARK

BO

ULEV

ARD

ASH

STRE

ET

CHESTNUT AVENUE

ASH

STRE

ET

BOULWARE PARK

SCVWD EASEMENTBOUNDARY

CITY OF PALO ALTOMATADERO CREEK

RE-NATURALIZATIONFEASIBILITY STUDY

PALO ALTO,CALIFORNIA

CONCEPT 1PLAN VIEW

DATE: DECEMBER 2019FIGURE BY: ACSIMAGE SOURCE: AUTOCAD ROADS MAP

L:\Acad 2000 Files\29000\29113\CAD\dwg\29113_CONCEPT-1.dwgPath:

N

SCALE: 1 " = 100'

0 100

Page 21: CITY OF PALO ALOTO MATADERO CREEK RENATURALIZATION

EXISTING ESTIMATED GROUNDWATERTOXIC PLUME BOUNDARYNOTE: DATA TAKEN FROM

WHATSDOWN.TERRADEX.COM

PROPOSEDSHEET PILE WALL EXISTING CONCRETE

WALL

EXISTINGSCVWD ACCESSRAMP

PROPOSED SHEET PILE WALL

EXISTING CONCRETEWALL

MATADERO CREEKCENTERLINE WITHEARTHEN BOTTOM

PROPOSED PEDESTRIAN/BIKE PATH

PROPOSED PLANTINGS

MATADERO CREEKCENTERLINE WITH

CONCRETE BOTTOM

MATADERO CREEKCENTERLINE WITH

CONCRETE BOTTOM

PROPOSED SCVWDMAINTENANCEACCESS

EL C

AMIN

O R

EAL

LAMBERT AVENUE

PARK

BO

ULEV

ARD

ASH

STRE

ET

CHESTNUT AVENUE

ASH

STRE

ET

BOULWARE PARKFR

Y'S

SCVWD EASEMENTBOUNDARY

CITY OF PALO ALTOMATADERO CREEK

RE-NATURALIZATIONFEASIBILITY STUDY

PALO ALTO,CALIFORNIA

CONCEPT 2PLAN VIEW

DATE: DECEMBER 2019FIGURE BY: ACSIMAGE SOURCE: AUTOCAD ROADS MAP

L:\Acad 2000 Files\29000\29113\CAD\dwg\29113_CONCEPT-2.dwgPath:

N

SCALE: 1 " = 100'

0 100

Page 22: CITY OF PALO ALOTO MATADERO CREEK RENATURALIZATION

EXISTING ESTIMATED GROUNDWATERTOXIC PLUME BOUNDARYNOTE: DATA TAKEN FROM

WHATSDOWN.TERRADEX.COM

PROPOSEDSHEET PILE WALL EXISTING CONCRETE

WALL

EXISTINGSCVWD ACCESSRAMP

PROPOSED SHEET PILE WALL

EXISTING CONCRETEWALL

MATADERO CREEKCENTERLINE WITHEARTHEN BOTTOM

PROPOSED PEDESTRIAN/BIKE PATH

PROPOSED PLANTINGS

MATADERO CREEKCENTERLINE WITH

CONCRETE BOTTOM

MATADERO CREEKCENTERLINE WITH

CONCRETE BOTTOM

PROPOSED SCVWDMAINTENANCEACCESS

EL C

AMIN

O R

EAL

LAMBERT AVENUE

PARK

BO

ULEV

ARD

ASH

STRE

ET

CHESTNUT AVENUE

ASH

STRE

ET

BOULWARE PARK

FRY'

S

SCVWD EASEMENTBOUNDARY

PROPOSEDSCVWD ACCESS

RAMP

MATADERO CREEKCENTERLINE WITHEARTHEN BOTTOM

PROPOSED SHEET PILE WALL

PROPOSED PEDESTRIAN/BIKE PATH

CITY OF PALO ALTOMATADERO CREEK

RE-NATURALIZATIONFEASIBILITY STUDY

PALO ALTO,CALIFORNIA

CONCEPT 2APLAN VIEW

DATE: DECEMBER 2019FIGURE BY: ACSIMAGE SOURCE: AUTOCAD ROADS MAP

L:\Acad 2000 Files\29000\29113\CAD\dwg\29113_CONCEPT-2A.dwgPath:

N

SCALE: 1 " = 100'

0 100

Page 23: CITY OF PALO ALOTO MATADERO CREEK RENATURALIZATION

EXISTING ESTIMATED GROUNDWATERTOXIC PLUME BOUNDARYNOTE: DATA TAKEN FROM

WHATSDOWN.TERRADEX.COM

PROPOSEDSHEET PILE WALL

EXISTINGSCVWD ACCESS

RAMP

PROPOSED SHEET PILE WALL

EXISTING CONCRETEWALL

MATADERO CREEKCENTERLINE WITHEARTHEN BOTTOM

PROPOSED PEDESTRIAN/BIKE PATH

PROPOSED PLANTINGS

MATADERO CREEKCENTERLINE WITH

CONCRETE BOTTOM

MATADERO CREEKCENTERLINE WITH

CONCRETE BOTTOM

PROPOSED SCVWDMAINTENANCEACCESS

EL C

AMIN

O R

EAL

LAMBERT AVENUE

PARK

BO

ULEV

ARD

ASH

STRE

ET

CHESTNUT AVENUE

ASH

STRE

ET

BOULWARE PARK

FRY'

S

SCVWD EASEMENTBOUNDARY

PROPOSEDSCVWD ACCESS

RAMP

MATADERO CREEKCENTERLINE WITHEARTHEN BOTTOM

PROPOSED SHEET PILE WALL

PROPOSED PEDESTRIAN/BIKE PATH

CITY OF PALO ALTOMATADERO CREEK

RE-NATURALIZATIONFEASIBILITY STUDY

PALO ALTO,CALIFORNIA

CONCEPT 3PLAN VIEW

DATE: DECEMBER 2019FIGURE BY: ACSIMAGE SOURCE: AUTOCAD ROADS MAP

L:\Acad 2000 Files\29000\29113\CAD\dwg\29113_CONCEPT-3.dwgPath:

N

SCALE: 1 " = 100'

0 100

Page 24: CITY OF PALO ALOTO MATADERO CREEK RENATURALIZATION

60'

~85'

100'

CONCEPT #0: NO ACTION ALTERNATIVE (30FT WIDTH)

CONCEPT #1: SCVWD EASEMENT ONLY (60FT)· WITHIN BOUNDARIES OF CURRENT SCVWD EASEMENT· EARTHEN CHANNEL BOTTOM· VERTICAL SHEET PILE WALLS· RIPARIAN PLANTINGS· FLOODWALLS TO MITIGATE INCREASE IN 100-YEAR FLOOD WSEL· PUBLIC ACCESS

CONCEPT #2: SAN LUIS OBISBO-STYLE IN PARKING LOT (~85FT)· OPTIMIZE ACCESS, FORM AND FUNCTION, WITH LIMITED SCOPE· LAY LEFT BANK BACK, TRANSITIONING FROM VERTICAL TO 3:1 (H:V) WITH TERRACES· ADD WALKING PATHS AND PUBLIC ACCESS· SAME BOTTOM WIDTH AS EXISTING· ORNAMENTAL PLANTINGS· LOW-FLOW CHANNEL MEANDERS· EARTHEN CHANNEL BOTTOM· FLOODWALLS TO MANAGE FLOOD RISK

CONCEPT #2A: SAN LUIS OBISBO-STYLE FROM CHESTNUT TO PARK BLVD (~85FT)· SAME AS CONCEPT #2, BUT EXPAND TO INCLUDE SAME APPROACH BOULWARE PARK

CONCEPT #3: CHANNEL MIGRATION ZONE FROM CHESTNUT TO PARK BLVD (100FT)· MAXIMUM FORM AND FUNCTION· VERTICAL SHEET PILE WALLS· ROUGHLY 4 TIMES EXISTING WIDTH· GEOMORPHIC BANKFULL MEANDERS FROM WALL TO WALL· NEW MAINTENANCE ACCESS RAMPS· PUBLIC WALKING TRAIL· REPLACE LAMBERT BRIDGE AND PARK BLVD BRIDGE· ACQUIRE PROPERTIES BETWEEN LAMBERT AND PARK

SHEET PILE FLOODWALL SHEET PILE FLOODWALL

SHEET PILE FLOODWALL SHEET PILE FLOODWALL

SHEET PILE FLOODWALLSHEET PILE FLOODWALL

MAINTENANCEACCESS

MAINTENANCEACCESS

MAINTENANCEACCESS

SHEET PILE WALL

CITY OF PALO ALTOMATADERO CREEK

RE-NATURALIZATIONFEASIBILITY STUDY

PALO ALTO,CALIFORNIA

SECTION VIEWS

DATE: DECEMBERR 2019FIGURE BY: ACS

L:\Acad 2000 Files\29000\29113\CAD\dwg\29113_SECTIONS.dwgPath:

Page 25: CITY OF PALO ALOTO MATADERO CREEK RENATURALIZATION

19