CITY OF Los A N GELES
Transcript of CITY OF Los A N GELES
![Page 1: CITY OF Los A N GELES](https://reader035.fdocuments.us/reader035/viewer/2022072017/62d77e5aa7bccd2fb7597073/html5/thumbnails/1.jpg)
CITY OF Los A N GELES BOARD OF PUBLIC WORKS
MEMBERS
KEVIN 」AMES
PREStDENT
”ONICA R。。則GUEZVICE PRESIDENT
HEATHER MARIE REPENN削GPRESIDENT PRO TEMPORE
MICHAEL R. DAVIS COMMISSIONER
JOEL F. JACINTO COMM倍SIONER
ELECTRONIC MAIL
Mr. Marc Damikolas, Vice President Brown and Caldwell, Inc. 1000 Wilshire Blvd., Suite 1690 Los Angeles, CA 90017
Dear Mr. Damikolas:
CALIFORNIA
ERIC GARCEITI
MAYOR
November 17, 2015
TRANSMITTAL 4
BUREAU OF SAN何'ATION
ENRIQUE C. ZALDIVAR DIRECTOR
TRACIJ. ”則AMIDECHIEF OPERATING。FF咚ER
LISAB. ”。”皓RYCHIEF F則ANC帆LOFFICER
ADEL H. HAGEK” ALIL ALEXANDER E. ”ELOU
ROBERT B. ’RVIN (ACTING} ιEON. ”ARTINEZ ﹛ACTING﹜
ASS陷TANT DIRECTORS
WASTEWATER ENGINEER’”S SERVICES DIV. 2714 MEDIA CENTER DRIVE ιOS ANGELES, CA 90065
FAX: (l23) 342-62’, OR -6211
LA SANITATION ON-CALL CONSULTANT SERVICES CONTRACT NO. C-124326 NOTICE TO PROCEED FOR Ai'1.ENDMENT NO. 1 TO EXISTING TOS SN-42
This letter serves 描 a Notice to Proceed (NTP) for Amendment No. 1 to exist時 TOS SN-42, NEIS Division Street Shaβ Site Remed旭tion, under 也e City of Los Angeles Co曲act C-124326, effective as of October 26, 2015 , which was the date 也at the Board of Public Works authorized Bureau of Sanitation (LASAN) to issue Amendment No. 1 to Brown and Caldwell to continue all tasks under this TOS for not to exceed $272,200. The duration of this TOS is one (1) ye紅企om the original NTP issu個.ce date; however, it is dependent upon re吋ew 組d approval by 也e California State’s Regional Water Quality Control Bo缸d(RWQCB)。f the remediation work done.
Please be advi品d 世祖t your insurance information must be current with the Board of Public Works Office during the duration of the contract.
To ens田e prompt payment for your services, all invoices including backup documents and Schedule C shall be submitted to 也e LASANPr,句ect Manager of this TOS:
Mr. Scott Hare, Environmental Engineer Wastewater Eng恆的:ring Services Division 2714 Media Center Drive, Los Angel剖, CA 90065
Also, please e-mail a copy of all invoic街(without backup documents) and Schedule C 如Judv.Fisrueroa(a)Jacitv.or2 or ien.martinezr«Hacitv.o眩.
If you have any questions or concerns, pie部e contact Mr. Scott Hare of my sta宜,前(323) 342-1583 or via e-mail at scott.h.缸它﹛缸,lacitv.o眩.
\\82MTCFS1\Div Filcs\On-Call Con甘acts\New Oncall 2014-19\TOS SN-42_NE1S Shaft St Remediation\EXECUTJON
zero waste • one water AN EQUAL EMPLOYMENT OPPORTUNITY - AFFIRMATIVE ACTION EMPLOYER 叫叫咱岫咱恤@
![Page 2: CITY OF Los A N GELES](https://reader035.fdocuments.us/reader035/viewer/2022072017/62d77e5aa7bccd2fb7597073/html5/thumbnails/2.jpg)
Mr. Marc Damikolas 11/17/2015 Page2 of2
AP:tvh
c: Abdul D缸lishw.缸, WESD
Scott Hare, WESD Thu-Van Ho, \VESD F缸ah Lavergne, WESD Judy Figueroa, \VESD Jennifer Martinez, WESD Jim Nguyen, Brwn&Cali
sm~ ~~£ti Ali Poo詞, Dhision Manager W品tewater Engineering Services Di'\ision
![Page 3: CITY OF Los A N GELES](https://reader035.fdocuments.us/reader035/viewer/2022072017/62d77e5aa7bccd2fb7597073/html5/thumbnails/3.jpg)
CITY OF LOS ANGELES/ BUREAU OF SANITATION {LASAN} ON-CALL CONSUL TANT SERVICES CONTRACT NO. C-124326
TASK ORDER AGREEMENT FORM {TAF} Brown and Caldwell (Consultant.}
TOS SN42 Amendment #1: NEIS Division St『eet Shaft Site Remediation
Original Budget 紅五~
Revised Budget: 泣互乏旦旦
Noti臼-to-Proceed (NTP) Date: Auaust 25. 2015
NTPAmendme叫 Date: 」旦/_l佯旦旦is=-LASAN’s TOS-SN42 Project Manager: Scott Hare
Consultant T0S-SN42 Project Manager: Jim Nauven
A. BASIS OF INITIATION OF TOS Amendment #可
Amendment 剝削II provide for wo『k identified under Stage 2 of the remediation se『vices under TOS SN妞, in support of a settlement between the City of Los Angeles (City} and Los Angeles Unified School District {lAUSD). This remediation work falls under the oversight of the Regional Water Control Board {RWQCB) and requi阻s their accep抽nee and approval. As a 時suit, it is difficult to specify a project end date.
B. SCOPE OF WORK
Brown and Caldwell shall provide technical services for the site remediation at 2110 N. San Fernando Road as described in Brown and Caldwell’s proposal submitted on August 12, 2015. The scope of work for Stage 2 includes b叫 is not limited to:
1. Continue to o悍rate the Soil Vapor Extraction (SVE) Sy剖開• Provide a qualified expe的 familia「 with the geographical area, the m司or contaminants
on site and SVE concepts and operation • Perform all operations and maintenance on the SV E system • C。nduct quarterly sampling, analyzation, and reporting
2. Install one additional Groundwater Monitoring Well at either 45 ft below ground su巾ce(旬s)。r65 ft bgs
3. Semi-Annual Groundwater Sampling and Collection • Prepare 間po前s and upload to Geotracker for the RWQCB app『oval
4. Prepare and submit Final Closure Report 5. Prepare and submit Final Human Health Risk Assessment (HHRA) 6. Participate in final meeting with the RWQCB to discuss soil cl。sure
C‘ SCHEDULE FOR COMPLETION OF WORK
The completion date of this p叫ect is dependent on any follow-up requirements/requests by the RWQCB to the stated testing/reporting.
D. SUBCONSUL TANT UTILIZATION
Please see the attached Schedule B for Task Work Order List of Sub-consultants (Attachment #1).
Page- I of 2
![Page 4: CITY OF Los A N GELES](https://reader035.fdocuments.us/reader035/viewer/2022072017/62d77e5aa7bccd2fb7597073/html5/thumbnails/4.jpg)
The Consultant shall not change any of these designated sub-consultants or 陶duce their level of I e仔ort without prior written appro心al of LA SAN's Director or his designated 陪presentative provided I that such approval will not be unreasonably withheld. I
E. COST REIMBURSEMENT
Invoice and Cost Reimbursement:
The work to be performed under this Task O吋er Amendment 削 is on a lump sum basis not to exceed $124,200. The to個I amended budget shall not exceed $272,200. All of the Consultant’s costs including Consultant’s employee sala吋師, overhead, other di時ct cos趟, subcont悶ct expenses, and prof社 a陪 included in the Lump Sum Amount (Attachment #3).
The Consul個nt wm submit invoices upon completion of the following milestones as prescribed in the expenditure t.able at the end of this document (Attachment 位).
F. CONSULTANT PRINCIPAL AND STAFF ASSIGNMENTS
The following is the Consultant’s key personnel assigned to work on this project. The Consultant may not substitute s個仟 identi有ed below without permission from the LASAN's Project Manager司
Principal-in-Charge
Project Manager
G. SIGNATURES
Marc Damikolas, PE
Jim Nguyen, PE
Work pe巾rmed under this T AF Amendment 削 is governed by Contract No.C斗24326, which is between LA SAN and the Consultant. LA SAN/ Wastewater Engineering Services Division (WESD) and the Consultant ag惜e to the above s祖祖d terms of this T AF. The terms of this T AF can only be modified by written agreement of LA SAN's P昀,ject Manager.
-~i~故此Scott Har長
LASAN Project Manager:
Brown and Caldwell's Contract Manager:
LASAN O仔Call Contract Manager:
Dist『ibution: Consultants Ali Poosti Abdulsamad Danishwar Scott Hare Farah Laverg間Thu-Van Ho Judy Figueroa
. 、
Date: Hit 的于
恥,,/,~5
Date: (\ft,/,(
![Page 5: CITY OF Los A N GELES](https://reader035.fdocuments.us/reader035/viewer/2022072017/62d77e5aa7bccd2fb7597073/html5/thumbnails/5.jpg)
Amendment #1
SCHEDULED TASK WORK ORDER LIST OF SUBCONSULTANTS
。OTE:CO叮IlS PAGE AND ADD ADDITIONιSHEETSASNI姐SSARY,腳趾S臨海
Project Title TOS SN-42 INVESTIGATION AND REMEDIATION OF Work Order Number
Con缸,ctor Addre” 1000 WILSHIRE 目_vo. SUITE 1690 BROV刷 AND CALDVVELL
LOS ANGELES, CA 90017
Contact Person MARC DAMIKOLAS
Phone/F,揖 (714} 730-7600
LIST OF ALL SUBCONSULTANTS (SERVICE PR.OVIDERSISUPPLII!遭S旭TC.﹜
PAGE1
NAME. ADDRDS, TELEPHONE NO. OF DESCRIPTION OF MBEIWBFJ CALTRANS/ DOLLAR VALUE 觀JBCONSULTANT WORK OR SUPPLY SBEfE.BE/ C叮Y/MTA OF
DVBE/OBE CERT.NO. SUBCONTRACT
GROUNDWATER NINYO AND MOORE
Mα地ITORINGAND MBE 964 $43,025
REPORTING
ECOTECH SVE EQUIPMENT QBE $14,400
ANDO&M
ADVANCED TECHNOLOGY LABORATORY MBE $16,991 4到9
LABORATORIES ANALYSIS
COREPROBE, INTERNATIONAL DRILLING OBE $15,927 SERVICES
PERCENT.AGE OF MBFJWBE/SBEIEBE/DVBE/OBE
μ:端,mPARTICIPATION
DOLLARS PERCENT
TOT.ALM!祖£AMOUNT s ” TOTAL WBEAMOUNT $
” 、哈缸,這rTOTAL SBE AMOUNT s ” N-e.rP C ldla1t11111'圓圓
TOTAL EBE AMOUNT s ” TOTAL DVBE..U直OUNT s % F在他注:~ b,/Jl'ltfer'"'Dllteg _月仟
TOTALOBE..U直OUNT s ” BASE BID AMOUNT s {Continued on next page)
MUST BE SUBMITTED PRIOR TO TIIE I~UANCE OF THE NOTICE TO PROCEED
Rev. IQ/17/07 (P副icWm區RFQ ﹒ BAV時