City of Houston Fondren Road Paving and Drainage From Braeswood Boulevard to Creekbend Drive TRC Meeting March 2016 WBS No. N-100008-0001-3

Transcript of City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis...

Page 1: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

City of HoustonFondren Road Paving and Drainage

From Braeswood Boulevard toCreekbend Drive

TRC MeetingMarch 2016

WBS No. N-100008-0001-3

Page 2: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Location and Vicinity Maps

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

City Council District K

Key Map 530 Z, 530 Y

Page 3: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Land Use

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

Commercial

Multi-Residential

Page 4: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

METRO Routes

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

Route 68 along Braeswood

Route 63 along Fondren

Route 10 along Willowbend/Fondren/Dumfries

FONDREN

DU

MF

RIE

S

WIL

LO

WB

EN

D

CR

EE

KB

EN

D

BR

AE

SW

OO

D

Page 5: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Roadway

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

Page 6: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Existing Typical Section

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

Roadway

Page 7: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

• Existing Sidewalks Substandard

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

Roadway

Page 8: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

• Existing Non ADA Compliant Ramps

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

Roadway

Page 9: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

Roadway

• Existing concrete pavement in poor condition

Page 10: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

Roadway

• Existing concrete pavement in poor condition

Page 11: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

• Signal equipment conflicts with sidewalk / ramps

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

Roadway

Page 12: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Proposed Typical Section

• 12-inch Concrete Pavement

• 5-foot Sidewalk (minimum)

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

Roadway

Page 13: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Traffic:

• 2013 ADT: 25,177; Overall LOS: D (for Current Geometry)

• 2035 ADT: 34,402; Overall LOS: C (for Complete Geometric Improvements)

• Heavy Truck Traffic < 5% of Total Volume (based on 2016 Traffic Count Data

obtained at the Dumfries Intersection)

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

Roadway

Page 14: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

Roadway

CR

EE

KB

EN

D

FONDREN

WILLO

WB

EN

D

Proposed Creekbend Intersection and Willowbend Intersection Improvements

Page 15: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

Roadway

CR

EE

KB

EN

D

FONDREN

WILLO

WB

EN

D

Proposed Creekbend Intersection Improvements

Proposed AddingDual Left-Turns

Page 16: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

Roadway

CR

EE

KB

EN

D

FONDREN

WILLO

WB

EN

D

Proposed Creekbend Intersection Improvements

UPGRADE ANDRELOCATE EXISTINGTRAFFIC SIGNALS

Page 17: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

Roadway

CR

EE

KB

EN

D

FONDREN

WILLO

WB

EN

D

Proposed Creekbend Intersection Improvements

UPGRADE ANDRELOCATE EXISTINGTRAFFIC SIGNALS

PROPOSED EASEMENT FORSIDEWALK AND/OR SIGNALRELOCATIONS

Page 18: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

Roadway

CR

EE

KB

EN

D

FONDREN

WILLO

WB

EN

D

Proposed Creekbend Intersection Improvements

UPGRADE ANDRELOCATE EXISTINGTRAFFIC SIGNALS

Page 19: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

Roadway

CR

EE

KB

EN

D

FONDREN

WILLO

WB

EN

D

Proposed Willowbend Intersection Improvements

MaintainDual Left-Turns

Page 20: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

Roadway

CR

EE

KB

EN

D

FONDREN

REPLACE EXISTING TRAFFICSIGNALS W

ILLOW

BE

ND

Proposed Willowbend Intersection Improvements

Page 21: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

Roadway

UPGRADE ANDRELOCATE EXISTINGTRAFFIC SIGNALS

CR

EE

KB

EN

D

FONDREN

REPLACE EXISTINGTRAFFIC SIGNALS

WILLO

WB

EN

D

Recommended Creekbend & Willowbend Intersection Improvements

PROPOSED EASEMENT FORSIDEWALK AND/OR SIGNALRELOCATIONS

PROPOSEDROW CLIPS

PROPOSEDROW CLIPS

Page 22: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

Roadway

DU

MF

RIE

S

ONGOING TRAFFICSIGNAL STUDY(RESULTS PENDING)

FONDREN

DU

MF

RIE

S

Dumfries Intersection Improvements

Page 23: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

Roadway

ONGOING TRAFFICSIGNAL STUDY(RESULTS PENDING)

FONDREN

DU

MF

RIE

S

Dumfries Intersection Improvements

Page 24: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

Roadway

ONGOING TRAFFICSIGNAL STUDY(RESULTS PENDING)

FONDREN

DU

MF

RIE

S

Dumfries Intersection Improvements

PROPOSEDROW CLIPS

Page 25: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

Roadway

BR

AE

SW

OO

D

FONDREN

Proposed Braeswood Intersection Improvements

PROPOSED:

- Dual WB Left-Turn lanes

- Dual NB Thru-lanes

Page 26: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

Roadway

BR

AE

SW

OO

D

FONDREN

Proposed Braeswood Intersection Improvements

REPLACE EXISTING(SW) TRAFFIC SIGNALPOLE & EQIPMENT

Page 27: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

Roadway

BR

AE

SW

OO

D

FONDREN

Proposed Braeswood Intersection Improvements

REPLACE EXISTING(SE) TRAFFIC SIGNALPOLE & EQIPMENT

Page 28: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

Roadway

RECONSTRUCTMEDIAN NOSE /CROSSWALK

BR

AE

SW

OO

D

FONDREN

Proposed Braeswood Intersection Improvements

RECONSTRUCTMEDIAN / CROSSWALK

Page 29: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

Roadway

RECONSTRUCTMEDIAN NOSE /CROSSWALK

BR

AE

SW

OO

D

FONDREN

Proposed Braeswood Intersection Improvements

RECONSTRUCTMEDIAN / CROSSWALK

REPLACE EXISTING(SW) TRAFFIC SIGNALPOLE & EQIPMENT

EXISTING TRAFFIC SIGNALSNORTH OF INTERSECTION

(TO REMAIN IN-PACE)

REPLACE EXISTING(SE) TRAFFIC SIGNALPOLE & EQIPMENT

PROP ROWCORNER CLIP

PROP ROWCORNER CLIP

Page 30: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Proposed Roadway Plan Layout:

• 100’ ROW along Fondren,

• 60’ ROW (Creekbend, Willowbend & Dumfries),

• 120’ ROW (Braeswood)

• Close 4 existing median openings for 660’ minimum length (per IDM guidelines)

Close ExistingMedian Opening

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

Roadway

CR

EE

KB

EN

D

WIL

LO

WB

EN

DFONDREN

Signal upgrade

Replace signalBRAESWOOD ASSEMBLYCHURCH OF GOD

BRAESWOOD OAKSAPARTMENTS

PUBLIC UTILITYPOWER STATIONCLINIC CLINIC

Page 31: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Proposed Roadway Plan Layout (Continued…)

Close ExistingMedian Opening

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

FONDREND

UM

FR

IES

Roadway

Ongoingtrafficsignal

MORRIS FRANK LIBRARY BRAYS OAKS TOWERS

WESTBURY CHRISTIAN SCHOOLSPORT COMPLEX

WEST HOLLOWAPARTMENTS

Page 32: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Proposed Roadway Plan Layout (Continued…)

Close ExistingMedian Opening

Close ExistingMedian Opening

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

Consolidation ofDriveway

BR

AE

SW

OO

D

FONDREN

Roadway

New signal

WEST HALLOWAPARTMENTS FOODTOWN

SUPERMARKET

CITGOGAS STATION

FONDRENWOODSHOPPING CENTER

WASHATERIA

Page 33: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Summary of Roadway Recommendations

• 12-inch Concrete Pavement

• 11’-11’-11’ lanes with 15’ median and 9.5’ pedestrian realm

• 5-feet minimum Sidewalk

• 11’ Left-Turn lanes with 4’ minimum median

• Corner Clips at all intersection

• 660’ minimum median length – (except from Creekbend to Willowbend)

• Full pavement reconstruction to extend 100-ft south of Creekbend

• Full pavement reconstruction at Braeswood southern curb-returns

• Signal Upgrades at Creekbend, Willowbend, Braeswood

• Possible Signal at Dumfries (Pending results from Warrant Study)

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

Roadway

Page 34: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Drainage

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

Page 35: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Drainage - Existing Conditions Northern section located in 100-year Floodplain (Zone AE)

Existing Parallel Systems has one independent Drainage Area (81.4 acres) with 3 Outfalls:

24-inch trunk (10’ East Esmnt); Outfalls into D140-00-00 @ Willowbend

24- to 42-inch trunk (10’ East Esmnt); Outfalls into D140-00-00 @Dumfries

30- to 60-inch trunk (under SB Pvmnt); Outfalls into D100-00-00 @ Braeswood

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

Outfall @ Willowbend Outfall @ Dumfries

Outfall @ Braeswood

24” trunk(10’ East Esmnt)

24” to 42” trunk(10’ East Esmnt)

30” to 60” trunk(along SB Pavement)

Page 36: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Drainage - Existing Conditions

2-yr HGL below gutter

100-yr WSE above MPE

Existing BB Inlets - Insufficient Capacity

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

100-yr MPEEXCEEDED

100-yr MPEEXCEEDED

100-yr MPEEXCEEDED

100-yr MPEEXCEEDED

Page 37: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Drainage – Analysis:

Analysis based on latest IDM Chapter 9; TP 100 & TP-101 Criteria

Existing drainage areas delineated using LiDAR data & record drawings

Reviewed existing hydraulic models for 2- & 100-year events using XP-SWMM

Identified flooding areas based on ponding data and flooding complaints

Proposed drainage areas delineated based on full topographic survey andproposed roadway profile and inlet locations

Optimized proposed pipes and inlet sizes for in-line detention to lower the100-yr WSE below MPE

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

Page 38: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Drainage – Proposed Conditions

700-LF 24” RCPparallel trunk

500-LF 30” RCPparallel trunk 400-LF 36” RCP

parallel trunk

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

24” RCPLaterals

30” to 36”RCP Laterals

24” to 42”RCP Laterals

36” RCPLaterals30” RCP

Laterals

24” RCPLateral

Page 39: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Results of Hydraulic Models

• 2-year HGL below the gutter line

• 100-year WSE are below the MPE

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

Page 40: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Results of Hydraulic Models:

• Existing outfall (peak flows) have been retained and increase in flowsmitigated within the proposed system

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

Page 41: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Summary of Recommended Storm Sewer Improvements:

• Utilize existing 2 parallel storm sewer trunk lines, as possible

• Add 3rd storm sewer system ranging from 24- to 42-inch diameter (located alongthe northbound proposed pavement)

• Replacing all existing BB-Inlets / C-inlets to C-1 inlets

• Replace Existing leads / laterals with sizes ranging from 24- to 36-inch diameter

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

Page 42: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Utilities

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

Page 43: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Existing Public Utilities:

• 20” water line along the entire project median

• Serves as distribution to 6”, 8” and 16” water lines

• 42” sanitary sewer main with 8”, 14”and 15” service lines

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

Utility

20” Waterline

42” Sanitary line

Page 44: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Existing Private Utilities:

• CenterPoint Energy electric, street lights

• CenterPoint Gas

• Teppco Crude Pipeline

• Underground Comcast Cable, fiber optic, Level 3, Phonoscope

• AT&T/SWBT 21-4 MCD Duct Bank (along the East ROW)

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

Roadway

CenterPoint ElectricCenterPoint Gas

Crude Pipeline

AT&T Duct Bank

Page 45: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Proposed Utilities

• 8” sanitary sewer line to be replaced at Fondren & Willowbend

8” Sanitary Lead

CR

EE

KB

EN

D

WIL

LO

WB

EN

D

FONDREN

Page 46: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Proposed Utilities

• New 24-inch Water line (along median)

24” Waterline

24” Waterline

CR

EE

KB

EN

D

WILLO

WB

EN

D

FONDREN

BR

AE

SW

OO

D

FONDREN

DU

MFR

IES

Page 47: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Construction Traffic Control

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

Page 48: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

Construction Traffic Control

3 Phase Construction Sequence

Phase 1• Temporary Pavement

Phase 2• Water / Storm /Sanitary• NB Pavement• Pedestrian realm

Phase 3• Storm• SB Pavement• Median / landscape• Pedestrian realm

Page 49: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Typical Cross-over Detail

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

Construction Traffic Control

Page 50: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Trees and Environmental Issues

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

Page 51: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

Trees and Environmental Issues

• Total: 44 Existing Trees• Creekbend to Willowbend (Median & East) – (6) 12” Crepe Myrtles ; (3) 10” Oak

• Willowbend to Dumfries (Median) – (17) 10” Oak; (1) 10” Palm

• Dumfries to Braeswood (Median & East) – (17) 8” Oak

• Tree Protection & Replanting Plan in Phase II Design

Estimated 30 Treeswithin Median areaswill be displaced

Page 52: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

• 3 Recognized Environmental Conditions (REC)

• Phase II ESA Recommended

Citgo Gas StationOld Exxon MobileGas Station

Old A-1 Cleaners

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

Trees and Environmental Issues

Page 53: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Construction Cost Estimate

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

Page 54: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Estimated Opinion of Construction Cost:

• General Items $ 699,064• Paving Items $ 5,255,320• Storm Sewer Items $ 565,401• Sanitary Sewer Items $ 40,190• Water Items $ 1,670,695• ROW acquisition $ 100,000

• Total Items $ 8,330,670• Contingencies (10%) $ 823,067

• TOTAL CONSTRUCTION COST $ 9,053,737

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3

Construction Cost Estimate

Page 55: City of Houston - Brays Oaks, · PDF fileCity of Houston Fondren Road Paving ... Analysis based on latest IDM Chapter 9; ... • Add 3rd storm sewer system ranging from 24- to 42-inch

Questions and Comments

Fondren Road Paving and Drainage - From Braeswood Blvd to Creekbend DriveWBS No. N-100008-0001-3