City of Fargo Meadow Creek Area Flood Risk Management...
Transcript of City of Fargo Meadow Creek Area Flood Risk Management...
City of Fargo
Meadow Creek Area Flood
Risk Management – Project
5944
Public Information Meeting #2
August 3, 2010
Potential
Flood Risk
Reduction
Projects.
•Total Est.
Cost $35
Million
Agenda
Recap of June 21st Public Meeting
– Recent Flood Fight Strategy (2009/2010)
– Assessment of Flood Risk
– Overview of June 21st Plan
Summary of Public Responses
Review of Options Considered
Project Schedule / Financing
Questions
Meadow Creek Flood Risk Management
Agenda
Recap of June 21st Public Meeting
– Recent Flood Fight Strategy (2009/2010)
– Assessment of Flood Risk
– Overview of June 21st Plan
Summary of Public Responses
Review of Options Considered
Project Schedule / Financing
Questions
Meadow Creek Flood Risk Management
2009 Spring Flood –
Meadow Creek Drive
2009 Spring Flood – Meadow Creek Area
2009 Flood Fight - Meadow Creek Drive
Sandbagging Effort
Assessment of Flood
Risk
River Stage
37.0ft
Insert Map Sandbag Estimate – 7,600
Assessment of Flood
Risk
River Stage
38.0ft
Insert Map Sandbag Estimate – 32,800
Assessment of Flood
Risk
River Stage
39.0ft
Insert Map Sandbag Estimate – 79,300
Assessment of Flood
Risk
River Stage
40.0ft
Insert Map Sandbag Estimate – 138,300
Assessment of Flood
Risk
River Stage
41.0ft
Insert Map Sandbag Estimate – 221,100
Assessment of Flood
Risk
River Stage
42.0ft
Insert Map Sandbag Estimate – 314,900
Assessment of Flood
Risk
River Stage
42.5ft
Insert Map
FEMA 100-yr Flood Stage 39.5
USACE Recent Evaluation – 1% Flood in Fargo is 42.4?
Sandbag Estimate – 375,000
Bike Path (East and West)
Permanent Storm Water Pond
Channel Relocation
Low Flow Storm Sewer Extension
Low Flow Storm Sewer Extension and Channel Re-grade
Completion of Timberline Levee
Earthen Flood Control Levees to RS 43+1ft
Summary of Public Responses
Based on 6/21
Proposed Plan
Agenda
Recap of June 21st Public Meeting
– Recent Flood Fight Strategy (2009/2010)
– Assessment of Flood Risk
– Overview of June 21st Plan
Summary of Public Responses
Review of Options Considered
Project Schedule / Financing
Questions
Meadow Creek Flood Risk Management
Option A – Levees Both Sides
Construction Cost = $1.8M±
Option B – Floodwall South End
Construction Cost = $3.2M±
Option C – Diversion/Realignment
Construction Cost = $4.3M±
Option A1 – Levees Both Sides
Construction Cost = $1.8M±
Revised Option A based on
landowner meeting last week.
Option A1 - Revised
Option A - Revised
VISUALIZATION
Agenda
Recap of June 21st Public Meeting
– Recent Flood Fight Strategy (2009/2010)
– 2010/11 Proposed City Flood Risk Management Projects
– Assessment of Flood Risk
– Overview of June 21st Plan
Summary of Public Responses
Review of Options Considered
Project Schedule / Financing
Questions
Meadow Creek Flood Risk Management
Recommended Plan – Option A1
– Approximately $1.8-2.0M (Option A1)
Preliminary Funding Plan
– City of Fargo Flood Control Sales Tax
– ND State Water Commission (50%)
Project Schedule / Financing
Conceptual Planning
Preliminary Geotechnical Review
Preliminary Design
City/Park District Meetings
Public Informational Meeting (6/21/2010)
Detailed Geotechnical Analysis
Alternative Evaluation
Public Informational Meeting(tonight)
– Public Comment Period (Until 8/13)
Recommendation to City Commission (8/22) / SE Cass WRD (8/13)
Final Plans / Specifications / Cost Estimates
Permitting/Construction Bidding
Anticipated Construction Begins (Fall 2010/Spring 2011??)
Project Schedule / Financing
Comment
Form
Questions / Discussion
www.cityoffargo.com\Engineering
Meadow Creek Area Flood Risk
Management – Project 5944