City of Aurora Neighborhood Services Neighborhood Liaison … · City of Aurora Neighborhood...
Transcript of City of Aurora Neighborhood Services Neighborhood Liaison … · City of Aurora Neighborhood...
Leadership Aurora | All-America City Day
1
City of Aurora Neighborhood Services
Neighborhood Liaison Program
Neighborhood Beautification Grant 2017
Leadership Aurora | All-America City Day
2
Beautification GrantAgenda …•Welcome and Introductions and Purpose of Meeting
•Background and History of the Neighborhood Beautification Program
•Application Review•Staff Specialists•Typical Projects That We Have Funded •Questions
Leadership Aurora | All-America City Day
3
Beautification Grant
History of Program …• Purpose of the program• The $60,000 of funding for this program comes
from the General Fund • There is $10,000 available per ward with up to
$5000 per project. • This is the third year• Successful partnerships• Community impact
Leadership Aurora | All-America City Day
4
Beautification Grant
Let’s look at the application…
Leadership Aurora | All-America City Day
5
Beautification GrantWhat A Successful Application Will Include …•A detailed description of who the group is, the neighborhood, and the exact location
•A strong organizing committee with good community outreach
•A detailed explanation of the project•A good detailed sketch of the project•A well thought out timeline•Before photos of the proposed site
Leadership Aurora | All-America City Day
6
Beautification GrantWhat A Successful Application Will Include …•A detailed and well-researched budget•An explanation of how the project with have a positive impact on the neighborhood
•Maintenance plan•Permissions to execute your plan (HOA signatures, land owners, etc)
Leadership Aurora | All-America City Day
7
Water Conservation-
• Zach Versluis, Water Conservation Specialist, 720-859-4366, [email protected]
• Meghan McCarroll, Water Conservation Specialist, 720-859-4361, [email protected]
Leadership Aurora | All-America City Day
8
Cost Considerations & Estimates
• Project– Volunteer Labor
• $2-5 / square foot– Contractor
• $5-9 / square foot
• Equipment rental• Delivery• Fuel surcharge• Permits & licenses• Legal
Leadership Aurora | All-America City Day
9
Landscape• Plants (not installed)
– $50 – #5 Shrub– $25 – #2 Ornamental Grass– $15 – #1 Perennial
• Inorganic mulch– $37-64 / ton– 1 ton covers 84 square feet
• Organic mulch– $38-57 / cubic yard– 1 cubic yard covers 100 square feet
• Edging– $0.95-1.21 / linear foot
Leadership Aurora | All-America City Day
10
Landscape
• Materials– Ace– Home Depot– Lowes– Nick’s Garden Center– Pioneer Sand Company– Sand Creek Nursery
Leadership Aurora | All-America City Day
11
Irrigation
• Automatic Irrigation System required for landscaped areas– City of Aurora Landscape Ordinance, Sec. 146-
1426, 1430, 1431 (C)
• Permit and Plans review– Required for the installation of a new system or
modification of an old system
Leadership Aurora | All-America City Day
12
0
5
10
15
20
25
30
Cool Season Turf Xeriscape (traditional) Xeriscape(ultra low-water)
Mortality Stress Growth
Water Use – Turf vs Xeriscape
Leadership Aurora | All-America City Day
13
Community Gardens
• Characteristics of a good site– Good visibility– Central location– 6 hours of direct sunlight– Contaminant-free soil
• Cost: $500-50,000 + annual maintenance• See: Community Garden Handbook
Leadership Aurora | All-America City Day
14
Improvements with Traffic Impacts
• Libby Nordeen, Traffic Engineering Technical Coordinator, 303-739-7317, [email protected]
Leadership Aurora | All-America City Day
15
Improvements with Traffic Impacts
• 1. Projects that will require work or materials within a lane of traffic, or closing a sidewalk, must provide traffic control devices and a traffic control plan for review and approval in advance of any work taking place.– We suggest obtaining quotes from one or more of
these three vendors:• Colorado Barricade 303-922-7815• United Rentals 303-366-6629• Warning Lites 303-936-2990
Leadership Aurora | All-America City Day
16
Improvements with Traffic Impacts
• 2. Projects located within 30’ of a driveway/intersection have specific requirements– Shall not restrict the view of oncoming motorists,
bicyclists, or pedestrians.– Height restriction limited to 36”.
Leadership Aurora | All-America City Day
17
Improvements with Traffic Impacts
• 3. Projects requiring traffic control have limited hours every day of a typical week:– Arterials/Collector Roadways-8:30am to 3:30pm– Local Roadways-8am to 5pm
Leadership Aurora | All-America City Day
18
Improvements with Traffic Impacts
• 4. Volunteers working near travel lanes are recommended to wear reflective safety vests and should not enter the roadway during activity. Minors under the age of 18 will need adult supervision.
Leadership Aurora | All-America City Day
19
Real Property
• Natasha Wade, Real Property Agent, 303-739-7267, [email protected]
Leadership Aurora | All-America City Day
20
Typical Previously Funded Projects
• Dumpster Day/Clean Up Initiatives• Island/Entryway Landscape/Hardscape• Neighborhood ID Signs• Perimeter Improvements• Community Gardens
Leadership Aurora | All-America City Day
21
Beautification Grant
Important Factors …• Project must be within the city of Aurora• Visible projects in the city• If there is landscaping, the project must have
irrigation• There needs to be a community building component• We will look for projects with the most impact• We will look for projects that demonstrate the most
need
Leadership Aurora | All-America City Day
22
Beautification Grant
What We Cannot Fund …• Religious and Political Organizations• Landscaping with no source of irrigation• Project without visibility and impact• Projects that do not comply with city codes• Projects on individual private residential property
Leadership Aurora | All-America City Day
23