CITY COUNCIL AGENDA SPECIAL MEETING CITY … · Siobhan Smith v. City of Half Moon Bay ADJOURNMENT...

121
CITY COUNCIL AGENDA SPECIAL MEETING CITY OF HALF MOON BAY TUESDAY, MAY 16, 2017 Adcock Community/Senior Center 535 Kelly Avenue Half Moon Bay, California 94019 Debbie Ruddock, Mayor Deborah Penrose, Vice Mayor Adam Eisen, Councilmember Rick Kowalczyk, Councilmember Harvey Rarback, Councilmember 5:00 PM This agenda contains a brief descripon of each item to be considered. Those wishing to address the City Council on any maer not listed on the Agenda, but within the jurisdicon of the City Council to resolve, may come forward to the podium during the Public Forum poron of the Agenda and will have a maximum of three minutes to discuss their item. Those wishing to speak on a Public Hearing maer will be called forward at the appropriate me during the Public Hearing consideraon. Please Note: Please Provide a Copy of Prepared Presentaons to the City Clerk Copies of wrien documentaon relang to each item of business on the Agenda are on file in the Office of the City Clerk at City Hall and the Half Moon Bay Library where they are available for public inspecon. If requested, the agenda shall be available in appropriate alternave formats to persons with a disability, as required by Secon 202 of the Americans with Disabilies Act of 1990 (42 U.S.C. Sec. 12132.) Informaon may be obtained by calling 650-726-8271. In compliance with the Americans with Disabilies Act, special assistance for parcipaon in this meeng can be obtained by contacng the City Clerk’s Office at 650-726-8271. A 48-hour noficaon will enable the City to make reasonable accommodaons to ensure accessibility to this meeng (28 CFR 35.102-35.104 ADA Title II). hp://hmbcity.com/ MEETING WILL CONCLUDE BY 11:00 PM UNLESS OTHERWISE EXTENDED BY COUNCIL VOTE 1

Transcript of CITY COUNCIL AGENDA SPECIAL MEETING CITY … · Siobhan Smith v. City of Half Moon Bay ADJOURNMENT...

CITY COUNCIL AGENDASPECIAL MEETING

CITY OF HALF MOON BAY

TUESDAY, MAY 16, 2017

Adcock Community/Senior Center535 Kelly AvenueHalf Moon Bay, California 94019

Debbie Ruddock, MayorDeborah Penrose, Vice MayorAdam Eisen, CouncilmemberRick Kowalczyk, CouncilmemberHarvey Rarback, Councilmember

5:00 PM

This agenda contains a brief description of each item to be considered. Those wishing to address the CityCouncil on any matter not listed on the Agenda, but within the jurisdiction of the City Council to resolve, may comeforward to the podium during the Public Forum portion of the Agenda and will have a maximum of three minutes todiscuss their item. Those wishing to speak on a Public Hearing matter will be called forward at the appropriate timeduring the Public Hearing consideration.

Please Note: Please Provide a Copy of Prepared Presentations to the City Clerk

Copies of written documentation relating to each item of business on the Agenda are on file in the Office ofthe City Clerk at City Hall and the Half Moon Bay Library where they are available for public inspection. If requested,the agenda shall be available in appropriate alternative formats to persons with a disability, as required by Section 202of the Americans with Disabilities Act of 1990 (42 U.S.C. Sec. 12132.) Information may be obtained by calling650-726-8271.

In compliance with the Americans with Disabilities Act, special assistance for participation in this meeting canbe obtained by contacting the City Clerk’s Office at 650-726-8271. A 48-hour notification will enable the City to makereasonable accommodations to ensure accessibility to this meeting (28 CFR 35.102-35.104 ADA Title II).

http://hmbcity.com/

MEETING WILL CONCLUDE BY 11:00 PM UNLESS OTHERWISE EXTENDED BY COUNCIL VOTE

1

CONVENE SPECIAL MEETING

CLOSED SESSIONCONFERENCE WITH LEGAL COUNSEL—ANTICIPATED LITIGATIONSignificant exposure to litigation pursuant to paragraph (2) or (3) of subdivision (d) of Section 54956.9:(1 potential case) (In addition to the information noticed above, the agency may be required to provideadditional information on the agenda or in an oral statement prior to the closed session pursuant toparagraphs (2) to (5), inclusive, of subdivision (e) of Section 54956.9.)

1. ORDINANCES AND PUBLIC HEARINGS1.A. ADJUSTMENTS TO THE COST OF SERVICES SCHEDULE (USER FEES)

STAFF REPORTATTACHMENT 1ATTACHMENT 2ATTACHMENT 3ATTACHMENT 4ATTACHMENT 5

CLOSED SESSIONCONFERENCE WITH LEGAL COUNSEL—EXISTING LITIGATION(Paragraph (1) of subdivision (d) of Section 54956.9)Names of cases: 1. Siobhan Smith v. City of Half Moon Bay

ADJOURNMENT

2

BUSINESS OF THE COUNCIL OF THE CITY OF HALF MOON BAY  

AGENDA REPORT  For meeting of:   May 16, 2017 

 TO:    Honorable Mayor and City Council  VIA:    Magda Gonzalez, City Manager  FROM:   Yulia Carter, Finance Director   TITLE:  ADJUSTMENTS TO THE COST OF SERVICES SCHEDULE (USER FEES)  

 RECOMMENDATION: 

1. Review results of the comprehensive User Fee study and proposed fee schedule;  2. Conduct a public hearing and adopt the attached resolution authorizing adjustments to 

the City of Half Moon Bay Cost of Services Schedule (User Fees) for Fiscal Year 2017‐18, as proposed in Attachment 1;, and  

3. Adopt  a  policy  guideline  for  future  annual  cost  of  services  increases  based  on  the  San Francisco  – Oakland –  San  Jose  (Bay Area) Urban Wage  Earners  and Clerical Workers Consumer Price Index (CPI‐W).  

 FISCAL IMPACT: The proposed fee schedule, if adopted, would result in a net annual increase to the General Fund revenue of approximately $405,300 based on current activity levels as presented in this report. Implementation of the new fees would be effective July 16, 2017. A minimum 60‐day notice is required for the user fees in accordance with California Government Code Section 66017.  STRATEGIC ELEMENT: This recommendation supports the Fiscal Sustainability and Inclusive Governance Elements of the Strategic Plan.  BACKGROUND: Municipal best practice guidelines state that staff should review the costs of providing fee‐related services in conjunction with development of the annual operating budget. A user fee and cost allocation model should be used as a basis for this review to ensure that the City of Half Moon Bay  is  utilizing  comprehensive overhead  rates  and  accurately  accounting  for  the  true  cost  of providing various programs and services within City operations.   The last comprehensive cost of services study was performed in FY 2003‐04 by Maximus, calling for a need for a new study.  In  June, 2014,  the City  released an RFP for services related to an overhead cost allocation and comprehensive rate and fee study. 

3

On August 19, 2014 the City Council awarded a contract to NBS Government Finance Group (NBS) to  prepare  a  Cost  Allocation  Plan,  Development  Impact  Fees  (DIF)  nexus  study,  and  a Comprehensive Fee Study.  The scope of the study included a comprehensive analysis of the total cost of providing services, including all applicable direct, indirect, and overhead costs associated with  individual  development‐related  services  (planning,  building,  public  works,  and administration).  

The first part of this project, the overhead Cost Allocation Plan (CAP) model was developed by NBS  in March 2015. Staff  incorporated appropriate and defensible general and administrative cost allocations  into  the FY 2015‐16 budget, and  later updated  the same for FY 2016‐17. The purpose of the CAP implementation is to ensure that the City  is accurately accounting for the true  cost  of  providing  various  programs  and  services  within  its  operations  and  maximizing recovery of General Fund indirect costs from identified operating departments, as well as from enterprise and other chargeable funds and projects.  

The CAP model serves as the backbone for the overall cost of services analysis, as it is the City’s goal  to  identify overhead rates  that can be used  in  the calculation of billable hourly  rates  for grants, fees, federal reimbursements, and other billings; and develop charges for user fees that comply with Proposition 218. A major goal of the user fee study was to build a model to allow the City to move closer to a full‐cost recovery when setting user fees.  

The second part of the project included conducting a Development Impact Fee nexus study to review  development  impact mitigation  fees  imposed  on  new  development,  including  capital outlay and park facilities, traffic mitigation, sewer connection and storm drainage fees. This study was  sub‐contracted  by NBS  to Michael  Baker  International  and was  presented  to  Council  on November 17, 2015. Following the Government Code and public hearing requirements the new development fees went into effect in January, 2016.   

The final stage of the project includes review of the City’s cost of services schedule (user fees) to provide staff with a baseline for recommended revisions to the current fee schedule, which is the subject for today’s discussion. Included in the study, a benchmark comparison of the City’s fees was conducted  to measure  the market consistency of  the City’s  service charges. This analysis showed  that  there  is  a  wide  variety  of  service  schedules  and  pricing  methodology  used  by different municipalities, which makes comparisons difficult. However, the methodologies used to calculate the fees are consistent with those used among neighboring cities.  

NBS presented preliminary results of the user  fee study to the Finance Committee on May 8, 2017. The Committee recommended bringing results of the study the City Council as a public hearing to satisfy the Government Code requirements. The committee also discussed building in a legally defensible increase into the recommended fees to reflect the anticipated increases in the FY 2017‐18 budget compared to the FY 2016‐17 Adopted budget, which was used as a basis of the study. Staff has prepared a master fee schedule that factors the most recent CPI increase of 3.3% (February 2017) to the consultant recommended fees to arrive at the staff recommended user fees (Attachment 5). 

 

  4

DISCUSSION: 

Conducting  a  comprehensive user  fee  study  is not  an  annual  requirement  and only becomes valuable  following  significant  shifts  in  the  organization,  local  practices,  legislative  values  or changes in legal requirements. Even if the City chooses to adjust fees automatically on an annual basis, certain fees can still be adjusted above or below the average rate at the Council’s direction. The full cost of services adjusted by CPI would be the City’s only limit in setting its fees. There are some  exceptions  to  the  Fee  Schedule  that  do  not  lend  themselves  to  strict  analysis  of  cost recovery. These exceptions are fees that are limited or set by statute, fines and penalties. The examples  of  fees  with  a  legal  limit  include  the  service  charge  on  checks  returned  for  non‐sufficient  funds,  or  vehicle  repossession  release  fee  that  is  established and mandated by  the State.  Based on the results of the cost allocation plan (CAP) and individual and group meetings with each  City  department,  the  resulting  report  provides  a  calculation  of  the  percentage  of  cost recovery currently attained for each service. This information provides staff and Council with a baseline for recommended revisions to the current fee schedule. A complete report of the User Fee  Study prepared by NBS  is  included  in Attachment  2  to  the  staff  report  and provides  the objectives,  approach  and methodology  of  the  study,  as  well  as  specific  details  and  analysis, including cost recovery of the City’s Planning, Building, Public Works, Police, and Administrative activities. As part of this project, staff took the opportunity to clean up and consolidate redundant and rarely used fees, like duplication of documents available online, etc.  While the majority of the fees show an increase, the study also identified 85 fees which will be lowered, which have also been incorporated in the Master Fee Schedule (Attachment 5).    

  As  shown  in  the  table below,  the City  is  currently  recovering approximately 56% of  the costs associated with providing user and regulatory fee‐related services. At the recommended level, the City will  recover approximately 99% of  the costs, which would  translate  into $405,300  in additional revenues based on prior year activity level. If the Council chose to add the 3.3% CPI‐W increase to these recommended fees, this would bring an additional $30,800.  Should the Council decide  to  adopt  a  policy  of  100%  recovery  for  all  fees  included  in  the  report,  approximately $14,000 in additional costs could be recovered.   

DepartmentRecommended Fees 

Decreasing from Current Fee

Recommended Fees 

Increasing over Current Fee

Administration 1 19

Planning 15 35

Public Works 4 66

Building 58 46

Public Safety 7 23

Total 85 189

5

  Staff recommends setting the fees by using a 100% recovery rate for the majority of City services. The rationale behind this recommendation is that the City should target a full cost recovery for services  that  provide  private  benefit  (e.g.  majority  of  building  and  planning  services).  This assumes that the City’s goal should be to maximize revenues from user fees to recover full cost of  service,  and  only  offer  subsidy  for  services  that  provide  public  benefit  (e.g.  public  safety, children and senior services and activities, etc.).   Included in this report are several fee categories that are not being recommended to recover 100% of the cost of providing various services. There are economic, policy and social reasons why staff  does  not  recommend  setting  all  fees  at  100%  of  their  cost  recovery  amount.  Staff recommends subsidizing some fees like block party permits, public safety service fees and solar panel  permit  fees  to  encourage  and  alleviate  citizens’  burdens  for  certain  activities.  Certain planning fees related to appeals are also proposed to be subsidized to maintain  local control. Additional information on city services that are recommended at less than 100% recovery rate can be found in Attachment 3 to this staff report.   Parks and Recreation Fees were not originally included in the scope of the user fee study, as these services were provided through a contract with Boys & Girls Club, and the City did not collect nor benefit from revenues associated with these services. In preparation for bringing these services back in‐house this July, Staff has compiled a schedule of Parks and Recreation Fees previously approved by City Council and/or used by Boys & Girls Club (Attachment 4). Staff recommends that these fees remain unchanged and be included in the City’s master fee schedule at this time to  ensure  easy  transition  and  continuity  of  Parks  &  Recreation  services  provided  to  the community. Staff also recommends a comprehensive review of these fees in about a 6‐12 months after the new Parks and Recreation program is established and fully functional.  

6

Staff also recommends that the Council adopt the guidelines to adjust most fees annually based on the San Francisco – Oakland – San Jose (Bay Area) Urban Wage Earners and Clerical Workers Consumer Price Index (CPI‐W). As noted previously, conducting a comprehensive user fee study becomes valuable when following significant shifts  in the organization,  local practices or  legal requirement changes. Even if the Council chooses to adjust fees automatically on an annual basis, certain  fees  can  still  be adjusted above or below  the average  rate at  the Council’s discretion within the full cost of services limits increased by CPI.  Staff also recommends that the City follows best practices of performing a comprehensive cost allocation  and  user  fee  study  every  five  years  to  ensure  that  the  current  fee  structure  is thoroughly studied and reviewed on a regular basis.  ATTACHMENTS: 1. Resolution authorizing adjustments to the City’s Cost of Services Schedule 2. Comprehensive User Fee Study Report 3. Fees recommended at less than 100% recovery level 4. Parks and Recreation Fees 5. Master Fee Schedule 

7

RESOLUTION NO. C‐2016‐  

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF HALF MOON BAY AUTHORIZING ADJUSTMENTS TO THE COST OF SERVICES SCHEDULE (USER FEES)  

FOR FISCAL YEAR 2017‐2018   

WHEREAS, the City Council of the City of Half Moon Bay has established certain fees for City services; and  

WHEREAS, the City Council awarded a contract to NBS Government Finance Group (NBS) to complete the Cost Allocation Plan and Comprehensive User Fee Study; and   

WHEREAS,  the  proposed  budget  is  a  balanced  expenditure  plan  that  ensures  the maintenance of adequate reserves during FY 2016‐17; and  

WHEREAS, the City of Half Moon Bay wishes to use the San Francisco – Oakland – San Jose  (Bay Area) Urban Wage Earners and Clerical Workers Consumer Price  Index (CPI‐W) as a guideline for future annual increases.  NOW THEREFORE, the City Council of the City of Half Moon Bay does hereby resolve that the amended  fees as presented  in  the Comprehensive User Fee Study,  raised by  the most  recent (February, 2017) CPI‐W increase of 3.3 percent as shown in the attached Master Fee Schedule, are hereby approved and effective July 16, 2017.              ******************************************************************** I, the undersigned, hereby certify that the foregoing Resolution was duly passed and adopted on the 16th day of May, 2017 by the City Council of Half Moon Bay by the following vote:  AYES, Councilmembers:   NOES, Councilmembers:   ABSENT, Councilmembers: ABSTAIN, Councilmembers:    ATTEST:            APPROVED:  ______________________________     _______________________________ Jessica Blair, City Clerk         Debbie Ruddock, Mayor  

8

32605 Temecula Parkway, Suite 100 Temecula, CA 92592

Toll free: 800.434.8349 Fax: 951.296.1998

City of Half Moon Bay Citywide User Fee Study Final Report April 24, 2017

9

Citywide User Fee Study – City of Half Moon Bay Prepared by NBS

TOC

TABLE OF CONTENTS Executive Summary ................................................................................................................... 1

Outcomes .................................................................................................................................................. 1

Report Format ........................................................................................................................................... 2

Section 1 – Introduction and Fundamentals ............................................................................... 3

Scope of Study ........................................................................................................................................... 3

Methods of Analysis .................................................................................................................................. 4

Cost of Service Analysis ......................................................................................................................... 4

Fee Establishment ................................................................................................................................. 6

Cost Recovery Evaluation ...................................................................................................................... 6

Comparative Fee Survey ........................................................................................................................... 8

Data Sources ............................................................................................................................................. 8

Section 2 – Administrative Fees ................................................................................................10

Cost of Service Analysis ........................................................................................................................... 10

Fee Establishment ................................................................................................................................... 10

Cost Recovery Evaluation ........................................................................................................................ 11

Section 3 – Planning Fees ........................................................................................................12

Cost of Service Analysis ........................................................................................................................... 12

Fee Establishment ................................................................................................................................... 13

Cost Recovery Evaluation ........................................................................................................................ 13

Section 4 – Public Works (Engineering) Fees ...........................................................................15

Cost of Service Analysis ........................................................................................................................... 15

Fee Establishment ................................................................................................................................... 16

Cost Recovery Evaluation ........................................................................................................................ 16

Section 5 – Building Fees .........................................................................................................17

Cost of Service Analysis ........................................................................................................................... 17

Fee Establishment ................................................................................................................................... 17

Cost Recovery Evaluation ........................................................................................................................ 18

Section 6 – Police Fees ............................................................................................................19

Cost of Service Analysis ........................................................................................................................... 19

Fee Establishment ................................................................................................................................... 19

Cost Recovery Evaluation ........................................................................................................................ 19

Section 7 – Technology Fee......................................................................................................21

Cost of Service Analysis ........................................................................................................................... 21 10

Citywide User Fee Study – City of Half Moon Bay Prepared by NBS

TOC

Fee Establishment ................................................................................................................................... 21

Cost Recovery Evaluation ........................................................................................................................ 22

Section 8 – Conclusion .............................................................................................................23

Appendices

Cost of Service Analysis (Fee Tables)

Administrative Departments Fees Appendix A.1

Planning Division Fees Appendix A.2

Public Works (Engineering) Fees Appendix A.3

Building and Safety Fees Appendix A.4

Police Department Fees Appendix A.5

Comparative Fee Survey

Administrative Departments Fees Appendix B.1

Planning Division Fees Appendix B.2

Public Works (Engineering) Fees Appendix B.3

Building and Safety Fees Appendix B.4

Police Department Fees Appendix B.5

11

Citywide User Fee Study – City of Half Moon Bay 1 Prepared by NBS

Executive Summary

NBS performed a User Fees and Charges Study (Study) for the City of Half Moon Bay (City). The purpose of this report

is to describe the Study’s findings and recommendations, which intend to defensibly update and establish user and

regulatory fees for service for the City of Half Moon Bay, California.

California cities impose user fees and regulatory fees for services and activities they provide through provisions of

the State Constitution. First, cities may perform broad activities related to their local policing power and other

service authority as defined in Article XI, Sections 7 and 9. Second, cities may establish fees for service through the

framework defined in Article XIIIC, Section 1. Under this latter framework, a fee may not exceed the estimated

reasonable cost of providing the service or performing the activity. For a fee to qualify as such, it must relate to a

service or activity under the control of the individual/entity on which the fee is imposed. For example, the

individual/entity requests service of the municipality or his or her actions specifically cause the municipality to

perform additional activities. In this manner, the service or the underlying action causing the municipality to perform

service is either discretionary and/or is subject to regulation. As a discretionary service or regulatory activity, the

user fees and regulatory fees considered in this Study fall outside requirements for imposition of taxes, special taxes,

or fees imposed as incidences of property ownership.

The City’s chief purposes in conducting this Study were to ensure that existing fees do not exceed the costs of service

and to provide an opportunity for the City Council to re-align fee amounts with the adopted cost recovery policies.

Outcomes

This Study examined user and regulatory fees managed by the following City departments and programs:

Administrative departments such as City Manager, City Clerk, and Finance

Community development departments, including, Planning, Public Works, and Building

Police

The Study identified approximately $528,000 currently collected per year from fees for service, versus $947,000 of

eligible costs for recovery from fees for service. The following table provides a summary of results for each service

area studied:

Department /

Division

Estimated

Annual Current

Fee Revenue

Estimated Annual

Full Cost

Recovery Fee

Revenue

Annual Cost

Recovery Surplus /

(Deficit)

Current Cost

Recovery %

Estimated

Annual

Recommended

Fee Revenue

Recommended

Cost Recovery %

Administrative

Departments $ 14,385 $ 30,983 $ (16,598) 46% $ 30,983 100%

Planning $ 100,080 $ 313,387 $ (213,307) 32% $ 305,561 98%

Public Works

(Engineering) $ 23,800 $ 144,227 $ (120,427) 17% $ 144,227 100%

Building $ 373,616 $ 365,897 $ 7,719 102% $ 365,897 100%

Police $ 16,467 $ 23,178 $ (6,711) 71% $ 17,430 75%

Technology Fee $ - $ 69,571 $ (69,571) 0% $ 69,571 100%

Total $ 528,348 $ 947,244 $ (418,897) 56% $ 933,671 99%12

Citywide User Fee Study – City of Half Moon Bay 2 Prepared by NBS

As shown, the City is recovering approximately 56% of costs associated with providing user and regulatory fee related

services. Should the Council elect to adopt fee levels at 100% of the full cost recovery amounts determined by this

Study, an additional $419,000 in costs could be recovered. However, as discussed in Section 1 of this report, there

are reasons for adopting a fee at less than the calculated full cost recovery amount. As such, City staff provided initial

recommended fee amounts for the Council’s consideration. If Council elects to adopt fee levels at staff’s initial

recommendations, an additional $405,000 in costs could be recovered, or a 99% cost recovery outcome for services

provided.

Report Format

This report documents analytical methods and data sources used throughout the Study, presents findings regarding

current levels of cost recovery achieved from user and regulatory fees, discusses recommended fee amounts, and

provides a comparative survey of fees imposed by neighboring agencies for similar services.

Section 1 of the report outlines the foundation of the Study and general approach.

Sections 2 through 7 discuss the results of the cost of service analysis performed, segmented by category

of fee and/or department. The analysis applied to each category/department falls into studies of: the fully

burdened costs of providing service, establishment of fee categories and amounts, evaluation of current

cost recovery levels, and the recommended fees for providing services.

Section 8 provides the grand scope conclusions of the analysis provided in the preceding sections.

Appendices to this report include additional analytical details for each department or division studied, and

a comparison of fees imposed by neighboring agencies for similar services.

An updated Master Fee Schedule document will accompany the City’s Staff Report.

13

Citywide User Fee Study – City of Half Moon Bay 3 Prepared by NBS

Section 1 – Introduction and Fundamentals

Scope of Study

The following is a summarized list of fees for each City department or program studied:

Administrative fees, including:

o Returned checks

o Copies and duplication requests

o Election filing fees

o Hourly rates for staff research requests

o Alarm permits

o Special event permits

o Annual parking permit processing for Poplar Beach

Planning fees, including:

o Pre-entitlement processing

o Coastal development permits

o Environmental review

o Design review

o Entitlement processing and appeals

Public Works fees, including:

o Improvements within the right-of-way

o Final map review and approval

o Grading review and inspection

o Encroachment permits

Building and Safety permits

Police permits for miscellaneous records requests, etc.

The fees examined in this Study specifically excluded utility rates, development impact fees, and special assessments,

all of which fall under distinct analytical and procedural requirements different from the body of user/regulatory

fees analyzed in this effort. Additionally, this Study excluded facility and equipment rental rates, as well as most of

the fines and penalties that may be imposed by the City for violations to its requirements or code. (The City is not

limited to the costs of service when charging for entrance to or use of government property, or when imposing fines

and penalties.)

14

Citywide User Fee Study – City of Half Moon Bay 4 Prepared by NBS

Methods of Analysis

There are three phases of analysis completed for each City department or program studied:

1) Cost of service analysis

2) Fee establishment

3) Cost recovery evaluation

Cost of Service Analysis

A cost of service analysis is a quantitative effort that compiles the full cost of providing governmental services and

activities. There are two primary types of costs considered: direct and indirect costs. Direct costs are those that

specifically relate to the activity in question, including the real-time provision of the service. Indirect costs are those

that support provision of services in general, but cannot be directly assigned to the fee for service in question.

Components of the full cost of service include direct labor costs, indirect labor costs, specific direct non-labor costs

where applicable, allocated non-labor costs, and allocated City-wide overhead. Definitions of these cost

components are as follows:

Labor costs – Salary, wages and benefits expenses for City personnel specifically involved in the provision of services and activities to the public.

Indirect labor costs – Personnel expenses supporting the provision of services and activities. This can include line supervision and departmental management, administrative support within a department, and staff involved in technical activities related to the direct services provided to the public.

Specific direct non-labor costs – Discrete expenses incurred by the City due to a specific service or activity performed, such as contractor costs, third-party charges, and very specific materials used in the service or activity. (In most fee types, this component is not used, as it is very difficult to directly assign most non-labor costs at the activity level.)

Allocated indirect non-labor costs – Expenses other than labor for the departments involved in the provision of services. In most cases, these costs are allocated across all services provided by a department, rather than directly assigned to fee categories.

Allocated indirect organization-wide overhead – These are expenses, both labor and non-labor, related to agency-wide support services. Support services include general administrative services such as City Council, City Manager, City Clerk, City Attorney, Human Resources, Finance, and Information Services, as well as cost burdens for building and equipment use and maintenance. An agency’s support services departments assist the direct providers of public service. The amount of costs attributable to each department or program included in this Study were sourced from a separate Cost Allocation Plan, prepared by NBS.

All cost components in this Study use annual (or annualized) figures, representing a twelve-month cycle of expenses

incurred by the City in the provision of all services and activities agency-wide.

Nearly all of the fees under review in this Study require specific actions on the part of City staff to provide the service

or conduct the activity. Because labor is the primary underlying factor in these activities, the Study expresses the

15

Citywide User Fee Study – City of Half Moon Bay 5 Prepared by NBS

full cost of service as a fully burdened cost per labor hour. NBS calculates a composite, fully burdened, hourly rate

for each department, division, program, or activity, as applicable to the specific organization and needs of each area

studied. The rate serves as the basis for further quantifying the average full cost of providing individual services and

activities.

Deriving the fully burdened labor rate for each department, and various functional divisions within a department,

requires two figures: the full costs of service and the number of hours available to perform those services. The full

costs of service are quantified through the earlier steps described in this analysis. NBS derives the hours available

from a complete listing of all personnel employed by the City.

A full-time employee equates to 2,080 hours per year of regular time. Using this as an initial benchmark of labor

time, the Study removes the average employee’s eligible annual leave from the total number of regular paid hours

to generate the total number of available labor hours for each City department or program. These available hours

represent the amount of productive time available for providing both fee-recoverable and non-fee recoverable

services and activities. The productive labor hours divided into the annual full costs of service equals the composite

fully burdened labor rate. Some agencies also use the resulting rates for other purposes than setting fees, such as

when the need arises to calculate the full cost of general services, or structure a cost recovery agreement with

another agency or third party.

Fully burdened labor rates applied at the individual fee level estimate an average full cost of providing each service

or activity. This step required the development of staff time estimates for the services and activities listed in the

City’s fee schedule. In some fee programs, the City’s time tracking records were useful in identifying time spent

providing general categories of service (e.g. plan review, inspection, public assistance, etc.). However, the City does

not systematically track activity service time for all departments or all fee services provided. Consequently,

interviews and questionnaires were used to develop the necessary data sets describing estimated labor time. In

most cases, City staff estimated the average amount of time (in minutes and hours) it would take to complete a

typical occurrence of each service or activity considered. Every attempt was made to ensure that each department

having a direct role in the provision of each service or activity provided a time estimate.

It should be noted that the development of these time estimates was not a one-step process: estimates received

were carefully reviewed by both consultant and departmental management to assess the reasonableness of such

estimates. Based on this review, the City reconsidered its time estimates until both parties were comfortable that

the fee models reasonably reflected the average service level provided by the City. Then, staff’s time estimates were

applied to the appropriate fully burdened labor rate to yield an average full cost of the service or activity.

The average full cost of service is just that: an average cost at the individual fee level. The City does not currently

have the systems in place to impose fees for every service or activity based on the actual amount of time it takes to

serve each individual. Moreover, such an approach is almost universally infeasible without significant – if not

unreasonable – investments in costly technology. Much of the City’s fee schedule is composed of flat fees, which by

definition, are linked to an average cost of service; thus, use of this average cost method is the predominant

approach in proceeding toward a schedule of revised fees. Flat fee structures based on average costs of service are

widely applied among other California municipalities, and it is a generally accepted approach. (Refer to the

subsection below regarding “Fee Establishment” for further discussion.)

Subsequent chapters and the appendices of this report discuss the completed cost of service analysis developed

for each department or division. 16

Citywide User Fee Study – City of Half Moon Bay 6 Prepared by NBS

Fee Establishment

Many of the City’s fees are flat fees, meaning they correspond directly to the average full cost of service result. For

the few activities where estimating an average was impossible – due to the highly variable nature of the service –

use of fully burdened hourly rates coupled with time tracking is the preferred fee structure. (In other words, the

City would impose a fee per hour of staff time, requiring some degree of time estimation or outright time-tracking

at the case level.)

Establishing fees also includes a range of considerations, as described below:

Addition to and deletion of fees – The Study’s process provided each department the opportunity to propose

additions and deletions to their fee schedules, as well as rename, reorganize, and clarify fees imposed. Many

such revisions better conform fees to current practices, as well as improve the calculation of fees owed by an

individual, the application of said fees, and the collection of revenues. In other words, as staff is more

knowledgeable and comfortable working with the fee schedule, the accuracy achieved in both imposing fees

on users and collecting revenues for the City is greater. Beyond this, some additions to the fee schedule were

simply identification of existing services or activities performed by City staff for which no fee is currently

charged.

Revision to the structure of fees – In most cases, the current structure of fees did not change; the focus is to

recalibrate the fee amount to match the costs of service. In several cases, however, fee categories and fee

names were simplified or re-structured to increase the likelihood of full cost recovery, or to enhance the

fairness of how the fee applies to various types of fee payers.

Documentation of tools to calculate special cost recovery – The City’s fee schedule should include the list of

fully burdened rates developed by the Study. Documenting these rates in the fee schedule provides an

opportunity for the City Council to approve rates for cost recovery under a “time and materials” approach. It

also provides clear publication of those rates, so fee payers of any uniquely determined fee can reference the

amounts. The fee schedule should provide language that supports special forms of cost recovery for activities

and services not contemplated by the adopted master fee schedule. These rare instances use the published

rates to estimate a flat fee, or bill on an hourly basis, at the discretion of the director of each department.

Cost Recovery Evaluation

The NBS fee model compares the existing fee for each service or activity to the average full cost of service quantified

through this analysis. A cost recovery rate of 0% identifies no current recovery of costs from fee revenues (or

insufficient information available for evaluation). A rate of 100% means that the fee currently recovers the full cost

of service. A rate between 0% and 100% indicates partial recovery of the full cost of service through fees. A rate

greater than 100% means that the fee exceeded the full cost of service.

User fees and regulatory fees examined in this Study should not exceed the full cost of service. In other words, the

cost recovery rate achieved by a fee should not be greater than 100%. In most cases, imposing a fee above this

threshold could require the consensus of the voters.

17

Citywide User Fee Study – City of Half Moon Bay 7 Prepared by NBS

NBS also assists with modeling the “recommended” or “targeted” level of cost recovery for each fee, always

established at 100%, or less, than the calculated full cost of service. Targets and recommendations always reflect

agency-specific judgments linked to a variety of factors, such as existing City policies, agency-wide or departmental

revenue objectives, economic goals, community values, market conditions, level of demand, and others.

A general means of selecting an appropriate cost recovery target is to consider the public and private benefits of the

service or activity in question.

To what degree does the public at large benefit from the service?

To what degree does the individual or entity requesting, requiring, or causing the service benefit?

When a service or activity completely benefits the public at large, there is generally little to no recommended fee

amount (i.e., 0% cost recovery), reflecting that a truly public-benefit service is best funded by the general resources

of the City, such as General Fund revenues (e.g., taxes). Conversely, when a service or activity completely benefits

an individual or entity, there is generally closer to or equal to 100% of cost recovery from fees, collected from the

individual or entity. An example of a completely private benefit service may be a request for exemption from a City

regulation or process.

In some cases, a strict public-versus-private benefit judgment may not be sufficient to finalize a cost recovery target.

Any of the following other factors and considerations may influence or supplement the public/private benefit

perception of a service or activity:

If optimizing revenue potential is an overriding goal, is it feasible to recover the full cost of service?

Will increasing fees result in non-compliance or public safety problems?

Are there desired behaviors or modifications to behaviors of the service population helped or hindered through the degree of pricing for the activities?

Does current demand for services support a fee increase without adverse impact to the citizenry served or

current revenue levels? (In other words, would fee increases have the unintended consequence of driving

away the population served?)

Is there a good policy basis for differentiating between type of users (e.g., residents and non-residents,

residential and commercial, non-profit entities and business entities)?

Are there broader City objectives that inform a less than full cost recovery target from fees, such as

economic development goals and local social values?

Because this element of the Study is subjective, NBS provides the full cost of service calculation information and the

framework for considering fees, while those closest to the fee-paying population – the City departments and

programs – have considered appropriate cost recovery levels at or below that full cost for the Council’s review.

18

Citywide User Fee Study – City of Half Moon Bay 8 Prepared by NBS

Comparative Fee Survey

Often policy makers request a comparison of their jurisdiction’s fees to surrounding or similar communities. The

purpose of a comparison is to provide a sense of the local market pricing for services, and to use that information to

gauge the impact of recommendations for fee adjustments.

Appendix B presents the results of the Comparative Fee Survey for the City of Half Moon Bay. NBS worked with the

City to choose five comparative agencies: Cities of Belmont, Brisbane, Hillsborough, Pacifica, and Woodside.

NBS notes the following about the approach to, and use of, comparative survey data:

Comparative surveys do not provide information about the cost recovery policies or procedures inherent in each

comparison agency.

A “market based” decision to price services below the full cost of service calculation, is the same as making a

decision to subsidize that service.

Comparative agencies may or may not base their fee amounts on the estimated and reasonable cost of providing

services. NBS did not perform the same level of analysis provided for this Study on the comparative agencies’

fees.

Comparative fee survey efforts are often non-conclusive for many fee categories. Comparison agencies typically

use varied terminology for provision of similar services.

In general, NBS reasonably attempts to source each comparison agency’s fee schedule from the Internet, and

compile a comparison of the City’s existing fee categories and amounts for the most readily comparable fee items

that match the client’s existing fee structure.

Data Sources

The following City-published data sources were used to support the cost of service analysis and fee establishment

phases of this Study:

The City of Half Moon Bay’s Adopted Budget for Fiscal Year 2016-17.

A complete listing of all City personnel, salary/wage rates, regular hours, paid benefits, and paid leave amounts – provided by the Finance Department.

Various correspondences with the City staff supporting the adopted budgets and current fees, including budget notes and expenditure detail not shown in the published document.

Prevailing fee schedules provided by each involved department.

Annual workload data from the prior fiscal year provided by each involved department or program studied.. The City’s adopted budget is the most significant source of information affecting cost of service results. NBS did not audit or validate the City’s financial management and budget practices, nor was cost information adjusted to reflect different levels of service or any specific, targeted performance benchmarks. This Study has accepted the City’s budget as a legislatively adopted directive describing the most appropriate and reasonable level of City spending.

19

Citywide User Fee Study – City of Half Moon Bay 9 Prepared by NBS

Consultants accept the City Council’s deliberative process and ultimate acceptance of the budget plan and further assert that through that legislative process, the City has yielded a reasonable expenditure plan, valid for use in setting cost-based fees.

Original data sets also support the work of this Study: primarily, estimated staff time at various levels of detail. To

develop these data sets, consultants prepared questionnaires and conducted interviews with individual

departments. In the fee establishment phase of the analysis, departmental staff provided estimates of average time

spent providing a service or activity corresponding with an existing or new fee. Consultants and departmental

management reviewed and questioned responses to ensure the best possible set of estimates.

20

Citywide User Fee Study – City of Half Moon Bay 10 Prepared by NBS

Section 2 – Administrative Fees

Most activities and services provided by Half Moon Bay’s administrative departments are not recoverable via user

or regulatory fees. The scope of this analysis focused solely on various administrative processing fees involving the

City Manager, City Clerk, and/or Finance departments.

Cost of Service Analysis

NBS developed a composite fully-burdened hourly rate for the City Manager, City Clerk, and Finance departments,

as shown below:

Section 1, Cost of Service Analysis, of this report describes the types of expenditures and allocated costs considered

in the development of these rates. All subsequent administrative fee calculations will incorporate the fully burdened

hourly rates of $221, $175, and $189, depending on which department provides the fee for service.

Fee Establishment

The list of fees shown in Appendix A.1 to this report incurred some notable changes, deletions, and/or additions to

the City’s existing fee schedule.

Returned Check fees are regulated (capped) by the State at $25 for the first check, and $35 for each

subsequent check. Recommended fee amounts were adjusted accordingly.

Several fees pertaining to duplication (copy) requests were recommended for elimination, including copies

of Municipal Code, City Budget, CAFR, and subscription services for commission and Council agendas, all of

which are available via the City’s website.

Certification of Documents fee for the City Clerk was eliminated. This service is now consolidated with the

County.

Staff Research fees were restructured to a blended rate per department or program performing the service.

Taxi Cab License fees were deleted, as the City’s updated Municipal Code requires operators to have permits

from another City in San Mateo County.

Expenditure Type City Manager City Clerk Finance

Labor 396,136$ 199,134$ 436,987$

Recurring Non-Labor 83,314 60,783 83,841

Citywide Overhead 124,572 62,454 205,465

Dept. Admin 183,711 100,050 334,314

Department Total 787,733$ 422,422$ 1,060,606$

Fully Burdened Hourly Rate 221$ 175$ 189$

3,560 2,411 5,625 Reference: Direct Hours Only

21

Citywide User Fee Study – City of Half Moon Bay 11 Prepared by NBS

New fees proposed by City staff include Business Improvement District Administration of City Hotels, and

cost recovery for Street Closures.

Cost Recovery Evaluation

Appendix A.1 presents the results of the detailed cost recovery analysis for the City’s various administrative fees.

The “Cost of Service per Activity” column establishes the maximum adoptable fee amount for the corresponding

service identified in the “Fee Description” list.

The City’s general administrative fees currently recover approximately 46% of the cost of providing services. As

shown in the following table, the City collects approximately $14,000 per year in revenues at current fee amounts.

At full cost recovery, the same demand for these services would generate approximately $31,000.

NBS provided the full cost of service information and the framework for considering fees, while those closest to the

fee-paying population, the City departments, considered appropriate cost recovery levels at or below that full cost.

The “Recommended Fee” column in Appendix A.1 displays the City staff’s initially recommended fee amounts. These

initial recommendations for adjusted fee amounts increase cost recovery for these services by approximately

$17,000 Fees would recover approximately 100% of the total costs of providing fee related services.

Department /

Division

Estimated

Annual Current

Fee Revenue

Estimated Annual

Full Cost

Recovery Fee

Revenue

Annual Cost

Recovery Surplus /

(Deficit)

Current Cost

Recovery %

Estimated

Annual

Recommended

Fee Revenue

Recommended

Cost Recovery %

Administrative

Departments $ 14,385 $ 30,983 $ (16,598) 46% $ 30,983 100%

22

Citywide User Fee Study – City of Half Moon Bay 12 Prepared by NBS

Section 3 – Planning Fees

The Planning Division performs a variety of functions that are intended to conserve and enhance the City’s

environmental resources and scenic beauty, to preserve its historic resources and small town heritage, to manage

the community’s growth rate, and to enforce the policies and regulations related to land use and development.

Cost of Service Analysis

The following categorizes the Planning Division’s costs across both fee related and non-fee related services, as well

as the resulting fully-burdened hourly rate applicable toward establishing the full cost of providing fee related

services.

Section 1, Cost of Service Analysis, of this report describes the types of expenditures and allocated costs considered

in the development of an hourly rate. All subsequent cost of service calculations at the individual fee level assume a

fully burdened hourly rate of $211, with maximum recovery of approximately $669,000 in costs from fees for service.

The cost category columns shown in the table above were adapted and summarized from Division staff interviews.

To assist the reader in understanding the underlying costs and assumptions used to calculate the fully burdened

hourly rate, the following provides summary descriptions of each cost category:

GP/LCP – Planning staff support the ongoing maintenance and cyclical update of the City’s General Plan (GP)

and Local Community Plans (LCP). These costs do not apply toward recovery from Planning and Zoning review

fees for service.

Special Projects – Planning staff support the Council and City management’s requests for research requests and

special project support. These costs do not apply toward recovery from Planning and Zoning review fees for

service.

CIP Support – Planning staff support the review and implementation of various City capital improvement projects. These costs do not apply toward recovery from Planning and Zoning review fees.

Public Information – Activities associated with responding to phone calls and supporting both active permits

and the development review process in general. Typically, some portion of costs for provision of general public

Expenditure Type GP / LCPSpecial

ProjectsCIP Support

Public

Information /

General

Application /

Permitting

Services

Total

Labor 101,849$ 39,145$ 5,345$ 24,635$ 187,414$ 358,388$

Recurring Non-Labor 117,208 45,048 6,151 28,350 215,676 412,433

Citywide Overhead 100,312 38,555 5,264 24,263 184,586 352,980

Dept. Admin 17,375 6,678 912 4,203 31,973 61,141

Department Total 336,744$ 129,426$ 17,671$ 81,451$ 619,649$ 1,184,941$

El igible Cost Recovery from Fees for Service 0% 0% 0% 60% 100% 56%

Division Totals:

Amount Targeted for Recovery in Billings/Fees -$ -$ -$ 48,871$ 619,649$ 668,519$

Amount Requiring Another Funding Source 336,744$ 129,426$ 17,671$ 32,580$ -$ 516,422$

Cost per Direct Hour Recoverable from Fees for Service -$ -$ -$ 15$ 196$ 211$

Reference: Direct

Hours 3,169

23

Citywide User Fee Study – City of Half Moon Bay 13 Prepared by NBS

information and assistance do not apply toward recovery from fees. Planning staff estimated that approximately

60% of these costs support land use application review activities, while the remaining costs should be not be

considered in the calculation of fees for services. The remaining 40% of the costs of providing public information

services requires funding from sources other than fees.

Application and Permitting Services – Development review and approval comprises the majority of this Division’s work efforts. 100% of these costs apply toward recovery from Planning and Zoning fees for service.

Significant analytical and policy decisions revolve around inclusion of categorized activity costs in the fully burdened

hourly rate. The decision of whether to apply or exclude certain costs toward recovery in fees for service stems from

the basic fee setting parameters offered by the California State Constitution and Statutes, which requires that any

new fee levied or existing fee increased should not exceed the estimated amount required to provide the service for

which the charge is levied.

Fee Establishment

Half Moon Bay’s Planning Division currently charges for application processing and entitlement review services via

a mixture of “flat” fees and “deposit based” fees. Flat fees charge one finite amount per project. Deposit based fees

require an initial deposit of funds to begin processing of an application, time is tracked and billed to the project by

City staff against the deposit amount, and additional funds are either requested from the applicant as needed, or

refunds are provided to the at completion of the project.

The City revaluated each fee item on the Planning Division’s current list of fees as to whether it should be charged

as a flat fee or a deposit based fee. The City re-grouped and re-ordered many of the fees for better organization, and

deleted several fee items. New fee items added include Pre-Application Review, Minor Amendment, and a new

deposit requested from developers for processing of Appeals.

While this section of the User Fee Study Report focuses on the Planning Division’s costs and fees, the Public Works

Engineering Division also participates in the review of Planning’s applications. As such, the Engineering Division’s

analysis establishes additional deposit amounts for their review, when required.

Cost Recovery Evaluation

Appendix A.2 presents the results of the detailed cost recovery analysis for the Planning Division’s fees. The “Cost

of Service per Activity” column establishes the maximum adoptable fee amount for the corresponding service

identified in the “Fee Description” list.

The City’s Planning and Zoning fees currently recover approximately 32% of the Planning Division’s cost of providing

services. As shown in the following table, the City collects approximately $100,000 per year in revenues at current

fee amounts. At full cost recovery, the same demand for these services would generate approximately $313,000.

Department /

Division

Estimated

Annual Current

Fee Revenue

Estimated Annual

Full Cost

Recovery Fee

Revenue

Annual Cost

Recovery Surplus /

(Deficit)

Current Cost

Recovery %

Estimated

Annual

Recommended

Fee Revenue

Recommended

Cost Recovery %

Planning $ 100,080 $ 313,387 $ (213,307) 32% $ 305,561 98%

24

Citywide User Fee Study – City of Half Moon Bay 14 Prepared by NBS

NBS provided the full cost of service information and the framework for considering fees, while those closest to the

fee-paying population, the City departments, considered appropriate cost recovery levels at or below that full cost.

The “Recommended Fee / Deposit Level” column in Appendix A.2 displays the City staff’s initially recommended flat

fee or deposit amounts. These initial recommendations for adjusted fee amounts would increase the Planning

Division’s costs recovered by approximately $205,000. Recommended fee amounts recover approximately 98% of

the total costs of providing fee related services.

The cost recovery evaluation described above assumes that the full deposit amount for each entitlement, on

average, is required to complete the project. In instances where the full deposit amount is not required, the balance

of the deposit should be refunded. In some instances, additional funds are requested for completion of City review

and approval. The analysis completed by NBS focuses on calibrating deposit amounts to reflect the average level of

effort required for each fee item.

25

Citywide User Fee Study – City of Half Moon Bay 15 Prepared by NBS

Section 4 – Public Works (Engineering) Fees

The Public Works Department provides various services to ensure safe living conditions and enhance life quality in

Half Moon Bay. The engineering staff develops master plans, prepares designs and studies, administers construction

contracts for the improvements to the City’s buildings and grounds, streets, sidewalks, trails, parks, parking lots,

drainage facilities, sewer collection and street lighting system..

Cost of Service Analysis

The Engineering Division of the Public Works Department plan checks and inspects development requests for

improvements within the City’s right-of way, reviews entitlements and final maps, and issues encroachment permits.

The following categorizes the Engineering Division’s costs across both fee related and non-fee related services, as

well as the resulting fully-burdened hourly rate applicable toward establishing the full cost of providing fee related

services.

Section 1, Cost of Service Analysis, of this report describes the types of expenditures and allocated costs considered

in the development of hourly rates. The total estimated cost of the Engineering Division’s fee related activities is

approximately $495,000 annually. All subsequent fee calculations will incorporate the fully burdened hourly rate of

$191 for Public Works services.

The cost category columns shown in the table above were adapted and summarized from Division staff interviews.

To assist the reader in understanding the underlying costs and assumptions used to calculate the fully burdened

hourly rate, the following provides summary descriptions of each cost category:

Public Counter / General Information – Activities associated with responding to phone calls and supporting

both active permits and the development review process in general. Typically, some portion of costs for

provision of general public information and assistance do not apply toward recovery from fees. Engineering staff

estimated that approximately 60% of these costs support land use application review activities, while the

remaining costs should be not be considered in the calculation of fees for services. The remaining 40% of the

costs of providing public information services requires funding from sources other than fees.

Traffic Engineering, NPDES Regulation, and Capital Improvement Project (CIP) Support – Engineering staff

spend the majority of their time performing tasks related to the design, contracting, and implementation of City

infrastructure and standards. These costs do not apply toward recovery from Engineering’s fees for service.

Expenditure TypePublic Counter /

General Info

Traffic

Engineering

NPDES

RegulationCIP

Private Dev. /

Permitting Total

Labor 54,388$ 18,309$ 15,938$ 103,116$ 105,620$ 297,370$

Recurring Non-Labor 5,538 1,864 1,623 374,786 253,612 637,424

Department and Citywide Overhead 11,117 3,742 3,258 88,654 66,640 173,410

Al located Common Activi ties 3,948 1,329 1,157 31,485 23,667 61,587

Division Total 74,990$ 25,245$ 21,975$ 598,041$ 449,540$ 1,169,791$

El igible Cost Recovery from Fees for Service 60% 0% 0% 0% 100% 42%

Division Totals:

Amount Targeted for Recovery in Billings/Fees 44,994$ -$ -$ -$ 449,540$ 494,534$

Amount Requiring Another Funding Source 29,996$ 25,245$ 21,975$ 598,041$ -$ 675,257$

Cost per Direct Hour Recoverable from Fees for Service 17$ -$ -$ -$ 174$ 191$

Reference: Direct

Hours 2,583

26

Citywide User Fee Study – City of Half Moon Bay 16 Prepared by NBS

Private Development / Permitting – Development review and permitting comprises a significant portion of this Division’s work efforts. 100% of these costs apply toward recovery from Engineering fees for service.

Significant analytical and policy decisions revolve around inclusion of categorized activity costs in the fully burdened

hourly rate. The decision of whether to apply or exclude certain costs toward recovery in fees for service stems from

the basic fee setting parameters offered by the California State Constitution and Statutes, which requires that any

new fee levied or existing fee increased should not exceed the estimated amount required to provide the service for

which the charge is levied.

Fee Establishment

The Engineering Division overhauled their existing approach to charging fees. Notable changes include adjustments

to the fee structure for Public Improvement Plan Check and Inspection. City staff created additional tiers in the fee

structure to accommodate smaller projects, and eliminated tiers above $500,000 in construction value. NBS also

recommended that scaling between tiers be done on an incremental, rather than percentage basis. Fees for

Encroachment Permits were expanded to include separate fee categories for the type of encroachment requested,

rather than a single fee category to cover all encroachment requests per current practice. Staff also added separate

fee categories for Grading Permits, which were previously combined within the general encroachment permits

category, and deleted fees for Annual Encroachment Permits for Utility Companies and Developer Agreements.

Finally, this Study quantified Engineering’s average cost of reviewing planning entitlements. The amounts shown

could be added to the Planning Divison’s deposit amount as needed to better recover for Engineering’s efforts to set

conditions of approval or provide input during this phase of City review.

Cost Recovery Evaluation

Appendix A.3 presents the results of the detailed cost recovery analysis for the City’s Public Works fees. The “Total

Cost of Service per Activity” column establishes the maximum adoptable fee amount for the corresponding service

identified in the “Fee Name” list.

The City’s Public Works fees currently recover approximately 17% of the Department’s cost of providing services. As

shown in the following table, the City collects approximately $24,000 per year in revenues at current fee amounts.

At full cost recovery, the same demand for these services would generate approximately $144,000.

NBS provided the full cost of service information and the framework for considering fees, while those closest to the

fee-paying population, the City departments, considered appropriate cost recovery levels at or below that full cost.

The “Recommended Fee” column in Appendix A.3 displays the City staff’s initially recommended fee amounts. These

initial recommendations for adjusted fee amounts would increase fee revenue for this Department by approximately

$120,000. Fees at recommended amounts would recover approximately 100% of the total costs of providing fee

related services.

Department /

Division

Estimated

Annual Current

Fee Revenue

Estimated Annual

Full Cost

Recovery Fee

Revenue

Annual Cost

Recovery Surplus /

(Deficit)

Current Cost

Recovery %

Estimated

Annual

Recommended

Fee Revenue

Recommended

Cost Recovery %

Public Works

(Engineering) $ 23,800 $ 144,227 $ (120,427) 17% $ 144,227 100%

27

Citywide User Fee Study – City of Half Moon Bay 17 Prepared by NBS

Section 5 – Building Fees

The mission of the Building and Safety Program is to ensure public safety, health and welfare through the effective

administration and enforcement of local ordinances and California Building Codes.

Cost of Service Analysis

The following table categorizes the Building Division’s costs across both fee related and non-fee related services, as

well as the resulting fully-burdened hourly rate applicable toward establishing the full cost of providing fee related

services.

All subsequent cost of service calculations at the individual fee level assume a fully burdened hourly rate of $158,

with maximum allowable recovery of approximately $367,000 in costs from fees for service. Processing, reviewing,

and inspecting building permit applications comprises the majority of this Division’s work efforts. 100% of these

costs apply toward recovery from Building’s fees for service. The Building Division also provides code enforcement

services for the City. These costs are not targeted for recovery in building permit fees, and typically are funded by

the General Fund and/or fines and penalties.

Fee Establishment

Half Moon Bay’ fees for building plan review and inspection services are based on what is known in the industry as

the “valuation-based” fee setting approach. Establishing the current fee generally works as follows:

The City calculates an estimated project value from the builder, or builder representative applying for

permit.

Using the valuation amount, the City uses the existing adopted fee table to calculate to recover the costs

of plan review, inspection and permitting.

Expenditure Type Code Enforcement

Direct

Permitting

Services

Total

Labor -$ -$ -$

Recurring Non-Labor 76,971 224,142 301,113

Department and Citywide Overhead 16,551 48,198 64,749

Al located Common Activi ties 32,342 94,181 126,523

Division Total 125,865$ 366,521$ 492,386$

El igible Cost Recovery from Fees for Service 0% 100% 74%

Amount El igible for Cons ideration in Bi l l ings/Fees -$ 366,521$ 366,521$

Division Totals:

Amount Targeted for Recovery in Billings/Fees -$ 366,521$ 366,521$

Amount Requiring Another Funding Source 125,865$ -$ 125,865$

Cost per Direct Hour Recoverable from Fees for Service -$ 158$ 158$

Reference: Direct

Hours 2,322

Allocated or Direct Assignment of Cost to

Functional Activity

28

Citywide User Fee Study – City of Half Moon Bay 18 Prepared by NBS

It should be noted that NBS did not evaluate the basis for establishing “project value” for any given project. This

information is supplied and maintained by the City. NBS focused on calibrating the fee table to reflect the estimated

and reasonable cost of providing services as relates to the level of effort required for various “tiers” of project value

sizes.

In addition to valuation-based project fees, the City’s fee structure includes:

Scaled fees per 100 square feet for mechanical, plumbing, and electrical work that accompanies a building

permit

Flat fees for mechanical, plumbing, electrical work not associated with a larger building permit project

Flat fees for minor permits such as solar installation, demolition, re-inspection, etc.

Very few modifications to the City’s existing fee structure were made during the Study’s process. The primary focus of the Building Division’s analysis was to ensure calibration of fee amounts to appropriate cost recovery levels, as discussed in the Cost Recovery Evaluation section, below.

Cost Recovery Evaluation

Appendix A.4 presents the results of the detailed cost recovery analysis for the Building Division’s fees. The “Cost of

Service per Activity” column establishes the maximum adoptable fee amount for the corresponding service

identified in the “Fee Description” list.

The City’s Building fees currently recover approximately 102% of the Division’s cost of providing services. As shown

in the following table, the City collects approximately $374,000 per year in revenues at current fee amounts. At full

cost recovery, the same demand for these services would generate approximately $366,000.

NBS provided the full cost of service information and the framework for considering fees, while those closest to the

fee-paying population, the City departments, considered appropriate cost recovery levels at or below that full cost.

The “Recommended Fee Level” column in Appendix A.4 displays the City staff’s initially recommended fee amounts.

These initial recommendations for adjusted fee amounts would decrease the annual revenue slightly. Fees at

recommended amounts would recover approximately 100% of the total costs of providing fee related services.

Department /

Division

Estimated

Annual Current

Fee Revenue

Estimated Annual

Full Cost

Recovery Fee

Revenue

Annual Cost

Recovery Surplus /

(Deficit)

Current Cost

Recovery %

Estimated

Annual

Recommended

Fee Revenue

Recommended

Cost Recovery %

Building $ 373,616 $ 365,897 $ 7,719 102% $ 365,897 100%

29

Citywide User Fee Study – City of Half Moon Bay 19 Prepared by NBS

Section 6 – Police Fees

The San Mateo County Sheriff’s Office provides all-inclusive enforcement services under contract for the City of Half

Moon Bay. The scope of this user and regulatory fee analysis for Police focused solely on fees for various

administrative records and processing requests provided by this Department.

Cost of Service Analysis

The majority of services provided by the Police Department are not recoverable in user/regulatory fees for service.

To support the unique operational aspects of public safety, the NBS fee model derived fully burdened labor rates for

sworn and non-sworn personnel.

Section 1, Cost of Service Analysis, of this report describes the types of expenditures and allocated costs considered

in the development of these rates. All subsequent administrative fee calculations will incorporate the fully burdened

hourly rates of $218, and $83, respectively.

Fee Establishment

The list fees shown in Appendix A.5 to this report did not incur many significant changes, deletions, or additions from

the City’s prior fee schedule. Notable changes include deletion of Massage Establishment licensing fees for

technicians, which recently changed to process through the State, and combining of Public Dance permitting fees

into a single category, regardless of the presence of alcohol at the event.

Cost Recovery Evaluation

Appendix A.5 presents the results of the cost recovery analysis for Police. The “Cost of Service per Activity” column

establishes the maximum adoptable fee amount for the corresponding service identified in the “Fee Description”

list. Police Department fees currently recover approximately 71% of the cost of providing services. As shown below,

the City collects approximately $16,000 per year in revenues at current fee amounts. At full cost recovery, the same

demand for these services would generate approximately $23,000.

Expenditure Type Sworn PersonnelNon-Sworn

Personnel

Labor 2,395,031$ 220,988$

Recurring Non-Labor 254,614 25,648

Citywide Overhead 168,966 17,021

Dept. Admin 362,372 33,897

Department Total 3,180,983$ 297,554$

Fully Burdened Hourly Rate 218$ 83$

14,603 3,600 Reference: Direct Hours Only

30

Citywide User Fee Study – City of Half Moon Bay 20 Prepared by NBS

Many fees charged by police departments are set by various sections of the State’s governmental codes, and are not

able to recover the costs of providing services. NBS provided the full cost of service information and the framework

for considering fees, while those closest to the fee-paying population, the City departments, considered appropriate

cost recovery levels at or below that full cost. The “Recommended Fee” column in Appendix A.5 displays Staff’s

initially recommended fee amounts. These initial recommendations for adjusted fee amounts increase cost recovery

by less than $1,000. Fees would adjust to recover approximately 75% of the total costs of providing fee related

services.

Department /

Division

Estimated

Annual Current

Fee Revenue

Estimated Annual

Full Cost

Recovery Fee

Revenue

Annual Cost

Recovery Surplus /

(Deficit)

Current Cost

Recovery %

Estimated

Annual

Recommended

Fee Revenue

Recommended

Cost Recovery %

Police $ 16,467 $ 23,178 $ (6,711) 71% $ 17,430 75%

Total $ 536,998 $ 898,486 $ (361,488) 60% $ 884,912 98%

31

Citywide User Fee Study – City of Half Moon Bay 21 Prepared by NBS

Section 7 – Technology Fee

Routine maintenance and investment into the City of Half Moon Bay’s land management software and systems are

key in supporting efficient development approval and processing services. The basic premise behind

implementation of a Technology Surcharge is that a separate fund is created and self-sustaining in meeting the

maintenance and capital replacement needs of development permitting software.

Cost of Service Analysis

As shown in the table below, the City’s cost estimate for the permitting system’s replacement is approximately

$200,000 every seven years, with on-going software licensing and maintenance of $40,000 each year.

The average annual funding requirements for the system is approximately $69,000 per year.

Fee Establishment

The main users of the permitting system for development review include the Planning, Public Works, and Building

and Safety departments. The number of projects requiring use of the system, on average, per department is below:

A “project” for Planning or Engineering is defined as an individual fee item requiring data entry and tracking within

the system. This means that projects requiring multiple entitlements or items from the Engineering fee list would

pay the fee equivalent to the number of fee items considered to fall within a “project”. A “project” for Building

includes the following items from the fee list:

1. Building Permit Fee for Alterations, Additions, and New Construction (based on valuation of improvement)

2. Building Plan Check fees for revisions or fourth and subsequent submittals. The surcharge is excluded

from building plan submittals.

3. Miscellaneous Permits

4. Other Inspections and Charges

Cost Total Cost

Amortization

Period (Yrs) Annual Cost

Land Management Software

Module 57,000$ 7 8,143$

Implementation (including data

conversion, travel, etc.) 150,000 7 21,429

Annual Maintenance 40,000 1 40,000

Total $ 247,000 $ 69,571

Department/DivisionNumber of

Projects

Planning 295

Public Works Engineering 353

Building 874

Total 1,522

32

Citywide User Fee Study – City of Half Moon Bay 22 Prepared by NBS

5. Permit Issuance fees for Electrical, Plumbing and Mechanical permits. Individual itemized scopes of work

are excluded. The fee applies to issuance only.

The following table calculates a Technology Surcharge based on the ratio of annual funding needs for the permitting

system, and the number of projects requiring use of the system:

To recover 100% of the costs for maintaining and replacing the City’s land management software system, a $46 fee

added to each Planning, Engineering, and Building and Safety, project applies. Should the City recommend a cost

recovery level less than 100%, the table above also provides the Technology Fee amount at varied recovery levels.

Cost Recovery Evaluation

The City does not have a current Technology Fee in place. This is a new fee requested for addition to the City’s

Master Fee Schedule, and is a common charge seen in other cities around the State. Staff is initially recommending

the Technology Fee at 100% cost recovery, which would provide approximately $69,000 in funding for the land

management software and systems’ maintenance and replacement.

NBS recommends the City track these revenues in a separate fund and utilize the funds solely for the purposes

identified in this report.

Cost Recovery Target

Annual Cost

Recovery @

Target

Average Fee

Amount Per

Project

100% $ 69,571 $ 46

75% $ 52,179 $ 34

50% $ 34,786 $ 23

25% $ 17,393 $ 11

Department /

Division

Estimated

Annual Current

Fee Revenue

Estimated Annual

Full Cost

Recovery Fee

Revenue

Annual Cost

Recovery Surplus /

(Deficit)

Current Cost

Recovery %

Estimated

Annual

Recommended

Fee Revenue

Recommended

Cost Recovery %

Technology Fee $ - $ 69,571 $ (69,571) 0% $ 69,571 100%

33

Citywide User Fee Study – City of Half Moon Bay 23 Prepared by NBS

Section 8 – Conclusion

Based on the various phases of analysis included within this Study, the proposed Master Schedule of Fees formatted

for implementation is included in the City’s accompanying Staff Report.

As discussed throughout this report, the proposed fee schedule includes fee increases intended to improve the

City’s recovery of costs incurred to provide individual services, as well as to adjust fees downward where fees

charge exceed the average costs incurred.

Predicting the amount to which any adopted fee increases will affect City revenues is difficult to quantify. For the

near-term, the City should not count on increased revenues to meet any specific expenditure plan. Experience with

these fee increases should be gained first before revenue projections are revised. However, unless there is some

significant, long-term change in activity levels at the City, proposed fee amendments should – over time – enhance

the City’s revenue capabilities, providing it the ability to stretch other resources further for the benefit of the public

at large.

The City’s Master Fee Schedule should become a living document but handled with care:

A fundamental purpose of the fee schedule is to provide clarity and transparency to the public and to staff

regarding fees imposed by the City. Once adopted by the Council, the fee schedule is the final word on

the amount and manner in which fees should be imposed by the departments. Old fee schedules should

be superseded by the new master document. If the master document is found to be missing fees, those

fees need eventually to be added to the master schedule and should not continue to exist outside the

consolidated, master framework.

The City should consider adjusting these user fees and regulatory fees on an annual basis to keep pace at

least with cost inflation. For all fees and charges, the City could use either a Consumer Price Index

adjustment or a percentage of Labor Cost increase, and that practice would be well applied to the new fee

schedule. Conducting a comprehensive user fee Study is not an annual requirement; it becomes

worthwhile only over time as significant shifts in organization, local practices, legislative values, or legal

requirements change. In NBS’ experience, a comprehensive analysis such as this should be performed

every three to five years. It should be noted that when an automatic adjustment is applied annually, the

City is free to use its discretion in applying the adjustment; not all fees need to be adjusted, especially

when there are good policy reasons for an alternate course. The full cost of service is the City’s only limit

in setting its fees.

As a final note in this Study, it is worth acknowledging the path that fees in general have taken in California. The

public demands ever more precise and equitable accounting of the basis for governmental fees and a greater say

in when and how they are imposed. It is inevitable in the not too distant future that user fees and regulatory fees

will demand an even greater level of analysis and supporting data to meet the public’s evolving expectations.

Technology systems will play an increased and significant role in an agency’s ability to accomplish this. Continuous

improvement and refinement of time tracking abilities will greatly enhance the City’s ability to set fees for service

and identify unfunded activities in years to come.

34

Citywide User Fee Study – City of Half Moon Bay 24 Prepared by NBS

In preparing this report and the opinions and recommendations included herein, NBS has relied on a number of

principal assumptions and considerations with regard to financial matters, conditions and events that may occur in

the future. This information and assumptions, including the City’s budgets, time estimate data, and workload

information from City staff, were provided by sources we believe to be reliable; however, NBS has not

independently verified such information and assumptions.

While we believe NBS’ use of such information and assumptions is reasonable for the purpose of this report, some

assumptions will invariably not materialize as stated herein and may vary significantly due to unanticipated events

and circumstances. Therefore, the actual results can be expected to vary from those projected to the extent that

actual future conditions differ from those assumed by us or provided to us by others.

35

Prepared by NBS for the City of Half Moon Bay

APPENDIX A.1

Cost of Service Analysis – Administrative Departments

36

City of Half Moon Bay

Administration - User Fee Study FY 17

Cost Estimation for Providing Activities and Services APPENDIX A. 1

Cost Recovery Analysis Annual Estimated Revenue Analysis

1 Returned Check Fee

1 First Item[1]

Eachfees set by

Statute

fees set by

Statute n/a $ 25 n/a $ 25 n/a n/a $ - $ - $ -

2 Each Additional Item[1]

Eachfees set by

Statute

fees set by

Statute n/a $ 35 n/a $ 35 n/a n/a $ - $ - $ -

2 Duplication

1 Photocopies Per Page n/a n/a n/a $ 0.22 n/a $ 0.10 n/a n/a $ - $ - $ -

2 Municipal Code Book[2]

Per Book n/a n/a n/a $ 115 n/a available on-line n/a n/a $ - $ - $ -

3 Bound Reports Per Report n/a n/a n/a Actual Cost n/a Actual Cost n/a n/a $ - $ - $ -

4 Budget[2]

Each n/a n/a n/a $ 33 n/a available on-line n/a n/a $ - $ - $ -

5 Comprehensive Annual Financial Report (CAFR)[2]

Each n/a n/a n/a $ 33 n/a available on-line n/a n/a $ - $ - $ -

6 CD Disc of City Council / Planning Commission Per Tape/Disc n/a n/a n/a $ 16 n/a Actual Cost of

CD n/a n/a $ - $ - $ -

3 Agenda Indexes for Meetings [2] n/a n/a n/a $ - n/a $ - n/a n/a $ - $ - $ -

4 City Clerk

1 Election Filing Fee [4]

Eachfees set by

Statute

fees set by

Statute n/a $ 25 n/a $ 25 n/a n/a $ - $ - $ -

2 Candidate Printing Fee [3] Deposit n/a n/a n/a $ 250 n/a $ 250 n/a n/a $ - $ - $ -

5 Staff Research

1 City Manager's Office Per Quarter Hour 0.25 $ 221 $ 55 $ 30 55% $ 55 100% 0 $ - $ - $ -

2 Finance Department Per Quarter Hour 0.25 $ 189 $ 47 $ 24 50% $ 47 100% 0 $ - $ - $ -

10 City Clerk's Office Per Quarter Hour 0.25 $ 175 $ 44 $ 14 32% $ 44 100% 0 $ - $ - $ -

11 Planning Department Per Quarter Hour 0.25 $ 211 $ 53 $ 41 78% $ 53 100% 0 $ - $ - $ -

12 Building Department Per Quarter Hour 0.25 $ 158 $ 39 $ - 0% $ 39 100% 0 $ - $ - $ -

13 Public Works Department - Engineering Per Quarter Hour 0.25 $ 191 $ 48 $ - 0% $ 48 100% 0 $ - $ - $ -

14 Public Works Department - Maintenance Per Quarter Hour 0.25 $ 162 $ 40 $ - 0% $ 40 100% 0 $ - $ - $ -

14 Police - Sworn Per Quarter Hour 0.25 $ 218 $ 54 $ - 0% $ 54 100% 0 $ - $ - $ -

15 Police - Non Sworn Per Quarter Hour 0.25 $ 83 $ 21 $ - 0% $ 21 100% 0 $ - $ - $ -

6 Film Permit (Chapter 9.74) Per Day 2.25 $ 221 $ 498 $ 225 45% $ 498 100% 7 $ 1,575 $ 3,485 $ 3,485

7 Special Event Permits

1 Block Parties Per Event 1.75 $ 221 $ 387 $ 56 14% $ 194 50% 0 $ - $ - $ -

2 Fund Raisers Per Event 1.75 $ 221 $ 387 $ 56 14% $ 194 50% 0 $ - $ - $ -

3 Miscellaneous Events [8] Per Event 1.75 $ 221 $ 387 $ 56 14% $ 387 100% 0 $ - $ - $ -

4 Carnival/Circus/Parade/Race/Rodeo, etc. Each 1.75 $ 221 $ 387 $ 191 49% $ 387 100% 34 $ 6,494 $ 13,167 $ 13,167

5 Amusement Concession Each 1.75 $ 221 $ 387 $ 62 16% $ 387 100% 0 $ - $ - $ -

8 Poplar Beach Parking [9]

1 Vehicles less than 20 feet Per Hour / Per Day n/a n/a n/a $2 / $10 n/a $2 / $10 n/a n/a $ - $ - $ -

2 Horse trailers and vehicles longer than 20 feet Per Hour / Per Day n/a n/a n/a $3 / $15 n/a $3 / $15 n/a n/a $ - $ - $ -

3 Yearly Permit - Half Moon Bay Residents onlyPer Year (Prorated

Quarterly)0.50 $ 189 $ 94 $ 50 53% $ 94 100% 86 $ 4,300 $ 8,108 $ 8,108

Fee Activity

# Fee Description

Activity Service Cost Analysis

Estimated

Average Labor

Time Per Activity

(hours)

FBHRCost of Service

Per ActivityUnit

Annual Estimated

Revenues at Current

Fee

Annual Estimated

Revenues at Full

Cost Recovery Fee

Annual

Estimated

Revenues at

Recommended

Current Fee Existing Cost

Recovery %

City Rec'd. Fee

Level

Rec'd Cost

Recovery %

Estimated Volume of

Activity (Performed)

NBS - Local Government Solutions

Web: www.nbsgov.com Toll-Free:800.676.7516 Admin - COS,Page 1 of 2

37

City of Half Moon Bay

Administration - User Fee Study FY 17

Cost Estimation for Providing Activities and Services APPENDIX A. 1

Cost Recovery Analysis Annual Estimated Revenue AnalysisFee Activity

# Fee Description

Activity Service Cost Analysis

Estimated

Average Labor

Time Per Activity

(hours)

FBHRCost of Service

Per ActivityUnit

Annual Estimated

Revenues at Current

Fee

Annual Estimated

Revenues at Full

Cost Recovery Fee

Annual

Estimated

Revenues at

Recommended

Current Fee Existing Cost

Recovery %

City Rec'd. Fee

Level

Rec'd Cost

Recovery %

Estimated Volume of

Activity (Performed)

9 BID Administration for City Hotels per month 2.75 $ 189 $ 519 $ 168 32% $ 519 100% 12 $ 2,016 $ 6,223 $ 6,223

10 Street Closure Actual Cost

TOTAL ADMINISTRATION 139 14,385$ 30,983$ 30,983$

Notes

[1] Fees set by California Civil Code Ch. 522 Sec. 1719. Additional charges may apply if not paid within 30 days of the receipt of the letter. See CA Civil Code Ch. 552 Sec. 1719.

[2] Available on-line at http://www.hmbcity.com

[3] Total cost equal to 100% of printing, handling, translating, and mailing costs. Deposit rate set by County of San Mateo and is subject to change.

[4] Rate is established by the California Government code and is subject to change.

[6] Based on the maximum number of employees & owners working in 24 hr. period in the prior year.

[7] License fee for a new business commenced after the first day of April shall be 50% of the annual fee.

[8] Special Event fees may be waived by the City Manager for NPDES related volunteer events

[9] Poplar Beach Parking fees may be waived by the City Manager for NPDES related volunteer events

NBS - Local Government Solutions

Web: www.nbsgov.com Toll-Free:800.676.7516 Admin - COS,Page 2 of 2

38

Prepared by NBS for the City of Half Moon Bay

APPENDIX A.2

Cost of Service Analysis – Planning Division

39

City of Half Moon Bay

Planning Division - User Fee Study FY 17

Cost Estimation for Planning Application Services APPENDIX A. 2

1 Pre-Entitlement Processing

1 Pre-Application Review Flat Fee 7.00 $ 211 $ 1,477 new fee 0% $ 1,450 98% $ - $ - $ - 2 Measure 'D'

Single Allocation (per allocation) [1] Flat Fee 2.50 $ 211 $ 527 $ 731.00 139% $ 527 100% 21 $ 15,351 $ 11,076 $ 11,076

Phasing Agreement [2] Deposit 10.00 $ 211 $ 2,110 $ 2,600.00 123% $ 2,110 100% $ - $ - $ -

2 Coastal Development Permit Processing

1 Coastal Development Permit Exemption [2] Deposit 2.00 $ 211 $ 422 $ 141.00 33% $ 422 100% 65 $ 9,165 $ 27,425 $ 27,425 2 Single Family Residential

Single family up to 3,000 sq. ft. [2] Deposit 10.00 $ 211 $ 2,110 $ 1,300.00 62% $ 2,100 100% $ - $ - $ -

Single family > 3,000 sq. ft. [2] Deposit 13.00 $ 211 $ 2,743 $ 2,600.00 95% $ 2,700 98% $ - $ - $ - 3 Accessory Dwelling Unit

No New Floor Area [1] Flat Fee 5.00 $ 211 $ 1,055 $ 141.00 13% $ 525 50% $ - $ - $ -

New Floor Area [1] Flat Fee 9.75 $ 211 $ 2,057 $ 1,300.00 63% $ 1,000 49% $ - $ - $ - 4 Multiple Family Residential

Multi Family up to 4 units [2] Deposit 15.00 $ 211 $ 3,164 $ 2,600.00 82% $ 3,100 98% $ - $ - $ -

Multi Family > 4 units [2] Deposit 25.00 $ 211 $ 5,274 $ 5,200.00 99% $ 5,200 99% $ - $ - $ - 5 Commercial / Mixed Use

Commercial up to 10,000 sq. ft. [2] Deposit 15.00 $ 211 $ 3,164 $ 2,600.00 82% $ 3,100 98% $ - $ - $ -

Commercial > 10,000 sq. ft. [2] Deposit 25.00 $ 211 $ 5,274 $ 5,200.00 99% $ 5,200 99% $ - $ - $ - 6 Industrial / Institutional

Industrial up to 10,000 sq. ft. [2] Deposit 15.00 $ 211 $ 3,164 $ 5,200.00 164% $ 3,100 98% $ - $ - $ -

Industrial > 10,000 sq. ft. [2] Deposit 25.00 $ 211 $ 5,274 $ 6,500.00 123% $ 5,200 99% $ - $ - $ - 7 Other Development

Director [2] Deposit 11.00 $ 211 $ 2,321 $ 650.00 28% $ 2,300 99% 65 $ 42,250 $ 150,839 $ 149,500

Planning Commission [2] Deposit 14.00 $ 211 $ 2,953 $ 1,300.00 44% $ 2,950 100% $ - $ - $ - 8 Ammendments

Minor Ammendment [1] Flat Fee 2.00 $ 211 $ 422 new fee 0% $ 420 100% $ - $ - $ -

Major Ammendment Deposit 11.00 $ 211 $ 2,321 $ 2,600.00 112% $ 2,300 99% $ - $ - $ -

3 Environmental Clearance Processing

1 CEQA/NEPA Environmental Clearance

Negative Declaration [1] Deposit 20.00 $ 211 $ 4,219 $ 1,300.00 31% $ 4,200 100% $ - $ - $ -

EIR [2] Deposit 45.00 $ 211 $ 9,493 $ 1,300.00 14% $ 9,450 100% 9 $ 11,700 $ 85,440 $ 85,050 2 Notice of Exemption Flat Fee 1.00 $ 211 $ 211 $ 141.00 67% $ 210 100% $ - $ - $ -

4 Design Review Processing

Architectural Review, CDD or Planning Commission [2] Deposit 3.00 $ 211 $ 633 $ 842.00 133% $ 625 99% $ - $ - $ - Includes structures and/or site design

5 Entitlement Processing

1 Home Occupation [1] Flat Fee 0.50 $ 211 $ 105 $ 141.00 134% $ 105 100% $ - $ - $ - 2 Variance/ Exception Planning Commission Deposit 4.50 $ 211 $ 949 $ 650.00 68% $ 950 100% $ - $ - $ - 3 Exception/ Community Development Director Deposit 2.00 $ 211 $ 422 $ 650.00 154% $ 420 100% $ - $ - $ - 4 Zoning, LCP, and 6P Amendments

LCP/ 6P [2] Deposit 70.00 $ 211 $ 14,767 $ 6,500.00 44% $ 14,750 100% $ - $ - $ -

IP/ Rezoning [2] Deposit 70.00 $ 211 $ 14,767 $ 6,500.00 44% $ 14,750 100% $ - $ - $ -

Planned Unit Development Specific Plan [2] Deposit 70.00 $ 211 $ 14,767 $ 6,500.00 44% $ 14,750 100% $ - $ - $ -

Planned Unit Development Specific Plan Amendment [2]

Deposit 35.00 $ 211 $ 7,384 $ 5,200.00 70% $ 7,350 100% $ - $ - $ -

Planned Unit Development Precise Plan [2] Deposit 35.00 $ 211 $ 7,384 $ 6,500.00 88% $ 7,350 100% $ - $ - $ -

Planned Unit Development Precise Plan Amendment[2]

Deposit 18.00 $ 211 $ 3,797 $ 5,200.00 137% $ 3,800 100% $ - $ - $ -

Annexation/ Prezoning [2] Deposit 70.00 $ 211 $ 14,767 $ 6,500.00 44% $ 14,750 100% $ - $ - $ - 6 Appeals

Filing Fee - Outside CCC Appeals Jurisdiction[1]

Flat Fee 2.00 $ 211 $ 422 1/2 deposit n/a $ 210 50% $ - $ - $ -

Filing Fee - Within CCC Apeals Jurisdiction [1] No Fee 2.00 $ 211 $ 422 1/2 deposit n/a $ - 0% $ - $ - $ -

Processing Fee - paid by developer [2] Deposit 15.00 $ 211 $ 3,164 New Deposit n/a $ 3,150 100% $ - $ - $ -

Cost of Service Per

Activity

Unit

Fee Activity

# Fee Description

Estimated

Average Labor

Time Per Activity

(hours)

FBHR

Activity Service Cost Analysis Cost Recovery Analysis Annual Estimated Revenue Analysis

Annual Estimated

Revenues at Full Cost

Recovery Fee

Annual Estimated

Revenues at

Recommended Fee

Current Fee

Existing Cost

Recovery

Percentage

Recommended Fee

/ Deposit Level

Recommended Cost

Recovery Percentage

Estimated

Volume of

Activity

Annual Estimated

Revenues at Current

Fee

NBS - Local Government Solutions

Web: www.nbsgov.com Toll-Free:800.676.7516 Plng - COS,Page 1 of 2

40

City of Half Moon Bay

Planning Division - User Fee Study FY 17

Cost Estimation for Planning Application Services APPENDIX A. 2

Cost of Service Per

Activity

Unit

Fee Activity

# Fee Description

Estimated

Average Labor

Time Per Activity

(hours)

FBHR

Activity Service Cost Analysis Cost Recovery Analysis Annual Estimated Revenue Analysis

Annual Estimated

Revenues at Full Cost

Recovery Fee

Annual Estimated

Revenues at

Recommended Fee

Current Fee

Existing Cost

Recovery

Percentage

Recommended Fee

/ Deposit Level

Recommended Cost

Recovery Percentage

Estimated

Volume of

Activity

Annual Estimated

Revenues at Current

Fee

7 Land Division and Merger

Certificate of Compliance [2] Deposit 9.00 $ 211 $ 1,899 $ 1,300.00 68% $ 1,900 100% 1 $ 1,300 $ 1,899 $ 1,900

Lot Merger [1] Flat Fee 4.00 $ 211 $ 844 $ 496.00 59% $ 840 100% 4 $ 1,984 $ 3,375 $ 3,360

Lot Line Adjustment [2] Deposit 9.00 $ 211 $ 1,899 $ 1,300.00 68% $ 1,900 100% $ - $ - $ -

Parcel Map (four or fewer lots) [2] Deposit 18.00 $ 211 $ 3,797 $ 3,900.00 103% $ 3,800 100% $ - $ - $ -

Tentative Subdivision Map [2] Deposit 50.00 $ 211 $ 10,548 $ 6,500.00 62% $ 10,500 100% $ - $ - $ -

Subdivision Agreement [2] Deposit 20.00 $ 211 $ 4,219 $ 7,800.00 185% $ 4,200 100% $ - $ - $ -

TimeExtension Deposit 9.00 $ 211 $ 1,899 $ 7,800.00 411% $ 1,900 100% $ - $ - $ -

9 Sign Permit/ CD Director

Review [1] Flat Fee 1.50 $ 211 $ 316 $ 141.00 45% $ 160 51% 12 $ 1,692 $ 3,797 $ 1,920

Planning Commission Review [2] Deposit 9.00 $ 211 $ 1,899 $ 660.00 35% $ 950 50% $ - $ - $ -

Exceptions Planning Commission Review [2] Deposit 4.50 $ 211 $ 949 $ 468.00 49% $ 950 100% $ - $ - $ - 10 Other Services

Zoning Compliance Letter [1] Flat Fee 2.00 $ 211 $ 422 $ 141.00 33% $ 210 50% 7 $ 987 $ 2,953 $ 1,470

Public Convenience & Necessity Letter [1] Flat Fee 1.00 $ 211 $ 211 $ 141.00 67% $ 210 100% $ - $ - $ -

Water Transfer Letter [1] Flat Fee 1.00 $ 211 $ 211 $ 141.00 67% $ 210 100% $ - $ - $ - 12 Tree Removal Review

CD Director Review [1] Deposit 2.50 $ 211 $ 527 $ 141.00 27% $ 265 50% 10 $ 1,410 $ 5,274 $ 2,650

Planning Commisison [2] Deposit 4.50 $ 211 $ 949 $ 483.00 51% $ 475 50% $ - $ - $ - 13 Mobile Food Vendor Permit Flat Fee 1.00 $ 211 $ 211 $ 71.00 34% $ 210 100% $ - $ - $ - 14 Sound Amplification Permit [1] Flat Fee 1.00 $ 211 $ 211 $ 141.00 67% $ 210 100% 1 $ 141 $ 211 $ 210 15 Fees Required by other Agencies

1 California Department of Fish and Wildlife

[3]

Fee required to

review various

environmental

documents

Per Agency Fee

Schedule

2 SMC Local Agency Formation Commission (LAFCo)

[3]

Annexation fees

vary by acreage

Per Agency Fee

Schedule

3 San Mateo County Recorder

[3]

Fee required to

record and/or post

various documents

Per Agency Fee

Schedule

Planning Hourly Rate [1] Flat Fee 1.00 $ 211 $ 211 $ 141.00 67% $ 210 100% 100 $ 14,100 $ 21,096 $ 21,000

TOTAL PLANNING DIVISION 295 100,080$ 313,387$ 305,561$

Notes

[1] Flat fees are adjusted annually by the CPI All Urban Consumers/San Francisco-Oakland-San Jose established in December.

[2] Total cost equal to 100% of staff and/or consultant time and materials.

[3] Fees charged by these agencies are available on their websites and are in addition to fees charged by the City.

NBS - Local Government Solutions

Web: www.nbsgov.com Toll-Free:800.676.7516 Plng - COS,Page 2 of 2

41

Prepared by NBS for the City of Half Moon Bay

APPENDIX A.3

Cost of Service Analysis – Public Works (Engineering)

42

City of Half Moon Bay

Public Works Department - User Fee Study FY 17

Cost Estimation for Permitting and Regulatory Services APPENDIX A.3

1 Improvement Plan Check [1]

Plan check fees are based on Estimated

Construction Cost (ECC) of on-site grading,

paving, drainage improvements, and storm water

pollution prevention measures

$ 10,000.00 Base Fee @

$10,0004.00 $ 191 $ 766 $ 300 39% $ 766 100% 2 $ 600 $ 1,532 $ 1,532

each additional $1,000 or fraction thereof each add'l

$1,0000.20 $ 191 $ 38 $ 30 78% $ 38.29 100% 0 $ - $ - $ -

$ 100,000.00 Base Fee @

$100,00022.00 $ 191 $ 4,212 $ 3,000 71% $ 4,212 100% 0 $ - $ - $ -

each additional $1,000 or fraction thereofeach add'l

$1,0000.17 $ 191 $ 32 $ 30 94% $ 32.07 100% 0 $ - $ - $ -

$ 500,000.00 Base Fee @

$500,00089.00 $ 191 $ 17,041 $ 15,000 88% $ 17,041 100% 0 $ - $ - $ -

each additional $1,000 or fraction thereofeach add'l

$1,0000.18 $ 191 $ 34 $ 30 88% $ 34.08 100% 0 $ - $ - $ -

2 Construction Inspection [1]

Construction Inspection fees are based on

Estimated Construction Cost (ECC) of on-site

grading, paving, drainage improvements, and

storm water pollution prevention measures

$ 10,000.00 Base Fee @

$10,0004.00 $ 191 $ 766 $ 500 65% $ 766 100% 0 $ - $ - $ -

each additional $1,000 or fraction thereof each add'l

$1,0000.33 $ 191 $ 64 $ 50 78% $ 63.82 100% 0 $ - $ - $ -

$ 100,000.00 Base Fee @

$100,00034.00 $ 191 $ 6,510 $ 5,000 77% $ 6,510 100% 0 $ - $ - $ -

each additional $1,000 or fraction thereof each add'l

$1,0000.27 $ 191 $ 51 $ 30 59% $ 51.22 100% 0 $ - $ - $ -

$ 500,000.00 Base Fee @

$500,000141.00 $ 191 $ 26,998 $ 15,000 56% $ 26,998 100% 0 $ - $ - $ -

each additional $1,000 or fraction thereof each add'l

$1,0000.28 $ 191 $ 54 $ 30 56% $ 54.00 100% 0 $ - $ - $ -

3 Final Maps

Parcel MapBase Fee @ 4 lots

or less32.00 $ 191 $ 6,127 $ 4,800 78% $ 6,127 100% 0 $ - $ - $ -

additional loteach add'l lot over

48.00 $ 191 $ 1,532 $ 150 10% $ 1,532 100% 0 $ - $ - $ -

Tract Map Base Fee @ 5 lots 40.00 $ 191 $ 7,659 $ 6,000 78% $ 7,659 100% 0 $ - $ - $ -

additional loteach add'l lot over

58.00 $ 191 $ 1,532 $ 150 10% $ 1,532 100% 0 $ - $ - $ -

4 Subdivision Improvement Agreement Fee 16.00 $ 191 $ 3,064 $ 3,200 104% $ 3,064 100% 0 $ - $ - $ -

Recommended Cost

Recovery Percentage

Estimated

Volume of

Activity

Annual Estimated

Revenues at

Current Fee

Annual Estimated

Revenues at Full

Cost Recovery Fee

Fee Activity Activity Service Cost Analysis Cost Recovery Analysis Annual Estimated Revenue Analysis

Unit# Fee Description

Annual Estimated

Revenues at

Recommended Fee

Estimated

Average Labor

Time Per

Activity

(hours)

FBHRCost of Service

Per ActivityCurrent Fee

Existing Cost

Recovery Percentage

Recommended

Fee / Deposit Level

NBS - Local Government Solutions

Web: www.nbsgov.com Toll-Free:800.676.7516 PW COS,Page 1 of 4

43

City of Half Moon Bay

Public Works Department - User Fee Study FY 17

Cost Estimation for Permitting and Regulatory Services APPENDIX A.3

Recommended Cost

Recovery Percentage

Estimated

Volume of

Activity

Annual Estimated

Revenues at

Current Fee

Annual Estimated

Revenues at Full

Cost Recovery Fee

Fee Activity Activity Service Cost Analysis Cost Recovery Analysis Annual Estimated Revenue Analysis

Unit# Fee Description

Annual Estimated

Revenues at

Recommended Fee

Estimated

Average Labor

Time Per

Activity

(hours)

FBHRCost of Service

Per ActivityCurrent Fee

Existing Cost

Recovery Percentage

Recommended

Fee / Deposit Level

6 Encroachment Permits Plan Review & Inspection

Spot repairs (I,e., water leaks, pothole patches) Base Fee 2.00 $ 191 $ 383 $ 300 78% $ 383 100% 53 $ 15,900 $ 20,296 $ 20,296

Excavations/Restorations less than 100 LF Base Fee 4.00 $ 191 $ 766 $ 600 78% $ 766 100% 0 $ - $ - $ -

Excavations/Restorations 100 LF or greater Base Fee 4.00 $ 191 $ 766 $ 600 78% $ 766 100% 0 $ - $ - $ -

each additional 100 LF each add'l 100 LF 2.00 $ 191 $ 383 $ 300 78% $ 383 100% 0 $ - $ - $ -

Curb, gutter, sidewalk, or driveway less than 100

LFBase Fee 4.00 $ 191 $ 766 $ 600 78% $ 766 100% 0 $ - $ - $ -

Curb, gutter, sidewalk, or driveway 100 LF or

greaterBase Fee 4.00 $ 191 $ 766 $ 600 78% $ 766 100% 0 $ - $ - $ -

each additional 100 LF each add'l 100 LF 2.00 $ 191 $ 383 $ 300 78% $ 383 100% 0 $ - $ - $ -

Sewer connections, repair or extension 100 LF or

less Base Fee 4.00 $ 191 $ 766 $ 600 78% $ 766 100% 0 $ - $ - $ -

Sewer connections, repair or extension 100 LF or

greaterBase Fee 4.00 $ 191 $ 766 $ 600 78% $ 766 100% 0 $ - $ - $ -

each additional 100 LF each add'l 100 LF 2.00 $ 191 $ 383 $ 300 78% $ 383 100% 0 $ - $ - $ -

Storm Drain connection, repair or extension < 100

LFBase Fee 4.00 $ 191 $ 766 $ 600 78% $ 766 100% 0 $ - $ - $ -

each additional 100 LF each add'l 100 LF 2.00 $ 191 $ 383 $ 300 78% $ 383 100% 0 $ - $ - $ -

Storm Drain connection, repair or extension > 100

LFBase Fee 4.00 $ 191 $ 766 $ 600 78% $ 766 100% 0 $ - $ - $ -

each additional 100 LF each add'l 100 LF 2.00 $ 191 $ 383 $ 300 78% $ 383 100% 0 $ - $ - $ -

Unpermitted encroachments [2] Penalty 1.5*fee

Monitoring Wells Flat Fee 2.00 $ 191 $ 383 $ 300 78% $ 383 100% 0 $ - $ - $ -

Permit Time Extension Flat Fee 0.50 $ 191 $ 96 $ - 0% $ 96 100% 0 $ - $ - $ -

7 Public Right-of-Way/Easement Encroachment (Temporary) Flat Fee 1.00 $ 191 $ 191 $ 150 78% $ 191 100% 30 $ 4,500 $ 5,744 $ 5,744

(traffic plan review and inspection for debris box, awnings, overhead transformers, etc.)

8 Deferred Improvement Agreement Flat Fee 2.00 $ 191 $ 383 $ 300 78% $ 383 100% 0 $ - $ - $ -

9 Grading Permits Plan Review and Inspection

Grade changes 50 – 1,000 CY Base Fee 4.00 $ 191 $ 766 $ 600 78% $ 766 100% 3 $ 1,800 $ 2,298 $ 2,298

Grade change > 1,000 CY Base Fee 4.00 $ 191 $ 766 $ 600 78% $ 766 100% 0 $ - $ - $ -

additional 100 CY over 1000 each add'l 100 CY 1.00 $ 191 $ 191 $ 150 78% $ 191 100% 0 $ - $ - $ -

10 Sewer Connections [4]

1 Transfer of Uninstalled Capacity Fee Flat Fee 2.00 $ 191 $ 383 $ 500 131% $ 383 100% 2 $ 1,000 $ 766 $ 766

Support to Planning

1 Pre-Entitlement Processing

Pre-Application Review Hourly 1.00 $ 191 $ 191 $ 150 78% $ 191 100% 0 $ - $ - $ -

Measure D

Single Allocation (per allocation) Flat Fee n/a

Phasing Agreement Deposit n/a

NBS - Local Government Solutions

Web: www.nbsgov.com Toll-Free:800.676.7516 PW COS,Page 2 of 4

44

City of Half Moon Bay

Public Works Department - User Fee Study FY 17

Cost Estimation for Permitting and Regulatory Services APPENDIX A.3

Recommended Cost

Recovery Percentage

Estimated

Volume of

Activity

Annual Estimated

Revenues at

Current Fee

Annual Estimated

Revenues at Full

Cost Recovery Fee

Fee Activity Activity Service Cost Analysis Cost Recovery Analysis Annual Estimated Revenue Analysis

Unit# Fee Description

Annual Estimated

Revenues at

Recommended Fee

Estimated

Average Labor

Time Per

Activity

(hours)

FBHRCost of Service

Per ActivityCurrent Fee

Existing Cost

Recovery Percentage

Recommended

Fee / Deposit Level

2 Coastal Development Permit Processing

Coastal Development Permit Exemption Deposit 2.00 $ 191 $ 383 $ - 0% $ 383 100% 65 $ - $ 24,892 $ 24,892

Single Family Residential Deposit 4.00 $ 191 $ 766 $ - 0% $ 766 100% 0 $ - $ - $ -

Second Dwelling Unit

No New Floor Area Flat Fee 4.00 $ 191 $ 766 $ - 0% $ 766 100% 0 $ - $ - $ -

New Floor Area Deposit 8.00 $ 191 $ 1,532 $ - 0% $ 1,532 100% 0 $ - $ - $ -

Multiple Family Residential Deposit 8.00 $ 191 $ 1,532 $ - 0% $ 1,532 100% 0 $ - $ - $ -

Commercial / Mixed Use Deposit 8.00 $ 191 $ 1,532 $ - 0% $ 1,532 100% 0 $ - $ - $ -

Industrial / Institutional Deposit 8.00 $ 191 $ 1,532 $ - 0% $ 1,532 100% 0 $ - $ - $ -

Other Development

Director Deposit 4.00 $ 191 $ 766 $ - 0% $ 766 100% 65 $ - $ 49,783 $ 49,783

Planning Commission Deposit 8.00 $ 191 $ 1,532 $ - 0% $ 1,532 100% 0 $ - $ - $ -

Ammendments

Minor Ammendment Flat Fee 4.00 $ 191 $ 766 $ - 0% $ 766 100% 0 $ - $ - $ -

Major Ammendment Deposit 8.00 $ 191 $ 1,532 $ - 0% $ 1,532 100% 0 $ - $ - $ -

3 Environmental Clearance Processing

CEQA/NEPA Environmental Clearance

Negative Declaration Deposit 4.00 $ 191 $ 766 $ - 0% $ 766 100% 0 $ - $ - $ -

EIR Deposit 8.00 $ 191 $ 1,532 $ - 0% $ 1,532 100% 9 $ - $ 13,786 $ 13,786

Notice of Exemption Flat Fee n/a 0

4 Design Review Processing

Architectural Review, Community Dev. Director Flat Fee n/a 0

NBS - Local Government Solutions

Web: www.nbsgov.com Toll-Free:800.676.7516 PW COS,Page 3 of 4

45

City of Half Moon Bay

Public Works Department - User Fee Study FY 17

Cost Estimation for Permitting and Regulatory Services APPENDIX A.3

Recommended Cost

Recovery Percentage

Estimated

Volume of

Activity

Annual Estimated

Revenues at

Current Fee

Annual Estimated

Revenues at Full

Cost Recovery Fee

Fee Activity Activity Service Cost Analysis Cost Recovery Analysis Annual Estimated Revenue Analysis

Unit# Fee Description

Annual Estimated

Revenues at

Recommended Fee

Estimated

Average Labor

Time Per

Activity

(hours)

FBHRCost of Service

Per ActivityCurrent Fee

Existing Cost

Recovery Percentage

Recommended

Fee / Deposit Level

5 Entitlement Processing

Home Occupation Flat Fee 1.00 $ 191 $ 191 $ - 0% $ 191 100% 0 $ - $ - $ -

Variance/ Exception Planning Commission Deposit 4.00 $ 191 $ 766 $ - 0% $ 766 100% 0 $ - $ - $ -

Exception/ Community Development Director Deposit 4.00 $ 191 $ 766 $ - 0% $ 766 100% 0 $ - $ - $ -

Zoning, LCP, and 6P Amendments

LCP/ 6P Deposit 4.00 $ 191 $ 766 0% $ 766 100% 0 $ - $ - $ -

IP/ Rezoning Deposit 4.00 $ 191 $ 766 0% $ 766 100% 0 $ - $ - $ -

Planned Unit Development Specific Plan Deposit 4.00 $ 191 $ 766 0% $ 766 100% 0 $ - $ - $ -

Planned Unit Development Specific Plan Amendment Deposit 4.00 $ 191 $ 766 0% $ 766 100% 0 $ - $ - $ -

Planned Unit Development Precise Plan Deposit 4.00 $ 191 $ 766 0% $ 766 100% 0 $ - $ - $ -

Planned Unit Development Precise Plan Amendment Deposit 4.00 $ 191 $ 766 0% $ 766 100% 0 $ - $ - $ -

Annexation/ Prezoning Deposit 4.00 $ 191 $ 766 0% $ 766 100% 0 $ - $ - $ -

Appeals

Outside CCC Appeals Jurisdiction Flat Fee n/a

Within CCC Apeals Jurisdiction No Fee n/a

Land Division and Merger

Certificate of Compliance Deposit 4.00 $ 191 $ 766 0% $ 766 100% 1 $ - $ 766 $ 766

Lot Merger Flat Fee 2.00 $ 191 $ 383 0% $ 383 100% 4 $ - $ 1,532 $ 1,532

Lot Line Adjustment Deposit 4.00 $ 191 $ 766 0% $ 766 100% 0 $ - $ - $ -

Parcel Map (four or fewer lots) Deposit 8.00 $ 191 $ 1,532 0% $ 1,532 100% 0 $ - $ - $ -

Tentative Subdivision Map Deposit 16.00 $ 191 $ 3,064 0% $ 3,064 100% 0 $ - $ - $ -

Subdivision Agreement Deposit n/a

TimeExtension Deposit 4.00 $ 191 $ 766 0% $ 766 100% 0 $ - $ - $ -

Sign Permit/ CD Director

Review Flat Fee n/a

Planning Commission Review Deposit n/a

Exceptions Planning Commission Review Deposit n/a

Other Services

Zoning Compliance Letter Flat Fee n/a

Public Convenience & Necessity Letter Flat Fee n/a

Water Transfer Letter Flat Fee n/a

Tree Removal Review Flat Fee 1.00 $ 191 $ 191 0% $ 191 100% 10 $ - $ 1,915 $ 1,915

CD Director Review Deposit n/a

Planning Commisison Deposit n/a

Mobile Food Vendor Permit Flat Fee n/a

Sound Amplification Permit Flat Fee n/a

Building Plan Review / Support

1 Minor Residential Improvement Flat Fee 1.00 $ 191 $ 191 $ - 0% $ 191 100% 109 $ - $ 20,918 $ 20,918

2 TI or Addition of s.f. Flat Fee 2.00 $ 191 $ 383 $ - 0% $ 383 100% 0 $ - $ - $ -

3 New SFD Flat Fee 2.00 $ 191 $ 383 $ - 0% $ 383 100% 0 $ - $ - $ -

4 New Multifamily or Commercial Flat Fee 5.00 $ 191 $ 957 $ - 0% $ 957 100% 0 $ - $ - $ -

TOTAL PW DEPARTMENT 353 23,800$ 144,227$ 144,227$

Notes

[1] Fees for external agency review or special studies may apply

in additon to City fees

[2] Fine/penalty set per City policy. NBS did not evaluate

[3] Fees are adjusted annually by the CPI All Urban

Consumers/San Francisco-Oakland-San Jose established in

December.

[4] Additional fee for City Attorney time applies

[5] Fees from external agencies may apply separately

NBS - Local Government Solutions

Web: www.nbsgov.com Toll-Free:800.676.7516 PW COS,Page 4 of 4

46

Prepared by NBS for the City of Half Moon Bay

APPENDIX A.4

Cost of Service Analysis – Building and Safety

47

City of Half Moon Bay

Building - User Fee Study FY 17

Cost Estimation for Permitting and Regulatory Services APPENDIX A.4

Cost Recovery Analysis Annual Estimated Revenue Analysis

1 [6]

Valuation ($)

0 - 500 Valuation 0.30 1.00 1.30 x $ 158 = $ 205.17 $ 51 25% $ 205 100%

501 - 2,000 Valuation

First 500 0.30 1.00 1.30 x $ 158 = $ 205.17 $ 51 25% $ 205 100%

Each Additional 100 or fraction thereof 0.02 0.05 0.07 x $ 158 = $ 11.05 $ 3.60 33% $ 11.05 100%

2,001 - 25,000 Valuation

First 2,000 0.60 1.80 2.40 x $ 158 = $ 378.78 $ 105 28% $ 379 100%

Each Additional 1,000 or fraction thereof 0.01 0.00 0.01 x $ 158 = $ 1.58 $ 15.40 976% $ 1.58 100%

25,001 - 50,000 Valuation

First 25,000 0.90 1.80 2.70 x $ 158 = $ 426.12 $ 459 108% $ 426 100%

Each Additional 1,000 or fraction thereof 0.01 0.02 0.03 x $ 158 = $ 4.73 $ 14.40 304% $ 4.73 100%

50,001 - 100,000 Valuation

First 50,000 1.20 2.40 3.60 x $ 158 = $ 568.17 $ 819 144% $ 568 100%

Each Additional 1,000 or fraction thereof 0.01 0.01 0.02 x $ 158 = $ 3.16 $ 8.20 260% $ 3.16 100%

100,000 - 500,000 Valuation

First 100,000 1.80 2.70 4.50 x $ 158 = $ 710.21 $ 1,229 173% $ 710 100%

Each Additional 1,000 or fraction thereof 0.01 0.01 0.02 x $ 158 = $ 3.16 $ 7.20 228% $ 3.16 100%

500,001 - 1,000,000 Valuation

First 500,000 4.80 7.20 12.00 x $ 158 = $ 1,893.89 $ 4,109 217% $ 1,894 100%

Each Additional 1,000 or fraction thereof 0.01 0.02 0.03 x $ 158 = $ 4.73 $ 6.20 131% $ 4.73 100%

1,000,001 and above Valuation

First 1,000,000 9.60 19.20 28.80 x $ 158 = $ 4,545.33 $ 7,209 159% $ 4,545 100%

Each Additional 1,000 or fraction thereof 0.01 0.02 0.03 x $ 158 = $ 4.73 $ 5.10 108% $ 4.73 100%

2 Building Plan Check Fee [1]

[6]

65% of Building

Permit Fee

65% of Building

Permit Fee

Plan Revision Per Hour 1.00 0.00 1.00 x $ 158 = $ 157.82 $ 128 81% $ 158 100%

Fee for 4th review onwards-charged on hourly basis Per Hour 1.00 0.00 1.00 x $ 158 = $ 157.82 $ 128 81% $ 158 100%

Electronic submittal fee [2] n/a n/a -

$2/drawing sheet

and $5.10 flat fee for

supporting

documents

$2/drawing sheet

and $5.10 flat fee for

supporting

documents

Building Permit Fee for Alterations, Additions, and New

Construction (based on valuation of improvement)

Estimated

Inspection Time

Per Activity

(hours)

Cost of Service

Per Activity Current Fee

Existing Cost

Recovery Percentage

Recommended Fee

Level

Recommended Cost

Recovery Percentage

Total Estimated

Average Labor Time

Per Activity

Fully Burdened

Hourly Rate

Fee Activity

UnitFee No.

Estimated

Processing Time

Per Activity

(hours)

Activity Service Cost Analysis

Fee Description

NBS - Local Government Solutions

Web: www.nbsgov.com Toll-Free:800.676.7516 Bldg - COS,Page 1 of 18

48

City of Half Moon Bay

Building - User Fee Study FY 17

Cost Estimation for Permitting and Regulatory Services APPENDIX A.4

Cost Recovery Analysis Annual Estimated Revenue Analysis

Estimated

Inspection Time

Per Activity

(hours)

Cost of Service

Per Activity Current Fee

Existing Cost

Recovery Percentage

Recommended Fee

Level

Recommended Cost

Recovery Percentage

Total Estimated

Average Labor Time

Per Activity

Fully Burdened

Hourly Rate

Fee Activity

UnitFee No.

Estimated

Processing Time

Per Activity

(hours)

Activity Service Cost Analysis

Fee Description

3 Miscellaneous Permit [6]

1 Demolition Up To 2 Hours 0.50 1.00 1.50 x $ 158 = $ 236.74 $ 236 100% $ 237 100%

2 Solar per permit 1.00 1.00 2.00 x $ 158 = $ 315.65 See Footnote 1 0% $ 158 50%

Residential

0-15kW 1.00 1.00 2.00 x $ 158 = $ 315.65 $ 500 158% $ 158 50%

Above 15kW

First 15kW 1.00 1.00 2.00 x $ 158 = $ 315.65 $ 500 158% $ 158 50%

Each Additional kW or fraction there of 0.50 0.50 1.00 x $ 158 = $ 157.82 $ 15 10% $ 79 50%

Commercial

0-50 kW 0.50 1.00 1.50 x $ 158 = $ 236.74 $ 1,000 422% $ 237 100%

51-250 kW

First 50kW 0.50 1.00 1.50 x $ 158 = $ 236.74 $ 1,000 422% $ 237 100%

Each Additional kW or fraction there of 0.25 0.25 0.50 x $ 158 = $ 78.91 $ 7 9% $ 79 100%

Above 250kW

First 50kW 0.50 1.00 1.50 x $ 158 = $ 236.74 $ 1,000 422% $ 237 100%

Each Additional kW or fraction there of 0.25 0.25 0.50 x $ 158 = $ 78.91 $ 5 6% $ 79 100%

3 Permit Fees for Work Without A Valid Permit [6] fine / penalty 2 Times Permit Fee

4 Business License Inspection Per 1/2 Hour 0.00 0.50 0.50 x $ 158 = $ 78.91 $ 59 75% $ 79 100%

4 Other Inspections and Fees [6]

Pre-Site Inspection Per Hour 0.00 1.00 1.00 x $ 158 = $ 157.82 $ 118 75% $ 158 100%

Re-Inspections Per Hour 0.00 1.00 1.00 x $ 158 = $ 157.82 $ 118 75% $ 158 100%

Inspections outside of normal business hours[8,

9]Per Hour

Inspection on Sundays and Holidays[8,

9]Per Hour

Reinspection fees [8] Per Hour 0.00 1.00 1.00 x $ 158 = $ 157.82 $ 118 75% $ 158 100%

Inspection for which no fee is specifically indicated [8] Per Hour 0.00 1.00 1.00 x $ 158 = $ 157.82 $ 118 75% $ 158 100%

Inspections outside of normal business hours Per Hour 0.00 1.00 1.00 x $ 158 = $ 157.82 $ 177 112% $ 158 100%

General Plan Fee[2]

[3]0.25% 0.25%

Technology Fee [7] 4% 4%

5 Refund for Withdrawl of Application per request 0.50 0.00 0.50 x $ 158 = $ 78.91 See Refund Policy 0% $ 79 100%

6 Special Structural Inspection Feeper inspection -

hourly0.00 1.00 1.00 x $ 158 = $ 157.82 Actual Cost 0% $ 158 100%

NBS - Local Government Solutions

Web: www.nbsgov.com Toll-Free:800.676.7516 Bldg - COS,Page 2 of 18

49

City of Half Moon Bay

Building - User Fee Study FY 17

Cost Estimation for Permitting and Regulatory Services APPENDIX A.4

Cost Recovery Analysis Annual Estimated Revenue Analysis

Estimated

Inspection Time

Per Activity

(hours)

Cost of Service

Per Activity Current Fee

Existing Cost

Recovery Percentage

Recommended Fee

Level

Recommended Cost

Recovery Percentage

Total Estimated

Average Labor Time

Per Activity

Fully Burdened

Hourly Rate

Fee Activity

UnitFee No.

Estimated

Processing Time

Per Activity

(hours)

Activity Service Cost Analysis

Fee Description

7 Electrical Permit [6]

Permit Issuance

For issuing each permit Each 0.08 0.16 0.24 x $ 158 = $ 38.08 $ 34 89% $ 38 100%

For issuing each supplemental permit for which the

original permit has not expired, been canceled or

finaled

Each 0.08 0.16 0.24 x $ 158 = $ 38.08 $ 12 30% $ 38 100%

New Residential Buildings

For new multifamily residential buildings

(apartments and condominiums) having three or

more living units, including the area of garages,

carports, and

other non-commercial automobile storage areas

constructed at the same time, per square foot

Per 100 s.f. 0.00 0.08 0.08 x $ 158 = $ 12.69 $ 10 79% $ 13 100%

For new single and two-family residential buildings,

including the area of garages, carports and other

minor accessory buildings constructed at the same

time, per square foot

Per 100 s.f. 0.00 0.08 0.08 x $ 158 = $ 12.69 $ 10 79% $ 13 100%

For other types of residential occupancies and

alteration, and modifications to existing residential

buildings, use the UNIT FEE SCHEDULE

Private Swimming Pools

For new private, residential, in-ground swimming

pools for single family/multi-family occupancies,

including a complete system of necessary branch

circuit wiring, bonding, grounding, underwater

lighting, water pumping, and other similar electrical

equipment directly related to the operation of a

swimming pool, each pool

Each 0.00 0.12 0.12 x $ 158 = $ 19.04 $ 67 350% $ 19 100%

Carnivals and Circuses

Carnivals, circuses, or other traveling shows or

exhibitions utilizing transportable-type rides,

booths, displays and attractions:

For electrical generators and electrically driven

rides, eachEach 0.00 0.20 0.20 x $ 158 = $ 31.74 $ 33 104% $ 32 100%

For mechanically driven rides and walk-through

attractions or displays having electric lighting, eachEach 0.00 0.04 0.04 x $ 158 = $ 6.35 $ 10 154% $ 6 100%

For a system of area and booth lighting, each Each 0.00 0.04 0.04 x $ 158 = $ 6.35 $ 10 154% $ 6 100%

For permanently installed rides, booths, displays and

attractions, use the UNIT FEE SCHEDULE

NBS - Local Government Solutions

Web: www.nbsgov.com Toll-Free:800.676.7516 Bldg - COS,Page 3 of 18

50

City of Half Moon Bay

Building - User Fee Study FY 17

Cost Estimation for Permitting and Regulatory Services APPENDIX A.4

Cost Recovery Analysis Annual Estimated Revenue Analysis

Estimated

Inspection Time

Per Activity

(hours)

Cost of Service

Per Activity Current Fee

Existing Cost

Recovery Percentage

Recommended Fee

Level

Recommended Cost

Recovery Percentage

Total Estimated

Average Labor Time

Per Activity

Fully Burdened

Hourly Rate

Fee Activity

UnitFee No.

Estimated

Processing Time

Per Activity

(hours)

Activity Service Cost Analysis

Fee Description

Temporary Power Services

For a temporary service power pole or pedestal

including all pole or pedestal-mounted receptacle

outlets and appurtenances, each

Each 0.00 0.12 0.12 x $ 158 = $ 19.04 $ 33 174% $ 19 100%

For a temporary distribution system and temporary

lighting and receptacle outlets for construction

sites, decorative light, Christmas tree sales lots,

fireworks stands, etc., each

Each 0.00 0.12 0.12 x $ 158 = $ 19.04 $ 17 87% $ 19 100%

Receptable, Switch and Lighting Outlets

For receptacle, switch, lighting, or other outlets at

which current is used or controlled (except services,

feeders, and meters):

First 20 fixtures, each Each 0.00 0.01 0.01 x $ 158 = $ 1.27 $ 1.40 110% $ 1.27 100%

Additional fixtures, each Each 0.00 0.002 0.00 x $ 158 = $ 0.25 $ 0.90 354% $ 0.25 100%

For lighting fixtures, sockets, or other lamp-holding

devices:

First 20 fixtures, each Each 0.00 0.008 0.01 x $ 158 = $ 1.27 $ 1.40 110% $ 1.27 100%

Additional fixtures, each Each 0.00 0.01 0.01 x $ 158 = $ 1.27 $ 0.90 71% $ 1.27 100%

For pole or platform-mounted lighting fixtures Each 0.00 0.16 0.16 x $ 158 = $ 25.39 $ 1.40 6% $ 25 100%

For theatrical-type lighting fixtures or assemblies Each 0.00 0.16 0.16 x $ 158 = $ 25.39 $ 1.40 6% $ 25 100%

Residential Appliances

For fixed residential appliances or receptacle outlets

for same, including wall-mounted electrical ovens;

counter-mounted cooking tops; electric ranges; self-

contained room, console, or through wall air

conditioners; space heaters; food waste grinders;

dishwashers; washing machines; water heaters;

clothes dryers; or other motor-operated appliance

not exceeding one horsepower (HP) in rating

Each 0.00 0.02 0.02 x $ 158 = $ 2.54 $ 6 252% $ 3 100%

Non-Residential Appliances

For residential appliances and self-contained factory-

wired non-residential appliances not exceeding one

horsepower (HP), kilowatt (KW), or kilovolt ampere

(KVA) in rating, including medical or dental devices;

food, beverage, and ice cream cabinets; illuminated

show cases; drinking fountains; vending machines;

laundry machines; or other similar types of

equipment

Each 0.00 0.02 0.02 x $ 158 = $ 2.54 $ 6 252% $ 3 100%

NBS - Local Government Solutions

Web: www.nbsgov.com Toll-Free:800.676.7516 Bldg - COS,Page 4 of 18

51

City of Half Moon Bay

Building - User Fee Study FY 17

Cost Estimation for Permitting and Regulatory Services APPENDIX A.4

Cost Recovery Analysis Annual Estimated Revenue Analysis

Estimated

Inspection Time

Per Activity

(hours)

Cost of Service

Per Activity Current Fee

Existing Cost

Recovery Percentage

Recommended Fee

Level

Recommended Cost

Recovery Percentage

Total Estimated

Average Labor Time

Per Activity

Fully Burdened

Hourly Rate

Fee Activity

UnitFee No.

Estimated

Processing Time

Per Activity

(hours)

Activity Service Cost Analysis

Fee Description

Busways

For trolley and plug-in-type busways, each 100 feet

or fraction thereof. Note: An additional fee is

required for lighting fixtures, motors and other

appliances that are connected to trolley and plug-in-

type busways. A fee is not required for portable

tools.

Each 100 ft or

Fraction Thereof0.00 0.16 0.16 x $ 158 = $ 25.39 $ 10 39% $ 25 100%

Power Apparatus

For motors, generators, transformers, rectifiers,

synchronous converters, capacitors, industrial

heating, air conditioners and heat pumps, cooking

or baking equipment and other apparatus, as

follows (Rating in Horsepower (HP), kilowatts (KW),

kilovolt-amperes (KVA), or kilo-volt-amperes-

reactive (KVAR):

Up to and including 1 0.00 0.08 0.08 x $ 158 = $ 12.69 $ 6 50% $ 13 100%

Over 1 and not over 10 0.00 0.08 0.08 x $ 158 = $ 12.69 $ 17 131% $ 13 100%

Over 10 and not over 50 0.00 0.16 0.16 x $ 158 = $ 25.39 $ 33 130% $ 25 100%

Over 50 and not over 100 0.00 0.16 0.16 x $ 158 = $ 25.39 $ 67 263% $ 25 100%

Over 100 0.00 0.32 0.32 x $ 158 = $ 50.78 $ 100 197% $ 51 100%

Signs, Outline Lighting and Marquees

For signs, outline lighting systems or marquees

supplied from one branch circuitEach 0.00 0.08 0.08 x $ 158 = $ 12.69 $ 33 261% $ 13 100%

For additional branch circuits within the same sign,

outline lighting system or marqueeEach 0.00 0.08 0.08 x $ 158 = $ 12.69 $ 6 50% $ 13 100%

Services

For services of 600 volts or less and no over 200

amperes in ratingEach 0.00 0.08 0.08 x $ 158 = $ 12.69 $ 41 323% $ 13 100%

For services of 600 volts or less and not over 200

amperes to 1,000 amperes in ratingEach 0.00 0.08 0.08 x $ 158 = $ 12.69 $ 84 659% $ 13 100%

For services over 600 volts or over 1,000 amperes in

ratingEach 0.00 0.12 0.12 x $ 158 = $ 19.04 $ 167 878% $ 19 100%

Miscellaneous Apparatus, Conduits and Conductors

For electrical apparatus, conduits and conductors

for which a permit is required but for which no fee

is herein set forth

Each 0.00 0.16 0.16 x $ 158 = $ 25.39 $ 25 97% $ 25 100%

Other Inspection and Fees

Inspections outside of normal business hours [8] Per Hour 0.00 1.00 1.00 x $ 158 = $ 157.82 $ 177 112% $ 158 100%

Inspection on Sundays and Holidays [8] Per Hour 0.00 1.00 1.00 x $ 158 = $ 157.82 $ 236 150% $ 158 100%

Reinspection fees [8] Per Hour 0.00 1.00 1.00 x $ 158 = $ 157.82 $ 118 75% $ 158 100%

Inspection for which no fee is specifically indicated [8] Per Hour 0.00 1.00 1.00 x $ 158 = $ 157.82 $ 118 75% $ 158 100%

NBS - Local Government Solutions

Web: www.nbsgov.com Toll-Free:800.676.7516 Bldg - COS,Page 5 of 18

52

City of Half Moon Bay

Building - User Fee Study FY 17

Cost Estimation for Permitting and Regulatory Services APPENDIX A.4

Cost Recovery Analysis Annual Estimated Revenue Analysis

Estimated

Inspection Time

Per Activity

(hours)

Cost of Service

Per Activity Current Fee

Existing Cost

Recovery Percentage

Recommended Fee

Level

Recommended Cost

Recovery Percentage

Total Estimated

Average Labor Time

Per Activity

Fully Burdened

Hourly Rate

Fee Activity

UnitFee No.

Estimated

Processing Time

Per Activity

(hours)

Activity Service Cost Analysis

Fee Description

8 Mechanical Permit [3]

[6]

Permit Issuance

For issuing each permit each 0.08 0.16 0.24 x $ 158 = $ 38.08 $ 34 89% $ 38 100%

For issuing each supplemental permit for which the

original permit has not expired, been canceled or

finaled

Each 0.08 0.16 0.24 x $ 158 = $ 38.08 $ 12 30% $ 38 100%

Furnaces

For the installation or relocation of each forced-air

or gravity-type furnace or burner, including ducts,

and vents attached to such appliances, up to and

including 100,000 Btu/h

Each 0.00 0.08 0.08 x $ 158 = $ 12.69 $ 22 176% $ 13 100%

For the installation or relocation of each forced-air

or gravity-type furnace or burner, including ducts,

and vents attached to such appliances over 100,000

Btu/h

Each 0.00 0.08 0.08 x $ 158 = $ 12.69 $ 27 216% $ 13 100%

For the installation or relocation of each floor

furnace, including ventEach 0.00 0.08 0.08 x $ 158 = $ 12.69 $ 22 176% $ 13 100%

For the installation or relocation of each suspended

heater, recessed wall heater or floor-mounted

heater

Each 0.00 0.08 0.08 x $ 158 = $ 12.69 $ 22 176% $ 13 100%

Appliance Vents

For the installation, relocation or replacement of

each appliance vent installed and not included in an

appliance permit

Each 0.00 0.08 0.08 x $ 158 = $ 12.69 $ 11 86% $ 13 100%

Repairs or Additions

For the repair of, alteration of, or addition to each

heating appliance, refrigeration unit, cooling unit,

absorption unit, or each heating, cooling,

absorption, or evaporative cooling system, including

installation of controls regulated by the Code

Each 0.00 0.12 0.12 x $ 158 = $ 19.04 $ 21 108% $ 19 100%

NBS - Local Government Solutions

Web: www.nbsgov.com Toll-Free:800.676.7516 Bldg - COS,Page 6 of 18

53

City of Half Moon Bay

Building - User Fee Study FY 17

Cost Estimation for Permitting and Regulatory Services APPENDIX A.4

Cost Recovery Analysis Annual Estimated Revenue Analysis

Estimated

Inspection Time

Per Activity

(hours)

Cost of Service

Per Activity Current Fee

Existing Cost

Recovery Percentage

Recommended Fee

Level

Recommended Cost

Recovery Percentage

Total Estimated

Average Labor Time

Per Activity

Fully Burdened

Hourly Rate

Fee Activity

UnitFee No.

Estimated

Processing Time

Per Activity

(hours)

Activity Service Cost Analysis

Fee Description

Boilers, Compressors and Absorption Systems

For the installation or relocation of each boiler or

compressor up to and including three horsepower,

or each absorption system up to and including

100,000 Btu/h

Each 0.00 0.25 0.25 x $ 158 = $ 39.46 $ 22 56% $ 39 100%

For the installation or relocation of each boiler or

compressor over three horsepower, up to and

including 15 horsepower, or each absorption

system over 100,000 Btu/h to and including 500,000

Btu/h

Each 0.00 0.25 0.25 x $ 158 = $ 39.46 $ 41 104% $ 39 100%

For the installation or relocation of each boiler or

compressor over 15 horsepower, up to and

including 30 horsepower, or each absorption

system over 500,000 Btu/h to and including

1,000,000 Btu/h

Each 0.00 0.25 0.25 x $ 158 = $ 39.46 $ 56 142% $ 39 100%

For the installation or relocation of each boiler or

compressor over 30 horsepower to and including 50

horsepower, or for each absorption system over

1,000,000 Btu/h to and including 1,750,000 Btu/h

Each 0.00 0.50 0.50 x $ 158 = $ 78.91 $ 84 106% $ 79 100%

Air Handlers

For each air-handling unit to and including 10,000

cubic feet per minute, including ducts attached

thereto

Each 0.00 0.08 0.08 x $ 158 = $ 12.69 $ 16 126% $ 13 100%

For each air-handling unit over 10,000 cfm Each 0.00 0.16 0.16 x $ 158 = $ 25.39 $ 27 108% $ 25 100%

Evaporative Coolers

For each evaporative cooler other than portable

typeEach 0.00 0.08 0.08 x $ 158 = $ 12.69 $ 16 126% $ 13 100%

Ventilation and Exhaust

For each ventilation fan connected to a single duct Each 0.00 0.08 0.08 x $ 158 = $ 12.69 $ 11 86% $ 13 100%

For each ventilation system which is not a portion of

any heating or air-conditioning system authorized

by a permit

Each 0.00 0.08 0.08 x $ 158 = $ 12.69 $ 16 126% $ 13 100%

For the installation of each hood which is served by

mechanical exhaust, including the ducts for such

hood

Each 0.00 0.08 0.08 x $ 158 = $ 12.69 $ 16 126% $ 13 100%

Incinerators

For the installation or relocation of each domestic-

type incineratorEach 0.00 0.16 0.16 x $ 158 = $ 25.39 $ 27 108% $ 25 100%

For the installation or relocation of each commercial

or industrial-type incineratorEach 0.00 0.16 0.16 x $ 158 = $ 25.39 $ 22 86% $ 25 100%

Miscellaneous

For each appliance or piece of equipment regulated

by the Mechanical Code but not classed in other

appliance categories, or for which no other fee is

listed in the table

Each 0.00 0.08 0.08 x $ 158 = $ 12.63 $ 16 127% $ 13 100%

NBS - Local Government Solutions

Web: www.nbsgov.com Toll-Free:800.676.7516 Bldg - COS,Page 7 of 18

54

City of Half Moon Bay

Building - User Fee Study FY 17

Cost Estimation for Permitting and Regulatory Services APPENDIX A.4

Cost Recovery Analysis Annual Estimated Revenue Analysis

Estimated

Inspection Time

Per Activity

(hours)

Cost of Service

Per Activity Current Fee

Existing Cost

Recovery Percentage

Recommended Fee

Level

Recommended Cost

Recovery Percentage

Total Estimated

Average Labor Time

Per Activity

Fully Burdened

Hourly Rate

Fee Activity

UnitFee No.

Estimated

Processing Time

Per Activity

(hours)

Activity Service Cost Analysis

Fee Description

9 Plumbing Permit [3]

[6]

Permit Issuance

For issuing each permit Each 0.08 0.16 0.24 x $ 158 = $ 38.08 $ 34 89% $ 38 100%

For issuing each supplemental permit for which the

original permit has not expired, been canceled or

finaled

Each 0.08 0.16 0.24 x $ 158 = $ 38.08 $ 12 30% $ 38 100%

Fixtures and Vents

For each plumbing fixture or trap or set of fixtures

on one trap (including water, drainage piping and

backflow protection therefore)

Each 0.00 0.08 0.08 x $ 158 = $ 12.69 $ 11 84% $ 13 100%

For each repair or alteration of drainage or vent

piping, each fixtureEach 0.00 0.08 0.08 x $ 158 = $ 12.69 $ 11 84% $ 13 100%

Sewers, Disposal Systems and Interceptors

For each building sewer and each trailer park sewer Each 0.00 0.16 0.16 x $ 158 = $ 25.39 $ 23 89% $ 25 100%

Rainwater systems-per drain (inside building) Each 0.00 0.08 0.08 x $ 158 = $ 12.69 $ 11 84% $ 13 100%

For each cesspool (where permitted) Each 0.00 0.08 0.08 x $ 158 = $ 12.69 $ 38 296% $ 13 100%

For each private sewage disposal system Each 0.00 0.12 0.12 x $ 158 = $ 19.04 $ 60 316% $ 19 100%

For each industrial waste pretreatment interceptor

including its trap and vent, except kitchen-type

grease interceptors functioning as fixture traps

Each 0.00 0.12 0.12 x $ 158 = $ 19.04 $ 11 56% $ 19 100%

Gas Piping Systems

For each gas-piping system of one to five outlets Each 0.00 0.08 0.08 x $ 158 = $ 12.69 $ 8 60% $ 13 100%

For each additional gas piping system outlet, per

outletEach 0.00 0.02 0.02 x $ 158 = $ 2.54 $ 1.40 55% $ 2.54 100%

Water Piping and Water Heaters

For installation, alteration, or repair of water piping

or water-treating equipment, or both, eachEach 0.00 0.08 0.08 x $ 158 = $ 12.69 $ 11 84% $ 13 100%

For each water heater and/or vent Each 0.00 0.02 0.02 x $ 158 = $ 2.54 $ 11 418% $ 3 100%

Lawn Sprinklers, Vacuum Breakers & Backflow

Protection Devices

For each lawn sprinkler system or any one meter,

including backflow protection devices thereofEach 0.00 0.08 0.08 x $ 158 = $ 12.69 $ 11 84% $ 13 100%

For atmospheric-type vacuum breakers or backflow

protection devices not included above:

1 to 5 Each 0.00 0.02 0.02 x $ 158 = $ 2.54 $ 8 299% $ 3 100%

Over 5, each Each 0.00 0.02 0.02 x $ 158 = $ 2.54 $ 1.40 55% $ 2.54 100%

For each backflow protective device other than

atmospheric type vacuum breakers:

2 inch diameter and smaller Each 0.00 0.04 0.04 x $ 158 = $ 6.35 $ 11 167% $ 6 100%

over 2 inch diameter Each 0.00 0.08 0.08 x $ 158 = $ 12.69 $ 23 178% $ 13 100%

NBS - Local Government Solutions

Web: www.nbsgov.com Toll-Free:800.676.7516 Bldg - COS,Page 8 of 18

55

City of Half Moon Bay

Building - User Fee Study FY 17

Cost Estimation for Permitting and Regulatory Services APPENDIX A.4

Cost Recovery Analysis Annual Estimated Revenue Analysis

Estimated

Inspection Time

Per Activity

(hours)

Cost of Service

Per Activity Current Fee

Existing Cost

Recovery Percentage

Recommended Fee

Level

Recommended Cost

Recovery Percentage

Total Estimated

Average Labor Time

Per Activity

Fully Burdened

Hourly Rate

Fee Activity

UnitFee No.

Estimated

Processing Time

Per Activity

(hours)

Activity Service Cost Analysis

Fee Description

Swimming Pools

Public Pool Each 0.00 0.24 0.24 x $ 158 = $ 38.08 $ 137 361% $ 38 100%

Public Spa Each 0.00 0.16 0.16 x $ 158 = $ 25.39 $ 92 361% $ 25 100%

Private Pool Each 0.00 0.24 0.24 x $ 158 = $ 38.08 $ 92 241% $ 38 100%

Private Spa (pre-manufactured) Per Valuation 0.00 0.04 0.04 x $ 158 = $ 6.35 Per valuation n/a $ 6 100%

Private Spa (custom built) Each 0.00 0.16 0.16 x $ 158 = $ 25.39 $ 46 179% $ 25 100%

Miscellaneous

For each appliance or piece of equipment regulated

by the Plumbing Code but not classed in other

appliance categories, or for which no other fee is

listed in this code

Each 0.00 0.08 0.08 x $ 158 = $ 12.63 $ 15 117% $ 13 100%

TOTAL BUILDING DIVISION

Notes

[1] Plan Check fees are passed through to outside consultant. NBS did not evaluate this fee

[2] The General Plan fee will be applied to all residential/commercial/industrial new construction and/or addition permits. The fee will be 0.25% ($2.50/$1000) of the valuation of the construction/addition.

[3] Fee was not evaluated by NBS under fee study's scope of services.

[4] Fee Set by City policy. NBS did not evaluate

[6] Permit Fees for Work Done Without A Valid Permit Are 2 times the Permit Fee for Bldg, Electrical, Mechanical, Plumbing, Encroachment & Grading Permits

[7] The Technology fee will apply to the total Building, Electrical, Mechanical, Plumbing permit fees. Excludes in-lieu fees.

[8] Overtime rate of 150% will apply for after hour inspection requests with 200% on Sundays and Holidays. 2-hour minimum charge.

[9] NBS did not evalutate these fee amounts. Set per City Policy

NBS - Local Government Solutions

Web: www.nbsgov.com Toll-Free:800.676.7516 Bldg - COS,Page 9 of 18

56

City of Half Moon Bay

Building - User Fee Study FY 17

Cost Estimation for Permitting and Regulatory Services

1 [6]

Valuation ($)

0 - 500 Valuation

501 - 2,000 Valuation

First 500

Each Additional 100 or fraction thereof

2,001 - 25,000 Valuation

First 2,000

Each Additional 1,000 or fraction thereof

25,001 - 50,000 Valuation

First 25,000

Each Additional 1,000 or fraction thereof

50,001 - 100,000 Valuation

First 50,000

Each Additional 1,000 or fraction thereof

100,000 - 500,000 Valuation

First 100,000

Each Additional 1,000 or fraction thereof

500,001 - 1,000,000 Valuation

First 500,000

Each Additional 1,000 or fraction thereof

1,000,001 and above Valuation

First 1,000,000

Each Additional 1,000 or fraction thereof

2 Building Plan Check Fee [1]

[6]

Plan Revision Per Hour

Fee for 4th review onwards-charged on hourly basis Per Hour

Electronic submittal fee [2]

Building Permit Fee for Alterations, Additions, and New

Construction (based on valuation of improvement)

Fee Activity

UnitFee No. Fee Description

APPENDIX A.4

Annual Estimated Revenue Analysis

14 $ 714 $ 2,872 $ 2,872

53 $ 2,703 $ 10,874 $ 10,874

511 $ 1,840 $ 5,645 $ 5,645

274 $ 28,770 $ 103,785 $ 103,785

2,753 $ 42,396 $ 4,345 $ 4,345

43 $ 19,746 $ 18,323 $ 18,323

298 $ 4,291 $ 1,411 $ 1,411

22 $ 18,022 $ 12,500 $ 12,500

459 $ 3,764 $ 1,449 $ 1,449

26 $ 31,959 $ 18,465 $ 18,465

4,654 $ 33,509 $ 14,690 $ 14,690

2 $ 8,218 $ 3,788 $ 3,788

503 $ 3,119 $ 2,382 $ 2,382

3 $ 21,628 $ 13,636 $ 13,636

17,042 $ 86,914 $ 80,689 $ 80,689

106 $ 13,568 $ 16,729 $ 16,729

- $ - $ - $ -

$ - $ - $ -

Annual Estimated

Revenues at Full Cost

Recovery Fee

Annual Estimated

Revenues at

Recommended Fee

Estimated Volume

of Activity

(Performed)

Annual Estimated

Revenues at Current

Fee

NBS - Local Government Solutions

Web: www.nbsgov.com Toll-Free:800.676.7516 Bldg - COS,Page 10 of 18

57

City of Half Moon Bay

Building - User Fee Study FY 17

Cost Estimation for Permitting and Regulatory Services

Fee Activity

UnitFee No. Fee Description

3 Miscellaneous Permit [6]

1 Demolition Up To 2 Hours

2 Solar per permit

Residential

0-15kW

Above 15kW

First 15kW

Each Additional kW or fraction there of

Commercial

0-50 kW

51-250 kW

First 50kW

Each Additional kW or fraction there of

Above 250kW

First 50kW

Each Additional kW or fraction there of

3 Permit Fees for Work Without A Valid Permit [6] fine / penalty

4 Business License Inspection Per 1/2 Hour

4 Other Inspections and Fees [6]

Pre-Site Inspection Per Hour

Re-Inspections Per Hour

Inspections outside of normal business hours[8,

9]Per Hour

Inspection on Sundays and Holidays[8,

9]Per Hour

Reinspection fees [8] Per Hour

Inspection for which no fee is specifically indicated [8] Per Hour

Inspections outside of normal business hours Per Hour

General Plan Fee[2]

[3]

Technology Fee [7]

5 Refund for Withdrawl of Application per request

6 Special Structural Inspection Feeper inspection -

hourly

APPENDIX A.4

Annual Estimated Revenue Analysis

Annual Estimated

Revenues at Full Cost

Recovery Fee

Annual Estimated

Revenues at

Recommended Fee

Estimated Volume

of Activity

(Performed)

Annual Estimated

Revenues at Current

Fee

1 $ 236 $ 237 $ 237

- $ - $ - $ -

- $ - $ - $ -

- $ - $ - $ -

- $ - $ - $ -

- $ - $ - $ -

- $ - $ - $ -

- $ - $ - $ -

- $ - $ - $ -

- $ - $ - $ -

$ - $ - $ -

- $ - $ - $ -

6 $ 708 $ 947 $ 947

- $ - $ - $ -

- $ - $ - $ -

- $ - $ - $ -

- $ - $ - $ -

- $ - $ - $ -

NBS - Local Government Solutions

Web: www.nbsgov.com Toll-Free:800.676.7516 Bldg - COS,Page 11 of 18

58

City of Half Moon Bay

Building - User Fee Study FY 17

Cost Estimation for Permitting and Regulatory Services

Fee Activity

UnitFee No. Fee Description

7 Electrical Permit [6]

Permit Issuance

For issuing each permit Each

For issuing each supplemental permit for which the

original permit has not expired, been canceled or

finaled

Each

New Residential Buildings

For new multifamily residential buildings

(apartments and condominiums) having three or

more living units, including the area of garages,

carports, and

other non-commercial automobile storage areas

constructed at the same time, per square foot

Per 100 s.f.

For new single and two-family residential buildings,

including the area of garages, carports and other

minor accessory buildings constructed at the same

time, per square foot

Per 100 s.f.

For other types of residential occupancies and

alteration, and modifications to existing residential

buildings, use the UNIT FEE SCHEDULE

Private Swimming Pools

For new private, residential, in-ground swimming

pools for single family/multi-family occupancies,

including a complete system of necessary branch

circuit wiring, bonding, grounding, underwater

lighting, water pumping, and other similar electrical

equipment directly related to the operation of a

swimming pool, each pool

Each

Carnivals and Circuses

Carnivals, circuses, or other traveling shows or

exhibitions utilizing transportable-type rides,

booths, displays and attractions:

For electrical generators and electrically driven

rides, eachEach

For mechanically driven rides and walk-through

attractions or displays having electric lighting, eachEach

For a system of area and booth lighting, each Each

For permanently installed rides, booths, displays and

attractions, use the UNIT FEE SCHEDULE

APPENDIX A.4

Annual Estimated Revenue Analysis

Annual Estimated

Revenues at Full Cost

Recovery Fee

Annual Estimated

Revenues at

Recommended Fee

Estimated Volume

of Activity

(Performed)

Annual Estimated

Revenues at Current

Fee

168 $ 5,695 $ 6,398 $ 6,398

- $ - $ - $ -

- $ - $ - $ -

- $ - $ - $ -

- $ - $ - $ -

- $ - $ - $ -

- $ - $ - $ -

- $ - $ - $ -

NBS - Local Government Solutions

Web: www.nbsgov.com Toll-Free:800.676.7516 Bldg - COS,Page 12 of 18

59

City of Half Moon Bay

Building - User Fee Study FY 17

Cost Estimation for Permitting and Regulatory Services

Fee Activity

UnitFee No. Fee Description

Temporary Power Services

For a temporary service power pole or pedestal

including all pole or pedestal-mounted receptacle

outlets and appurtenances, each

Each

For a temporary distribution system and temporary

lighting and receptacle outlets for construction

sites, decorative light, Christmas tree sales lots,

fireworks stands, etc., each

Each

Receptable, Switch and Lighting Outlets

For receptacle, switch, lighting, or other outlets at

which current is used or controlled (except services,

feeders, and meters):

First 20 fixtures, each Each

Additional fixtures, each Each

For lighting fixtures, sockets, or other lamp-holding

devices:

First 20 fixtures, each Each

Additional fixtures, each Each

For pole or platform-mounted lighting fixtures Each

For theatrical-type lighting fixtures or assemblies Each

Residential Appliances

For fixed residential appliances or receptacle outlets

for same, including wall-mounted electrical ovens;

counter-mounted cooking tops; electric ranges; self-

contained room, console, or through wall air

conditioners; space heaters; food waste grinders;

dishwashers; washing machines; water heaters;

clothes dryers; or other motor-operated appliance

not exceeding one horsepower (HP) in rating

Each

Non-Residential Appliances

For residential appliances and self-contained factory-

wired non-residential appliances not exceeding one

horsepower (HP), kilowatt (KW), or kilovolt ampere

(KVA) in rating, including medical or dental devices;

food, beverage, and ice cream cabinets; illuminated

show cases; drinking fountains; vending machines;

laundry machines; or other similar types of

equipment

Each

APPENDIX A.4

Annual Estimated Revenue Analysis

Annual Estimated

Revenues at Full Cost

Recovery Fee

Annual Estimated

Revenues at

Recommended Fee

Estimated Volume

of Activity

(Performed)

Annual Estimated

Revenues at Current

Fee

19 $ 629 $ 362 $ 362

- $ - $ - $ -

918 $ 1,285 $ 1,165 $ 1,165

335 $ 302 $ 85 $ 85

$ -

714 $ 1,000 $ 906 $ 906

210 $ 189 $ 267 $ 267

- $ - $ - $ -

- $ - $ - $ -

73 $ 467 $ 185 $ 185

- $ - $ - $ -

NBS - Local Government Solutions

Web: www.nbsgov.com Toll-Free:800.676.7516 Bldg - COS,Page 13 of 18

60

City of Half Moon Bay

Building - User Fee Study FY 17

Cost Estimation for Permitting and Regulatory Services

Fee Activity

UnitFee No. Fee Description

Busways

For trolley and plug-in-type busways, each 100 feet

or fraction thereof. Note: An additional fee is

required for lighting fixtures, motors and other

appliances that are connected to trolley and plug-in-

type busways. A fee is not required for portable

tools.

Each 100 ft or

Fraction Thereof

Power Apparatus

For motors, generators, transformers, rectifiers,

synchronous converters, capacitors, industrial

heating, air conditioners and heat pumps, cooking

or baking equipment and other apparatus, as

follows (Rating in Horsepower (HP), kilowatts (KW),

kilovolt-amperes (KVA), or kilo-volt-amperes-

reactive (KVAR):

Up to and including 1

Over 1 and not over 10

Over 10 and not over 50

Over 50 and not over 100

Over 100

Signs, Outline Lighting and Marquees

For signs, outline lighting systems or marquees

supplied from one branch circuitEach

For additional branch circuits within the same sign,

outline lighting system or marqueeEach

Services

For services of 600 volts or less and no over 200

amperes in ratingEach

For services of 600 volts or less and not over 200

amperes to 1,000 amperes in ratingEach

For services over 600 volts or over 1,000 amperes in

ratingEach

Miscellaneous Apparatus, Conduits and Conductors

For electrical apparatus, conduits and conductors

for which a permit is required but for which no fee

is herein set forth

Each

Other Inspection and Fees

Inspections outside of normal business hours [8] Per Hour

Inspection on Sundays and Holidays [8] Per Hour

Reinspection fees [8] Per Hour

Inspection for which no fee is specifically indicated [8] Per Hour

APPENDIX A.4

Annual Estimated Revenue Analysis

Annual Estimated

Revenues at Full Cost

Recovery Fee

Annual Estimated

Revenues at

Recommended Fee

Estimated Volume

of Activity

(Performed)

Annual Estimated

Revenues at Current

Fee

- $ - $ - $ -

49 $ 314 $ 622 $ 622

- $ - $ - $ -

- $ - $ - $ -

- $ - $ - $ -

- $ - $ - $ -

3 $ 99 $ 38 $ 38

- $ - $ - $ -

15 $ 615 $ 190 $ 190

1 $ 84 $ 13 $ 13

- $ - $ - $ -

1 $ 25 $ 25 $ 25

- $ - $ - $ -

- $ - $ - $ -

- $ - $ - $ -

- $ - $ - $ -

NBS - Local Government Solutions

Web: www.nbsgov.com Toll-Free:800.676.7516 Bldg - COS,Page 14 of 18

61

City of Half Moon Bay

Building - User Fee Study FY 17

Cost Estimation for Permitting and Regulatory Services

Fee Activity

UnitFee No. Fee Description

8 Mechanical Permit [3]

[6]

Permit Issuance

For issuing each permit each

For issuing each supplemental permit for which the

original permit has not expired, been canceled or

finaled

Each

Furnaces

For the installation or relocation of each forced-air

or gravity-type furnace or burner, including ducts,

and vents attached to such appliances, up to and

including 100,000 Btu/h

Each

For the installation or relocation of each forced-air

or gravity-type furnace or burner, including ducts,

and vents attached to such appliances over 100,000

Btu/h

Each

For the installation or relocation of each floor

furnace, including ventEach

For the installation or relocation of each suspended

heater, recessed wall heater or floor-mounted

heater

Each

Appliance Vents

For the installation, relocation or replacement of

each appliance vent installed and not included in an

appliance permit

Each

Repairs or Additions

For the repair of, alteration of, or addition to each

heating appliance, refrigeration unit, cooling unit,

absorption unit, or each heating, cooling,

absorption, or evaporative cooling system, including

installation of controls regulated by the Code

Each

APPENDIX A.4

Annual Estimated Revenue Analysis

Annual Estimated

Revenues at Full Cost

Recovery Fee

Annual Estimated

Revenues at

Recommended Fee

Estimated Volume

of Activity

(Performed)

Annual Estimated

Revenues at Current

Fee

119 $ 4,034 $ 4,532 $ 4,532

2 $ 23 $ 76 $ 76

161 $ 3,606 $ 2,044 $ 2,044

$ - $ - $ -

$ - $ - $ -

$ - $ - $ -

11 $ 120 $ 140 $ 140

$ - $ - $ -

NBS - Local Government Solutions

Web: www.nbsgov.com Toll-Free:800.676.7516 Bldg - COS,Page 15 of 18

62

City of Half Moon Bay

Building - User Fee Study FY 17

Cost Estimation for Permitting and Regulatory Services

Fee Activity

UnitFee No. Fee Description

Boilers, Compressors and Absorption Systems

For the installation or relocation of each boiler or

compressor up to and including three horsepower,

or each absorption system up to and including

100,000 Btu/h

Each

For the installation or relocation of each boiler or

compressor over three horsepower, up to and

including 15 horsepower, or each absorption

system over 100,000 Btu/h to and including 500,000

Btu/h

Each

For the installation or relocation of each boiler or

compressor over 15 horsepower, up to and

including 30 horsepower, or each absorption

system over 500,000 Btu/h to and including

1,000,000 Btu/h

Each

For the installation or relocation of each boiler or

compressor over 30 horsepower to and including 50

horsepower, or for each absorption system over

1,000,000 Btu/h to and including 1,750,000 Btu/h

Each

Air Handlers

For each air-handling unit to and including 10,000

cubic feet per minute, including ducts attached

thereto

Each

For each air-handling unit over 10,000 cfm Each

Evaporative Coolers

For each evaporative cooler other than portable

typeEach

Ventilation and Exhaust

For each ventilation fan connected to a single duct Each

For each ventilation system which is not a portion of

any heating or air-conditioning system authorized

by a permit

Each

For the installation of each hood which is served by

mechanical exhaust, including the ducts for such

hood

Each

Incinerators

For the installation or relocation of each domestic-

type incineratorEach

For the installation or relocation of each commercial

or industrial-type incineratorEach

Miscellaneous

For each appliance or piece of equipment regulated

by the Mechanical Code but not classed in other

appliance categories, or for which no other fee is

listed in the table

Each

APPENDIX A.4

Annual Estimated Revenue Analysis

Annual Estimated

Revenues at Full Cost

Recovery Fee

Annual Estimated

Revenues at

Recommended Fee

Estimated Volume

of Activity

(Performed)

Annual Estimated

Revenues at Current

Fee

1 $ 22 $ 39 $ 39

- $ - $ - $ -

- $ - $ - $ -

- $ - $ - $ -

- $ - $ - $ -

- $ - $ - $ -

1 $ 16 $ 13 $ 13

280 $ 3,052 $ 3,554 $ 3,554

44 $ 704 $ 559 $ 559

125 $ 2,000 $ 1,587 $ 1,587

- $ - $ - $ -

- $ - $ - $ -

4 $ 64 $ 51 $ 51

NBS - Local Government Solutions

Web: www.nbsgov.com Toll-Free:800.676.7516 Bldg - COS,Page 16 of 18

63

City of Half Moon Bay

Building - User Fee Study FY 17

Cost Estimation for Permitting and Regulatory Services

Fee Activity

UnitFee No. Fee Description

9 Plumbing Permit [3]

[6]

Permit Issuance

For issuing each permit Each

For issuing each supplemental permit for which the

original permit has not expired, been canceled or

finaled

Each

Fixtures and Vents

For each plumbing fixture or trap or set of fixtures

on one trap (including water, drainage piping and

backflow protection therefore)

Each

For each repair or alteration of drainage or vent

piping, each fixtureEach

Sewers, Disposal Systems and Interceptors

For each building sewer and each trailer park sewer Each

Rainwater systems-per drain (inside building) Each

For each cesspool (where permitted) Each

For each private sewage disposal system Each

For each industrial waste pretreatment interceptor

including its trap and vent, except kitchen-type

grease interceptors functioning as fixture traps

Each

Gas Piping Systems

For each gas-piping system of one to five outlets Each

For each additional gas piping system outlet, per

outletEach

Water Piping and Water Heaters

For installation, alteration, or repair of water piping

or water-treating equipment, or both, eachEach

For each water heater and/or vent Each

Lawn Sprinklers, Vacuum Breakers & Backflow

Protection Devices

For each lawn sprinkler system or any one meter,

including backflow protection devices thereofEach

For atmospheric-type vacuum breakers or backflow

protection devices not included above:

1 to 5 Each

Over 5, each Each

For each backflow protective device other than

atmospheric type vacuum breakers:

2 inch diameter and smaller Each

over 2 inch diameter Each

APPENDIX A.4

Annual Estimated Revenue Analysis

Annual Estimated

Revenues at Full Cost

Recovery Fee

Annual Estimated

Revenues at

Recommended Fee

Estimated Volume

of Activity

(Performed)

Annual Estimated

Revenues at Current

Fee

149 $ 5,051 $ 5,674 $ 5,674

$ - $ - $ -

1,014 $ 10,748 $ 12,872 $ 12,872

- $ - $ - $ -

38 $ 859 $ 965 $ 965

- $ - $ - $ -

- $ - $ - $ -

- $ - $ - $ -

- $ - $ - $ -

190 $ 1,444 $ 2,412 $ 2,412

6 $ 8 $ 15 $ 15

318 $ 3,371 $ 4,037 $ 4,037

84 $ 890 $ 213 $ 213

- $ - $ - $ -

- $ - $ - $ -

- $ - $ - $ -

- $ - $ - $ -

- $ - $ - $ -

NBS - Local Government Solutions

Web: www.nbsgov.com Toll-Free:800.676.7516 Bldg - COS,Page 17 of 18

64

City of Half Moon Bay

Building - User Fee Study FY 17

Cost Estimation for Permitting and Regulatory Services

Fee Activity

UnitFee No. Fee Description

Swimming Pools

Public Pool Each

Public Spa Each

Private Pool Each

Private Spa (pre-manufactured) Per Valuation

Private Spa (custom built) Each

Miscellaneous

For each appliance or piece of equipment regulated

by the Plumbing Code but not classed in other

appliance categories, or for which no other fee is

listed in this code

Each

TOTAL BUILDING DIVISION

Notes

[1] Plan Check fees are passed through to outside consultant. NBS did not evaluate this fee

[2] The General Plan fee will be applied to all residential/commercial/industrial new construction and/or addition permits. The fee will be 0.25% ($2.50/$1000) of the valuation of the construction/addition.

[3] Fee was not evaluated by NBS under fee study's scope of services.

[4] Fee Set by City policy. NBS did not evaluate

[6] Permit Fees for Work Done Without A Valid Permit Are 2 times the Permit Fee for Bldg, Electrical, Mechanical, Plumbing, Encroachment & Grading Permits

[7] The Technology fee will apply to the total Building, Electrical, Mechanical, Plumbing permit fees. Excludes in-lieu fees.

[8] Overtime rate of 150% will apply for after hour inspection requests with 200% on Sundays and Holidays. 2-hour minimum charge.

[9] NBS did not evalutate these fee amounts. Set per City Policy

APPENDIX A.4

Annual Estimated Revenue Analysis

Annual Estimated

Revenues at Full Cost

Recovery Fee

Annual Estimated

Revenues at

Recommended Fee

Estimated Volume

of Activity

(Performed)

Annual Estimated

Revenues at Current

Fee

- $ - $ - $ -

- $ - $ - $ -

- $ - $ - $ -

- $ - $ - $ -

- $ - $ - $ -

324 $ 4,795 $ 4,091 $ 4,091

373,616$ 365,897$ 365,897$

NBS - Local Government Solutions

Web: www.nbsgov.com Toll-Free:800.676.7516 Bldg - COS,Page 18 of 18

65

Prepared by NBS for the City of Half Moon Bay

APPENDIX A.5

Cost of Service Analysis – Police Department

66

City of Half Moon Bay

Public Safety - User Fee Study FY 17

Cost Estimation for Providing Activities and Services APPENDIX A.5

Cost Recovery Analysis Annual Estimated Revenue Analysis

1 Duplication [4]

1 Public Safety Reports

Sworn 0.00 $ 218 $ -

Non-Sworn 0.25 $ 83 $ 21

Each 0.25 $ 21 $ 10 48% $ 10 48% 136 $ 1,360 $ 2,810 $ 1,360

2 Photo Reproduction

Sworn 0.00 $ 218 $ -

Non-Sworn 0.25 $ 83 $ 21

Each 0.25 $ 21 $ 36 174% $ 20 97% 3 $ 108 $ 62 $ 60

3 Audio Tape/CD Reproduction

Sworn 0.00 $ 218 $ -

Non-Sworn 0.25 $ 83 $ 21

Per Tape/CD

Disc

0.25 $ 21 $ 16 77% $ 20 97% 0 $ - $ - $ -

4 Video Tape Reproduction

Sworn 0.00 $ 218 $ -

Non-Sworn 0.25 $ 83 $ 21

Per

Tape/DVD

Disc

0.25 $ 21 $ 16 77% $ 20 97% 0 $ - $ - $ -

2 Licensing

1Bingo Establishment Processing (Chapter 3.94)

Bingo Establishment

Sworn 0.20 $ 218 $ 44

Non-Sworn 1.00 $ 83 $ 83

Each 1.20 $ 126 $ 62 49% $ 126 100% 0 $ - $ - $ -

Renewal

Sworn 0.20 $ 218 $ 44

Non-Sworn 1.00 $ 83 $ 83

Each Per

Year1.20 $ 126 $ 34 27% $ 126 100% 1 $ 34 $ 126 $ 126

2 Fortune Telling (Chapter 3.95)

New Business

Sworn 2.50 $ 218 $ 545

Non-Sworn 1.00 $ 83 $ 83

Each 3.50 $ 627 $ 269 43% $ 627 100% 0 $ - $ - $ -

Renewal

Sworn 0.20 $ 218 $ 44

Non-Sworn 1.00 $ 83 $ 83

Each Per

Year1.20 $ 126 $ 74 59% $ 126 100% 0 $ - $ - $ -

New Tech.

Sworn 2.50 $ 218 $ 545

Non-Sworn 1.00 $ 83 $ 83

Each 3.50 $ 627 $ 269 43% $ 627 100% 0 $ - $ - $ -

Renewal Tech

Sworn 0.20 $ 218 $ 44

Non-Sworn 1.00 $ 83 $ 83

Each Per

Year1.20 $ 126 $ 74 59% $ 126 100% 0 $ - $ - $ -

Fee Activity Activity Service Cost Analysis

# Fee Description FBHR

Annual Estimated

Revenues at

Recommended Fee

Annual Estimated

Revenues at Full Cost

Recovery Fee

Annual Estimated

Revenues at Current

Fee

Estimated Volume of

Activity (Performed)

Rec'd Cost

Recovery %City Rec'd. Fee Level

Existing Cost

Recovery %

Cost of Service

Per Activity

Estimated

Average Labor

Time Per Activity

(hours)

Unit Current Fee

NBS - Local Government Solutions

Web: www.nbsgov.com Toll-Free:800.676.7516 PS - COS,Page 1 of 4

67

City of Half Moon Bay

Public Safety - User Fee Study FY 17

Cost Estimation for Providing Activities and Services APPENDIX A.5

Cost Recovery Analysis Annual Estimated Revenue AnalysisFee Activity Activity Service Cost Analysis

# Fee Description FBHR

Annual Estimated

Revenues at

Recommended Fee

Annual Estimated

Revenues at Full Cost

Recovery Fee

Annual Estimated

Revenues at Current

Fee

Estimated Volume of

Activity (Performed)

Rec'd Cost

Recovery %City Rec'd. Fee Level

Existing Cost

Recovery %

Cost of Service

Per Activity

Estimated

Average Labor

Time Per Activity

(hours)

Unit Current Fee

3 Massage Establishments (Chapter 3.88)

New Business

Sworn 2.50 $ 218 $ 545

Non-Sworn 1.00 $ 83 $ 83

Each 3.50 $ 627 $ 269 43% $ 627 100% 6 $ 1,614 $ 3,763 $ 3,763

Renewal

Sworn 0.20 $ 218 $ 44

Non-Sworn 1.00 $ 83 $ 83

Each Per

Year1.20 $ 126 $ 74 59% $ 126 100% 4 $ 296 $ 505 $ 505

Transfer

Sworn 2.50 $ 218 $ 545

Non-Sworn 1.00 $ 83 $ 83

Each 3.50 $ 627 $ 269 43% $ 627 100% 0 $ - $ - $ -

Reinstatement

Sworn 0.20 $ 218 $ 44

Non-Sworn 1.00 $ 83 $ 83

Each 1.20 $ 126 $ 269 213% $ - 0% 0 $ - $ - $ -

Each 1.20 $ 126 $ 269 213% $ - 0% 0 $ - $ - $ -

4 Secondhand Dealers [3]

New Dealers

Sworn 0.20 $ 218 $ 44

Non-Sworn 1.00 $ 83 $ 83

Each 1.20 $ 126 $ 98 78% $ 126 100% 1 $ 98 $ 126 $ 126

Renewal

Sworn 0.20 $ 218 $ 44

Non-Sworn 1.00 $ 83 $ 83

Each Per

Year1.20 $ 126 $ 98 78% $ 126 100% 1 $ 98 $ 126 $ 126

5 Solicitor / Peddler

New Applicant

Sworn 2.50 $ 218 $ 545

Non-Sworn 1.00 $ 83 $ 83

Each 3.50 $ 627 $ 269 43% $ 627 100% 2 $ 538 $ 1,254 $ 1,254

Annual Renewal

Sworn 0.20 $ 218 $ 44

Non-Sworn 1.00 $ 83 $ 83

Each Per

Year1.20 $ 126 $ 74 59% $ 126 100% 2 $ 148 $ 252 $ 252

NBS - Local Government Solutions

Web: www.nbsgov.com Toll-Free:800.676.7516 PS - COS,Page 2 of 4

68

City of Half Moon Bay

Public Safety - User Fee Study FY 17

Cost Estimation for Providing Activities and Services APPENDIX A.5

Cost Recovery Analysis Annual Estimated Revenue AnalysisFee Activity Activity Service Cost Analysis

# Fee Description FBHR

Annual Estimated

Revenues at

Recommended Fee

Annual Estimated

Revenues at Full Cost

Recovery Fee

Annual Estimated

Revenues at Current

Fee

Estimated Volume of

Activity (Performed)

Rec'd Cost

Recovery %City Rec'd. Fee Level

Existing Cost

Recovery %

Cost of Service

Per Activity

Estimated

Average Labor

Time Per Activity

(hours)

Unit Current Fee

3 Miscellaneous Fees

1 Public Safety Service Fees

Public Dance (non-profit)

Sworn 0.10 $ 218 $ 22

Non-Sworn 0.50 $ 83 $ 41

Each 0.60 $ 63 $ 34 54% $ 40 63% 33 $ 1,122 $ 2,083 $ 1,320

Deputy / Sergeant / Reserve / Community

Service Officer

Sworn 1.00 $ 218 $ 218

Non-Sworn 0.00 $ 83 $ -

Per Hour1.00 $ 218 As Quoted 0% $ 218 100% 4 $ - $ 871 $ 871

2 Vehicle Release [5]

Sworn 0.30 $ 218 $ 65

Non-Sworn 0.30 $ 83 $ 25

Per Vehicle0.60 $ 90 $ 91 101% $ 90 100% 24 $ 2,184 $ 2,163 $ 2,163

Repossession Release [5]

Sworn 0.00 $ 218 $ -

Non-Sworn 0.30 $ 83 $ 25

Per Vehicle0.30 $ 25 $ 15 60% $ 15 60% 3 $ 45 $ 74 $ 45

3 Clearance/Special Letters

Sworn 0.00 $ 218 $ -

Non-Sworn 0.50 $ 83 $ 41

Each 0.50 $ 41 $ 40 97% $ 40 97% 6 $ 240 $ 248 $ 240

4 Illegal Sign Confiscation

Sworn 0.75 $ 218 $ 163

Non-Sworn 0.00 $ 83 $ -

Per

Incidence0.75 $ 163 $ 34 21% $ 163 100% 0 $ - $ - $ -

5 Illegal Fireworks Confiscation

Sworn 0.75 $ 218 $ 163

Non-Sworn 0.00 $ 83 $ -

Per Citation0.75 $ 163 $ 112 69% $ 163 100% 0 $ - $ - $ -

4 Parking Fees

1 Nighttime Permit Parking Program (Miramar/Naples

& Alsace Lorraine Neighborhoods)

HMB Resident

Sworn 0.00 $ 218 $ -

Non-Sworn 0.50 $ 83 $ 41

Per Year 0.50 $ 41 $ 20 48% $ 41 100% 10 $ 200 $ 413 $ 413

Additional Resident Permits > 4

Sworn 0.00 $ 218 $ -

Non-Sworn 0.25 $ 83 $ 21

Each Per

Year0.25 $ 21 $ 5 24% $ 21 100% 0 $ - $ - $ -

NBS - Local Government Solutions

Web: www.nbsgov.com Toll-Free:800.676.7516 PS - COS,Page 3 of 4

69

City of Half Moon Bay

Public Safety - User Fee Study FY 17

Cost Estimation for Providing Activities and Services APPENDIX A.5

Cost Recovery Analysis Annual Estimated Revenue AnalysisFee Activity Activity Service Cost Analysis

# Fee Description FBHR

Annual Estimated

Revenues at

Recommended Fee

Annual Estimated

Revenues at Full Cost

Recovery Fee

Annual Estimated

Revenues at Current

Fee

Estimated Volume of

Activity (Performed)

Rec'd Cost

Recovery %City Rec'd. Fee Level

Existing Cost

Recovery %

Cost of Service

Per Activity

Estimated

Average Labor

Time Per Activity

(hours)

Unit Current Fee

HMB Resident Outside Permitted Areas

Sworn 0.00 $ 218 $ -

Non-Sworn 0.50 $ 83 $ 41

Per Year 0.50 $ 41 $ 20 48% $ 41 100% 0 $ - $ - $ -

Visitors

Sworn 0.00 $ 218 $ -

Non-Sworn 0.50 $ 83 $ 41

Per Vehicle

Per Year

0.50 $ 41 $ 20 48% $ 41 100% 0 $ - $ - $ -

Lost or Damaged Replacement Permit

Sworn 0.00 $ 218 $ -

Non-Sworn 0.25 $ 83 $ 21

Each 0.25 $ 21 $ 15 73% $ 21 100% 0 $ - $ - $ -

5 Citation Fee Schedule (placeholder for MFS, not studied as fees for service)

6 D.U.I. Cost Recovery

Arrest with Traffic Collision & Transportation [6]

Non-Sworn (Record) 0.75 $ 83 $ 62

Sworn 2.00 $ 218 $ 436

Non-Sworn (Finance) 1.00 $ 189 $ 189

Per

Response3.75 $ 686 $ 937 137% $ 686 100% 7 $ 6,559 $ 4,804 $ 4,804

TOTAL PUBLIC SAFETY 265 16,467$ 23,178$ 17,430$

Notes

[1] Citation fee amounts increase for two or more offenses. Applicable fees are stated on the violation notice.

[2] California Vehicle Code Fees are established by the State of California and are not escalated by the CPI All Urban Consumers/San Francisco-Oakland-San Jose

[3] Department of Justice Fees apply in addition to City processing fee

[4] Additional fingerprinting and Department of Justice fees may apply

[5] Towing charges are applied separate from City fee

[6] Booking fees are charged separately. Total fee not to exceed $12,000 per State Statute, GC 53150-53159

[7] Regardless of alcohol use

NBS - Local Government Solutions

Web: www.nbsgov.com Toll-Free:800.676.7516 PS - COS,Page 4 of 4

70

Prepared by NBS for the City of Half Moon Bay

APPENDIX B.1

Comparative Fee Survey – Administrative Departments

71

City of Half Moon BayAdministrationUser Fee Study APPENDIX B. 1Fee Comparison

1 Returned Check Fee1 First Item Each $ 25 $ 25 $ 49 comparison not available $ 26 comparison not available

2 Each Additional Item Each $ 35 $ 35 $ 49 comparison not available $ 26 comparison not available

2 Duplication1 Photocopies Per Page $ 0.22 $ 0 $ - $1 + $0.20 each $ 0.25 $ 0.15 2 Municipal Code Book Per Book $ - Actual Cost $ - comparison not available $ 181 comparison not available

3 Bound Reports Per Report

Actual Cost Actual Cost comparison not available comparison not available $ 43 $10-$125 depending on

report 4 Budget Each $ - Actual Cost $ 65 $ 50 $ 34 5 Comprehensive Annual Financial Report (CAFR) Each $ - Actual Cost $ 15 $ 50 $ 34 6 CD Disc of City Council / Planning Commission Per Tape/Disc $ 16 $ 20 $ 15 comparison not available comparison not available $10 + Job Cost

3 Agenda Indexes for Meetings $ - comparison not available comparison not available comparison not available comparison not available comparison not available

4 City Clerk

1 Election Filing Fee Each $ 25 comparison not available comparison not available comparison not available comparison not available comparison not available

2 Candidate Printing Fee Deposit $ 250 comparison not available comparison not available comparison not available comparison not available comparison not available

5 Staff Research

1 Accounting Technician Per Quarter

Hour $ 11 comparison not available comparison not available Actual Cost comparison not available $71/hr.

2 Administrative Assistant Per Quarter

Hour $ 12 comparison not available comparison not available Actual Cost comparison not available $92/hr.

3 Administrative Services Officer Per Quarter

Hour $ 24 comparison not available comparison not available Actual Cost comparison not available comparison not available

4 Assistant to the City Manager Per Quarter

Hour $ 18 comparison not available comparison not available Actual Cost comparison not available comparison not available

5 Capital Projects (CIP) Manager Per Quarter

Hour $ 24 comparison not available comparison not available Actual Cost comparison not available comparison not available

6 City Attorney review of Development proposals Per Hour $ 270 comparison not available comparison not available Actual Cost comparison not available $250/hr.

7 City Clerk Per Quarter

Hour $ 17 comparison not available comparison not available Actual Cost comparison not available $107/hr.

8 City Manager Per Quarter

Hour $ 30 comparison not available comparison not available Actual Cost comparison not available $208/hr.

9 Community Development Director Per Quarter

Hour $ 24 comparison not available comparison not available Actual Cost comparison not available $81/hr.

10 Deputy City Clerk/Records Technician Per Quarter

Hour $ 14 comparison not available comparison not available Actual Cost comparison not available $71/hr.

11 Deputy City Manager Per Quarter

Hour $ 24 comparison not available comparison not available Actual Cost comparison not available comparison not available

12 Finance Director Per Quarter

Hour $ 23 comparison not available comparison not available Actual Cost comparison not available comparison not available

13 Finance Manager Per Quarter

Hour $ 23 comparison not available comparison not available Actual Cost comparison not available comparison not available

14 Project Manager/Management Analyst Per Quarter

Hour $ 15 comparison not available comparison not available Actual Cost comparison not available $106/hr.

15 Contract Planning Director Per Quarter

Hour $ 41 comparison not available comparison not available

Actual Cost + 20% Admin

fee comparison not available $195/hr.

16 Contract Senior Planner Per Quarter

Hour $ 25 comparison not available comparison not available

Actual Cost + 20% Admin

fee comparison not available $169/hr.

17 Contract Associate Planner Per Quarter

Hour $ 23 comparison not available comparison not available $128/ hr. comparison not available $142/hr.

Brisbane Hillsborough Pacifica Woodside

$0.10/page (reports &

statements filed pursuant

No Half Moon Bay -

Current Fee BelmontFee Description Unit

NBS - Local Government Solutions

Web: www.nbsgov.com Toll-Free:800.676.7516 Administration, 1 of 3

72

City of Half Moon BayAdministrationUser Fee Study APPENDIX B. 1Fee Comparison

Brisbane Hillsborough Pacifica WoodsideNo Half Moon Bay -

Current Fee BelmontFee Description Unit

6 Business License Tax (Chapter 3.40)

1Businesses within Half Moon Bay City Limits in Commercial/Industrial

Space1-4 Employees plus owners Oct 1 - Sept 30 $ 135 comparison not available

5-14 Employees plus owners Oct 1 - Sept 30 $ 400 comparison not available

15-49 Employees plus owners Oct 1 - Sept 30 $ 845 comparison not available

50-99 Employees plus owners Oct 1 - Sept 30 $ 1,665 comparison not available

100+ Employees plus owners Oct 1 - Sept 30 $ 2,360 comparison not available

2 Home Businesses within Half Moon Bay and Businesses outside City Limits

1-4 Employees plus owners Oct 1 - Sept 30 $ 180 comparison not available comparison not available comparison not available

5-14 Employees plus owners Oct 1 - Sept 30 $ 470 comparison not available comparison not available comparison not available

15-49 Employees plus owners Oct 1 - Sept 30 $ 880 comparison not available comparison not available comparison not available

50-99 Employees plus owners Oct 1 - Sept 30 $ 1,700 comparison not available comparison not available comparison not available

100+ Employees plus owners Oct 1 - Sept 30 $ 2,470 comparison not available comparison not available comparison not available

3 Pinball MachinesPer Machine

Oct 1 - Sept 1 $ 150

0.75% of gross receipts in

excess of $19,274 comparison not available comparison not available comparison not available comparison not available

4 Miniature Bowling AlleyPer Machine

Oct 1 - Sept 1 $ 150 $ 962 comparison not available comparison not available comparison not available comparison not available

5 Other Mechanical Amusement Devises (coin, token or slug operated)Per Machine

Oct 1 - Sept 1 $ 36

5% of gross receipts in

excess of $1,928 comparison not available comparison not available comparison not available comparison not available

6 Minimum Business License Tax Not Classified Elsewhere Oct 1 - Sept 30 $ 100 $ 290 comparison not available comparison not available comparison not available comparison not available

7 Business License Inspection (In City Fixed Place of Business)

New Business,

Owner or

Location $ 58 comparison not available comparison not available comparison not available comparison not available comparison not available

8 CarnivalPer Day in

Advance $ 150 comparison not available comparison not available comparison not available comparison not available

9 CircusesPer Day in

Advance $ 150 comparison not available comparison not available comparison not available comparison not available

10 SolicitorsPer Day in

Advance $ 35 $ 290 $25/ Quarter comparison not available $ 50 comparison not available

11 PeddlersPer Day in

Advance $ 35 comparison not available $25/ Quarter comparison not available comparison not available comparison not available

12 Distributor of Mechanical Amusement DevisesPer Machine

Oct 1-Sept 1

$ 75 comparison not available

$100 annually + 6% of

gross receipts, with

annual maximum of $350

comparison not available comparison not available comparison not available

13 Lost, Damaged or Change of Address Replacement Unexpired LicenseEach

$ 5 $ 19 comparison not available comparison not available comparison not available comparison not available

14 Penalty on Delinquent Business License Tax 30, 60, 90, and 120 Days

Per Month (not

to exceed

100%) 25% of License Tax comparison not available

10%-25% depending on

type of lic. and duration comparison not available comparison not available comparison not available

15 Interest on Delinquent Business License Tax Per Month 1% of License Tax comparison not available comparison not available comparison not available comparison not available comparison not available

$30 (per FT employee);

$11 (per PT employee)

$30 (per FT employee);

$11 (per PT employee)

$18 1st employee or $18/

employee (Sole

Proprietorship); $9/

employee, next 19

employees or $189/ 20

employees (Partnership);

$4.50/ employee, next 80

$150 for 1st day and $50

each day thereafter

$0.30/ $1,000 face value

of each title insurance

policy;

$0.50/ $100 gross

receipts + $100

processing fee (all other

businesses);

$25/ unit (property

management); free (non-

profit); $500 (palmists);

$100 + $25/ agent

(agents); $40 (vending

machine); $300(tobacco);

0.03%-0.077% of gross

$180 + business lic. tax

NBS - Local Government Solutions

Web: www.nbsgov.com Toll-Free:800.676.7516 Administration, 2 of 3

73

City of Half Moon BayAdministrationUser Fee Study APPENDIX B. 1Fee Comparison

Brisbane Hillsborough Pacifica WoodsideNo Half Moon Bay -

Current Fee BelmontFee Description Unit

7 Temporary Business Location - Fruit, Vegetable and

1 Christmas Tree Sales (Chapter 3.73)

Per 90 Days/Not

renewable for

the same use

for 30 days

$ 100 comparison not available comparison not available comparison not available comparison not available comparison not available

8 Bingo License (Chapter 3.94) Per Year $ 10 comparison not available comparison not available comparison not available comparison not available comparison not available

10 Private Alarm Permits (Chapter 9.10)1 Alarm Permit July 1 - June 30 $ 50 $50/ address $ 65 $ 60 $ 82 $ 30 2 False Alarm Response with Permit

1st & 2nd Alarms Each $ - $ - $ 44 $ - $ - comparison not available

3rd Alarm Each $ 50 $ 75 $ 44 $ 100 $ 125 comparison not available

4th Alarm Each $ 100 $ 100 $ 44 $ 100 $ 125 comparison not available

5th Alarm Each $ 150 $ 125 $ 44 $ 100 $ 125 comparison not available

6th Alarm and responses thereafter Each $ 200 $ 125 $ 44 $ 200 $ 195 comparison not available

3 False Alarm without Permit1st & 2nd Alarms Each $ 50 comparison not available comparison not available comparison not available $ - comparison not available

3rd Alarm Each $ 100 comparison not available comparison not available comparison not available $ 195 comparison not available

4th Alarm Each $ 125 comparison not available comparison not available comparison not available $ 195 comparison not available

5th Alarm Each $ 175 comparison not available comparison not available comparison not available $ 195 comparison not available

6th Alarm and responses thereafter Each $ 250 comparison not available comparison not available comparison not available $ 195 comparison not available

11 Film Permit (Chapter 9.74) Per Day $ 225 comparison not available $ 458 comparison not available comparison not available comparison not available

12 Special Event Permits1 Block Parties Per Event $ 56 comparison not available comparison not available $ 118 comparison not available

2 Fund RaisersPer Event

$ 56 comparison not available $500 (app fee) + $80

(public notice) comparison not available comparison not available

3 Miscellaneous Events Per Event $ 56 comparison not available comparison not available comparison not available comparison not available

4 Carnival/Circus/Parade/Race/Rodeo, etc. Each $ 191 comparison not available comparison not available comparison not available comparison not available

5 Amusement Concession Each $ 62 comparison not available comparison not available comparison not available comparison not available

comparison not available comparison not available comparison not available

13 Poplar Beach Parking

1 Vehicles less than 20 feetPer Hour / Per

Day $2.00 / $10.00 comparison not available comparison not available comparison not available comparison not available

2 Horse trailers and vehicles longer than 20 feetPer Hour / Per

Day $3.00 / $15.00 comparison not available comparison not available comparison not available comparison not available

3 Yearly Permit - Half Moon Bay Residents only

Per Year

(Prorated

Quarterly) $ 50 comparison not available comparison not available comparison not available $ 65 comparison not available

14 Sewer Connections1 Transfer of Uninstalled Capacity Fee Deposit $ 500 comparison not available comparison not available comparison not available comparison not available comparison not available

15 Facilities Rentals1 Janitorial Fee Flat $ 168 $ 250 comparison not available comparison not available comparison not available comparison not available

$4 (four hrs.);

$8 (all day)

Special Events Permit

(per hour); $38

NBS - Local Government Solutions

Web: www.nbsgov.com Toll-Free:800.676.7516 Administration, 3 of 3

74

Prepared by NBS for the City of Half Moon Bay

APPENDIX B.2

Comparative Fee Survey – Planning Division

75

City of Half Moon BayPlanningUser Fee Study APPENDIX B. 2Fee Comparison

1 Pre-Entitlement Processing1 Pre-Application Meeting2 Measure 'D'

Single Allocation (per allocation) Flat Fee $ 731 comparison not available comparison not available comparison not available comparison not available comparison not available

Phasing Agreement Deposit $ 2,600 comparison not available comparison not available comparison not available comparison not available comparison not available

2 Coastal Development Permit Processing1 Coastal Development Permit Exemption Deposit $ 141 comparison not available comparison not available comparison not available comparison not available comparison not available

2 Single Family Residential Deposit $1,300-$2,600 comparison not available comparison not available comparison not available comparison not available comparison not available

3 Second Dwelling UnitNo New Floor Area Flat Fee $ 141 comparison not available comparison not available comparison not available comparison not available comparison not available

New Floor Area Deposit $ 1,300 comparison not available comparison not available comparison not available comparison not available comparison not available

4 Multiple Family Residential Deposit $2,600-$5,200 comparison not available comparison not available comparison not available comparison not available comparison not available

5 Commercial / Mixed Use Deposit $2,600-$5,200 comparison not available comparison not available comparison not available comparison not available comparison not available

6 Industrial / Institutional Deposit $5,200-$6,500 comparison not available comparison not available comparison not available comparison not available comparison not available

7 Other DevelopmentPlanning Director Deposit $ 650 comparison not available comparison not available comparison not available comparison not available comparison not available

Planning Commission Deposit $ 1,300 comparison not available comparison not available comparison not available comparison not available comparison not available

8 AmmendmentsMinor Ammendment Flat Fee $ 1,300 comparison not available comparison not available comparison not available comparison not available comparison not available

Major Ammendment Deposit $ - comparison not available comparison not available comparison not available comparison not available comparison not available

3 Environmental Clearance Processing1 CEQA/NEPA Environmental Clearance

Negative Declaration Deposit $ 141 comparison not available $ 2,373.00 Actual cost with $5,000

minimum deposit $ 2,210.00

EIR Deposit $ 1,300 comparison not available consultant cost plus 10%

hourly

Actual cost with $10,000

minimum deposit Actual costs

2 Notice of Exemption Flat Fee $ - comparison not available comparison not available comparison not available comparison not available

4 Design Review Processing

Architectural Review, Community Development Director Flat Fee $ 842 $259-$5,360 (depending

on review type) comparison not available $ 362 comparison not available comparison not available

5 Entitlement Processing

1 Home Occupation Flat Fee $ 141

$5,357

(No New Construction);

$5,357 (All Others);

$2,282

(Administrative Permit)

$619-$2,317 (depending

on type) comparison not available comparison not available

$2,800 (conditional use);

$1,330 (amendment);

$415 (renewal)

2 Variance Deposit comparison not available comparison not available $ 5,128.00 comparison not available $2,970(new residence);

3 Exception / Community Development Director Deposit $650 - $1,300

$5,357

(No New Construction);

$5,357 (All Others);

$2,282

(Administrative Permit)

$1,160 (new

construction, all

structures); $869

(existing, residential);

$1,160 (existing all

structures)

$350 (grading);

$400 (ROW);

$450 (tentative map) comparison not available $ 1,125.00

4 Zoning, LCP, and 6P Amendments Local Coastal Program (includes LUP/Policies) Deposit $2,600-$6,500 comparison not available comparison not available comparison not available comparison not available comparison not available

IP/Zoning Code/Rezoning Deposit $2,600-$6,500 $ 5,991 $ 1,479 actual cost w/$5,000

min. deposit comparison not available $ 4,425

Planned Unit Development Specific Plan Deposit $2,600-$6,500 Planned Unit Development Specific Plan Amendment Deposit $2,600-$6,500 Planned Unit Development Precise Plan Deposit $2,600-$6,500 Planned Unit Development Precise Plan Amendment Deposit $2,600-$6,500

Annexation/ Prezoning Deposit $2,600 plus LAFCo fees comparison not available comparison not available actual cost w/$10,000

min. deposit comparison not available

100% of

estimated Job

Cost

comparison not available

Hillsborough Pacifica WoodsideBrisbane

Fees addopted by State od

California and San Mateo

County Clerk

$ 4,425.00 hourly + deposit comparison not available

No Half Moon Bay - Current

Fee BelmontFee Description Unit

comparison not available

NBS - Local Government Solutions

Web: www.nbsgov.com Toll-Free:800.676.7516 Planning, Page 1 of 2

76

City of Half Moon BayPlanningUser Fee Study APPENDIX B. 2Fee Comparison

Hillsborough Pacifica WoodsideBrisbaneNo Half Moon Bay - Current

Fee BelmontFee Description Unit

5 Appeals

Minor Ammendment Flat Fee $ 500

Major Ammendment No Fee $ - 6 Land Division and Merger

Certificate of Compliance Deposit $ 1,300 $ 2,282 $321-$892 (depending

on type) comparison not available

$2 , 250initialdeposit

$180/hour $ 750.00

Lot Merger Flat Fee $ 496 comparison not available $ 321.00 comparison not available $2 , 250initialdeposit

$180/hour $ 625.00

Lot Line Adjustment Deposit $ 1,300 $ 2,282 $ 853.00

actual cost w/$5,000

min. deposit $2 , 250initialdeposit

$180/hour $ 2,850.00

Parcel Map (four or fewer lots) Deposit $ 3,900 $ 5,360 $ 2,560.00 actual cost w/$20,000

min. deposit

$2 , 250initialdeposit

$180/hour comparison not available

Tentative Subdivision Map Deposit $6,500 - $7,800 plus

$360 per lot over 30 lots

$16,938 min. fee +

$1,784 for each 

addl 10,000 sq.ft. (non-

residential);

$17,697 min. fee +

 $331 per addl unit

(residential), $14,990 min

fee +  $563 per lot. 

$ 2,650.00 actual cost w/$20,000

min. deposit comparison not available $ 10,000.00

Final Map Deposit $3,900 plus $360 per lot

over 30 lots

$10,521 + $447/lot for 

deposit

 $ 216/hr. for time in 

excess of deposit

Consultant actual cost + 3

0%.

comparison not available actual cost w/$20,000

min. deposit

$1800initialdeposit

$180/hour comparison not available

Subdivision Agreement Deposit $360-$7,800 comparison not available $ 348 comparison not available comparison not available comparison not available

Time Extension Deposit $360-$7,800 comparison not available $ 348 comparison not available comparison not available comparison not available

7 Sign Permit/CD DirectorReview Flat Fee $ 141 Planning Commission Review Deposit $ 660 Exceptions Planning Commission Review Deposit $ 468

8 Other Services1 Zoning Compliance Letter Flat Fee $ 141 comparison not available comparison not available comparison not available comparison not available comparison not available

2 Public Convenience & Necessity Letter Flat Fee $ 141 comparison not available comparison not available comparison not available comparison not available comparison not available

3 Water Transfer Letter Flat Fee $ 141 comparison not available comparison not available comparison not available comparison not available comparison not available

9 Tree Removal ReviewCD Director Review Flat Fee $ 141 comparison not available $ 329.00 $ 271.00 $ 50.00 Planning Commisison Deposit $ 483 comparison not available comparison not available comparison not available comparison not available

# Mobile Food Vendor Permit Per Permit $ 71 comparison not available comparison not available comparison not available comparison not available comparison not available

# Sound Amplification Permit Flat Fee $ 141 comparison not available comparison not available comparison not available comparison not available comparison not available

# Fees Required by other Agencies

1 California Department of Fish and Wildlife

Fee required to review

various environmental

documents 3

comparison not available comparison not available comparison not available comparison not available comparison not available

2 SMC Local Agency Formation Commission (LAFCo) Annexation fees vary by

acreage 3 comparison not available comparison not available comparison not available comparison not available comparison not available

3 San Mateo County Recorder

Fee required to record

and/or post various

documents 3

comparison not available comparison not available comparison not available comparison not available comparison not available

Planning Hourly Rate Flat Fee $ 141 $ 218 comparison not available comparison not available $ 180.00 comparison not available

$677 (w/hearing);

$286 (w/o hearing)

$95 (sign permit); $95

(sign permit

amendment); $65

$ 334.00 $3,330 (appeal of ADRB) $100 (Planning

Commission) $ 400.00

comparison not available comparison not available

$ 2,829

$100 (planning

commission);

comparison not available

NBS - Local Government Solutions

Web: www.nbsgov.com Toll-Free:800.676.7516 Planning, Page 2 of 2

77

Prepared by NBS for the City of Half Moon Bay

APPENDIX B.3

Comparative Fee Survey – Public Works (Engineering)

78

City of Half Moon Bay Public Works Department - User Fee Study FY 17Cost Estimation for Permitting and Regulatory Services APPENDIX B. 3

1 Improvement Plan Check [1]

Plan check fees are based on Estimated Construction Cost (ECC) of

on-site grading, paving, drainage improvements, and storm water

pollution prevention measures

10,000.00$ Base Fee @

$10,000 $ 300

each additional $1,000 or fraction thereof each add'l

$1,000 $ 30

100,000.00$ Base Fee @

$100,000 $ 3,000

each additional $1,000 or fraction thereofeach add'l

$1,000 $ 30

500,000.00$ Base Fee @

$500,000 $ 15,000

each additional $1,000 or fraction thereofeach add'l

$1,000 $ 30

2 Construction Inspection [1]

Construction Inspection fees are based on Estimated Construction

Cost (ECC) of on-site grading, paving, drainage improvements, and

storm water pollution prevention measures

10,000.00$ Base Fee @

$10,000 $ 500

each additional $1,000 or fraction thereofeach add'l

$1,000 $ 50

100,000.00$ Base Fee @

$100,000 $ 5,000

each additional $1,000 or fraction thereofeach add'l

$1,000 $ 30

500,000.00$ Base Fee @

$500,000 $ 15,000

each additional $1,000 or fraction thereofeach add'l

$1,000 $ 30

0.00

3 Final Maps [2]

Parcel MapBase Fee @ 4

lots or less $ 4,800

additional loteach add'l lot

over 4 $ 150

Tract Map Base Fee @ 5

lots $ 6,000

additional loteach add'l lot

over 5 $ 150

Fee No. Fee Description Hillsborough Pacifica WoodsideCurrent Fee Unit Belmont Brisbane

$180/hr

$75 flat fee plus

$300 deposit plus

actual cost

$180/hr

$75 flat fee plus

$300 deposit plus

actual cost

$ 1,875

$1,800 initial

deposit plus

$180/hour

Actual Cost with

$20,000

minimum deposit

$865 first 2

reviews; $676 each

subsequent

review; $1,313

projects disturbing

more than once

acre of land (in

addition to the

grading plan check

and inspection

fees)

Staff time cost

$463 plus actual

cost LS review

(requires

$1,500 F/A min)

comparison not

available

comparison not

available

$10,521 + $447/lot 

(deposit);

$ 216/hr. (time in

 excess of deposit);

Consultant actual 

cost + 30%.

$216 (residential);

5% of valuation or

min. of $701

(commercial, $0-

$25,000);

$216/hr.

(commercial,

$25,001+)

$701 (residential);

5% of valuation or

min. of $701

(commercial, $0-

$25,000);

$216/hr.

(commercial,

$25,001+)

NBS - Local Government Solutions

Web: www.nbsgov.com Toll-Free:800.676.7516 Public Works,Page 1 of 2

79

City of Half Moon Bay Public Works Department - User Fee Study FY 17Cost Estimation for Permitting and Regulatory Services APPENDIX B. 3

Fee No. Fee Description Hillsborough Pacifica WoodsideCurrent Fee Unit Belmont Brisbane

4 Improvement Agreement Fee $ 3,200 No Comparison No Comparison No Comparison No Comparison $ 3,450

6 Encroachment Permits Plan Review & Inspection

Spot repairs (I,e., water leaks, pothole patches) Base Fee $ 300

Excavations/Restorations less than 100 LF Base Fee $ 600

Excavations/Restorations 100 LF or greater Base Fee $ 600

each additional 100 LFeach add'l 100

LF $ 300

Curb, gutter, sidewalk, or driveway less than 100 LF Base Fee $ 600

Curb, gutter, sidewalk, or driveway 100 LF or greater [2] Base Fee $ 600

each additional 100 LFeach add'l 100

LF $ 300

Sewer connections, repair or extension 100 LF or less Base Fee $ 600

Sewer connections, repair or extension 100 LF or greater Base Fee $ 600

each additional 100 LFeach add'l 100

LF $ 300

Storm Drain connection, repair or extension < 100 LF Base Fee $ 600

each additional 100 LFeach add'l 100

LF $ 300

Storm Drain connection, repair or extension > 100 LF Base Fee $ 600

each additional 100 LFeach add'l 100

LF $ 300

Unpermitted encroachments Penalty 1.5*fee

Monitoring Wells Flat Fee $ 300

Permit Time Extension Flat Fee

7 Public Right-of-Way/Easement Encroachment (Temporary) Flat Fee $ 150 $ 418

(traffic plan review and inspection for debris box, awnings, overhead transformers, etc.)

8 Agreements

Development Agreements Flat Fee $ - $ 3,450

Deferred Improvement Agreement Flat Fee $ 300 comparison not

available

9 Grading Permits Plan Review and Inspection

Grade changes 50 – 1,000 CY Base Fee $ 600

Grade change > 1,000 CY Base Fee $ 600

additional 100 CY over 1000each add'l 100

CY $ 150

comparison not

available

comparison not

available

comparison not

available

comparison not

available

comparison not

available $ 179

$1,394 - $4,496

$ 75

comparison not

available

$318 base non-

street fee; $171

per additional

servce

comparison not

available

$ 75

comparison not

available

$89/hr $180/hr

NBS - Local Government Solutions

Web: www.nbsgov.com Toll-Free:800.676.7516 Public Works,Page 2 of 2

80

Prepared by NBS for the City of Half Moon Bay

APPENDIX B.4

Comparative Fee Survey – Building and Safety

81

City of Half Moon BayBuildingUser Fee Study APPENDIX B. 4Fee Comparison

1

Valuation ($)0 - 500 Valuation $ 51 comparison not available comparison not available 52$

501 - 2,000 ValuationFirst 500 $ 51 comparison not available comparison not available 52$

Each Additional 100 or fraction thereof $ 4 comparison not available comparison not available 4$

2,001 - 25,000 ValuationFirst 2,000 $ 105 comparison not available comparison not available 106$

Each Additional 1,000 or fraction thereof $ 15 comparison not available comparison not available 15$

25,001 - 50,000 ValuationFirst 25,000 $ 459 comparison not available comparison not available 461$

Each Additional 1,000 or fraction thereof $ 14 comparison not available comparison not available 14$

50,001 - 100,000 ValuationFirst 50,000 $ 819 comparison not available comparison not available 821$

Each Additional 1,000 or fraction thereof $ 8 comparison not available comparison not available 8$

100,000 - 500,000 ValuationFirst 100,000 $ 1,229 comparison not available comparison not available 1,233$

Each Additional 1,000 or fraction thereof $ 7 comparison not available comparison not available 7$

500,001 - 1,000,000 ValuationFirst 500,000 $ 4,109 comparison not available comparison not available 4,117$

Each Additional 1,000 or fraction thereof $ 6 comparison not available comparison not available 6$

1,000,001 and above ValuationFirst 1,000,000 $ 7,209 comparison not available comparison not available 6,692$

Each Additional 1,000 or fraction thereof $ 5 comparison not available comparison not available 5$

2 Building Plan Check Fee

Plan Revision Per Hour $ 128 comparison not available comparison not available SUM OF (Consultant cost +

20%) + (staff time x 1.5) comparison not available comparison not available

Fee for 4th review onwards-charged on hourly basis Per Hour $ 128 comparison not available comparison not available comparison not available comparison not available comparison not available

Electronic submittal fee

$2/drawing sheet and

$5.10 flat fee for

supporting documents

comparison not available comparison not available comparison not available comparison not available comparison not available

3 Miscellaneous Permit

1 Demolition Up To 2 Hours $ 236 comparison not available Based on valuation ($35

min) comparison not available comparison not available comparison not available

2 Solar See Footnote 1 comparison not available comparison not available comparison not available comparison not available comparison not available

3 Permit Fees for Work Without A Valid Permit 2 Times Permit Fee comparison not available comparison not available comparison not available comparison not available comparison not available

4 Business License Inspection Per 1/2 Hour $ 59 comparison not available comparison not available comparison not available comparison not available comparison not available

$100 ($1-$3,000);

$100 1st $3,000 + $14

each addl $1,000 ($3,001-

$50,000);

$758 1st $50,000 + $9.50

each addl $1,000 ($50,001-

$100,000);

$1,233 1st $100,000 +

$5.50 each addl $1,000

($100,001+)

Building Permit Fee for Alterations, Additions, and New

Construction (based on valuation of improvement)

Unit

$130 ($1-$4,000); $130

1st $4,000 + $14.30 each

addl $1,000 ($4,001-

$25,000);

$430.30 1st $25,000 +

$10.21 each addl $1,000

($25,001-$50,000);

$685.55 1st $50,000 +

$7.35 each addl $1,000

($50,001-$100,000);

$1,053.05 1st $100,000 +

$5.90 each addl $1,000

($100,001-$500,000);

$3,413.05 1st $500,000 +

$5 each addl $1,000

($500,001-$1,000,000);

$5,913.05 1st $1,000,000 +

$3.75 for each addl $1,000

($1,000,000+)

WoodsideHillsborough PacificaNo Half Moon Bay -

Current Fee Belmont BrisbaneFee Description

NBS - Local Government Solutions

Web: www.nbsgov.com Toll-Free:800.676.7516 Building, Page 1 of 7

82

City of Half Moon BayBuildingUser Fee Study APPENDIX B. 4Fee Comparison

Unit WoodsideHillsborough PacificaNo Half Moon Bay -

Current Fee Belmont BrisbaneFee Description

4 Other Inspections and Fees

Pre-Site Inspection Per Hour $ 118 $ 218 comparison not available comparison not available comparison not available comparison not available

Re-Inspections Per Hour $ 118 $ 218 comparison not available $ 108 $ 100

Inspections outside of normal business hours Per Hour $ 177 $ 218 comparison not available

3 hr min x 1.5 hourly rate

Additional hours at 1.5 x

rate Sunday = 3 hr min

hourly rate x 2

comparison not available comparison not available

Inspection on Sundays and Holidays Per Hour $ 236 $ 218 comparison not available comparison not available comparison not available comparison not available

Inspection for which no fee is specifically indicated Per Hour $ 118 $ 218 comparison not available comparison not available 119$ comparison not available

General Plan Fee $ 0 0.25% of Building

valuation comparison not available 0.05% of permit valuation comparison not available comparison not available

Technology Fee $ 0 comparison not available comparison not available 5% of permit fee comparison not available comparison not available

5 Refund See Refund Policy comparison not available comparison not available comparison not available comparison not available comparison not available

6 Special Structural Inspection Fee Actual Cost comparison not available comparison not available comparison not available comparison not available comparison not available

7 Electrical Permit

Permit IssuanceFor issuing each permit Each $ 34 $ 136 comparison not available $ 140 32$ $ 120

For issuing each supplemental permit for which the

original permit has not expired, been canceled or finaledEach $ 12 $ 15 comparison not available comparison not available 11$ comparison not available

New Residential Buildings

For new multifamily residential buildings (apartments and

condominiums) having three or more living units,

including the area of garages, carports, and

other non-commercial automobile storage areas

constructed at the same time, per square foot

Per Square Foot $ 0.10 $ 0 comparison not available $ 0.11 0.10$ $1.95 per gross sq.ft.

For new single and two-family residential buildings,

including the area of garages, carports and other minor

accessory buildings constructed at the same time, per

square foot

Per Square Foot $ 0.10 $ 0 comparison not available $ 0.11 0.10$ comparison not available

For other types of residential occupancies and alteration,

and modifications to existing residential buildings, use

the UNIT FEE SCHEDULE

See Unit Fee Schedule

Below See Unit Fee Schedule comparison not available comparison not available comparison not available comparison not available

Private Swimming Pools

For new private, residential, in-ground swimming pools

for single family/multi-family occupancies, including a

complete system of necessary branch circuit wiring,

bonding, grounding, underwater lighting, water pumping,

and other similar electrical equipment directly related to

the operation of a swimming pool, each pool

Each $ 67 $ 376 comparison not available $170 + base fee comparison not available comparison not available

NBS - Local Government Solutions

Web: www.nbsgov.com Toll-Free:800.676.7516 Building, Page 2 of 7

83

City of Half Moon BayBuildingUser Fee Study APPENDIX B. 4Fee Comparison

Unit WoodsideHillsborough PacificaNo Half Moon Bay -

Current Fee Belmont BrisbaneFee Description

Carnivals and CircusesCarnivals, circuses, or other traveling shows or exhibitions

utilizing transportable-type rides, booths, displays and

attractions:For electrical generators and electrically driven

rides, eachEach $ 33 $ 49 comparison not available comparison not available comparison not available comparison not available

For mechanically driven rides and walk-through

attractions or displays having electric lighting, eachEach $ 10 $ 15 comparison not available comparison not available comparison not available comparison not available

For a system of area and booth lighting, each Each $ 10 $ 15 comparison not available comparison not available comparison not available comparison not available

For permanently installed rides, booths, displays

and attractions, use the UNIT FEE SCHEDULE

See Unit Fee Schedule

Below See Unit Fee Schedule comparison not available comparison not available comparison not available comparison not available

Temporary Power ServicesFor a temporary service power pole or pedestal including

all pole or pedestal-mounted receptacle outlets and

appurtenances, each

Each $ 33 $ 125 comparison not available $72 + base fee comparison not available $ 180

For a temporary distribution system and temporary

lighting and receptacle outlets for construction sites,

decorative light, Christmas tree sales lots, fireworks

stands, etc., each

Each $ 17 $ 116 comparison not available comparison not available comparison not available comparison not available

Receptable, Switch and Lighting OutletsFor receptacle, switch, lighting, or other outlets at which

current is used or controlled (except services, feeders,

and meters):First 20 fixtures, each Each $ 1.40 $ 2 comparison not available comparison not available 1.45$ comparison not available

Additional fixtures, each Each $ 0.90 $ 1 comparison not available comparison not available 1$ comparison not available

For lighting fixtures, sockets, or other lamp-holding

devices:First 20 fixtures, each Each $ 1.40 $ 3 comparison not available comparison not available 1$ comparison not available

Additional fixtures, each Each $ 0.90 $ 1 comparison not available comparison not available 1$ comparison not available

For pole or platform-mounted lighting fixtures Each $ 1.40 $ 3 comparison not available comparison not available comparison not available comparison not available

For theatrical-type lighting fixtures or assemblies Each $ 1.40 $ 3 comparison not available comparison not available comparison not available comparison not available

Residential Appliances

For fixed residential appliances or receptacle outlets for

same, including wall-mounted electrical ovens; counter-

mounted cooking tops; electric ranges; self-contained

room, console, or through wall air conditioners; space

heaters; food waste grinders; dishwashers; washing

machines; water heaters; clothes dryers; or other motor-

operated appliance not exceeding one horsepower (HP)

in rating

Each $ 6 $ 10 comparison not available $ 26 6$ comparison not available

Non-Residential Appliances

For residential appliances and self-contained factory-

wired non-residential appliances not exceeding one

horsepower (HP), kilowatt (KW), or kilovolt ampere (KVA)

in rating, including medical or dental devices; food,

beverage, and ice cream cabinets; illuminated show

cases; drinking fountains; vending machines; laundry

machines; or other similar types of equipment

Each $ 6 $ 10 comparison not available $ 26 comparison not available $ 250

NBS - Local Government Solutions

Web: www.nbsgov.com Toll-Free:800.676.7516 Building, Page 3 of 7

84

City of Half Moon BayBuildingUser Fee Study APPENDIX B. 4Fee Comparison

Unit WoodsideHillsborough PacificaNo Half Moon Bay -

Current Fee Belmont BrisbaneFee Description

Busways

For trolley and plug-in-type busways, each 100 feet or

fraction thereof. Note: An additional fee is required for

lighting fixtures, motors and other appliances that are

connected to trolley and plug-in-type busways. A fee is

not required for portable tools.

Each 100 ft or

Fraction Thereof $ 10 $ 15 comparison not available comparison not available comparison not available comparison not available

Power Apparatus

For motors, generators, transformers, rectifiers,

synchronous converters, capacitors, industrial heating, air

conditioners and heat pumps, cooking or baking

equipment and other apparatus, as follows (Rating in

Horsepower (HP), kilowatts (KW), kilovolt-amperes (KVA),

or kilo-volt-amperes-reactive (KVAR):

Up to and including 1 $ 6 $ 10 comparison not available comparison not available 6$ comparison not available

Over 1 and not over 10 $ 17 $ 1 comparison not available comparison not available 16$ comparison not available

Over 10 and not over 50 $ 33 $ 52 comparison not available comparison not available 33$ comparison not available

Over 50 and not over 100 $ 67 $ 103 comparison not available comparison not available 66$ comparison not available

Over 100 $ 100 $ 156 comparison not available comparison not available 98$ comparison not available

Signs, Outline Lighting and MarqueesFor signs, outline lighting systems or marquees supplied

from one branch circuitEach $ 33 $ 48 comparison not available comparison not available

33$ comparison not available

For additional branch circuits within the same sign,

outline lighting system or marqueeEach $ 6 $ 10 comparison not available comparison not available comparison not available comparison not available

ServicesFor services of 600 volts or less and no over 200 amperes

in ratingEach $ 41 $ 135 comparison not available comparison not available

40$ For services of 600 volts or less and not over 200 amperes

to 1,000 amperes in ratingEach $ 84 $ 135 comparison not available comparison not available

81$ For services over 600 volts or over 1,000 amperes in

ratingEach $ 167 $ 273 comparison not available comparison not available

164$

Miscellaneous Apparatus, Conduits and ConductorsFor electrical apparatus, conduits and conductors for

which a permit is required but for which no fee is herein

set forth

Each $ 25 comparison not available comparison not available comparison not available

24$

comparison not available

Other Inspection and FeesInspections outside of normal business hours Per Hour $ 177 $ 218 comparison not available comparison not available comparison not available comparison not available

Inspection on Sundays and Holidays Per Hour $ 236 $ 218 comparison not available comparison not available comparison not available comparison not available

Reinspection fees Per Hour $ 118 $ 218 comparison not available $ 108 comparison not available comparison not available

Inspection for which no fee is specifically indicated Per Hour $ 118 $ 218 comparison not available $ 108 comparison not available comparison not available

$250 (electrical svcs 100

or 200 amp stand-alone

permit);

$360 (electrical svcs 400

amp and up stand-alone

permit)

NBS - Local Government Solutions

Web: www.nbsgov.com Toll-Free:800.676.7516 Building, Page 4 of 7

85

City of Half Moon BayBuildingUser Fee Study APPENDIX B. 4Fee Comparison

Unit WoodsideHillsborough PacificaNo Half Moon Bay -

Current Fee Belmont BrisbaneFee Description

8 Mechanical Permit

Permit IssuanceFor issuing each permit $ 34 $ 137 comparison not available $ 140 32$ $ 120

For issuing each supplemental permit for which the

original permit has not expired, been canceled or finaledEach $ 12 $ 16 comparison not available comparison not available

11$

comparison not available

FurnacesFor the installation or relocation of each forced-air or

gravity-type furnace or burner, including ducts, and vents

attached to such appliances, up to and including 100,000

Btu/h

Each $ 22 $ 136 comparison not available $98 + base fee

22$

$ 150

For the installation or relocation of each forced-air or

gravity-type furnace or burner, including ducts, and vents

attached to such appliances over 100,000 Btu/h

Each $ 27 $ 136 comparison not available $98 + base fee

27$

$ 150

For the installation or relocation of each floor furnace,

including ventEach $ 22 $ 33 comparison not available $98 + base fee comparison not available comparison not available

For the installation or relocation of each suspended

heater, recessed wall heater or floor-mounted heaterEach $ 22 $ 33 comparison not available $98 + base fee comparison not available comparison not available

Appliance VentsFor the installation, relocation or replacement of each

appliance vent installed and not included in an appliance

permit

Each $ 11 $ 16 comparison not available comparison not available

11$

comparison not available

Repairs or AdditionsFor the repair of, alteration of, or addition to each heating

appliance, refrigeration unit, cooling unit, absorption unit,

or each heating, cooling, absorption, or evaporative

cooling system, including installation of controls

regulated by the Code

Each $ 21 $ 29 comparison not available $ 26 comparison not available comparison not available

Boilers, Compressors and Absorption SystemsFor the installation or relocation of each boiler or

compressor up to and including three horsepower, or

each absorption system up to and including 100,000

Btu/h

Each $ 22 $ 137 comparison not available comparison not available

21$

comparison not available

For the installation or relocation of each boiler or

compressor over three horsepower, up to and including

15 horsepower, or each absorption system over 100,000

Btu/h to and including 500,000 Btu/h

Each $ 41 $ 57 comparison not available comparison not available

38$

comparison not available

For the installation or relocation of each boiler or

compressor over 15 horsepower, up to and including 30

horsepower, or each absorption system over 500,000

Btu/h to and including 1,000,000 Btu/h

Each $ 56 $ 77 comparison not available comparison not available

53$

comparison not available

For the installation or relocation of each boiler or

compressor over 30 horsepower to and including 50

horsepower, or for each absorption system over

1,000,000 Btu/h to and including 1,750,000 Btu/h

Each $ 84 $ 114 comparison not available comparison not available

78$

comparison not available

NBS - Local Government Solutions

Web: www.nbsgov.com Toll-Free:800.676.7516 Building, Page 5 of 7

86

City of Half Moon BayBuildingUser Fee Study APPENDIX B. 4Fee Comparison

Unit WoodsideHillsborough PacificaNo Half Moon Bay -

Current Fee Belmont BrisbaneFee Description

Air Handlers

For each air-handling unit to and including 10,000 cubic

feet per minute, including ducts attached theretoEach $ 16 $ - comparison not available comparison not available

17$

comparison not available

For each air-handling unit over 10,000 cfm Each $ 27 $ 38 comparison not available comparison not available 27$ comparison not available

Evaporative CoolersFor each evaporative cooler other than portable type Each $ 16 $ 113 comparison not available comparison not available 17$ comparison not available

Ventilation and ExhaustFor each ventilation fan connected to a single duct Each $ 11 $ 16 comparison not available comparison not available 11$ comparison not available

For each ventilation system which is not a portion of any

heating or air-conditioning system authorized by a permitEach $ 16 $ 23 comparison not available comparison not available

17$

comparison not available

For the installation of each hood which is served by

mechanical exhaust, including the ducts for such hoodEach $ 16 $ 23 comparison not available comparison not available

17$

comparison not available

IncineratorsFor the installation or relocation of each domestic-type

incineratorEach $ 27 $ 38 comparison not available comparison not available

17$ comparison not available

For the installation or relocation of each commercial or

industrial-type incineratorEach $ 22 $ 31 comparison not available comparison not available

17$ comparison not available

Miscellaneous

For each appliance or piece of equipment regulated by

the Mechanical Code but not classed in other appliance

categories, or for which no other fee is listed in the table

Each $ 16 $ 23 comparison not available comparison not available

17$

comparison not available

Other Inspection and FeesInspections outside of normal business hours Per Hour $ 177 $ 242 comparison not available comparison not available comparison not available comparison not available

Inspection on Sundays and Holidays Per Hour $ 236 $ 242 comparison not available comparison not available comparison not available comparison not available

Reinspection fees Per Hour $ 118 $ 242 comparison not available comparison not available comparison not available comparison not available

Inspection for which no fee is specifically indicated Per Hour $ 118 $ 242 comparison not available comparison not available comparison not available comparison not available

9 Plumbing Permit

Permit IssuanceFor issuing each permit Each $ 34 $ 136 comparison not available $ 140 32$ $ 120

For issuing each supplemental permit for which the

original permit has not expired, been canceled or finaledEach $ 12 $ 61 comparison not available comparison not available

11$

comparison not available

NBS - Local Government Solutions

Web: www.nbsgov.com Toll-Free:800.676.7516 Building, Page 6 of 7

87

City of Half Moon BayBuildingUser Fee Study APPENDIX B. 4Fee Comparison

Unit WoodsideHillsborough PacificaNo Half Moon Bay -

Current Fee Belmont BrisbaneFee Description

Fixtures and VentsFor each plumbing fixture or trap or set of fixtures on one

trap (including water, drainage piping and backflow

protection therefore)

Each $ 11 $ 19 comparison not available comparison not available

10$

$ 315

For each repair or alteration of drainage or vent piping,

each fixtureEach $ 11 $ 10 comparison not available comparison not available

10$ $ 315

Sewers, Disposal Systems and InterceptorsFor each building sewer and each trailer park sewer Each $ 23 $ 52 comparison not available comparison not available 22$ comparison not available

Rainwater systems-per drain (inside building) Each $ 11 $ 19 comparison not available comparison not available 15$ comparison not available

For each cesspool (where permitted) Each $ 38 $ 77 comparison not available comparison not available 15$ comparison not available

For each private sewage disposal system Each $ 60 $ 156 comparison not available comparison not available 57$ comparison not available

For each industrial waste pretreatment interceptor

including its trap and vent, except kitchen-type grease

interceptors functioning as fixture traps

Each $ 11 $ 41 comparison not available comparison not available

10$

comparison not available

Gas Piping SystemsFor each gas-piping system of one to five outlets Each $ 8 $ 125 comparison not available comparison not available 7$ comparison not available

For each additional gas piping system outlet, per outlet Each $ 1 $ 25 comparison not available comparison not available comparison not available comparison not available

Water Piping and Water HeatersFor installation, alteration, or repair of water piping or

water-treating equipment, or both, eachEach $ 11 $ 10 comparison not available comparison not available

15$ $ 120

For each water heater and/or vent Each $ 11 $ 10 comparison not available comparison not available comparison not available comparison not available

Lawn Sprinklers, Vacuum Breakers & Backflow Protection

DevicesFor each lawn sprinkler system or any one meter,

including backflow protection devices thereofEach $ 11 $ 33 comparison not available $144 + base fee

15$ comparison not available

For atmospheric-type vacuum breakers or backflow

protection devices not included above:1 to 5 Each $ 8 $ 25 comparison not available comparison not available comparison not available comparison not available

Over 5, each Each $ 1 $ 5 comparison not available comparison not available comparison not available comparison not available

For each backflow protective device other than

atmospheric type vacuum breakers:2 inch diameter and smaller Each $ 11 $ 25 comparison not available comparison not available 15$ comparison not available

over 2 inch diameter Each $ 23 $ 52 comparison not available comparison not available 15$ comparison not available

Swimming PoolsPublic Pool Each $ 137 $ 191 comparison not available $170 + base fee 129$ comparison not available

Public Spa Each $ 92 $ 126 comparison not available $170 + base fee 86$ comparison not available

Private Pool Each $ 92 $ 126 comparison not available $170 + base fee 86$ comparison not available

Private Spa (pre-manufactured) Per Valuation Per valuation Private Spa (custom built) Each $ 46 $ 64 comparison not available $170 + base fee 86$ comparison not available

Miscellaneous

For each appliance or piece of equipment regulated by

the Plumbing Code but not classed in other appliance

categories, or for which no other fee is listed in this code

Each $ 15 $ 19 comparison not available comparison not available

15$

comparison not available

Other Inspections and FeesInspections outside of normal business hours Per Hour $ 177 $ 605 comparison not available comparison not available comparison not available comparison not available

Inspection on Sundays and Holidays Per Hour $ 236 $ 243 comparison not available comparison not available comparison not available comparison not available

Reinspection fees Per Hour $ 118 $ 243 comparison not available $ 108 comparison not available

Inspection for which no fee is specifically indicated Per Hour $ 118 $ 243 comparison not available $ 108 114$ comparison not available

NBS - Local Government Solutions

Web: www.nbsgov.com Toll-Free:800.676.7516 Building, Page 7 of 7

88

Prepared by NBS for the City of Half Moon Bay

APPENDIX B.5

Comparative Fee Survey – Police Department

89

City of Half Moon BayPublic SafetyUser Fee Study APPENDIX B. 5Fee Comparison

1 Duplication1 Public Safety Reports Each $ 10.00 $ 10 $ 15 $ 10 $ - comparison not available

2 Photo Reproduction Each $ 36.00 $ 8 $75 + actual cost $ 50 $ 22 comparison not available

3Audio Tape/CD Reproduction

Per Tape/CD

Disc $ 16.00 $ 27 $ 50 $ 30 comparison not available

4Audio Tape Reproduction

Per Tape/DVD

Disc $ 16.00 $ 27 $ 50 $ 30 comparison not available

2 Licensing1 Bingo Establishment Processing (Chapter 3.94)

Bingo Establishment Each $ 62.00 comparison not available comparison not available comparison not available $ 29 comparison not available

Renewal Each Per Year $ 34.00 comparison not available comparison not available comparison not available $ 29 comparison not available

2 Fortune Telling (Chapter 3.95)New Business Each $ 269.00 comparison not available comparison not available comparison not available $ 58 comparison not available

Renewal Each Per Year $ 74.00 comparison not available comparison not available comparison not available $ 58 comparison not available

New Tech. Each $ 269.00 comparison not available comparison not available comparison not available comparison not available comparison not available

Renewal Tech Each Per Year $ 74.00 comparison not available comparison not available comparison not available comparison not available comparison not available

3 Massage Establishments (Chapter 3.88)

New Business Each $ 269.00 $ 500 $ 100 comparison not available

$162; $50

(state certified) comparison not available

Renewal Each Per Year $ 74.00 $ 150 $ 25 comparison not available

$50; $25

(state certified) comparison not available

Transfer Each $ 269.00 comparison not available comparison not available comparison not available comparison not available comparison not available

Reinstatement Each $ 269.00 comparison not available comparison not available comparison not available comparison not available comparison not available

New Tech. Each $ 269.00 comparison not available comparison not available comparison not available

$331;

$50 (state certified) comparison not available

Renewal (Tech) Each Per Year $ 74.00 comparison not available comparison not available comparison not available

$100;

$25 (state certified) comparison not available

Reinstatement (Tech) Each $ 269.00 comparison not available comparison not available comparison not available

4 Secondhand DealersNew Dealers Each $ 98.00 comparison not available comparison not available comparison not available $ 130 comparison not available

Renewal Each Per Year $ 98.00 comparison not available comparison not available comparison not available $ 130 comparison not available

5 Solicitor / PeddlerNew Applicant Each $ 269.00 $ 200 comparison not available comparison not available comparison not available comparison not available

Annual Renewal Each Per Year $ 74.00 comparison not available comparison not available comparison not available comparison not available comparison not available

3 Miscellaneous Fees

1 Public Safety Service FeesPublic Dance Each $ 34.00 comparison not available comparison not available comparison not available comparison not available comparison not available

Temporary Alcohol Use, License Renewal Each $ 34.00 comparison not available comparison not available comparison not available $ 49 comparison not available

Deputy / Sergeant / Reserve / Community Service Officer Per Hour As Quoted comparison not available comparison not available comparison not available comparison not available comparison not available

2 Vehicle Release Per Vehicle $ 91.00 $200 + $50 storage $ 47 $ 40 $ 133 comparison not available

Repossession Release Per Vehicle $ 15.00 $ 15 $ 40 $ 15 comparison not available

3Clearance/Special Letters Each

$ 40.00 $ 30 $6 (resident); $29

(non-resident) $ 10 $ 53 comparison not available

4 Illegal Sign Confiscation Per Incidence $ 34.00 comparison not available comparison not available comparison not available comparison not available comparison not available

5 Illegal Fireworks Confiscation Per Citation $ 112.00 comparison not available comparison not available comparison not available comparison not available comparison not available

Hillsborough Pacifica

$88/ hr. (min of $20 + 

cost of tape)

WoodsideNo Half Moon Bay -

Current Fee Belmont BrisbaneFee Description Unit

NBS - Local Government Solutions

Web: www.nbsgov.com Toll-Free:800.676.7516 Public Safety, Page 1 of 2

90

City of Half Moon BayPublic SafetyUser Fee Study APPENDIX B. 5Fee Comparison

Hillsborough Pacifica WoodsideNo Half Moon Bay -

Current Fee Belmont BrisbaneFee Description Unit

4 Parking Fees

1Nighttime Permit Parking Program (Miramar/Naples & Alsace Lorraine

Neighborhoods)HMB Resident Per Year $ 20.00 comparison not available comparison not available comparison not available comparison not available comparison not available

Additional Resident Permits > 4 Each Per Year $ 5.00 comparison not available comparison not available comparison not available comparison not available comparison not available

HMB Resident Outside Permitted Areas Per Year $ 20.00 comparison not available comparison not available comparison not available comparison not available comparison not available

Visitors

Per Vehicle Per

Year $ 20.00 comparison not available comparison not available comparison not available comparison not available comparison not available

Lost or Damaged Replacement Permit Each $ 15.00 comparison not available comparison not available comparison not available comparison not available comparison not available

5 Citation Fee Schedule (placeholder for MFS, not studied as fees for service)

6 D.U.I. Cost Recovery

Arrest with Traffic Collision & Transportation Per Response $ 937.00 comparison not available comparison not available comparison not available Actual Cost comparison not available

Notes

[1] All other services provided by Hillsborough are charged on an hourly basis depending on the employee in charge.

[2] Woodside Publics Safety services are provided by San Mateo County Sherriff

NBS - Local Government Solutions

Web: www.nbsgov.com Toll-Free:800.676.7516 Public Safety, Page 2 of 2

91

City of Half Moon Bay

Public Hearing

May 16, 2017Fees at less than 100% Cost Recovery

Fee Activity Current Fee

Existing Cost

Recovery %

Full Cost of

Service to City

City Rec Fee

Level

Rec. Cost

Recovery % Notes/Comments

Administrative Fees

Block Party/Fund Raiser Permits 56.00 14% 387.00 194.00 50% The City would like to support activities which promote community building.

Planning Division Fees

Accessory Dwelling Unit

No New Floor Area 141.00 13% 1,055.00 525.00 50%

New Floor Area 1,300.00 63% 2,057.00 1,000.00 49%

Appeals Filing Fee - Outside CCC Appeals Jurisdiction Actual Cost N/A 422.00 210.00 50% Filing Fee - Within CCC Appeals Jurisdiction Actual Cost N/A 422.00 - 0%

Sign Permit/CD Director Review 141.00 45% 316.00 160.00 51%

Planning Commission Review 660.00 35% 1,889.00 950.00 50%

Other Services - Zoning Compliance Letter 141.00 33% 422.00 210.00 50%

This activity improves the quality of future applications and possibly reduce future appeals and code

violations.

Tree Removal Review CD Director Review 141.00 27% 527.00 265.00 50%

Planning Commission Review 483.00 51% 949.00 475.00 50%

Building Division Fees

Miscellaneous Permit

Solar (Residential)

0-15kW 500.00 158% 315.65 158.00 50%

Above 15kW

First 15 kW 500.00 158% 315.65 158.00 50%

Each Addition kW (or fraction thereof) 15.00 10% 157.82 79.00 50%

Public Safety Fees

Public Safety Reports 10.00 48% 21.00 10.00 48%

The City proposes to keep the costs of receiving a report at a reasonable level and on par with

neighboring jurisdictions.

Public Safety Services Fees

Public Dance (non-profit) 34.00 54% 63.00 40.00 63%

Vehicle Repossession release 15.00 60% 25.00 15.00 60% Fee must remain at $15 as established and mandated by the State.

This fee represents a service that is provided by the Sheriff Department to provide an assessment of

the security required for certain events. While only non-profit organizations are required to obtain

this service, the City recommends a subsidy to encourage this process for all events for safety reasons.

High permit costs for signage can result in permit avoidance, and the City wishes to ensure strict

compliance with the City's Heritage Trees Ordinance.

These units are "affordable by design" and help the City achieve its Regional Housing Needs

Allocation (RHNA), without any City subsidy.

City would like to promote and encourage residential Solar panel installation.

For all appeals, the applicant's account will be charged for staff time to process. Low appeal fees

provide better access to the public decision making process. For cases within the CCC appeals

jurisdiction, if no fee is charged, the City can retain control over the process through the Planning

Commission and City Council as applicable. This approach is supported by the CCC.

High permit costs for signage can result in permit avoidance. High quality signage conforming to City

standards has a positive aesthetic impact and supports economic development.

92

Fee Unit/Type Notes

1 Grand Oak Room*Non-profit

Weekday (9 a.m. - 5 p.m.) $50 Per HourWeekend and Weekday (5 p.m. - midnight) $90 Per Hour

RegularWeekday (9 a.m. - 5 p.m.) $60 Per HourWeekend and Weekday (5 p.m. - midnight) $125 Per Hour

2 Oak Room* Non-profit

Weekday (9 a.m. - 5 p.m.) $30 Per HourWeekend and Weekday (5 p.m. - midnight) $70 Per Hour

RegularWeekday (9 a.m. - 5 p.m.) $40 Per HourWeekend and Weekday (5 p.m. - midnight) $100 Per Hour

3 Manzanita Room*Non-profit

Weekday (9 a.m. to 5 p.m.) $20 Per HourWeekend and Weekday (5 p.m. - midnight) $45 Per Hour

RegularWeekday (9 a.m. to 5 p.m.) $25 Per HourWeekend and Weekday (5 p.m. - midnight) $60 Per Hour

4 Willow or Pine Room*Non-profit

Weekday (9 a.m. to 5 p.m.) $15 Per HourWeekend and Weekday (5 p.m. - midnight) $25 Per Hour

RegularWeekday (9 a.m. to 5 p.m.) $20 Per HourWeekend and Weekday (5 p.m. - midnight) $35 Per Hour

5 Sun Room, Day Room N, or Day Room S* (each)Non-profit

Weekday (9 a.m. to 5 p.m.) $15 Per HourWeekend and Weekday (5 p.m. - midnight) $25 Per Hour

RegularWeekday (9 a.m. to 5 p.m.) $20 Per HourWeekend and Weekday (5 p.m. - midnight) $35 Per Hour

6 Train DepotNon-profit

Weekday (9 a.m. to 5 p.m.) $15 Per HourWeekend and Weekday (5 p.m. - midnight) $20 Per Hour

RegularWeekday (9 a.m. to 5 p.m.) $30 Per HourWeekend and Weekday (5 p.m. - midnight) $35 Per Hour

7 Facility Use Deposit (with approved rental application)Grand Oak Room $500 Per RentalOak Room $300 Per RentalManzanita Room $200 Per RentalWillow or Pine Room $100 Per RentalSun Room, Day Room N, or Day Room S $100 Per RentalTrain Depot $100 Per Rental

8 Staff Time ChargesBuilding Attendant As Quoted Per HourRecreation Employees (Weekday after 5 p.m.: two (2) hour minimum)As Quoted Per HourRecreation Employees (Weekend: three (3) hour minimum)As Quoted Per Hour

City of Half Moon Bay

Parks and Recreation User Fees Schedule

Description of Services

100% Multi-purpose room;

Four (4) hour minimum

Friday - Sunday

60% Multi-purpose room;

Four (4) hour minimum

Friday - Sunday

40% Multi-purpose room;

Four (4) hour minimum

Friday - Sunday

20% Multi-purpose room;

Four (4) hour minimum

Friday - Sunday

-

-

-

-

FY 2017-2018

93

9 Parks and Recreation Fees & ChargesContract Classes and Camps Market Per StudentCity Administrative Fee - Contact Classes and Camps $13 Per StudentClass Cancellation Fee (within ten (10) days of start) $10 Per ClassCity Cancelled Class $0 Per ClassDrop-in: Pickle Ball $2 Per DayDrop-in: Basketball $7 Per DayDrop-in: Zumba $15 Per DayDrop-in: Zumba (Coast Hope) $2 Per DayDrop-in: Hula $15 Per DayDrop-in: Ballroom Dancing $15 Per DayFacility Rental - Beer, Wine, Champaign $339 Per RentalActivity Guide - Ad Rate 1/8th Page, Black and White (B/W)$100 Per IssueActivity Guide - Ad Rate 1/4th Page, B/W $300 Per IssueActivity Guide - Ad Rate 1/2th Page, B/W $400 Per IssueActivity Guide - Ad Rate Full Page, B/W $600 Per IssueActivity Guide - Ad Rate 1/8th Page, Color $125 Per IssueActivity Guide - Ad Rate 1/4th Page, Color $350 Per IssueActivity Guide - Ad Rate 1/2th Page, Color $475 Per IssueActivity Guide - Ad Rate Full Page, Color $700 Per Issue

10 Smith Field #3Daytime $20 Per HourWith Lights $55 Per Hour

11 Notes: *No charge for rooms for Senior Coastsiders (when rooms are available); all-day rentals are from 9 a.m. - midnight (includes set-up and clean-up times); beer and wine permitted, no hard alcohol.

Fee Unit/Type Notes

15 Facility RentalsJanitorial Fee $168 Flat Fee

-

I. ADMINISTRATION

-

-

94

UNIT / TYPE

1 Returned Check Fee

1 First Item Each

2 Each Additional Item Each

2 Duplication

1 Photocopies Per page

2 Municipal Code Book* Per book

3 Bound Reports Per report

4 Budget* Each

5 Comprehensive Annual Financial Report (CAFR)* Each

6 CD Disc of City Council / Planning Commission Each

3 Agenda Indexes for Meetings *

4 City Clerk

Election Filing Fee Each2

Candidate Printing Fee Deposit1

5 Staff Research

1 City Manager's Office Per Quarter Hour

2 Finance Department Per Quarter Hour

3 City Clerk's Office Per Quarter Hour

4 Planning Department Per Quarter Hour

5 Building Department Per Quarter Hour

6 Public Works Department - Engineering Per Quarter Hour

7 Public Works Department - Maintenance Per Quarter Hour

8 Police - Sworn Per Quarter Hour

9 Police - Non Sworn Per Quarter Hour[1]

Fees set by California Civil Code Ch. 522 Sec. 1719. Additional charges may apply if not paid within 30 days of the receipt of the letter. See CA Civil Code 552 Sec. 1719.

* Available on-line at http://www.hmbcity.com Check indicates Credit Cards Accepted - Minimum charge $10.00Check indicates Credit Cards Accepted - Minimum charge $10.00[3]

Total cost equal to 100% of printing, handling, translating, and mailing costs. Deposit rate set by County of San Mateo and is subject to change.[4]

Rate is established by the California Government code and is subject to change. [6]

Based on the maximum number of employees & owner working in 24 hr. period in the prior year.[7]

License fee for a new business commenced after the first day of April shall be 50% of the annual fee.[8]

Special Event fees may be waived by the City Manager for NPDES related volunteer events.[9]

Poplar Beach Parking fees may be waived by the City Manager for NPDES related volunteer events.

City of Half Moon Bay

Master Fee Schedule

Proposed, Other Fees, Charges & Services

I. ADMINISTRATION

DESCRIPTION OF SERVICES FEE

$25.00

$35.00

$0.10

available on-line

Actual Cost

available on-line

available on-line

Actual Cost of CD

$0.00

$25.00

$250.00

$55.00

$47.00

$44.00

$53.00

$39.00

$48.00

$48.00

$54.00

$21.00

available on-line

Actual Cost

available on-line

available on-line

Actual Cost of CD

FEE + CPI

$25.00

$35.00

$0.00

$0.00

$25.00

$250.00

$56.00

$48.00

$45.00

$54.00

$40.00

$49.00

$49.00

$55.00

$21.00

Page 1 of 27

95

City of Half Moon Bay

Master Fee Schedule

Proposed, Other Fees, Charges & ServicesDESCRIPTION OF SERVICES FEE FEE + CPI UNIT / TYPE

6 Film Permit (Chapter 9.74) Per Day

7 Special Event Permits [8]

1 Block Parties Per Event

2 Fund Raisers Per Event

3 Miscellaneous Events Per Event

4 Carnival/Circus/Parade/Race/Rodeo, etc. Each

5 Amusement Concession Each

8 Poplar Beach Parking [9]

Vehicles less than 20 feet Per Hour / Per Day

Horse trailers and vehicles longer than 20 feet Per Hour / Per Day

Yearly Permit - Half Moon Bay Residents only Per Year (Prorated Quarterly)

9 BID Administration for City Hotels Per Month (all hotels)

10 Street Closure

Fees set by California Civil Code Ch. 522 Sec. 1719. Additional chardges may apply if not paid within 30 days of the receipt of the letter. See CA Civil Code 552 Sec. 1719.

* Available on-line at http://www.hmbcity.com Check indicates Credit Cards Accepted - Minimum charge $10.00Check indicates Credit Cards Accepted - Minimum charge $10.00[3]

Total cost equal to 100% of printing, handling, translating, and mailing costs. Deposit rate set by County of San Mateo and is subject to change.[4]

Rate is established by the California Government code and is subject to change. [6]

Based on the maximum number of employees & owner working in 24 hr. period in the prior year.[7]

License fee for a new business commenced after the first day of April shall be 50% of the annual fee.[8]

Special Event fees may be waived by the City Manager for NPDES related volunteer events.[9]

Poplar Beach Parking fees may be waived by the City Manager for NPDES related volunteer events.

DESCRIPTION OF SERVICES

I. ADMINISTRATION (Cont'd)

FEE

$498.00

$194.00

$194.00

$387.00

$387.00

$387.00

$2.00 / $10.00

$3.00 / $15.00

$94.00

$516.00

Actual Cost

FEE + CPI

$514.00

$200.00

$200.00

$399.00

$399.00

$399.00

$2.00 / $10.00

$3.00 / $15.00

$97.00

$533.00

Actual Cost

Page 2 of 27

96

City of Half Moon Bay

Master Fee Schedule

Proposed, Other Fees, Charges & ServicesDESCRIPTION OF SERVICES FEE FEE + CPI UNIT / TYPE

1 Duplication

1 Public Safety Reports Each

2 Photo Reproduction Each

3 Audio Tape/CD Reproduction Per Tape/CD Disc

4 Audio Tape Reproduction Per Tape/DVD Disc

2 Licensing

1 Bingo Establishment Processing (Chapter 3.94)

Bingo Establishment Each

Renewal Each per year

2 Fortune Telling (Chapter 3.95)

New Business Each

Renewal Each per year

New Tech. Each

Renewal Tech Each per year

3 Massage Establishments (Chapter 3.88)

New Business Each

Renewal Each per year

Transfer Each

Reinstatement Each

4 Secondhand Dealers

New Dealers Each

Renewal Each per year

5 Solicitor / Peddler

New Applicant Each

Annual Renewal Each per year

DESCRIPTION OF SERVICES FEE

$10.00

$20.00

II. PUBLIC SAFETY

$20.00

$20.00

$126.00

$126.00

$627.00

$126.00

$627.00

$126.00

$627.00

$126.00

$627.00

$126.00

$126.00

$126.00

$627.00

$126.00

FEE + CPI

$10.00

$20.00

$20.00

$20.00

$130.00

$130.00

$647.00

$130.00

$647.00

$130.00

$647.00

$130.00

$647.00

$130.00

$130.00

$130.00

$647.00

$130.00

Page 3 of 27

97

City of Half Moon Bay

Master Fee Schedule

Proposed, Other Fees, Charges & ServicesDESCRIPTION OF SERVICES FEE FEE + CPI UNIT / TYPE

3 Miscellaneous Fees

1 Public Safety Service Fees

Public Dance Each

Deputy / Sergeant / Reserve / Community Service Officer Per Hour

Fees are adjusted annually by the CPI All Urban Consumers/San Francisco-Oakland-San Jose

established in December.

3 Miscellaneous Fees (Cont'd)

2 Vehicle Release Per Vehicle

Repossession Release Per Vehicle

3 Clearance/Special Letters Each

4 Illegal Sign Confiscation Per Incidence

5 Illegal Fireworks Confiscation Per Citation

4 Parking Fees

1 Nighttime Permit Parking Program (Miramar/Naples & Alsace Lorraine Neighborhoods)

HMB Resident $41.00 Incl. up to 4 guest permits $41.00 Incl. up to 4 guest permits Per Year

Additional Resident Permits > 4 $21.00 $21.00 Each Per Year

HMB Resident Outside Permitted Areas $41.00 Up to two vehicles. $41.00 Up to two vehicles. Per Year

Visitors $41.00 $41.00 Per Vehicle Per Year

2 Temporary Offstreet Parking $21.00 $21.00 Per Vehicle Per Day

DESCRIPTION OF SERVICES

II. PUBLIC SAFETY (Cont'd)

FEE

$40.00

$218.00

$90.00

$15.00

$40.00

$163.00

$163.00

FEE + CPI

$40.00

$225.00

$90.00

$15.00

$40.00

$168.00

$168.00

Page 4 of 27

98

City of Half Moon Bay

Master Fee Schedule

Proposed, Other Fees, Charges & ServicesDESCRIPTION OF SERVICES FEE FEE + CPI UNIT / TYPE

5 Citation Fee Schedule1

1. Municipal Code 2

FEE DELINQUENT FEE FEE DELINQUENT FEE

10.08.060 Removing Chalk Marks $74.00 $44.00 $74.00 $44.00 Each

10.12.030 Obedience To Signs $74.00 $44.00 $74.00 $44.00 Each

10.36.110 Wheels Not Curbed $43.00 $44.00 $44.00 $45.00 Each

10.28.060 Limited Access $43.00 $44.00 $44.00 $45.00 Each

10.36.010 No Parking, Stopping, Standing $42.00 $44.00 $43.00 $45.00 Each

10.36.030 Parking Restricted $42.00 $44.00 $43.00 $45.00 Each

10.36.040 No Parking Zone (Permits) $46.00 $44.00 $47.00 $45.00 Each

10.36.050 Parked Over 72 Hours $46.00 $44.00 $47.00 $45.00 Each

10.36.060 Advertising For Sale On Street $43.00 $44.00 $44.00 $45.00 Each

10.36.070 Repair Vehicle On Street $43.00 $44.00 $44.00 $45.00 Each

10.36.080 Washing Vehicle On Street $43.00 $44.00 $44.00 $45.00 Each

10.36.090 (B) School Zone $46.00 $44.00 $47.00 $45.00 Each

10.36.100 (A) No Parking Posted $46.00 $44.00 $47.00 $45.00 Each

10.36.100 (B) No Parking-Narrow Street $46.00 $44.00 $47.00 $45.00 Each

10.36.120 Peddler Vehicle-No Permit $43.00 $44.00 $44.00 $45.00 Each

10.36.130 Emergency Signs $74.00 $44.00 $76.00 $45.00 Each

10.37.020 Oversize Vehicle 0200-0500 $74.00 $44.00 $76.00 $45.00 Each

10.37.030 Non-Motorized Vehicle Unhook $74.00 $44.00 $76.00 $45.00 Each

10.40.010 15 Min Zone (Green Curb) $46.00 $44.00 $47.00 $45.00 Each

10.40.020 2 Hour Zone $46.00 $44.00 $47.00 $45.00 Each

10.40.030 Parking On One-Way Streets $46.00 $44.00 $47.00 $45.00 Each

10.40.040 (A) Diagonal Parking Zone $46.00 $44.00 $47.00 $45.00 Each

10.40.040 (B) Front Tire 6 Inches From Curb $46.00 $44.00 $47.00 $45.00 Each

10.40.050 Use More Than One Space $46.00 $44.00 $47.00 $45.00 Each

10.40.060 No Stopping Zone $46.00 $44.00 $47.00 $45.00 Each1

Citation fee amounts increase for two or more offenses. Applicable fees are stated on the violation notice.2

Municipal Code Fees are adjusted annually by the CPI All Urban Consumers/San Francisco-Oakland-San Jose established in December.

FEEDESCRIPTION OF SERVICES

II. PUBLIC SAFETY (Cont'd)

FEE + CPI

Page 5 of 27

99

City of Half Moon Bay

Master Fee Schedule

Proposed, Other Fees, Charges & ServicesDESCRIPTION OF SERVICES FEE FEE + CPI UNIT / TYPE

5 Citation Fee Schedule1 (Cont'd)

1. Municipal Code 2 (Cont'd) FEE DELINQUENT FEE FEE DELINQUENT FEE

10.40.070 12 Hour Parking-When Posted $46.00 $44.00 $46.00 $44.00 Each

10.40.080 Move Vehicle - Avoid Time Limit $46.00 $44.00 $46.00 $44.00 Each

10.40.090 Store Vehicle On Street $46.00 $44.00 $46.00 $44.00 Each

10.40.100 Repeat Violations $46.00 $44.00 $46.00 $44.00 Each

10.40.110 Extended Parking Permits $46.00 $44.00 $46.00 $44.00 Each

10.44.020 Curb Marked (Red/White/Green) $74.00 $44.00 $74.00 $44.00 Each

10.44.030 No Truck/Trailer $71.00 $44.00 $71.00 $44.00 Each

10.44.040 Loading Zone $46.00 $44.00 $46.00 $44.00 Each

10.44.050 Passenger Loading Zone $46.00 $44.00 $46.00 $44.00 Each

10.44.060 No Parking In Alley $46.00 $44.00 $46.00 $44.00 Each

10.44.070 Bus Zone $46.00 $44.00 $46.00 $44.00 Each

10.48.030 Vehicle Off Road $71.00 $44.00 $71.00 $44.00 Each

10.50.010 No Parking After Dusk Mirada/Redondo/Poplar $74.00 $44.00 $74.00 $44.00 Each

10.50.020 No Parking After Dusk Wavecrest $74.00 $44.00 $74.00 $44.00 Each

12.08.040 Dumping On Street/Alley/Gutter $286.00 $44.00 $286.00 $44.00 Each

12.12.030 Dumping $124.00 $44.00 $124.00 $44.00 Each1

Citation fee amounts increase for two or more offenses. Applicable fees are stated on the violation notice.2

Municipal Code Fees are adjusted annually by the CPI All Urban Consumers/San Francisco-Oakland-San Jose established in December.3

California Vehicle Code Fees are established by the State of California and are not escalated by the CPI All Urban Consumers/San Francisco-Oakland-San Jose

II. PUBLIC SAFETY (Cont'd)

DESCRIPTION OF SERVICES FEE FEE + CPI

Page 6 of 27

100

City of Half Moon Bay

Master Fee Schedule

Proposed, Other Fees, Charges & ServicesDESCRIPTION OF SERVICES FEE FEE + CPI UNIT / TYPE

2. California Vehicle Code 3

FEE DELINQUENT FEE FEE DELINQUENT FEE

21113 (A) Parked On Public Ground $43.00 $42.00 $43.00 $42.00 Each

Parking Prohibited $38.00 $42.00 $38.00 $42.00 Each

22500 (A) Parking In Intersection $38.00 $42.00 $38.00 $42.00 Each

22500 (B) Parking On Crosswalk $38.00 $42.00 $38.00 $42.00 Each

22500 ( C) Parking In Safety Zone $38.00 $42.00 $38.00 $42.00 Each

22500 (D) Within 15' Fire Station Driveway $38.00 $42.00 $38.00 $42.00 Each

22500 (E) Parking In Driveway $38.00 $42.00 $38.00 $42.00 Each

22500 (F) Parking On Sidewalk $38.00 $42.00 $38.00 $42.00 Each

22500 (G) Obstruct Traffic @ Excavation $38.00 $42.00 $38.00 $42.00 Each

22500 (H) Double Parking $38.00 $42.00 $38.00 $42.00 Each

22500 (I) Parking In Bus Zone $38.00 $42.00 $38.00 $42.00 Each

22500 (J) Parking In Tunnel $38.00 $42.00 $38.00 $42.00 Each

22500 (K) Parking On Bridge $38.00 $42.00 $38.00 $42.00 Each

22500 (L) Blocking Wheelchair Access $333.00 $42.00 $333.00 $42.00 Each

22502 (A) Over 18" From Curb $33.00 $42.00 $33.00 $42.00 Each

22502 (E) Curb Parking/One-Way Street $30.00 $42.00 $30.00 $42.00 Each

22504 (A) Unincorporated Area Parking $43.00 $42.00 $43.00 $42.00 Each

22505 (B) No Parking - State Hwy $48.00 $42.00 $48.00 $42.00 Each

22507.8 ( A) Handicapped Space Without Placard $333.00 $42.00 $333.00 $42.00 Each1

Citation fee amounts increase for two or more offenses. Applicable fees are stated on the violation notice.2

Municipal Code Fees are adjusted annually by the CPI All Urban Consumers/San Francisco-Oakland-San Jose established in December.3

California Vehicle Code Fees are established by the State of California and are not escalated by the CPI All Urban Consumers/San Francisco-Oakland-San Jose

22500.1

DESCRIPTION OF SERVICES

II. PUBLIC SAFETY (Cont'd)

FEE FEE + CPI

Page 7 of 27

101

City of Half Moon Bay

Master Fee Schedule

Proposed, Other Fees, Charges & ServicesDESCRIPTION OF SERVICES FEE FEE + CPI UNIT / TYPE

5

2. California Vehicle Code (Cont'd) 2

FEE DELINQUENT FEE FEE DELINQUENT FEE

22507.8 ( B) Blocking Handicapped Space $333.00 $333.00 $333.00 $333.00 Each

22507.8 ( C) Hashmarks Handicap Zone $333.00 $333.00 $333.00 $333.00 Each

22514 Fire Hydrants - Within 15 Feet $38.00 $38.00 $38.00 $38.00 Each

22515 Unattended Vehicle - Engine Running $33.00 $33.00 $33.00 $33.00 Each

22519 Posted For Patrons Only $33.00 $33.00 $33.00 $33.00 Each

22522 Block Sidewalk Ramp $333.00 $333.00 $333.00 $333.00 Each

22523 (A) Abandon Vehicle On Highway $105.00 $105.00 $105.00 $105.00 Each

22523 A/B Abandoned Vehicle $105.00 $105.00 $105.00 $105.00 Each

22523 (B) Abandon Vehicle - Private Property $105.00 $105.00 $105.00 $105.00 Each

22526 (A) Blocking Intersection $53.00 $53.00 $53.00 $53.00 Each

22951 Park Lot - Street & Alley $25.00 $25.00 $25.00 $25.00 Each

22952 (A) Park Lot-Tow/Removal $40.00 $40.00 $40.00 $40.00 Each

22952 (B) Park Lot-Tow/Removal $40.00 $40.00 $40.00 $40.00 Each

23333 Stop/Park On Bridge $43.00 $43.00 $43.00 $43.00 Each

23336 Violate Posted Signs $40.00 $40.00 $40.00 $40.00 Each

28071 Bumper Required-Fine Or P/C $25.00 $25.00 $25.00 $25.00 Each

22507.8 (A) Handicapped Space Without Placard $333.00 $333.00 $333.00 $333.00 Each

4000 (A) Unregistered Vehicle $53.00 $53.00 $53.00 $53.00 Each

4462 (B) Registration On Wrong Vehicle $30.00 $30.00 $30.00 $30.00 Each

5200 Lic Plate Missing - Fine Or P/C $35.00 $35.00 $35.00 $35.00 Each

5202 Period Of Display - Fine Or P/C $30.00 $30.00 $30.00 $30.00 Each

5204 (A) Tags Attach Wrong - Fine Or P/C $30.00 $30.00 $30.00 $30.00 Each

6 D.U.I. Cost Recovery

Arrest with Traffic Collision & Transportation Per Response1

Citation fee amounts increase for two or more offenses. Applicable fees are stated on the violation notice.2

California Vehicle Code Fees are established by the State of California and are not escalated by the CPI All Urban Consumers/San Francisco-Oakland-San Jose

II. PUBLIC SAFETY (Cont'd)

DESCRIPTION OF SERVICES

Citation Fee Schedule1 (Cont'd)

FEE

$686.00

FEE + CPI

$686.00

Page 8 of 27

102

City of Half Moon Bay

Master Fee Schedule

Proposed, Other Fees, Charges & ServicesDESCRIPTION OF SERVICES FEE FEE + CPI UNIT / TYPE

1 Building Permit Fee for Alterations, Additions, and New Construction (based on valuation of improvement) 3,6

Valuation ($)

0 - 500 Valuation

501 - 2,000 Valuation

First 500

Each Additional 100 or fraction thereof

2,001 - 25,000 Valuation

First 2,000

Each Additional 1,000 or fraction thereof

25,001 - 50,000 Valuation

First 25,000

Each Additional 1,000 or fraction thereof

50,001 - 100,000 Valuation

First 50,000

Each Additional 1,000 or fraction thereof

100,000 - 500,000 Valuation

First 100,000

Each Additional 1,000 or fraction thereof

500,001 - 1,000,000 Valuation

First 500,000

Each Additional 1,000 or fraction thereof

1,000,001 and above Valuation

First 1,000,000

Each Additional 1,000 or fraction thereof

2 Building Plan Check Fee 3,5,6

Plan Revision Per Hour

Fee for 4th review onwards-charged on hourly basis Per Hour

Electronic submittal fee

1

2 The General Plan fee will be applied to all residential/commercial/industrial new construction and/or addition permits. The fee will be 0.25% ($2.50/$1000) of the valuation of the construction/addition.

III. BUILDING

DESCRIPTION OF SERVICES

$2/drawing sheet and $5.10 flat fee for

supporting documents

Solar permit fees shall be established based on valuation with a 70% discount of the total of the building permit fee, plan check fee and electrical permit fee.

FEE

$205.00

$205.00

$11.05

$379.00

$1.58

$426.00

$4.73

$568.00

$3.16

$710.00

$3.16

$1,894.00

$4.73

$4,545.00

$4.73

$158.00

$158.00

65% of Building Permit Fee

FEE + CPI

$211.00

$211.00

$11.41

$391.00

$1.63

$440.00

$4.89

$586.00

$3.26

$733.00

$3.26

$1,956.00

$4.89

$4,694.00

$4.89

65% of Building Permit Fee

$163.00

$163.00

$2/drawing sheet and $5.10 flat fee for

supporting documents

Page 9 of 27

103

City of Half Moon Bay

Master Fee Schedule

Proposed, Other Fees, Charges & ServicesDESCRIPTION OF SERVICES FEE FEE + CPI UNIT / TYPE

3 Miscellaneous Permit 3,6

1 Demolition Up To 2 Hours4

2 Solar

Residential

0-15kW

Above 15kW

First 15kW

Each Additional kW or fraction thereof

Commercial

0-50 kW

51-250 kW

First 50kW

Each Additional kW or fraction thereof

Above 205kW

First 50kW

Each Additional kW or fraction thereof

3 Permit Fees for Work Without A Valid Permit Fine / Penalty

4 Business License Inspection Per 1/2 Hour

4 Other Inspections and Fees 3,6

Pre-Site Inspection $158.00 see footnote 4 $163.00 see footnote 4 Per Hour4

Re-Inspections $158.00 see footnote 4 $163.00 see footnote 4 Per Hour4

Reinspection fees

Inspection for which no fee is specifically indicated, per hour Per Hour4

Inspections outside of normal business hours, per hour

General Plan Fee Valuation 2,3

Technology Fee

4% see footnote 7 4% see footnote 7Building/Electrical/Mechanical/Plumbing

permit fee

5 Refund

6 Special Structural Inspection Fee $158.00 Deposit to be determined by Public Works Director at time of application.$158.00 Deposit to be determined by Public Works Director at time of application.

Total cost equal to 100% of staff and/or consultant time and materialsTotal cost equal to 100% of staff and/or consultant time and materials

1

2 The General Plan fee will be applied to all residential/commercial/industrial new construction and/or addition permits. The fee will be 0.25% ($2.50/$1000) of the valuation of the construction/addition.

3 Fees are adjusted annually by the CPI All Urban Consumers/San Francisco-Oakland-San Jose established in December.

4 Overtime rate per hour of 150% will apply for after hour inspection requests with 200% on Sundays and Holidays (Minimum 2 Hours).

5 Miscellaneous plan review or similar services will be charged at $128 per hour.

6 Permit Fees for Work Done Without A Valid Permit Are 2 times the Permit Fee for Bldg, Electrical, Mechanical, Plumbing, Encroachment & Grading Permits

7 The Technology fee will be 4.0% of the total Building, Electrical, Mechanical, Plumbing permit fees. Excludes in-lieu fees.

Solar permit fees shall be established based on valuation with a 70% discount of the total of the building permit fee, plan check fee and electrical permit fee.

III. BUILDING (Cont'd)

DESCRIPTION OF SERVICES FEE

$236.00

$158.00

$158.00

$158.00

$79.00

$237.00

$237.00

$79.00

$237.00

$79.00

2 X Permit Fee

$79.00

$158.00

$158.00

$158.00

0.25%

See IX. Refund Policy

FEE + CPI

$243.00

$163.00

$163.00

$163.00

$81.00

$244.00

$244.00

$81.00

$244.00

$81.00

2 X Permit Fee

$81.00

$163.00

$163.00

$163.00

0.25%

Page 10 of 27

104

City of Half Moon Bay

Master Fee Schedule

Proposed, Other Fees, Charges & ServicesDESCRIPTION OF SERVICES FEE FEE + CPI UNIT / TYPE

7 Electrical Permit 3,6

Permit Issuance

For issuing each permit Each

For issuing each supplemental permit for which the original permit has not expired,

been canceled or finaled Each

New Residential Buildings

For new multifamily residential buildings (apartments and condominiums) having three

or more living units, including the area of garages, carports, and

other non-commercial automobile storage areas constructed at the same time, per

square foot

Per square foot

For new single and two-family residential buildings, including the area of garages,

carports and other minor accessory buildings constructed at the same time, per square

foot

Per square foot

For other types of residential occupancies and alteration, and modifications to existing

residential buildings, use the UNIT FEE SCHEDULE See Unit Fee Schedule Below See Unit Fee Schedule Below

Private Swimming Pools

For new private, residential, in-ground swimming pools for single family/multi-family

occupancies, including a complete system of necessary branch circuit wiring, bonding,

grounding, underwater lighting, water pumping, and other similar electrical equipment

directly related to the operation of a swimming pool, each pool

Each

Carnivals and Circuses

Carnivals, circuses, or other traveling shows or exhibitions utilizing

transportable-type rides, booths, displays and attractions:

For electrical generators and electrically driven rides, each Each

For mechanically driven rides and walk-through attractions or displays having electric

lighting, each Each

For a system of area and booth lighting, each Each

For permanently installed rides, booths, displays and attractions, use the UNIT FEE

SCHEDULE

1

2 The General Plan fee will be applied to all residential/commercial/industrial new construction and/or addition permits. The fee will be 0.25% ($2.50/$1000) of the valuation of the construction/addition.

3 Fees are adjusted annually by the CPI All Urban Consumers/San Francisco-Oakland-San Jose established in December.

4 Overtime rate per hour of 150% will apply for after hour inspection requests with 200% on Sundays and Holidays (Minimum 2 Hours).

5 Miscellaneous plan review or similar services will be charged at $128 per hour.

6 Permit Fees for Work Done Without A Valid Permit Are 2 times the Permit Fee for Bldg, Electrical, Mechanical, Plumbing, Encroachment & Grading Permits

7 The Technology fee will be 4.0% of the total Building, Electrical, Mechanical, Plumbing permit fees. Excludes in-lieu fees.

Solar permit fees shall be established based on valuation with a 70% discount of the total of the building permit fee, plan check fee and electrical permit fee.

DESCRIPTION OF SERVICES

III. BUILDING (Cont'd)

FEE

$38.00

$38.00

$13.00

$13.00

$19.00

$32.00

$6.00

$6.00

See Unit Fee Schedule Below

FEE + CPI

$39.00

$39.00

$13.00

$13.00

$19.00

$33.00

$6.00

$6.00

See Unit Fee Schedule Below

Page 11 of 27

105

City of Half Moon Bay

Master Fee Schedule

Proposed, Other Fees, Charges & ServicesDESCRIPTION OF SERVICES FEE FEE + CPI UNIT / TYPE

7 Electrical Permit 3,6

(Cont'd)

Temporary Power Services

For a temporary service power pole or pedestal including all pole or pedestal-mounted

receptacle outlets and appurtenances, each Each

For a temporary distribution system and temporary lighting and receptacle outlets for

construction sites, decorative light, Christmas tree sales lots, fireworks stands, etc.,

each

Each

Receptable, Switch and Lighting Outlets

For receptacle, switch, lighting, or other outlets at which current is used or

controlled (except services, feeders, and meters):

First 20 fixtures, each Each

Additional fixtures, each Each

For lighting fixtures, sockets, or other lamp-holding devices:

First 20 fixtures, each Each

Additional fixtures, each Each

For pole or platform-mounted lighting fixtures Each

For theatrical-type lighting fixtures or assemblies Each

Residential Appliances

For fixed residential appliances or receptacle outlets for same, including wall-mounted

electrical ovens; counter-mounted cooking tops; electric ranges; self-contained room,

console, or through wall air conditioners; space heaters; food waste grinders;

dishwashers; washing machines; water heaters; clothes dryers; or other motor-

operated appliance not exceeding one horsepower (HP) in rating

Each

Non-Residential Appliances

For residential appliances and self-contained factory-wired non-residential appliances

not exceeding one horsepower (HP), kilowatt (KW), or kilovolt ampere (KVA) in rating,

including medical or dental devices; food, beverage, and ice cream cabinets;

illuminated show cases; drinking fountains; vending machines; laundry machines; or

other similar types of equipment

Each

3 Fees are adjusted annually by the CPI All Urban Consumers/San Francisco-Oakland-San Jose established in December.

6 Permit Fees for Work Done Without A Valid Permit Are 2 times the Permit Fee for Bldg, Electrical, Mechanical, Plumbing, Encroachment & Grading Permits

DESCRIPTION OF SERVICES

III. BUILDING (Cont'd)

FEE

$19.00

$19.00

$1.27

$0.25

$1.27

$1.27

$25.00

$25.00

$3.00

$3.00

FEE + CPI

$19.00

$19.00

$1.31

$0.26

$1.31

$1.31

$25.00

$25.00

$3.00

$3.00

Page 12 of 27

106

City of Half Moon Bay

Master Fee Schedule

Proposed, Other Fees, Charges & ServicesDESCRIPTION OF SERVICES FEE FEE + CPI UNIT / TYPE

7 Electrical Permit 3,6

(Cont'd)

Busways

For trolley and plug-in-type busways, each 100 feet or fraction thereof

Note: An additional fee is required for lighting fixtures, motors and other appliances

that are connected to trolley and plug-in-type busways. A fee is not required for

portable tools.

Each 100 ft or fraction thereof

Power Apparatus

For motors, generators, transformers, rectifiers, synchronous converters,

capacitors, industrial heating, air conditioners and heat pumps, cooking or

baking equipment and other apparatus, as follows (Rating in Horsepower (HP),

kilowatts (KW), kilovolt-amperes (KVA), or kilo-volt-amperes-reactive (KVAR):

Up to and including 1

Over 1 and not over 10

Over 10 and not over 50

Over 50 and not over 100

Over 100

Signs, Outline Lighting and Marquees

For signs, outline lighting systems or marquees supplied from one branch circuit Each

For additional branch circuits within the same sign, outline lighting system or marquee

Each

Services

For services of 600 volts or less and no over 200 amperes in rating Each

For services of 600 volts or less and not over 200 amperes to 1,000 amperes in rating Each

For services over 600 volts or over 1,000 amperes in rating Each

Miscellaneous Apparatus, Conduits and Conductors

For electrical apparatus, conduits and conductors for which a permit is required but for EachOther Inspection and Fees

Inspections outside of normal business hours, per hour* Per hour

Inspection on Sundays and Holidays, per hour* Per hour

Reinspection fees, per hour* Per hour

Inspection for which no fee is specifically indicated, per hour* Per hour* Overtime rate of 150% will apply for after hour inspection requests with 200% on Sundays and Holidays.

3 Fees are adjusted annually by the CPI All Urban Consumers/San Francisco-Oakland-San Jose established in December.

6 Permit Fees for Work Done Without A Valid Permit Are 2 times the Permit Fee for Bldg, Electrical, Mechanical, Plumbing, Encroachment & Grading Permits

DESCRIPTION OF SERVICES

III. BUILDING (Cont'd)

FEE

$25.00

$13.00

$13.00

$25.00

$25.00

$51.00

$13.00

$13.00

$13.00

$13.00

$19.00

$25.00

$158.00

$158.00

$158.00

$158.00

FEE + CPI

$25.00

$13.00

$13.00

$25.00

$25.00

$52.00

$13.00

$13.00

$13.00

$13.00

$19.00

$25.00

$163.00

$163.00

$163.00

$163.00

Page 13 of 27

107

City of Half Moon Bay

Master Fee Schedule

Proposed, Other Fees, Charges & ServicesDESCRIPTION OF SERVICES FEE FEE + CPI UNIT / TYPE

8 Mechanical Permit 3,6

Permit Issuance

For issuing each permit Each

For issuing each supplemental permit for which the original permit has not expired,

been canceled or finaled Each

Furnaces

For the installation or relocation of each forced-air or gravity-type furnace or burner,

including ducts, and vents attached to such appliances, up to and including 100,000

Btu/h

Each

For the installation or relocation of each forced-air or gravity-type furnace or burner,

including ducts, and vents attached to such appliances over 100,000 Btu/h Each

For the installation or relocation of each floor furnace, including vent Each

For the installation or relocation of each suspended heater, recessed wall heater or

floor-mounted heater Each

Appliance Vents

For the installation, relocation or replacement of each appliance vent installed and not

included in an appliance permit Each

Repairs or Additions

For the repair of, alteration of, or addition to each heating appliance, refrigeration unit,

cooling unit, absorption unit, or each heating, cooling, absorption, or evaporative

cooling system, including installation of controls regulated by the Code

Each

Boilers, Compressors and Absorption Systems

For the installation or relocation of each boiler or compressor up to and including three

horsepower, or each absorption system up to and including 100,000 Btu/h Each

For the installation or relocation of each boiler or compressor over three horsepower,

up to and including 15 horsepower, or each absorption system over 100,000 Btu/h to

and including 500,000 Btu/h

Each

For the installation or relocation of each boiler or compressor over 15 horsepower, up

to and including 30 horsepower, or each absorption system over 500,000 Btu/h to and

including 1,000,000 Btu/h

Each

For the installation or relocation of each boiler or compressor over 30 horsepower to

and including 50 horsepower, or for each absorption system over 1,000,000 Btu/h to

and including 1,750,000 Btu/h

Each

* Overtime rate of 150% will apply for after hour inspection requests with 200% on Sundays and Holidays.

3 Fees are adjusted annually by the CPI All Urban Consumers/San Francisco-Oakland-San Jose established in December.

6 Permit Fees for Work Done Without A Valid Permit Are 2 times the Permit Fee for Bldg, Electrical, Mechanical, Plumbing, Encroachment & Grading Permits

DESCRIPTION OF SERVICES

III. BUILDING (Cont'd)

FEE

$38.00

$38.00

$13.00

$13.00

$13.00

$13.00

$13.00

$19.00

$39.00

$39.00

$39.00

$79.00

FEE + CPI

$39.00

$39.00

$13.00

$13.00

$13.00

$13.00

$13.00

$19.00

$40.00

$40.00

$40.00

$81.00

Page 14 of 27

108

City of Half Moon Bay

Master Fee Schedule

Proposed, Other Fees, Charges & ServicesDESCRIPTION OF SERVICES FEE FEE + CPI UNIT / TYPE

8 Mechanical Permit 3,6

(Cont'd)

Air Handlers

For each air-handling unit to and including 10,000 cubic feet per minute, including ducts

attached thereto Each

For each air-handling unit over 10,000 cfm Each

Evaporative Coolers

For each evaporative cooler other than portable type Each

Ventilation and Exhaust

For each ventilation fan connected to a single duct Each

For each ventilation system which is not a portion of any heating or air-conditioning

system authorized by a permit Each

For the installation of each hood which is served by mechanical exhaust, including the

ducts for such hood Each

Incinerators

For the installation or relocation of each domestic-type incinerator Each

For the installation or relocation of each commercial or industrial-type incinerator Each

Miscellaneous

For each appliance or piece of equipment regulated by the Mechanical Code but not

classed in other appliance categories, or for which no other fee is listed in the table

Each

* Overtime rate of 150% will apply for after hour inspection requests with 200% on Sundays and Holidays.

3 Fees are adjusted annually by the CPI All Urban Consumers/San Francisco-Oakland-San Jose established in December.

6 Permit Fees for Work Done Without A Valid Permit Are 2 times the Permit Fee for Bldg, Electrical, Mechanical, Plumbing, Encroachment & Grading Permits

III. BUILDING (Cont'd)

DESCRIPTION OF SERVICES FEE

$13.00

$25.00

$13.00

$13.00

$13.00

$13.00

$25.00

$25.00

$13.00

FEE + CPI

$13.00

$25.00

$13.00

$13.00

$13.00

$13.00

$25.00

$25.00

$13.00

Page 15 of 27

109

City of Half Moon Bay

Master Fee Schedule

Proposed, Other Fees, Charges & ServicesDESCRIPTION OF SERVICES FEE FEE + CPI UNIT / TYPE

9 Plumbing Permit 3,6

Permit Issuance

For issuing each permit Each

For issuing each supplemental permit for which the original permit has not expired,

been canceled or finaled Each

Fixtures and Vents

For each plumbing fixture or trap or set of fixtures on one trap (including water,

drainage piping and backflow protection therefore) Each

For each repair or alteration of drainage or vent piping, each fixture Each

Sewers, Disposal Systems and Interceptors

For each building sewer and each trailer park sewer Each

Rainwater systems-per drain (inside building) Each

For each cesspool (where permitted) Each

For each private sewage disposal system Each

For each industrial waste pretreatment interceptor including its trap and vent, except

kitchen-type grease interceptors functioning as fixture traps Each

Gas Piping Systems

For each gas-piping system of one to five outlets Each

For each additional gas piping system outlet, per outlet Each

Water Piping and Water Heaters

For installation, alteration, or repair of water piping or water-treating equipment, or

both, each Each

For each water heater and/or vent Each

Lawn Sprinklers, Vacuum Breakers & Backflow Protection Devices

For each lawn sprinkler system or any one meter, including backflow protection devices

thereof Each

For atmospheric-type vacuum breakers or backflow protection devices not

included above:

1 to 5 Each

Over 5, each Each

For each backflow protective device other than atmospheric type vacuum

breakers:

2 inch diameter and smaller

Each

over 2 inch diameter Each

3 Fees are adjusted annually by the CPI All Urban Consumers/San Francisco-Oakland-San Jose established in December.

6 Permit Fees for Work Done Without A Valid Permit Are 2 times the Permit Fee for Bldg, Electrical, Mechanical, Plumbing, Encroachment & Grading Permits

DESCRIPTION OF SERVICES

III. BUILDING (Cont'd)

FEE

$38.00

$38.00

$13.00

$13.00

$25.00

$13.00

$13.00

$19.00

$19.00

$13.00

$2.54

$13.00

$3.00

$13.00

$3.00

$2.54

$6.00

$13.00

FEE + CPI

$39.00

$39.00

$13.00

$13.00

$25.00

$13.00

$13.00

$19.00

$19.00

$13.00

$2.00

$13.00

$3.00

$13.00

$3.00

$2.00

$6.00

$13.00

Page 16 of 27

110

City of Half Moon Bay

Master Fee Schedule

Proposed, Other Fees, Charges & ServicesDESCRIPTION OF SERVICES FEE FEE + CPI UNIT / TYPE

9 Plumbing Permit 3,6

(Cont'd)

Swimming Pools

Public Pool Each

Public Spa Each

Private Pool Each

Private Spa (pre-manufactured) Per valuation

Private Spa (custom built) Each

Miscellaneous

For each appliance or piece of equipment regulated by the Plumbing Code but not

classed in other appliance categories, or for which no other fee is listed in this code

Each

* Overtime rate of 150% will apply for after hour inspection requests with 200% on Sundays and Holidays.

3 Fees are adjusted annually by the CPI All Urban Consumers/San Francisco-Oakland-San Jose established in December.

6 Permit Fees for Work Done Without A Valid Permit Are 2 times the Permit Fee for Bldg, Electrical, Mechanical, Plumbing, Encroachment & Grading Permits

III. BUILDING (Cont'd)

DESCRIPTION OF SERVICES FEE

$38.00

$25.00

$38.00

$6.00

$25.00

$13.00

FEE + CPI

$39.00

$25.00

$39.00

$6.00

$25.00

$13.00

Page 17 of 27

111

City of Half Moon Bay

Master Fee Schedule

Proposed, Other Fees, Charges & ServicesDESCRIPTION OF SERVICES FEE FEE + CPI UNIT / TYPE

1 Public Improvement Plan Check Fee (including grading)1

Valuation ($)

$10,000

Each additional $1,000 or fraction thereof

$100,000

Each additional $1,000 or fraction thereof

$500,000

Each additional $1,000 or fraction thereof

2 Construction Inspection

Valuation ($)

$10,000

Each additional $1,000 or fraction thereof

$100,000

Each additional $1,000 or fraction thereof

$500,000

Each additional $1,000 or fraction thereof

3 Final Map Review

Parcel Map

addition lot

Tract Map

addition lot

4 Subdivision Improvement Agreement Fee

1Construction activities during October through April shall require Storm Water Pollution Prevention plans, measures and fees.

2Total cost equal to 100% of staff and/or consultant time and materials. Check indicates Credit Cards Accepted - Minimum charge $10.00

3 Fees are adjusted annually by the CPI All Urban Consumers/San Francisco-Oakland-San Jose established in December.

4Overtime rate per hour of 150% will apply for after hour inspection requests with 200% on Sundays and Holidays (Minimum 2 Hours).

6 Permit Fees for Work Done Without A Valid Permit Are 2 times the Permit Fee for Bldg, Electrical, Mechanical, Plumbing, Encroachment & Grading Permits

DESCRIPTION OF SERVICES

IV. PUBLIC WORKS

$766.00

$63.82

$6,510.00

$51.22

$26,998.00

$54.00

$6,127.00

$766.00

$38.29

$4,212.00

$32.07

$17,041.00

$34.08

FEE

$1,532.00

$7,659.00

$54.00

$3,064.00

$791.00

$39.00

$4,350.00

$33.00

$17,603.00

$35.00

$791.00

$65.00

$6,724.00

$52.00

$27,888.00

$55.00

$6,329.00

$1,582.00

$7,911.00

$55.00

$3,165.00

FEE + CPI

Page 18 of 27

112

City of Half Moon Bay

Master Fee Schedule

Proposed, Other Fees, Charges & ServicesDESCRIPTION OF SERVICES FEE FEE + CPI UNIT / TYPE

6 Encroachment Permits Plan Review & Inspection

Spot Repair (I.e. water leaks, pothole patches)

Excavation/Restoration less that 100 LF

Excavation/Restoration 100 LF or greater

each additional 100 LF

Curb, gutter, sidewalk, or driveway less that 100 LF

Curb, gutter, sidewalk, or driveway 100 LF or greater

each additional 100 LF

Sewer connections, repair or extension 100 LF or less

Storm Drain connection, repair or extension 100 LF or Greater

each additional 100 LF

Storm Drain connection, repair or extension <100 LF

each additional 100 LF

Storm Drain connection, repair or extension >100 LF

each additional 100 LF

Unpermitted encroachments

Monitoring Wells

Permit Time Extension

7 Public Right-of-way/Easement Encroachment (Temporay)

8 Deferred Improvement Agreement

9 Grading Permits Plan Review and Imspection

Grading changes 50-1,000 CY

Grading changes >1,000 CY

Additional 100 CY over 1000

10 Sewer Connections Per Hundred Cubic Feet (HCF)

1 Transfer of Uninstalled Capacity Fee Flate fee

1Construction activities during October through April shall require Storm Water Pollution Prevention plans, measures and fees.

2Total cost equal to 100% of staff and/or consultant time and materials. Check indicates Credit Cards Accepted - Minimum charge $10.00

3 Fees are adjusted annually by the CPI All Urban Consumers/San Francisco-Oakland-San Jose established in December.

4Overtime rate per hour of 150% will apply for after hour inspection requests with 200% on Sundays and Holidays (Minimum 2 Hours).

6 Permit Fees for Work Done Without A Valid Permit Are 2 times the Permit Fee for Bldg, Electrical, Mechanical, Plumbing, Encroachment & Grading Permits

$383.00

$766.00

$766.00

$383.00

$766.00

$766.00

$383.00

$766.00

$383.00

$766.00

$383.00

1.5% fee (penalty)

$383.00

$96.00

$191.00

$383.00

$766.00

$766.00

$191.00

$33.58

DESCRIPTION OF SERVICES FEE

$383.00

$766.00

$766.00

IV. PUBLIC WORKS (Cont'd)

$395.00

$791.00

$791.00

$395.00

$791.00

$791.00

$395.00

$791.00

$395.00

$791.00

$395.00

1.5% fee (penalty)

$395.00

$99.00

$383.00

$197.00

$395.00

$791.00

$791.00

$197.00

$34.00

$395.00

FEE + CPI

$395.00

$791.00

$791.00

Page 19 of 27

113

City of Half Moon Bay

Master Fee Schedule

Proposed, Other Fees, Charges & ServicesDESCRIPTION OF SERVICES FEE FEE + CPI UNIT / TYPE

1 Single Family

1 Sewer Connection - Assessment District Participant Per Dwelling Unit

Sewer Connection - Assessment District Non-Participant Each SFRE***

2 SMIP Residential* $100,000 Valuation

SMIP Commercial* $100,000 Valuation

3 BSRF (Bldg. Stndrds Admin Spec Revolving Fnd)**

$1 - 25,000 Valuation

$25,001 - 50,000 Valuation

$50,001 - 75,000 Valuation

$75,001 - 100,000 Valuation

Every $25,000 or fraction above $100,000 Valuation

4 Storm Drainage Per Dwelling Unit

5 Capital Outlay Facilities Per Dwelling Unit

6 Traffic Mitigation Per Dwelling Unit

7 Park Facilities Per Dwelling Unit

2 Development Fees; Multi-Family / Commercial

1 Sewer Connections

Multi-Family Per Dwelling Unit

Mobile Home Per Dwelling Unit

Office Per 1,000 Square Feet

Commercial/Retail Per 1,000 Square Feet

Lodging Per Room

Industrial Per 1,000 Square Feet

Sewer Connection - Assessment District Non-Participant *** Each SFRE***

2 SMIP Residential* $100,000 Valuation

SMIP Commercial* $100,000 Valuation

3 BSRF (Bldg. Stndrds Admin Spec Revolving Fnd)**

$1 - 25,000 Valuation

$25,001 - 50,000 Valuation

$50,001 - 75,000 Valuation

$75,001 - 100,000 Valuation

Every $25,000 or fraction thereof above $100,000 Valuation

* Strong Motion Instrumentation Program Fees Set According to State of CA Dept of Conservation Rates

** Fees Set According to Chapter 719, Statutes of 2008 (Senate Bill No. 1473) Check indicates Credit Cards Accepted - Minimum charge $10.00

*** Single Family Residential Equivalent. See Chapter 13.36.080 Section C. for Commercial, Professional and Institutional Calculation of Connection Charge.

DESCRIPTION OF SERVICES

$3,829.22

$2,871.92

$1,230.82

$4,558.60

$16,203.60

$0.00

$0.00

$1.00

$2.00

$3.00

$4.00

$1.00

According to Chapter 719, Statutes of 2008 (Senate Bill No. 1473)

FEE

$1,777.85

$1,777.85

$1,777.85

$16,203.60

$0.00

$0.00

$1.00

$2.00

$3.00

$4.00

$1.00

$696.00

$985.65

$6,413.50

$7,241.64

FEE + CPI

$4,709.00

$16,738.00

$0.00

$0.00

$1.00

$2.00

$3.00

V. DEVELOPER IMPACT FEES [Effective 03/19/16 - per 12/15/15 Council Approval]

$4.00

$1.00

$718.00

$1,018.00

$6,625.00

$7,480.00

$3,955.00

$2,966.00

$1,271.00

$1,836.00

$1,836.00

$1,836.00

$16,738.00

$0.00

$0.00

$1.00

$2.00

$3.00

$4.00

$1.00

Page 20 of 27

114

City of Half Moon Bay

Master Fee Schedule

Proposed, Other Fees, Charges & ServicesDESCRIPTION OF SERVICES FEE FEE + CPI UNIT / TYPE

2 Development Fees; Multi-Family / Commercial (Cont'd)

4 Storm Drainage

Multi-Family Per Dwelling Unit

Mobile Home Per Dwelling Unit

Office Per 1,000 Square Feet

Commercial/Retail Per 1,000 Square Feet

Lodging Per Room

Industrial Per 1,000 Square Feet

5 Capital Outlay

Multi-Family Per Dwelling Unit

Mobile Home Per Dwelling Unit

Office Per 1,000 Square Feet

Commercial/Retail Per 1,000 Square Feet

Lodging Per Room

Industrial Per 1,000 Square Feet

6 Traffic Mitigation

Multi-Family Per Dwelling Unit

Mobile Home Per Dwelling Unit

Office Per 1,000 Square Feet

Commercial/Retail Per 1,000 Square Feet

Lodging Per Room

Industrial Per 1,000 Square Feet

7 Park Facility Fee

Multi-Family Per Dwelling Unit

Mobile Home Per Dwelling Unit

3 Development Fees - Residential Subdivision Fees OnlyPark Dedication Per Chapter 17.48 of Municipal Code Per Chapter 17.48 of Municipal Code

* Strong Motion Instrumentation Program Fees Set According to State of CA Dept of Conservation Rates

** Fees Set According to Chapter 719, Statutes of 2008 (Senate Bill No. 1473) Check indicates Credit Cards Accepted - Minimum charge $10.00

*** Single Family Residential Equivalent. See Chapter 13.36.080 Section C. for Commercial, Professional and Institutional Calculation of Connection Charge.

N/A

$293.40

$821.38

$624.25

$315.40

$175.05

$23.66

$157.70

$3,499.01

$3,311.20

$4,021.25

V. DEVELOPER IMPACT FEES (Cont'd) [Effective 03/19/16 - per 12/15/15 Council Approval]

DESCRIPTION OF SERVICES FEE

$276.72

N/A

$586.80

$425.43

$6,736.90

$2,135.96

$3,269.22

$6,034.70

$4,586.37

FEE + CPI

$285.00

N/A

$606.00

$439.00

N/A

$303.00

$848.00

$644.00

$325.00

$180.00

$24.00

$162.00

$3,614.00

$3,420.00

$4,153.00

$6,959.00

$2,206.00

$3,377.00

$6,233.00

$4,737.00

Page 21 of 27

115

City of Half Moon Bay

Master Fee Schedule

Proposed, Other Fees, Charges & ServicesDESCRIPTION OF SERVICES FEE FEE + CPI UNIT / TYPE

1

1 Pre-Application Meeting Flat fee

2 Measure 'D'

Single Allocation (per allocation) Flat fee

Phasing Agreement Deposit

2

1 Coastal Development Permit Exemption Deposit

2 Single Family Residential

<= 3,000 square feet Deposit

> 3,000 square feet Deposit

3 Accessory Dwelling Unit

No New Floor Area Flat fee

New Floor Area Flat fee

4 Multiple Family Residential

>= Four dwelling units Deposit

< Four dwelling units Deposit

5 Commercial / Mixed Use

<= 10,000 square feet Deposit

> 10,000 square feet Deposit

6 Industrial / Institutional

<= 20,000 square feet Deposit

> 20,000 square feet Deposit

7 Other Development

Planning Director Deposit

Planning Commission Deposit

8 Amendments

Minor Amendment Flat fee

Major Amendments Deposit

3

1 CEQA/NEPA Environmental Clearance

Negative Declaration Deposit

EIR Deposit

2 Notice of Exemption Flat fee

[1] Flat fees are adjusted annually by the CPI All Urban Consumers/San Francisco-Oakland-San Jose established in December.

[2] Total cost equal to 100% of staff and/or consultant time and materials. Check indicates Credit Cards Accepted - Minimum charge $10.00[3] Fees Charged by these agencies are available on their websites and are in addition to fees charged by the City.

DESCRIPTION OF SERVICES

Environmental Clearance Processing

VI. PLANNING

Coastal Development Permit Processing

Pre-Entitlement Processing

FEE

$1,450.00

$527.00

$2,110.00

$422.00

$2,100.00

$2,700.00

$525.00

$1,000.00

$3,100.00

$5,200.00

$2,600.00

$5,200.00

$3,100.00

$5,200.00

$2,300.00

$2,950.00

$420.00

$1,300.00

$4,200.00

$9,450.00

$210.00

FEE + CPI

$1,497.00

$544.00

$2,179.00

$435.00

$2,169.00

$2,789.00

$542.00

$1,033.00

$3,202.00

$5,371.00

$2,685.00

$5,371.00

$3,202.00

$5,371.00

$2,375.00

$3,047.00

$433.00

$1,342.00

$4,200.00

$9,450.00

$210.00

Page 22 of 27

116

City of Half Moon Bay

Master Fee Schedule

Proposed, Other Fees, Charges & ServicesDESCRIPTION OF SERVICES FEE FEE + CPI UNIT / TYPE

4

1 Architectural Review, CDD or Planning Commision

Includes structures and/or site design Deposit

5

1 Home Occupation Flat fee

2 Variance / Exception Planning Commission Deposit

3 Exception/Community Development Director Deposit

4 Zoning, LCP, and 6P Amendments

LCP/6P Deposit

IP/Rezoning Deposit

Planned Unit Development Specific Plan Deposit

Planned Unit Development Specific Plan Amendment Deposit

Planned Unit Development Precise Plan Deposit

Planned Unit Development Precise Plan Amendment Deposit

Annexation/Prezoning Deposit

6 Appeals

Filling Fee - Outside CCC Aplleals Jurisdiction Flat fee

Filling Fee - Within CCC Aplleals Jurisdiction No fee

Processing Fee - Paid by developer Deposit

[1] Flat fees are adjusted annually by the CPI All Urban Consumers/San Francisco-Oakland-San Jose established in December.

[2] Total cost equal to 100% of staff and/or consultant time and materials. Check indicates Credit Cards Accepted - Minimum charge $10.00[3] Fees Charged by these agencies are available on their websites and are in addition to fees charged by the City.

DESCRIPTION OF SERVICES

VI. PLANNING (Cont'd)

Entitlement Processing

Design Review Processing

FEE

$625.00

$105.00

$950.00

$420.00

$14,750.00

$14,750.00

$14,750.00

$7,350.00

$7,350.00

$3,800.00

$14,750.00

$210.00

$0.00

Half the original fee if applicable. No appeal fee

$3,150.00

FEE + CPI

$645.00

$108.00

$981.00

$433.00

$15,236.00

$15,236.00

$15,236.00

$7,592.00

$7,592.00

$3,925.00

$15,236.00

Half the original fee if applicable. No appeal fee

$216.00

$0.00

$3,253.00

Page 23 of 27

117

City of Half Moon Bay

Master Fee Schedule

Proposed, Other Fees, Charges & ServicesDESCRIPTION OF SERVICES FEE FEE + CPI UNIT / TYPE

7 Land Division and Merger

Certificate of Compliance Deposit

Lot Merger Flat fee

Lot Line Adjustment Deposit

Parcel Map (four or fewer lots) Deposit

Tentative Subdivision Map Deposit

Subdivision Agreement Deposit

Time Extension Deposit

9 Sign Permit

Review Flat fee

Planning Commission Review Deposit

Exceptions Planning Commission Review Deposit

10 Other Services

Zoning Compliance Letter Flat fee

Public Convenience & Necessity Letter Flat fee

Water Transfer Letter Flat fee

12 Tree Removal Review

CD Director Review Deposit

Planning Commisison Deposit

13 Mobile Food Vendor Permit Flat fee

14 Sound Amplification Permit Flat fee

15 Fees Required by other Agencies

1 California Department of Fish and WildlifePer Agency Schedgule

2 SMC Local Agency Formation Commission (LAFCo)Per Agency Schedgule

3 San Mateo County Recorder Per Agency Schedgule

4 Planning Hourly Rate Flat fee

[1] Flat fees are adjusted annually by the CPI All Urban Consumers/San Francisco-Oakland-San Jose established in December.

[2] Total cost equal to 100% of staff and/or consultant time and materials. Check indicates Credit Cards Accepted - Minimum charge $10.00[3] Fees Charged by these agencies are available on their websites and are in addition to fees charged by the City.

VI. PLANNING (Cont'd)

Fee required to record and/or post various

documents

Annexation fees vary by acrage

Fee required to review various environmental

documents

$1,900.00

$160.00

$950.00

$950.00

$210.00

$210.00

$265.00

$475.00

DESCRIPTION OF SERVICES FEE

$1,900.00

$840.00

$1,900.00

$3,800.00

$10,500.00

$4,200.00

$210.00

$210.00

$210.00

$210.00

FEE + CPI

$1,962.00

$867.00

$1,962.00

$3,925.00

$10,846.00

$4,338.00

$1,962.00

$165.00

$981.00

$981.00

$216.00

$216.00

$216.00

$273.00

$490.00

$216.00

$216.00

Fee required to review various environmental

documents

Annexation fees vary by acrage

Fee required to record and/or post various

documents$216.00

Page 24 of 27

118

City of Half Moon Bay

Master Fee Schedule

Proposed, Other Fees, Charges & ServicesDESCRIPTION OF SERVICES FEE FEE + CPI UNIT / TYPE

2 Development Fees; Multi-Family / Commercial

1 Sewer Connections

Multi-Family Per Dwelling Unit

Mobile Home Per Dwelling Unit

Office Per 1,000 Square Feet

Commercial/Retail Per 1,000 Square Feet

Lodging Per Room

Industrial Per 1,000 Square Feet

Sewer Connection - Assessment District Non-Participant *** Each SFRE***

2 SMIP Residential* $100,000 Valuation

SMIP Commercial* $100,000 Valuation

3 BSRF (Bldg. Stndrds Admin Spec Revolving Fnd)** According to Chapter 719, Statutes of 2008 (Senate Bill No. 1473)According to Chapter 719, Statutes of 2008 (Senate Bill No. 1473)

$1 - 25,000 Valuation

$25,001 - 50,000 Valuation

$50,001 - 75,000 Valuation

$75,001 - 100,000 Valuation

Every $25,000 or fraction thereof above $100,000 Valuation

4 Storm Drainage

Multi-Family Per Dwelling Unit

Mobile Home Per Dwelling Unit

Office Per 1,000 Square Feet

Commercial/Retail Per 1,000 Square Feet

Lodging Per Room

Industrial Per 1,000 Square Feet

5 Capital Outlay

Multi-Family Per Dwelling Unit

Mobile Home Per Dwelling Unit

Office Per 1,000 Square Feet

Commercial/Retail Per 1,000 Square Feet

Lodging Per Room

Industrial Per 1,000 Square Feet

6 Traffic Mitigation

Multi-Family Per Dwelling Unit

Mobile Home Per Dwelling Unit

Office Per 1,000 Square Feet

Commercial/Retail Per 1,000 Square Feet

Lodging Per Room

Industrial Per 1,000 Square Feet

[1] Flat fees are adjusted annually by the CPI All Urban Consumers/San Francisco-Oakland-San Jose established in December.

[2] Total cost equal to 100% of staff and/or consultant time and materials. Check indicates Credit Cards Accepted - Minimum charge $10.00[3] Fees Charged by these agencies are available on their websites and are in addition to fees charged by the City.

DESCRIPTION OF SERVICES

VI. PLANNING (Cont'd)

FEE

$3,829.22

$2,871.92

$1,230.82

$1,777.85

$1,777.85

$1,777.85

$16,203.60

$0.00

$0.00

$1.00

$175.05

$23.66

$157.70

$2.00

$3.00

$4.00

$1.00

$276.72

N/A

$586.80

$425.43

$3,499.01

$3,311.20

$4,021.25

$6,736.90

$2,135.96

$3,269.22

N/A

$293.40

$821.38

$624.25

$315.40

FEE + CPI

$3,955.00

$2,966.00

$1,271.00

$1,836.00

$1,836.00

$1,836.00

$16,738.00

$0.00

$0.00

$1.00

$2.00

$24.00

$162.00

$3.00

$4.00

$1.00

$285.00

N/A

$606.00

$439.00

N/A

$3,614.00

$3,420.00

$4,153.00

$6,959.00

$2,206.00

$3,377.00

$303.00

$848.00

$644.00

$325.00

$180.00

Page 25 of 27

119

City of Half Moon Bay

Master Fee Schedule

Proposed, Other Fees, Charges & ServicesDESCRIPTION OF SERVICES FEE FEE + CPI UNIT / TYPE

2 Development Fees; Multi-Family / Commercial (Cont'd)

7 Park Facility Fee

Multi-Family Per Dwelling Unit

Mobile Home Per Dwelling Unit

3 Development Fees - Residential Subdivision Fees Only

Park Dedication

* Strong Motion Instrumentation Program Fees Set According to State of CA Dept of Conservation Rates

** Fees Set According to Chapter 719, Statutes of 2008 (Senate Bill No. 1473)

*** Single Family Residential Equivalent. See Chapter 13.36.080 Section C. for Commercial, Professional and Institutional Calculation of Connection Charge.

DESCRIPTION OF SERVICES

VI. PLANNING (Cont'd)

Per Chapter 17.48 of Municipal Code

$4,586.37

FEE

$6,034.70

Per Chapter 17.48 of Municipal Code

FEE + CPI

$6,233.00

$4,737.00

Page 26 of 27

120

City of Half Moon Bay

Master Fee Schedule

Proposed, Other Fees, Charges & ServicesDESCRIPTION OF SERVICES FEE FEE + CPI UNIT / TYPE

1 Violations of Municipal Code other than building or safety provisions

1 First Violation Each

2 Second Violation within one calendar year Each

3 Third or subsequent violations within one calendar year Each

2 Violations of building or safety provisions of the Municipal Code

1 First Violation Each

2 Second Violation within one calendar year Each

3 Third or subsequent violations within one calendar year Each

DESCRIPTION OF SERVICES

Any request for Fee refunds shall be submitted in writing to the appropriate Department’s Director within 90 days from the date of submittal. The grounds for requesting a refund shall be detailed in the written

request. However, once the City has commenced work on an applicable service for which a fee is charged, no refunds are allowed. The Department’s Director shall determine if a fee is refundable based on this

criterion. Any refund will be net a processing fee of $25 and any other incidentals that may be incurred. The party requesting the refund shall be informed in writing of the decision of the Department’s Director within

ten (10) working days of receiving the written refund request. The requesting party may appeal the determination of the Department’s Director to the City Manager, within ten (10) days of mailing notice to the

requesting party. The City Manager’s decision of the appeal review will be the final action taken by the City.

VIII. REFUND POLICY

VII. ADMINISTRATIVE CITATION PENALTIES

Check indicates Credit Cards Accepted - Minimum charge $10.00

FEE

$100.00

$200.00

$500.00

$100.00

$500.00

$1,000.00

FEE + CPI

$100.00

$200.00

$500.00

$100.00

$500.00

$1,000.00

Page 27 of 27

121