Circular No. 3 Requirements

17
• Any particular land unit should be located in only one Toolkit folder • Only one practice schedule will be created per customer folder • All land unit boundaries must be digitized and attributed in Toolkit using the primary (‘Master’) plan’s land unit layer (exemptions shown below). • Plans and folders linked to active contracts are exempt from current cleanup; CSP also exempt; also CURRENT CRP. NO new CRP. Circular No. 3 Requirements

description

Circular No. 3 Requirements. Any particular land unit should be located in only one Toolkit folder Only one practice schedule will be created per customer folder - PowerPoint PPT Presentation

Transcript of Circular No. 3 Requirements

Page 1: Circular No. 3 Requirements

• Any particular land unit should be located in only one Toolkit folder

• Only one practice schedule will be created per customer folder

• All land unit boundaries must be digitized and attributed in Toolkit using the primary (‘Master’) plan’s land unit layer (exemptions shown below).

• Plans and folders linked to active contracts are exempt from current cleanup; CSP also exempt; also CURRENT CRP. NO new CRP.

Circular No. 3 Requirements

Page 2: Circular No. 3 Requirements

Four key issues to address

1. A tract appears in more than one customer folder.

2. A folder contains too many plans.

3. Adding practices from other existing plans intothe Master plan

4. When should I make a new folder / plan?

Page 3: Circular No. 3 Requirements

1. A tract appears in more than one customer folder.

Page 4: Circular No. 3 Requirements

ARCHIVE

Page 5: Circular No. 3 Requirements

MAINTAINAS IS

Page 6: Circular No. 3 Requirements

MAINTAINAS IS

2. A folder has too many plans.

Page 7: Circular No. 3 Requirements

ARCHIVEPossible Delete?

Page 8: Circular No. 3 Requirements

MAINTAINNo more newseparate CRP

Page 9: Circular No. 3 Requirements

MAINTAINRename as Master?

Page 10: Circular No. 3 Requirements

ARCHIVE

Page 11: Circular No. 3 Requirements

Options Review

1. Maintain as is2. Archive3. Revise

Page 12: Circular No. 3 Requirements

1. Maintain as is, if…

a. No other plans in the folder

b. No technical revision needed

c. Practices are linked to ProTracts contract(s)

d. CSP02, CSP08 or previously existing CRP

Page 13: Circular No. 3 Requirements

2. Archive, if…

a. Workflow status is “Completed” or “Non Selected”

b. Several years old, no planned practices applied,and no practices linked to active contract(s)

c. Created prior to 2005, not updated since, andno practices linked to active contract(s)

Page 14: Circular No. 3 Requirements

3. Notes on Plan Revisions

a. Practices linked to ProTracts contracts MUSTbe edited by a modification in ProTracts

b. Remember to change the Plan Approval Datefound under the “Reporting” tab

c. New land units CAN be added to a Master plan

Page 15: Circular No. 3 Requirements

3. Adding Existing or New PracticesTo The Master Plan

1. Creating a new pracrice on an entire existing field*

2. Creating a new practice on part of an existing field*a. if a practice layer is not present in the planb. if a practice layer is already present in the plan

3. Copying practices from one plan to the master plan*

*see specific documents for details.

Page 16: Circular No. 3 Requirements

4a. When To Create A New Folder

a. Check Toolkit for the Tract number. b. Check for the Customer name.

c. Check for the Operator name.

If none of the above appear in the Toolkit search thenyou can create a new customer folder

Page 17: Circular No. 3 Requirements

4b. When To Create A New Plan

1. Check Toolkit for the Tract number.2. Check for the Customer name.3. Check for the Operator name.

If any of the above appear during a Toolkit search thencheck out the folder(s), and examine the plans that arepresent. Create a new plan if the only plan present:1) is a CSP plan, 2) has a workflow status of “Completed”or “Non-Selected”, or3) was created before 2005 and has no practices linked to any

active contracts.

Do NOT create any new CRP plans this Spring.