IT Architecture and Infrastructure Committee 9:00 10:30 a.m., June 12, 2015, FAC 228D I. VoIP – Update (William Green, Linda Buckley) II. ASMP Technical Architecture – Update (Julienne VanDerZiel, Pat Jones, Eric Weigel) III. Pilot to Explore Leveraging the Full Capabilities of UT System Office 365 Licensing – Proposal (Trice Humpert, Shannon Strank, Bob Gloyd) IV. TSC Training Update – Update (Sandra Germenis, Cam Beasley)

Transcript of cio. Web viewExadata, Storage, Infrastructure. Monitoring. We are here . 2. Release. 1- ... This...

Page 1: cio.   Web viewExadata, Storage, Infrastructure. Monitoring. We are here . 2. Release. 1- ... This includes the Office Suite (Word, Excel, PowerPoint) and more

IT Architecture and Infrastructure Committee 9:00 – 10:30 a.m., June 12, 2015, FAC 228D I. VoIP – Update (William Green, Linda Buckley) II. ASMP Technical Architecture – Update (Julienne VanDerZiel, Pat Jones, Eric Weigel) III. Pilot to Explore Leveraging the Full Capabilities of UT System Office 365 Licensing – Proposal (Trice Humpert, Shannon Strank, Bob Gloyd) IV. TSC Training Update – Update (Sandra Germenis, Cam Beasley)

Page 2: cio.   Web viewExadata, Storage, Infrastructure. Monitoring. We are here . 2. Release. 1- ... This includes the Office Suite (Word, Excel, PowerPoint) and more

Voice over Internet Protocol - ‐ Update

Overview The university is moving its legacy phone system to Voice over Internet Protocol (VoIP). Contractor assisted deployment process is projected to complete in August 2015.

Status • Deployment:

o 18,238 of 23,000 lines have been converted or removed

o Units are being efficient—projections:

§ $2.6- $3M local expenditures ($4M original estimate) ‐

§ 25% of lines removed (10% original estimate, impacts Rate)

§ Annual phone bill reduced campus- wide by $2.3-‐ $2.5M ‐

o Eliminated Avaya phones and FAX ATA adapters

o Catching up on 911 building turn- overs to Units ‐

• Tasks:

o Unit self- provisionin‐ g for Basic Service

o Mobile client (smart phone)

o Transition: Long Distance, Call Centers, other old technologies

• Rate Projection: Basic $5à$7/month; Business $17à$20/month

Learn more • Project web site for more info: https://www.utexas.edu/its/voip/

AIC V 1.0 June 5, 2015

Page 3: cio.   Web viewExadata, Storage, Infrastructure. Monitoring. We are here . 2. Release. 1- ... This includes the Office Suite (Word, Excel, PowerPoint) and more

Administrative SystemsModernization Program(ASMP 2.0)

Technical Architecture Implementation (TAI) Plan Review

Page 4: cio.   Web viewExadata, Storage, Infrastructure. Monitoring. We are here . 2. Release. 1- ... This includes the Office Suite (Word, Excel, PowerPoint) and more

Agenda

•  The New Technical Architecture•  Key Milestones•  Key Processes•  Next Steps•  Questions

2

Page 5: cio.   Web viewExadata, Storage, Infrastructure. Monitoring. We are here . 2. Release. 1- ... This includes the Office Suite (Word, Excel, PowerPoint) and more

Introduction: TAI Major Milestones7. Technical Architecture Opera2ons (TAO)

6. Release 4 – University Portal, Document Genera2on, Automated Virtual Environment

5. SoHware Developer Training Program Redesign

4. Release 3 – Jama Full Release, DVCS, Workload Automa2on

3. Release 2 – Exadata, Storage, Infrastructure Monitoring

We are here

2. Release 1 - Jama Pilot, Enterprise Serv‐ ice Bus, Electronic Document Signature

1. Technical Architecture Implementa2on Project Ini2a2on

0. Technical Architecture Design and Specifica2on > COMPLETE!!! 3

Page 6: cio.   Web viewExadata, Storage, Infrastructure. Monitoring. We are here . 2. Release. 1- ... This includes the Office Suite (Word, Excel, PowerPoint) and more

The New Technical ArchitectureOur Mission:

•  Provide production and development environments that support cloud, package, and custom applications for Administrative units and their interfaces.

•  Provide an Administrative Systems Technical Architecture that is component-based, flexible, predictable, resilient, secure, and scalable.

•  Enable University developers to focus their IT skills on solving business problems, not figuring out architecture, tools, and environments.

•  Follow ITIL and CMMI practices to build environments, processes, and tools that support these goals.

4

Page 7: cio.   Web viewExadata, Storage, Infrastructure. Monitoring. We are here . 2. Release. 1- ... This includes the Office Suite (Word, Excel, PowerPoint) and more

TEXAS-ATAUSnN-

WHAT STARTS HERE CHANGES THE WORLD

The New Technical Architecture:

mJ

1

Interim Administrative Systems Technical ArchitectureTech nology Modeling

TAl Interim Systems ArchitectureThe following diagram shows a high level view of major administrative systems and technical archi tecture at UT and where they reside.In some cases,the diagram shows future systems that are not yet online,but are being planned.

High evelV0.8

Apr.9, 2015

Financials

Ggolet:Tmail

lmking

* Admissions * TRECS

Web Si tes ContentManagement

;:.llllimJAVA

Build Automilionmaven

softw.are ccnrc..illio n

GitHub

c

:0

workday

'R<

* Registrar *Housing & B.a a* Stu Fin Service Food*Advising * UT System D<X.UMI: TUM 02* Dev. Off ce * College Apps (/pEutrNm* TxCiass *Budget*

Job Scheduling I SFTP

sea.ity COde Anolysis Continuous

CH ln •F,

·y·JIRAContinu ous lnttio n/

•Q•ualinty/Testing

ThoughtWorksUT Forge

XMLGateway !j softWARe R6 EntireX Brokerstonebranch

Project Management

Portals Data Warehouse(UT D rect) OS'

n::t::baseSQLServer

Define ContentManagement

Project

®[ERP-UI) ORACLE' RCABA" nAtuRAl ==---- zenoss splunk>

Virtualizationvm l..

Backup/RestoreOrldtRMAN

emCI!f'lll'r

Compute

DeLLS[MfA

ORACLE EXADATA

Sto9=1geHITACHI

IBM z/OSSystem

IBM Mainframe

"" ,.System Center

4rmt

ITIL I Service

Management

servJCellCIW

'"-"bOn

LAN/WAN/DC/DSN

------------ pp

Application Delivery Control Routing,Firewall

Management...............

Page 8: cio.   Web viewExadata, Storage, Infrastructure. Monitoring. We are here . 2. Release. 1- ... This includes the Office Suite (Word, Excel, PowerPoint) and more

TEXAS-ATAUSnN-

WHAT STARTS HERE CHANGES THE WORLD

The New Technical Architecture:

TIH UNIV[R51TY Of

= ®SoiiPoint

"'., A1D lnfoblox · A10 cmr.- .d ...r.. 3.

sso .zBI

NDNetScaler ..,. """' Dftetory

[TI M/TED) services

Page 9: cio.   Web viewExadata, Storage, Infrastructure. Monitoring. We are here . 2. Release. 1- ... This includes the Office Suite (Word, Excel, PowerPoint) and more

TEXAS-Af AUSTIN-

WHAT STARTS HERE CHANGES THE WORLD

The New Technical Architecture:

0

€)

-

2020 Administrative Systems Technical Architecture2020 Systems Architecture

The following diagram shows a high level view of major admini strative systems and techni cal architecture at UT a sit is currently envisi oned to be. In some cases, the diagram shows future systems that are not yet online,but are being planned.

High Levelv0.8

Apr.9, 2015

SharePoint Gosgle

lmking

softl.vare conf igwation[PyPE)

UTmail U.l."·'*i®A )AVA GitHubWeb Sites

Ma nagement

0

mBuild

aAu

vto

ema

nt ion "'

'0

Brava secwitycode Analysis Con tinu ous1nte ration/Oelivery

.._,Data Visuali zation

CCCIE\ {)+} +..o.b.I.e.o..u· OOCUMENTUM D2 .-J-IRA .§.l4

Job Scheduling I SFTP

(/p Exstream

Requ irements "'Con tinu ous I nt egration/ if/

oeriveW 0Quality/Testing Thought orks· ";;

PAijn !_

Portasl[ERP-UI]

Data Warehouse

KlS'Database

SQLrver ORACLE'

stonebranch

ContentMa nagementHdoc•n t

tum

Thousa ndEyes<0

Pro ject Ma nagement

Project

s:0

"

Virtualizationvmware

Compute

DeLLMy

Sto geORACLE' } "system center

EXADATA

zen5ss splunk > ·

ITIL / SeiVice Management s:";;':

Backup/RestoreOraelt RMAN L

AN/WAN/DC/DSN Ani' l

nfob

Page 10: cio.   Web viewExadata, Storage, Infrastructure. Monitoring. We are here . 2. Release. 1- ... This includes the Office Suite (Word, Excel, PowerPoint) and more

TEXAS-Af AUSTIN-

WHAT STARTS HERE CHANGES THE WORLD

The New Technical Architecture:

1 Uf UNI\1'1M,\ITY Of

&\ bs n

.

FM9HITACHI

Application Delivery Control

A: 'J ci1'11.1X

4redhlt :1. pupP,et

Routing,Firewall

oi!Jodlo

servteeni!IW

®SaiJPoinf

Q_.

""3' <-·";;:.'"'

"'5_

BI N D m: NetScaler CISCO services somfrre

Page 11: cio.   Web viewExadata, Storage, Infrastructure. Monitoring. We are here . 2. Release. 1- ... This includes the Office Suite (Word, Excel, PowerPoint) and more

Major TAI Milestones•  Release 1 – 01/2016•  Release 2 – 06/2016•  Release 3 – 11/2016•  Release 4 – 04/2017

TAI Start05/2015

Release 101/2016

Release 206/2016

Release 311/2016

Release 404/2017

2015 Q2

Today- MuleSoH (Alpha ‐Release)

- Oracle ‐Exadata

-‐MySQL

- Portal as a ‐Service

2017

- Jama (Alpha Release)‐- Oracle Database Ho‐ s2ng(General Release)- MuleSoH (General ‐Release)

- IaaS Backup and ‐Restore- IaaS One Stop Shop‐- EMC Documentum‐- Open Text Brava ‐Viewer- Splunk‐- Zenoss SaaS‐

- Stonebranch‐- Kofax Products‐- ADC: Citrix Netscaler‐- IaaS Windows‐- Linux Mgmt Tools‐- Checkmarx Sta2c‐ CodeAnalyser- GitHub Enterprise‐- Sauce Labs‐- SeleniumHQ‐- Sonar Source ‐

SonarQube

Page 12: cio.   Web viewExadata, Storage, Infrastructure. Monitoring. We are here . 2. Release. 1- ... This includes the Office Suite (Word, Excel, PowerPoint) and more

- Kofax Mul2func2on‐ Capture- Exoprise‐- New Relic SaaS‐- Apache Jmeter‐- Apache Maven‐- Jenkins‐- JIRA‐- ParasoH‐- Development Tes2ng‐ Plaform- Thoughtworks Go!‐- HP Exstream: Document‐Genera2on 7

Page 13: cio.   Web viewExadata, Storage, Infrastructure. Monitoring. We are here . 2. Release. 1- ... This includes the Office Suite (Word, Excel, PowerPoint) and more

Key Processes: Key Document Overview•  Five major documents are interrelated and share a common

numbering system

Technical Release

Schedule

Product release sequence based on UT requirements and priori2es.

MethodologyDiagrams

Visual depic2on of Release Management and Service Deployment workflows.

Technical Descrip2on

of WorkDetailed descrip2on of each major step in the methodology.

ProjectWorkplan

Detailed plan to implement products and Services via Technical Releases.

Future Architecture

Diagrams

Visual depic2on of the future Architecture and Services.

8

Page 14: cio.   Web viewExadata, Storage, Infrastructure. Monitoring. We are here . 2. Release. 1- ... This includes the Office Suite (Word, Excel, PowerPoint) and more

9

Key Processes:Organizational Change Management Overview

•  Change Impact Assessments, Role Mapping, SkillChange

ReadinessGap Analysis for Service Providers

•  Provide data, tools, and templates to CSUs for RoleMapping

StakeholderEngagement

•  Focus Groups•  Key Stakeholder Interviews

Communication•  FYI Sessions & Newsletters•  Messages & Training Invitations/Availability

Notifications

Training•  Plan & Coordinate Training for Service Providers &

Service Consumers•  Redesign the Software Developer Training Program

(SDTP)

Page 15: cio.   Web viewExadata, Storage, Infrastructure. Monitoring. We are here . 2. Release. 1- ... This includes the Office Suite (Word, Excel, PowerPoint) and more

Key Processes: Release Methodology DiagramInitializeRelease

ReleaseApproval

(By Service)

Configure& Build

Operational Readiness(By Service)

Quality Assurance(By Service)

CandidateApproval

(By Service)

Implementatio n

Post- Implementation

10

Page 16: cio.   Web viewExadata, Storage, Infrastructure. Monitoring. We are here . 2. Release. 1- ... This includes the Office Suite (Word, Excel, PowerPoint) and more

Key Processes: Service Deployment MethodologyIdentify

Service CapacityManagement

AcquirePrepare

Define OperationalProcess

Define Institutionalization

ProcessDeploy

Early AdopterImplementation

Sunset

11

Page 17: cio.   Web viewExadata, Storage, Infrastructure. Monitoring. We are here . 2. Release. 1- ... This includes the Office Suite (Word, Excel, PowerPoint) and more

Key Processes: Alpha Users

•  Early Service Consumers that have a business need to begin early use of service

•  Service is not yet deployed nor fully supported:–  Training may or may not be available–  Incomplete/unstable environments–  “Best Effort” support model–  Effort matures over time and service nears deployment

readiness

•  Reconfiguration or Refactoring may be needed as processes and standards are defined

•  Required to collaborate, provide feedback and work closely with Service Owner

12

Page 18: cio.   Web viewExadata, Storage, Infrastructure. Monitoring. We are here . 2. Release. 1- ... This includes the Office Suite (Word, Excel, PowerPoint) and more

Next Steps:Major Upcoming Deliverables

Name StartTAI Begins 05/2015TAI Organiza>onal Change Management Strategy 06/2015TAI Stakeholder Management Strategy 06/2015Service Deployment Playbook 06/2015Release Management Playbook 06/2015TAI Project Plan 06/2015TAI Organiza>on Design Strategy 07/2015Release Deployment Training for UT 07/2015Service Deployment Training for UT 07/2015TAI Communica>ons Strategy 07/2015App Mod Org Design Toolkit for TAI Release I 08/2015TAI Training Strategy 08/2015

Page 19: cio.   Web viewExadata, Storage, Infrastructure. Monitoring. We are here . 2. Release. 1- ... This includes the Office Suite (Word, Excel, PowerPoint) and more

TAI Service Design Package - Enterprise Service Bus (ESB)‐ 08/2015

Page 20: cio.   Web viewExadata, Storage, Infrastructure. Monitoring. We are here . 2. Release. 1- ... This includes the Office Suite (Word, Excel, PowerPoint) and more

Next Steps: Release 1

•  Release 1 Implementation date – 01/2016•  Services in scope

–  IaaS - Compute and Storage–  IaaS - System Administration–  Application Lifecycle Management

•  Requirements Management•  Jama Product Pilot

–  Integration Services•  Enterprise Service Bus•  Message Service•  API Registry

14

Page 21: cio.   Web viewExadata, Storage, Infrastructure. Monitoring. We are here . 2. Release. 1- ... This includes the Office Suite (Word, Excel, PowerPoint) and more

Questions?

15

Page 22: cio.   Web viewExadata, Storage, Infrastructure. Monitoring. We are here . 2. Release. 1- ... This includes the Office Suite (Word, Excel, PowerPoint) and more

Proposing a pilot to explore leveraging the full capabilities of UT System Office 365 licensing

Overview:

UT System Office 365 licensing is in place for a number of tools we are not currently leveraging. UT Austin pilot would provide data relevant to evaluating the value and incremental labor cost to deploying this toolset across campus.

Perspective:

The McCombs School of Business has already deployed these tools in a separate tenant.Per David Burns:

We’ve been able to deploy Lync, Yammer, and OneDrive at essentially zero cost to our department. Training is available in Lynda.Com and the software deployment and licensing is trivial to manage.

It may be useful to note that it is our understanding that all of these enhanced Office 365 tools are already in use at:

- UT Dallas: htt p:/ / www . u t d al l a s .e d u /ir/ o ff ic e3 6 5/ - UT El Paso: htt p:/ / admin. u t ep.e d u / D ef a u lt.a s p x ?tab i d = 7 4 0 58 - UTSA: htt p:/ / ut s a c l o u d - p u blic.s h a r epoint. c om / P ages / Tr ain i ng/ T r ain i ng.aspx - UT Pan American: htt p:/ / blo g s.utpa.ed u / i t/ c a t ego r y/ off i ce - 3 6 5/

Opportunity: to leverage existing productivity and software installations from a trusted source

Key capabilities that are envisioned for the evaluation within the pilot are:1) Streamlining personal productivity through a richer set of collaboration and document

sharing tools, in the form of Skype for Business and OneDrive.a. Enterprise Instant messaging (EIM) and Presence are also part of this package.

i. The EIM capabilities could help unify adhoc implementations of various tools currently deployed around campus. (including Jabber)

b. Since OneDrive can host a richer set of file formats, applications such as OneDrive canbe leveraged significantly more effectively.

2) Further facilitating software installations from a trusted source, to include perpetual upgrade paths via the UT System portal.

a. This includes the Office Suite (Word, Excel, PowerPoint) and more…i. outlook.office365.com/owa/utexas.edu, …

b. Including enhanced capabilities, such asa. Online versions of Office 2013 available via the browser on many devices for easy

file sharing and editingb. Office 365 now supports larger email messages—up to 150 MB

a. htt p://b l ogs.o ff ic e. c om / 2 0 1 5/ 0 4 /1 5 /o f f i c e - 3 6 5 - now - sup p o rt s - l arge r -ema i l- me s sage s - u p -t o -15 0 - mb/

Page 23: cio.   Web viewExadata, Storage, Infrastructure. Monitoring. We are here . 2. Release. 1- ... This includes the Office Suite (Word, Excel, PowerPoint) and more

Scope: initial participants, yet open to those who are interested and able to self-support.

CSU, etc. Contact Comments:

Cockrell School ofEngineering

Bob Gloyd - chomping at the bit to leverage these additional capabilitieson main campus and at research facilities at PRC, etc.

COLA Tim Fackler - improve business processes using the full set of distributedMS storage, content, and collaboration tools

Communication Charles Soto - just deployed Ofc365 recently and getting asked about additional functionality.

Jackson School ofGeosciences

Jeffrey Ty Lehman - enhanced communication tools would be immediately useful for them, including PRC.

Law Mike Harvey - “Must have it” chance to upgrade functionality, inparticular desire for improved communication tools.

LBJ School of PublicAffairs

Caren Troutman - collaboration and document sharing especially to support improved and streamlined business processes

Libraries Christian Carter - 10 campus buildings, PRC and Marine Science Institute in Port Aransas.

McCombs School ofBusiness

David Burns - already has these tools deployed in a separate tenant.- willing to engage in a transformative campus endeavor.

TechnologyResources

Roy Ruiz - especially interested in additional software licensing options.

ITS Systems would certainly need to be a facilitating partner on this project and are welcomed to be a participant. Their overhead, in support of this UT System/Cloud service, is expected to be minimal. However, if units are contracting IT support through MITS or ATS, these corresponding support organizations would be appropriately engaged to support the aspirations of their customers.

Timeline: nominally one year, initiating in June 2015 and communicating results whenever the AIC would like, with final recommendations in the Summer of 2016.

Other factors:- This pilot is intended to be a precursor to making these capabilities available to any unit that chooses to

leverage them, with the goal of making these services shovel ready for the campus at large.- Nominally all of the currently identified partners are highly managed desktop environments that can deploy

the software and train users without assistance from ITS.- Once the product is available for pilot units and our IT staff can test functionality and integration with Office

365 and AD, we will start an open-ended pilot to demonstrate both the utility of the software for our businesses and the support requirements.

- Pilot units will document support costs for the added features.

Request to AIC:Endorse a Task Force to explore/exercise these tools over the coming year. Limited support needed fromITS other than enabling capabilities for select units. Bob Gloyd will lead and report findings back to AIC.