Proposals for a New Community Hall at
S.Thomas the Apostle, Elson
Fr. Simon Rundell, SCPParish Priest
S.T
hom
as th
e A
postle
, Elso
n: S
mall C
hurch
, Big
Heart
Overview
• Statement of Significance– the existing Church Hall
• Statement of Need– Mission Perspective– Community Perspective
• Proposed Solution• Discarded Solutions• Funding & Timescales
S.T
hom
as th
e A
postle
, Elso
n: S
mall C
hurch
, Big
Heart
Statement of Significance• Elson is a small parish on the edge
of Gosport with 16,500 souls in my cure
• Features in bottom 25% of IMD scoring in Hampshire
• Full-core Surestart provision in community
• Church dates from 1845 & has been subject to a process of mission-focused reordering since 2005
S.T
hom
as th
e A
postle
, Elso
n: S
mall C
hurch
, Big
Heart
Statement of Significance
S.T
hom
as th
e A
postle
, Elso
n: S
mall C
hurch
, Big
Heart
Current Church Hall
• Built in 1908 in an ‘Italianate style’
• Some distance from Church
• In poor state of repair
• Heavily used by local community
S.T
hom
as th
e A
postle
, Elso
n: S
mall C
hurch
, Big
Heart
Current Church Hall UseDay Morning Afternoon Evening
Monday Pre-School Pre-School Martial Arts
Tuesday Pre-School Pre-School Dog Club
Wednesday Pre-School Pre-School Martial Arts
Thursday Pre-School Pre-School Slimming World
Friday Pre-School Pre-School Fridays Youth Club
Saturday Dog Club
Sunday
S.T
hom
as th
e A
postle
, Elso
n: S
mall C
hurch
, Big
Heart
Statement of Need
• Mission• The parish believes that the
buildings are tools of its mission• Provide a focus of the local
community• Base for outreach, youth ministry
and evangelism• Source of funding to underwrite
mission
S.T
hom
as th
e A
postle
, Elso
n: S
mall C
hurch
, Big
Heart
Proposed Solution
• We submit a proposal based upon the following key principles:
• Cost-Effectiveness– Realistic and based upon our situation
• Mission and Community Focus– Providing quality in this community
• A desire to provide for the local community
S.T
hom
as th
e A
postle
, Elso
n: S
mall C
hurch
, Big
Heart
Style and Position
• S. Thomas, Elson is a unique building in this community
• It would be inappropriate to mimic this
• Physical connection to this building would demean it
• Seeking a solution which is conducive to the Church & the built environment surrounding it
S.T
hom
as th
e A
postle
, Elso
n: S
mall C
hurch
, Big
Heart
Why next to the Church?
• We can’t afford to develop the existing site!
• Distance from current church hall fractures missional opportunities
• Churchyard closed in 1908, last interment in 1927, corner of Elson Lane & Elson Road redeveloped 1967
S.T
hom
as th
e A
postle
, Elso
n: S
mall C
hurch
, Big
Heart
Proposed Solution
S.T
hom
as th
e A
postle
, Elso
n: S
mall C
hurch
, Big
Heart
Location
• Mature Trees do not have Tree Preservation Orders yet
• We are committed to their preservation
• Other locations on site cannot ensure such preservation
• Other locations would impose on church appearance
S.T
hom
as th
e A
postle
, Elso
n: S
mall C
hurch
, Big
Heart
Style
• Seeking a building which is conducive
• Needs to mirror shape without parody
• Cloister-style unrealistic• Attached to either end of Church
building would detract from unique sacred space
• This solution meets our requirements within the given space
S.T
hom
as th
e A
postle
, Elso
n: S
mall C
hurch
, Big
Heart
S.T
hom
as th
e A
postle
, Elso
n: S
mall C
hurch
, Big
Heart
S.T
hom
as th
e A
postle
, Elso
n: S
mall C
hurch
, Big
Heart
S.T
hom
as th
e A
postle
, Elso
n: S
mall C
hurch
, Big
Heart
S.T
hom
as th
e A
postle
, Elso
n: S
mall C
hurch
, Big
Heart
S.T
hom
as th
e A
postle
, Elso
n: S
mall C
hurch
, Big
Heart
Construction
• Location placed over 45 graves• Pile Foundations with ground
beams to cause minimal disruption to graves and tree roots
• Any graves which still need to be disturbed to be reinterred in ossiary in the North part of the yard.
S.T
hom
as th
e A
postle
, Elso
n: S
mall C
hurch
, Big
Heart
Construction
• The Hall comprises a single-story construction which is able to provide a large hall slightly larger than the existing one (135m2 as opposed to 100m2 at present) and the same quantity of storage space.
• Cost effective solution
S.T
hom
as th
e A
postle
, Elso
n: S
mall C
hurch
, Big
Heart
Facilities
• Parish office • Meeting room for small group
meetings such as PCC, pastoral encounters and staff support and training.
• Soft Tarmac surface and enclosed in a small 1m fence to enable the Pre-School to meet their Foundation Stage Curriculum needs for safe outside play.
S.T
hom
as th
e A
postle
, Elso
n: S
mall C
hurch
, Big
Heart
Parking• Parking is not an issue• Current hall only provides for six cars• The Church site is a more centrally
located site than the Hall, close to local schools
• A Bus Stop is immediately outside the Church, encouraging the use of public transport
• The adjacent roads (Elson Road, Elson Lane, Frater Lane) are all unrestricted parking and could easily absorb the increased traffic to that area
S.T
hom
as th
e A
postle
, Elso
n: S
mall C
hurch
, Big
Heart
Parking
• Despite fears from local residents, this will have minimal additional impact on roads which apart from 8.30-9am and 3-3.30pm (School Pickup) are quiet
• Church Hall is not in use at these peak times
S.T
hom
as th
e A
postle
, Elso
n: S
mall C
hurch
, Big
Heart
Parking
• The Hall Use Survey indicates that the majority of hall users access the current hall on foot. – Usage is distributed throughout the day and the last
evening hall use ends at around 9pm.– Weekend hall use (when local residents have their
cars at home) is minimal.• The Church should be discouraging car use
and healthier lifestyles by not making parking provision. – Any parking provision would threaten the heritage
trees in the churchyard and the parish is unwilling to remove any of these simply to create parking spaces.
S.T
hom
as th
e A
postle
, Elso
n: S
mall C
hurch
, Big
Heart
Daytime Traffic
S.T
hom
as th
e A
postle
, Elso
n: S
mall C
hurch
, Big
Heart
Hall Users Survey
Group Number WalkingHappy Days Pre-School
20 19
FreeSpirit Martial Arts
5 4
Slimming World 2 1
K9 Dog Club 4 4
Friday’s Youth Club 14 9
Other 0 N/A
Total 46 37 (80.5%)
S.T
hom
as th
e A
postle
, Elso
n: S
mall C
hurch
, Big
Heart
Hall Users SurveyGroup Number Parking
Happy Days Pre-School
20 1 (staff)
FreeSpirit Martial Arts
5 1 (staff)
Slimming World 2 1
K9 Dog Club 4 0
Friday’s Youth Club 14 5 (all staff)
Other 0 N/A
Total 46 8 (17%)
S.T
hom
as th
e A
postle
, Elso
n: S
mall C
hurch
, Big
Heart
Adjacent Car Park• It is extensively used by Park and
GADSAD users and so there is little space
• That extra 100 yards makes all the difference and if users have driven to the hall, they will avoid that walk where possible
• The Car Park has a lingering reputation for insecurity, and so users are reluctant to park there at a distance from their own activity fearing car crime or vandalism.
S.T
hom
as th
e A
postle
, Elso
n: S
mall C
hurch
, Big
Heart
Church UseMass Total
NumberDrive Walk Bus
Weds 7.30pm
6 3 3 0
Fri 10am
8 2 6 0
Sunday 8am
8 2 6 0
Sunday 10am
36 16 18 2
S.T
hom
as th
e A
postle
, Elso
n: S
mall C
hurch
, Big
Heart
Traffic Conclusions
• If the parish locality on a Sunday morning (when many residents also have their cars parked) is able to absorb 10 or so cars, then one might conclude from the Hall Use Survey that the additional hall traffic would have little impact, as the times of Church Hall use and Church use rarely coincide
• When they do, it would be because a single event would combine the two of them, thus making the overall impact less severe.
S.T
hom
as th
e A
postle
, Elso
n: S
mall C
hurch
, Big
Heart
Funding
• Elson has no resources other than the existing Church Hall
• Sale for development is the only funding option
• Developers are being approached• Church Hall will decay and become
unusable within next 5 years
S.T
hom
as th
e A
postle
, Elso
n: S
mall C
hurch
, Big
Heart
Timescales
• Because of the Hall condition, we seek to move quickly on this project
• We envision a planning process through 2010
• ...and we pray to have the new Community Hall available by Easter 2011
S.T
hom
as th
e A
postle
, Elso
n: S
mall C
hurch
, Big
Heart
Conclusion
• We believe that this project is one whose kairos has come
• We pray that this cost-effective, missional solution will find approval
• We seek to deliver it within a short timescale and within a tight budget
• We pray that you are able to support our vision