CHROME ORE AMUEL.ppt
-
Upload
ruchika-choudhary -
Category
Documents
-
view
56 -
download
0
description
Transcript of CHROME ORE AMUEL.ppt
AMUEL &
A STRONG DESIRE
TO
CREATE WEALTH
BY
KNOWLEDGE
• KNOWLEDGE BASE ON MINERAL PROCESSING AND SYNTHETIC MINERAL PRODUCTION
• EXTENSIVE STUDY FOR UTILIZATION OF MINERSLS, LOW GRADE ORE & OVER-BURDEN
OUR STRATEGY OF CONSULTANCY 1. STUDY DEMAND2. MARKET SURVEY OF THE ORE3. ORE PROCESSING 4. CONSTITUTED TEAM OF EXPERTS5. LABORATORY SCALE STUDY OF ORE6. PILOT SCALE PRODUCTION8. SELECTION OF SUITABLE TECHNOLOGY
NOW READY TO CATER TO THE REQUIREMENT OF
1. MINERAL PROCESS INDUSTRY2. MINING INDUSTRY
PROMET AUSTRAILIA TEAM
1. JIM CRIBBES2. BRIAN POVEY3. CHRISTOPHER WELSH4. Dr. RICHARD C PECK5. DEREK MACAULEY
AMUEL TEAM CONSIST 1. ANIL PASSARY2. JHON APPLEBY3. BILLY MORIMOTTO4. S.C.MISHRA 5. S.K.DAS 6. ANUP AGARWAL
ANALYSE CUSTOMER’S REQUIREMENT
STUDY VARIOUS OPTIONS AVAILABLE
BASIC ENGINEERING & DETAILED ENGINEERING
PREPARATION OF THE BUSINESS MODEL
IMPLEMENTATION
ONE OF OUR INOVATION FOR SLIME MANAGEMENT
GOLF COURSE OR FRUIT ORCHARD DEVELOPEMENT OVER EXHAUSTED SLIME
POND
Total Project CapabilitiesTotal Project Capabilities
Start-up AssistanceStart-up Assistance
AuditAudit
Project Management Services
Project Management Services
Procurement/Inspection/Equipment
Supply
Procurement/Inspection/Equipment
Supply
Financing Financing Assistance ServicesAssistance Services
Financing Financing Assistance ServicesAssistance Services
Pre-feasibility & Feasibility Studies
Pre-feasibility & Feasibility Studies
AMUEL
AMUELAMUEL
Operations Management
& Training
Operations Management
& Training
Basic & Detailed
Engineering
Basic & Detailed
Engineering&
7
PRESENTATION
ON
INSTALLATION OF A
CHROME ORE BENEFICIATION PLANT
8
PLANT CAPACITY – 10,000 Mt CONCENTRATE PER MONTH
FEED QUALITY – 17% Cr2O3
PRODUCT QUALITY – 30% Cr2O3
NO INFORMATION HAS BEEN PROVIDED FOR FE/CR RATIO
ENQUIRY INPUTS
9
IT IS EXPECTED THAT THE PLANT OF SUCH SCALE COULD BE
COMPLETED WITHIN 18 MONTHS FROM GO-AHEAD.
THE WORK INVOLVES FOLLOWING TENTATIVE VOLUME OF
CONSTRUCTION:
CONCRETE - 3700 – 4000 CU M
STRUCTURAL STEEL WORK - 525 – 700 TON
CONSTRUCTION POWER 200 TO 250 kVA AND WATER 150 CU
M PER DAY AT PEAK CONSTRUCTION PERIOD ARE AVAILABLE
AT SITE.
PLANT CONSTRUCTION
10
UTILITIES
RECIRCULATING WATER QTY. .. 300 - 400 CU M/HR SPECIFIC WATER CONSUMTION .. 1.0 – 2.0 CU M/T
SPECIFIC WATER CONSUMTION CAN BE CONTROLLED BY DEPLOYING EFFECTIVE TAILINGS MANAGEMENT SYSTEM
WATER SYSTEM
ESTIMATED POWER REQUIREMENT .. 800 – 1000 kVA
POWER CONSUMPTION WILL BE MOSTLY DEPENDENT ON THE MATERIAL CHARACTERISTICS AND CANNONT BE ESTIMATED VERY ACCURATELY
POWER SYSTEM
11
BENEFICIATION PLANT
TYPICAL PROCESS FLOW SHEET
THE PROCESS FLOW SHEET WILL BE COMPOSED OF FOLLWING UNIT PROCESSES:
COMMINUITION
SIZING
GRAVITY CONCENTRATION
DEWATERING
12
PROCESS CONCEPT
IN ORDER TO DEVELOP PROCESS FLOW SHEET A DETAILED TEST WORK TO BE CONDUCTED
THE PROCESS FLOW SHEET WILL THEN BE CONFIRMED WITH THE PILOT PLANT STUDY.
THE QUALITY OF SAMPLE REQUIRED WILL BE CONFIRMED LATER.
SOME OF THE TEST DATA:
TESTING SOURCE OF FEED GR. PRODUCT Cr2O3 RECOVERY
AGENCY SAMPLE Cr2O3 GR. Cr2O3 IN PRODUCT YIELD
% % % %
NML SOUTH KALIAPANI 20 42 50 23.8NML SUKRANGI 23 50 53 24.4RRL SOUTH KALIAPANI 24 50 62 29.8RRL SUKRANGI 26 50 68 35.3BARC SOUTH KALIAPANI 33 52 84 53.3
13
PROCESS CONCEPT (CONT’D)
RESULTS OF CONFIRMATORY TESTWORK:
COMPOSITESKLP:SUKG
SKLP SUKG 50 : 50
FEED GRADE, % Cr2O3 33.50 33.20 33.35
PRODUCT GRADE, % Cr2O3 54.10 54.00 54.05
RECOVERY IN CONCENTRATE, % Cr2O3 DISTR. 79.80 67.10 73.45
YIELD WEIGHT, % 49.40 41.30 45.35
SiO2 IN CONCENTRATE, % 1.10 0.40 0.75
Cr:Fe RATIO IN CONCENTRATE 2.9:1 2.9:1 2.9:1
TAILINGS GRADE, % Cr2O3 13.40 18.60 16
CONSIDERATION FOR SITE SELECTION1. CONSUMPTION
POINT2. LANDED COST OF
ORE AT CONSUMPTION POINT
3. LAND AVAILABILITY4. LOCATION OF MINES5. DISPOSAL OF WASTE6. INFRASTRUCTURE
FACILITY7. LOGISTIC COST8. WATER
9. POWER10. HUMAN RESOURCES11. MARKET OF
PRODUCTS AND BY-PRODUCTS
12. OTHER INPUT COST13. FUTURE EXPANSION14. ADMINISTRATION15. FUEL COST16. PAY BACK PERIOD17. MAINTENENCE18. TIME FOR PROJECT
EXECUTION
AMUEL
THANK YOU AMUEL ENGINEERING PVT
LTD