Managing Catastrophe
Observations Of
A Canadian Peacekeeper In Haiti On 12 January 2010
And Potential Application Towards Project Management
Chris Haché, MSM, CD, PMPLieutenant Commander
Canadian Forces Maritime Warfare Centre
2
Learning Objectives
• Creating a risk matrix that is truly reflective of your risk environment
• Adapting to immediate changes in the triple constraints
• Managing increases to project complexity
3
Disclaimer
• The views and opinions expressed herein are my own based on my personal observations and perspectives
• My views are not necessarily reflective of or are endorsed by the Royal Canadian Navy, the Canadian Forces, the Government of Canada, the United Nations or my spouse
4
Online Resources
• Public Safety Canada
• A guide to business continuity planning
• Nova Scotia Emergency Management Office
• Business Continuity Management
5555
Creating A Risk Matrix That Is Truly Reflective
Of Your Risk Environment
Creating A Risk Matrix That Is Truly Reflective
Of Your Risk Environment
6
Risk Environment
• Understanding your physical environment
• Team impacts
• Security / emergency services
• Infrastructure
7
Understand Your Environment
• Emergency services
• Much applicable across industry
• How it can affect you
• Personally
• Entering an affected area
8
Team Impact• Loss of critical members
• Loss of critical mass
• Effect on team efficiency• Family loss, disabilities,
injuries, trauma, etc.
• Environmental effects• Breathing, drinking, eating,
sanitation
• Acclimatization for new members
9
Security / Emergency Services
• Requirements
• Police, fire, medical, military
• Damage to prisons & jails
• Impact on security levels
• Civil disobedience
• Civil unrest
• Internal conflict
• External conflict
10
Infrastructure
• Requirements
• Power, water, fuel, heat, etc.
• New products, repairs, spares, etc.
• Effects to transportation
• Vehicles, roads, rail, air, seaports, etc.
• Debris
11
Risk Matrix• UN knew of risk
• Hotel (HQ) was a known risk entity
• Executives concentrated in one location
• Earthquake caused by undiscovered fault
• How detailed is your matrix?
• Interrelationships of risk matrices
11221122
Adapting To Immediate Changes In The Triple
Constraints
Adapting To Immediate Changes In The Triple
Constraints
13
Adapting The Triple Constraints
• (Integration / Communications)
• Scope
• Time
• Cost
14
Project Charter• Originally UNSC Resolution 1529
(2004)
• Originally 8,322 military and police
• UNSC Resolution 1908 (2010)
• Military – from 6,940 to 8,940 (+2,000)
• UNPOL – from 2,211 to 3,711 (+1,500)
• Ensure safe and secure environment
• Implied task – provide relief
15
Stakeholder Analysis• Citizens!
• UN Organizations
• OCHA, UNICEF, WFP, UNHCR, etc.
• International Military
• Over 20
• Integrated / arms length
• International NGOs / Charities
• Dozens / Hundreds
16
Requirements• Maintain secure environment
• Integration with foreign security partners
• Integration with NGOs - security and distribution
• Responding to debris concerns
• Responding to sanitation concerns - IDP camps, mass burials
• Responding to stakeholder concerns (e.g., UNESCO)
17
Time
• ASAP!
• Three main period identified
• Emergency/Rescue
• Recovery
• Improvement
• Determining activity resources/durations
18
Cost
• Initially not a significant concern
• Opportunity
• Land owners
• Trades industries
• Employment Programs
• Cash For Work
• Cash For Food And Work
11991199
Managing Increases To Project
Complexity
Managing Increases To Project
Complexity
20
Managing Increased Complexity
• Quality
• HR
• Communications
• Risk
• Procurement
• DATA!!!
21
Quality
• Measuring effects
• Rioting levels
• Security incidents
• Personnel migration
22
Human Resources
• 2000 troops / 1500 police
• Composition / requirements matrix
• Security? Engineering? Specialists? Optimal ratio?
• Rapid indoctrination
• Modifications to other documents
23
Communications
• Communications matrix is key
• Appropriate method for each stakeholder
• Radio
• Cell phone (SMS)
• Television
• Web
• Manage expectations
24
Risk• Re-evaluate risk matrix
• New items may be present
• Severity / impact may have changed
• Not all risk events are bad
• Extra attention / assistance
• More health projects (water, medical)
• Economic development
• Innovative business opportunities
25
Procurement• Land
• Extra footprint of incoming troops
• IDP
• Debris
• Logistical Issues
• Ready-use stores
• Ramp-up of suppliers
• Landing areas
26
Data!!!• Significant Impact
• Loss of computer servers on same site
• Infrequent backups
• Even offsite susceptible
• Could be equally affected)
22772277
Criteria For SuccessCriteria For Success
28
Criteria for Success (1)• Robust risk analysis /
detailed planning
• Identification of reliance & interdependency
• Potential partnerships
• Haiti had the world
• Measures to assess catastrophe impact
• Adequate response
• Exercise the plan
29
Criteria for Success (2)• Empowerment
• Provide strategic direction & let teams work
• Lessens personal impact (keeping people busy)
• Capture identified lessons
• Generate lessons learned
33003300
SummarySummary
31
Learning Objectives• Creating a risk
matrix that is truly reflective of your risk environment
• Adapting to immediate changes in the triple constraints
• Managing increases to project complexity
32
Take-Away Tool
33
Contact Information
Chris Haché, MSM, CD, PMP
Lieutenant CommanderCanadian Forces
Maritime Warfare Centre
(902) 721-8482 (w)[email protected]@hotmail.co
m
33443344
Take-Away ToolBonus MaterialTake-Away ToolBonus Material
35
Calculating Risk
• Risk is the estimate of injury or gain/loss, defined as a measure of the probability and severity of an event
• Risk has two components
• Probability – the probability or frequency of the event occurring
• Severity – the impact if the event occurs
36
Risk Can Be Good!Pro
babili
ty
Severity
Highest Risk
Lowest Risk
Exploitatio
n
Remainder of
presentation will
focus on negative
risk…
37
“Traditional” Risk MatrixPro
babili
ty
Severity
Highest Risk
Lowest Risk
Mitigatio
n
38
Risk Indices
• Probability
1. Improbable
2. Remote
3. Occasional
4. Probable
5. Frequent
• Consequences
1. Negligible
2. Marginal
3. Significant
4. Critical
5. Catastrophic
39
ProbabilityImprobabl
eSo unlikely it may not be experienced
Remote Unlikely, but could possibly occur in the life of the project
Occasional Unlikely, but can be reasonably expected to occur in the life of the project
Probable Will occur several times in the life of the project
Frequent Likely to occur regularly
40
Consequences - Negligible
• Personnel
• Minor impact / minor first aid, no appreciable change in productivity
• Infrastructure
• Minor damage, limited & temporary loss of some non-critical resources
• Project
• Minor degradation / project continues as scheduled
41
Consequences - Marginal
• Personnel
• Single minor injury or temporary disability, emergency medical treatment
• Infrastructure
• Moderate damage, moderate &/or longer loss of some non-critical resources, possible minor/temporary impact on critical resources
• Project
• Certain aspects of the project will be notably over on time/scope/cost, project continues
42
Consequences - Significant
• Personnel
• Single severe or permanent injury, multiple minor injuries or disabilities
• Infrastructure
• Major damage, temporary loss of critical resources, requires specialized repair teams
• Project
• Single significant project element failure but with workarounds - may be unsuitable to continue
43
Consequences - Critical• Personnel
• Single death / multiple severe injuries / multiple permanent disabilities
• Infrastructure
• Severe damage, extended loss of critical resources, requires specialized repair teams
• Project
• Multiple significant project element failures but with workarounds, likely unsuitable to continue
44
Consequences - Catastrophic
• Personnel
• Multiple deaths
• Infrastructure
• Damaged beyond repair
• Project
• Irrecoverable project failure and inability to continue
45
Risk Levels•Acceptable (without review)
•No further action required
A
•Acceptable With Review
•Tolerable but must be reviewed by the project team on a periodic basis
R
•Undesirable
•Should only be tolerated if risk reduction is impractical
U
•Intolerable
•Intolerable – risk is to be reduced / transferred or else the project should be cancelled
I
46
Risk Matrix
5
4
3
2
1
NegligibleMarginalSignificantCriticalCatastrophic
R U I I I
R R U I I
A R U U I
A A R U U
A A A R R
Pro
babili
ty
Consequences
1 2 4 5
Frequent
Probable
Occasional
Remote
Improbable
3
47
Risk Mitigation / Controls
• To reduce risk levels, you must:
• Reduce the frequency and/or
• Reduce the severity
• Eliminate, reduce, transfer, share, etc.
• If risk level has not dropped, then inappropriate / inadequate controls being used
48
Example
• Risk – Documentation on the plan no longer exists (server room collapsed)
• Probability: Remote
• Severity: Critical (Project)
• Risk Assessment Undesirable
49
Example (continued)
• Risk Mitigation/Controls:
• Off-site server backup, cloud computing, DVD backups
• Probability: Remote
• Severity: Negligible (Project)
• Residual Risk Assessment
• Acceptable
50
Risk Posture After Controls
FrequentProbable
OccasionalRemote
Improbable
Catastrophic
Critical
Marginal
Negligible
0
5
10
15
20
25
30
35
40
45
Before Controls
FrequentProbable
OccasionalRemote
Improbable
Catastrophic
Critical
Marginal
Negligible
0
10
20
30
40
50
60
70
After Controls
The number of risks have not changed,but the risk levels have!