CHPS Era Archive/Data Backup
John Halquist
Development and Operations Officer
National Operational Hydrologic Remote Sensing Center (NOHRSC)
HIC Meeting – Feb 2010
Major categories for Archive use
General Archive requirements
Model development Unitgraph Routing
Calibration
Verification Analogs
Studies Case studies Applied Research Modeling/Product improvement Hindcasting/Reanalysis
Current situation NWS
IHFS(ops DB)
NWSRFS
ofs-de
raw SHEF-dec.
proc.SHEF-dec.
RAXarchive RDB
flat files(grids)
(field) data
acquisition
SHEF-dec.
FEWS fc DB
XSETS…
products
MPE
NAVX
ICPEVS
SHEFSHEF
SHEFSHEF
Current situation (FEWS archive)
FEWS archive:
• all data related to forecast bundled in one zip file
• forecast and associated inputs can be retrieved in stand alone FEWS
• data not directly accessible
Recommendation:intermediate solution only
(as short as possible)
FEWS fc DBmeta data
RDB
zip files archive-server
Where do we plan to go?
import
Exchange
Grid
Point
FEWSDB
Outbox (dir)
Archive Relational
DB
ArchiveFiles
External Sources
?
Could use
SOAP or PI
Possible NEW import JAVA
class
Enhanced or Additional FEWS
Export functionality
export
GGCalb
Verif
IWRSS
Key differences from existing Archive System
Data flows “through” the operational system to feed the Archiveseliminates Quality Control nightmareminimizes multiple “decode” pathways
Provide for a more “Integrated” Archive2 way data flow to support usage in operations and
analysis
Scalable, Flexible & Extensible architecturehardware & database schemas
Filling in the gaps …
Gaps in current requirements:
Meta-data What do we really need?What do we want?What about current archived data with little meta-
data?
Modifiers in CHPS Implemented significantly different than NWSRFSSome decisions need to be made on how we want to
handle modified time series
CHPS time series, example:
originaldatatimeseries
modifiers
time seriesused
Hardware modification:
chps2 (rdms)
Enclosure* (tuples)
Expansion…* Indicates New hardware
Schedule objectives:
Finalize conceptual design - Done
Determine Hardware requirements – Mar 2010
Data requirements finalization – May/Jun 2010
Build Prototype system – Sept 2010 Test system built at NOHRSC Operational field test at NWRFC
Provide initial DB Schema for review – Nov 2010
Field Deployment - ~2012
fini ...