CHP Govora, Unit 7 - steinmueller.com · Tel. +49 2261 78950-0 Völklingen-Fenne (FGD) Wesseling...
Transcript of CHP Govora, Unit 7 - steinmueller.com · Tel. +49 2261 78950-0 Völklingen-Fenne (FGD) Wesseling...
www.steinmueller.comTel. +49 2261 78950-0
Völklingen-Fenne (FGD)
Wesseling (SCR)
Novaky (FGD)
Hemweg (FGD)
Deuben(FGD)
Paroseni(FGD)Fusina
Maritsa East 3
Trbovlje
Ratcliffe on Soar(FGD)
Cottam
Pocerady
LesothoSOUTH AFRICA
Medupi(FGD)
Kusile (FGD)Pretoria
CHP Govora, Unit 7
Retrofi t with Effi ciency Increase of ElectrostaticPrecipitator (ESP)
Flue Gas Treatment
Achievements:
Dust: < 50 mg/m³ (originally 180 mg/m³)(STP @ 6 % O2)
Fuel : Romanian Lignite (a.r.)
LCV: 6.7 – 8.3 MJ/kg (1.6 - 2.0 Mcal/kg)w: 34 – 43 %a: 15 – 32 %S: 0.9 – 1.5 %
Boiler design: 420 t/h, 2-pass boiler
Scope of Supply:
• Flow cross-section enlarged by introducing new roof design
• Flow distribution improved by installing guide vanes
• Mechanically more robust electrodes installed
• High voltage system replaced
Selected Flue Gas Treatment References
of Steinmüller Engineering
Please contact us for further information.
Literature can be provided upon request
• Presentation on Steinmüller Engineering Conference 2013
• Steinmüller Engineering Workshop 2012 “Retrofi t with Effi ciency Increase of ESP”
Govora (ESP)
Steinmüller Engineering GmbH IHI Group Company
Fabrikstraße 5 • D-51643 Gummersbach • Germany
Tel: +49 2261 78950-0 Fax: +49 2261 78950-199
[email protected] www.steinmueller.com
Co
nce
pt/
Layo
ut:
tsi
tro
ne
med
ien
Gm
bH
& C
o. K
G, C
olo
gne
Edition 2015