Presentation on Gazipur City Corporation (GCC),
Bangladesh
1
Presented by:
1. Ashadur Rahman Kiron, Mayor (Acting), GCC
2. Md. Akbar Hossain, Superintending Engineer, GCC
3. Md. Moinul Islam, Senior Urban Planner, GCC
Wednesday, 04 March 2016
Tongi
PubailUnion
GachaUnion
GazipurKashimpur Union
Konabari Union
Kayaltia Union
Basan Union
RANGPUR
RAJSHAHI
KHULNA
DHAKA
SYLHET
CHITTAGONG
BARISAL
DMDP Area
GCC Area
BAY OF BENGAL
RANGPUR
RAJSHAHI
KHULNA
DHAKA
SYLHET
CHITTAGONG
BARISAL
DMDP Area
GCC Area
BAY OF BENGAL
Location of Gazipur City Corporation in Respect of Bangladesh
GCC
Map of Gazipur City Corporation
Tongi
PubailUnion
GachaUnion
GazipurKashimpur Union
Konabari Union
Kayaltia Union
Basan Union
Vision
“Make a green, poverty free and safe livable city by
preparing a master plan and implementing it
properly by improving governance and people’s
participation without hampering natural
environment”
City Introduction
Background: Gazipur City Corporation is the largest and 11th city corporation of the country. Total area of City Corporation is 329.53 sq.km and population is almost 3.0 million. Gazipur City Corporation is located in the center of the country. Connectivity of the capital city Dhaka with northern regions is through Gazipur City. It lies between 23052’45" and 2406’12"north latitudes and between 90015’2"and 90029’50" east longitudes.
Challenges and Opportunities:
1. Improper solid waste management.
2. Environmental pollution and water logging due to improper drainage
3. Land Crisis and Capacity Constraints. 4.Insufficient Water Supply
5. Rapid and Unplanned Urbanization.
6. Lack of adequate financing. 7. Huge number of migrated people.
8. High land. 9. Opportunity of more revenue income.
5
Unplanned Waste
Management
7
Increase of Migrating people towards
Urban Areas
Unplanned Drainage System
Traffic congestion
Steps to be taken by the City Corporation
1. Preparation of action area plan is going on.
2. Preparation of sub project priority list.
3. Water supply, drainage and road network projects have been
taken by the JICA finance.
4. PFS and FS for the Solid waste treatment plant will be started
soon.
10
Infrastructure Project Overview
Necessity: In Gazipur City Corporation, a huge quantity of solid waste almost 600 ton is produced every day. But there is a lack of dumping sites, equipment and garbage trucks. For this solid waste management project is needed.
Objective: To make a green, clean, livable and pollution free city for all.
Beneficiaries: Ultimately, total population of the city will be benefited from the project. They will get a clean and pollution free city. On the other hand, many new employment will be generated due to the project.
Key Steps: Solid management is one of the vital activities of the city corporation. It is included in cities development plan. City corporation has taken has several strategies such as- crash program, establishing road side dustbin (Secondary points), public awareness program, etc. And now we are trying to take a project to establish solid waste treatment plant. 11
Photographs on solid waste dumping
Technical Description
Project description: Construction of solid waste treatment plant.
Project components :
1. Land.
2. Vehicle (Garbage Truck, Pay loader, Excavator, Chain Dozer, etc)
3. Modern Equipments related with solid and liquid waste management (e.g. Compactor).
Supporting measures: To make the project viable fund, land purchase, different types of vehicles, modern equipments, technical support and capacity development activities are needed.
Key challenges:
1. Land Acquisition.
2. Funding
3. Very few number of resettlement.
13
Cost Break up
Project Investment
1. Project development 2 crore tk 250000 USD
2. Capital Expenditure
(e.g. for land acquisition, construction, equipment and furnishing)
119.5 crore tk 14937500 USD
3. Other costs 0.5 crore tk 62500 USD
4. Supporting non-infrastructure costs 0.5 crore tk 62500 USD
(e.g. CapDev)
TOTAL(project investment) 122.5 crore tk 15312500 USD
City own source 25 crore tk 3125000 USD
Financial Gap will be 97.5 crore tk 12187500 USD
Approx. Operation &Maintenance year 10 crore tk 1250000 USD
Anticipated Socio-Economic Impacts (Positive & Negative)
Social and poverty Impacts:
Positive Impacts:
1. Household solid waste will be disposed regularly.
2. Ensuring pollution free city which is also social impact.
Negative impact:
1. Very few number of resettlement.
Economic Impacts:
Positive Impacts:
1. Income generation of the employers.
2. Savings of people from medical treatment due to pollution free city.
3. Create opportunity of investment project.
Negative impact:
1. Increase of operation and maintenance cost for vehicle and fuel. 15
Anticipated Environmental and Climate [Resilience] Impacts (Positive & Negative)
Environment Impacts:
Positive Impacts:
1. City will become clean and green.
2. City will be pollution (Air, Water, etc) free.
Negative Impact:
1. Air and underground water may be polluted to some extent around the dumping places.
Climate [Resilience]Impacts:
Positive Impacts:
1. Due to proper management of the waste less carbon dioxide will be emitted and thus ozone layer depletion will be less.
Negative Impact:
1. Increase of temperature of the surrounding area to some extent due to incinerate. 16
Illustration, images, maps for the infrastructure project
Some pictures of
secondary points
Some pictures of unplanned
waste management
Waste falling here there creating water
logging and environmental pollution
Map of Gazipur
City Corporation Nagar Bhaban Removal of waste
under crash program
Some pictures of Current waste
disposal site (Kodda Bymile)
18