CHINA’S Renewable Energy Industrial Development Strategy. Li Junfeng APEC Renewable Energy Expert Group Meeting October 13 to 15, 2003 Shanghai China. Main contents. 1.Renewable energy development status Resources potential Current industrial development progress Potential projects - PowerPoint PPT Presentation

Transcript of CHINA’S Renewable Energy Industrial Development Strategy

Page 1: CHINA’S  Renewable Energy Industrial Development Strategy

Li JunfengAPEC Renewable Energy Expert Group Meeting

October 13 to 15, 2003

Shanghai China

CHINA’S Renewable Energy Industrial Development Strategy

Page 2: CHINA’S  Renewable Energy Industrial Development Strategy

2

Main contents

1.Renewable energy development status1.Renewable energy development status– Resources potentialResources potential– Current industrial development progressCurrent industrial development progress– Potential projectsPotential projects

2. 2003-2005 and 2003-2020 RE Industrial 2. 2003-2005 and 2003-2020 RE Industrial Development Strategy Development Strategy – RE industry development targetsRE industry development targets– Development strategyDevelopment strategy

3. Measures and Actions3. Measures and Actions

Page 3: CHINA’S  Renewable Energy Industrial Development Strategy

3

Part 1

Overview of China’s RE industrial Overview of China’s RE industrial developmentdevelopment

Page 4: CHINA’S  Renewable Energy Industrial Development Strategy

4

Renewable Energy Resources Potentials

Wind 253 GW

Biomass 300MTCE

Solar 0.6MJ/cm2 in Average

Geothermal 6.7 GW

Small Hydro Power 90 GW

Others

Page 5: CHINA’S  Renewable Energy Industrial Development Strategy

Wind ResourcesWind Resources

•Total 250 GW

•Mainly located in Northwest, west and the east-coastal region

Page 6: CHINA’S  Renewable Energy Industrial Development Strategy

Solar EnergySolar Energy

Average radiation is between 3360 to 8400 MJ/mAverage radiation is between 3360 to 8400 MJ/m22

2/3 of the territory is above 5020MJ /m2 2/3 of the territory is above 5020MJ /m2 Richest region is the west part of China, especially Tibetan PlateauRichest region is the west part of China, especially Tibetan Plateau

Page 7: CHINA’S  Renewable Energy Industrial Development Strategy

7

Current development status for Wind

Wind turbine installationWind turbine installation– 28 wind farms have been developed around China28 wind farms have been developed around China– The largest wind farm is located in Xinjiang, with about 100 The largest wind farm is located in Xinjiang, with about 100

MWMW– Total installation was 468 MW by the end of 2002Total installation was 468 MW by the end of 2002

Project investmentProject investment– More then 60% the investment from bilateral and multilateralMore then 60% the investment from bilateral and multilateral– Domestic investment is about 40%Domestic investment is about 40%

ManufactureManufacture– 6 manufactures can produce 600 kW system, including 3 6 manufactures can produce 600 kW system, including 3

joint venturesjoint ventures– 1MW and above system is under the R & D1MW and above system is under the R & D

Page 8: CHINA’S  Renewable Energy Industrial Development Strategy

8

Wind turbine installation in China(MW)

Page 9: CHINA’S  Renewable Energy Industrial Development Strategy

9

Current development status for solar thermal

More than 1000 More than 1000 manufacturesmanufactures

Annual Annual production is production is about 10 million about 10 million mm22

Accumulated Accumulated the largest the largest installation of 33 installation of 33 million mmillion m22 by by end 2001 in the end 2001 in the whole worldwhole world

Page 10: CHINA’S  Renewable Energy Industrial Development Strategy

10

Current development status for solar PV

InstallationInstallation– more than 10 MW for household more than 10 MW for household

systemsystem

– 700 village power systems 700 village power systems

– more than 20 MW for more than 20 MW for commercial usecommercial use

ManufactureManufacture– 4 old manufactures with total 4 old manufactures with total

capacity of 4 MWcapacity of 4 MW

– 4 new manufactures are under 4 new manufactures are under the development stage, at least the development stage, at least one is targeted 20 MW one is targeted 20 MW production capacity per annualproduction capacity per annual

Page 11: CHINA’S  Renewable Energy Industrial Development Strategy

11

Current development status for biomass

BiogasBiogas::– Over 1000 industrial wastewater /livestock farm large-Over 1000 industrial wastewater /livestock farm large-

scale biogas engineeringscale biogas engineering– Annual biogas production 600 million mAnnual biogas production 600 million m22

Direct burning of biomassDirect burning of biomass– 90% of the biomass for energy is direct burning for rural 90% of the biomass for energy is direct burning for rural

householdshouseholds

Other technologiesOther technologies– improved stove for biomass burningimproved stove for biomass burning– Gasification for over 200 village gas systemsGasification for over 200 village gas systems– bio-diesel for 10,000 tons per annualbio-diesel for 10,000 tons per annual

Page 12: CHINA’S  Renewable Energy Industrial Development Strategy

12

Current development status for geothermal

PowerPower– total capacity of 32.08 MWtotal capacity of 32.08 MW– mainly in Tibet 25.18 MWmainly in Tibet 25.18 MW

Heatng supplyHeatng supply– traditional heating system about 15 Mm2traditional heating system about 15 Mm2– geothermal heat pump systems are increasgeothermal heat pump systems are increas

ing like bamboo shoots after a spring raining like bamboo shoots after a spring rain

Page 13: CHINA’S  Renewable Energy Industrial Development Strategy

13

Part 2

2003-2005 and 2003- 2020 Renewable 2003-2005 and 2003- 2020 Renewable Energy Industrial Development StrategyEnergy Industrial Development Strategy

Page 14: CHINA’S  Renewable Energy Industrial Development Strategy

14

Targets of RE Industry in 2005

By 2005, RE industry development wilBy 2005, RE industry development will provide energy about 13 Mtce, equival provide energy about 13 Mtce, equivalent to reduce CO2 10 Mt, SO2 0.6 Mtlent to reduce CO2 10 Mt, SO2 0.6 Mt

Supply power for 1.3 million remote hSupply power for 1.3 million remote householdsouseholds

Provide 200K employee positionsProvide 200K employee positions

Page 15: CHINA’S  Renewable Energy Industrial Development Strategy

15

Targets of RE Sectors

SWHSWH• Annual production 11 million mAnnual production 11 million m22

• Accumulated installations 64 million mAccumulated installations 64 million m22

• Support 5Support 5-- 10 manufacturers10 manufacturers Solar PVSolar PV

• Annual production 10-15 MWAnnual production 10-15 MW• Accumulated installations 53 MWAccumulated installations 53 MW

WindWind• Wind farm installation 1000 MWWind farm installation 1000 MW• Wind turbine production capacity 150-200MWWind turbine production capacity 150-200MW

Page 16: CHINA’S  Renewable Energy Industrial Development Strategy

16

Targets of RE Sectors (cont.)

GeothermalGeothermal• Space heating area 20 million mSpace heating area 20 million m22

• Large-scale dissemination of geothermal Large-scale dissemination of geothermal heat pump technologyheat pump technology

BiogasBiogas• Supply 2 billion mSupply 2 billion m33

Page 17: CHINA’S  Renewable Energy Industrial Development Strategy

17

Industrial Development Strategy

Conform to the guideline to facilitate – domestic technology– enterprises’ scale-up– markets’ regulation– Products’ standardization

Focus on 4 fields:– SWH and PV– Wind– Biomass– Geothermal

Page 18: CHINA’S  Renewable Energy Industrial Development Strategy

18

2003-2020 Renewable Energy Industrial Development Strategy

Overall target of RE power generation 100GWOverall target of RE power generation 100GW Wind: 20 GWWind: 20 GW Small hydro: 50GWSmall hydro: 50GW Solar PV: 1GWSolar PV: 1GW Biomass: 15 GWBiomass: 15 GW Others: 14GWOthers: 14GW

10% of the total capacity by year 202010% of the total capacity by year 2020

Page 19: CHINA’S  Renewable Energy Industrial Development Strategy

19

Part 3

Measures and Actions Measures and Actions --what we are doing?--what we are doing?

Page 20: CHINA’S  Renewable Energy Industrial Development Strategy

20

Measures

●●regulations and incentive policyregulations and incentive policy

●●Technology AdvancementTechnology Advancement

●●Demonstration projectsDemonstration projects

●●Exploring and regulating marketsExploring and regulating markets

●●International cooperationInternational cooperation

Page 21: CHINA’S  Renewable Energy Industrial Development Strategy

21

Policy Incentives

Subsides Subsides directly subsidesdirectly subsides

– indirect subsidesindirect subsides

TaxationTaxation– half VAT for windhalf VAT for wind– 0 VAT for landfill power0 VAT for landfill power– othersothers

FinancingFinancing– Interest subsidesInterest subsides– National debtNational debt– Development banksDevelopment banks– international banksinternational banks

Page 22: CHINA’S  Renewable Energy Industrial Development Strategy

22

Legislation/regulations/guidelines

– By 2004, draft RE promotion lawBy 2004, draft RE promotion law

– DecreesDecrees New and renewable energy development plan for New and renewable energy development plan for

1996-20101996-2010 New and renewable energy industry development New and renewable energy industry development

plan for the 10plan for the 10thth five-year period five-year period Guidelines for wind energy industry developmentGuidelines for wind energy industry development Guidelines for speeding up localization of wind Guidelines for speeding up localization of wind

turbinesturbines Currently developing guidelines for solar/biogas Currently developing guidelines for solar/biogas

industrializationindustrialization Start the developing the draft RE Promotion LawStart the developing the draft RE Promotion Law

Page 23: CHINA’S  Renewable Energy Industrial Development Strategy

23

Mechanism BuildingWe are paying attentions to new mechaniWe are paying attentions to new mechani

sm for renewable energy:sm for renewable energy:– Wind concessional programWind concessional program

2x100 MW wind farms2x100 MW wind farms

– Prepare renewable energy legislationPrepare renewable energy legislation RPSRPS Feed in law, and Feed in law, and OtherOther

Page 24: CHINA’S  Renewable Energy Industrial Development Strategy

24

Tech. Advancement/ demonstration projects

– Demonstrative wind farms to promote domestic 600kW Demonstrative wind farms to promote domestic 600kW wind turbine tech. wind turbine tech. AdvancementAdvancement

– Initiating pilot projects to integrate SWH into buildingsInitiating pilot projects to integrate SWH into buildings– SWH production tech. innovation projectsSWH production tech. innovation projects– Bagasse co-generation demonstration projectsBagasse co-generation demonstration projects– Demonstration projects for industrial/agricultural waste Demonstration projects for industrial/agricultural waste

biogas engineeringbiogas engineering– Hybrid village power system in XinjiangHybrid village power system in Xinjiang– Geothermal heat pump commercial demonstration projGeothermal heat pump commercial demonstration proj

ectsects– …………

Page 25: CHINA’S  Renewable Energy Industrial Development Strategy

25

Action Plans / Programs

National-bond Wind Power ProgramNational-bond Wind Power Program• 8 MW in 4 pilot projects8 MW in 4 pilot projects• Supporting the development of domestic wind turbine and componSupporting the development of domestic wind turbine and compon

ent manufacture systement manufacture system• National wind resources measure in total 10 wind farms National wind resources measure in total 10 wind farms • Setting up the wind turbine certification programSetting up the wind turbine certification program

Sunshine Industry PlanSunshine Industry Plan– Promoting three industrial bases in Shandong, Jiangshu and BeijingPromoting three industrial bases in Shandong, Jiangshu and Beijing– Promoting 5-10 enterprises to expand their scalesPromoting 5-10 enterprises to expand their scales– Using national bond to support enterprises’ technology advancemeUsing national bond to support enterprises’ technology advanceme

ntsnts– Promoting the integration of SWH into buildingsPromoting the integration of SWH into buildings

Page 26: CHINA’S  Renewable Energy Industrial Development Strategy

26

Action Plans / Programs(cont.)

Western Sunshine EngineeringWestern Sunshine Engineering– Support solar industry development in western pro

vinces (Xinjiang, Inner Mongolia, Qinghai, etc.)– Support large-scale use of solar PV system for rem

ote households National Biogas Action PlanNational Biogas Action Plan

– Under developingUnder developing– Supporting “three river basins” region to use biogaSupporting “three river basins” region to use bioga

s engineering technology to disposal water pollutios engineering technology to disposal water pollutionn

Page 27: CHINA’S  Renewable Energy Industrial Development Strategy

27

International cooperation --Current Projects

1. SETC/WB/GEF RE project: China Renewable Energy Development Project

2. SETC/UNDP/GEF RE project: Capacity Building for the Rapid Commercialization of Renewable Energy in China

3. SETC/UNF Improvement and Expansion of Solar Water Heating Technology in China

4. Energy Foundation

5. SETC/ USDoE RE commercial business project/

Geothermal heat pump

6. Sino-EU Energy/Environment Project

7. others

Page 28: CHINA’S  Renewable Energy Industrial Development Strategy

Thanks!