505 NARRAGANSETT PARK DR PAWTUCKET, RI 02861 WWW.ARDENENG.COM TEL (401) 727-3500 FAX (401) 727-3540 CHILLER REPLACEMENT PROJECT ISSUED FOR BID MAY 8, 2015 HVAC DRAWING LIST SHEET NUMBER SHEET NAME CURRENT REVISION SHEET ISSUE DATE CURRENT REVISION DESCRIPTION H2.1 CHILLED WATER FLOW DIAGRAMS E 05/08/15 ISSUED FOR BID H3.0 PIPING DEMOLITION PLANS AND SECTION E 05/08/15 ISSUED FOR BID H5.1 PIPING NEW WORK PLANS AND SECTION E 05/08/15 ISSUED FOR BID H5.2 PIPING ISOMETRIC VIEWS E 05/08/15 ISSUED FOR BID H5.3 MECHANICAL RM PIPING DEMO AND NEW WORK PLANS E 05/08/15 ISSUED FOR BID H5.4 PIPING NEW WORK PLANS - ALTERNATE #1 E 05/08/15 ISSUED FOR BID H5.5 PIPING ISOMETRIC VIEWS - ALTERNATE #1 E 05/08/15 ISSUED FOR BID H7.1 HVAC SCHEDULES AND DETAILS E 05/08/15 ISSUED FOR BID H9.1 HVAC CONTROL DIAGRAM SHEET 1 E 05/08/15 ISSUED FOR BID ELECTRICAL DRAWING LIST SHEET NUMBER SHEET NAME CURRENT REVISION SHEET ISSUE DATE CURRENT REVISION DESCRIPTION E1.1 ELECTRICAL POWER PLAN E 05/08/15 ISSUED FOR BID

Transcript of CHILLER REPLACEMENT PROJECT

Page 1: CHILLER REPLACEMENT PROJECT

505 NARRAGANSETT PARK DRPAWTUCKET, RI 02861WWW.ARDENENG.COM

TEL (401) 727-3500FAX (401) 727-3540

CHILLER REPLACEMENT PROJECT

ISSUED FOR BID

MAY 8, 2015

HVAC DRAWING LIST

SHEET NUMBER SHEET NAMECURRENTREVISION

SHEET ISSUEDATE

CURRENT REVISION DESCRIPTION

H2.1 CHILLED WATER FLOW DIAGRAMS E 05/08/15 ISSUED FOR BID

H3.0 PIPING DEMOLITION PLANS AND SECTION E 05/08/15 ISSUED FOR BID

H5.1 PIPING NEW WORK PLANS AND SECTION E 05/08/15 ISSUED FOR BID

H5.2 PIPING ISOMETRIC VIEWS E 05/08/15 ISSUED FOR BID

H5.3MECHANICAL RM PIPING DEMO AND NEW

WORK PLANSE 05/08/15 ISSUED FOR BID

H5.4 PIPING NEW WORK PLANS - ALTERNATE #1 E 05/08/15 ISSUED FOR BID

H5.5 PIPING ISOMETRIC VIEWS - ALTERNATE #1 E 05/08/15 ISSUED FOR BID

H7.1 HVAC SCHEDULES AND DETAILS E 05/08/15 ISSUED FOR BID

H9.1 HVAC CONTROL DIAGRAM SHEET 1 E 05/08/15 ISSUED FOR BID

ELECTRICAL DRAWING LIST

SHEET NUMBER SHEET NAMECURRENTREVISION

SHEET ISSUEDATE

CURRENT REVISION DESCRIPTION

E1.1 ELECTRICAL POWER PLAN E 05/08/15 ISSUED FOR BID

Page 2: CHILLER REPLACEMENT PROJECT

CONTROL

PANEL

CONTROL

PANEL

CONTROL

PANEL

CONTROL

PANEL

X" CHWS

X" CHWRX" CHWS

AI

6" CHWS

PIXXX

PIXXX

HVAC - CHILLED WATER GENERATION FLOW DIAGRAM - DEMOLTIONSCALE: NONE

HVAC - CHILLED WATER GENERATION FLOW DIAGRAM - NEW WORKSCALE: NONE

TIXXX

TIXXX TIXXX

TIXXX

TI 001

AI

TI001

TI 002

AI

TI002

6" CHWR

BALANCE TO 300 GPM

MODEL SFDEJ FLEXCONNECTOR BYMASON INDUSTRIES(TYPICAL)

6" CHWS

PIXXX

PIXXX

TIXXX

TIXXX TIXXX

TIXXX

TI 003

AI

TI003

TI 004

AI

TI004

6" CHWR

BALANCE TO 300 GPM

6" CHWS

6" CHWS

6" CHWR

6" CHWR

CH

WR

FR

OM

BLD

G.

CH

WR

TO

BLD

G.

CH

WR

FR

OM

BLD

G.

CH

WR

TO

BLD

G.

EXISTING CHILLER TO REMAIN (ACC-1)

EXISTING CHILLER TO BE REMOVED (ACC-2)

EXISTING CHILLER TO REMAIN (ACC-1)

NEW CHILLER (ACC-2)

6" CHWS

6" CHWR

6" CHWS

6" CHWR

6" CHWS

6" CHWS

6" CHWS

AI

CV001

AI

CV002

BUTTERFLY VALVEWITH GEAR OPERATOR(TYPICAL)

"Y" STRAINER WITH BLOW OFF VALVE, CAP& CHAIN AND HOSE END CONNECTION(TYPICAL)

PRESSURE GAUGE (TYPICAL) PROVIDEDIELECTRIC NIPPLE CONNECTION TOSTEEL MAIN

4" TOR & ANDERSSON STAFBALANCING VALVE.PROVIDE 2" PORTEXTENSIONS TO CLEARINSULATION. (TYPICAL)

DRAIN VALVE(TYPICAL)

AIR VENT (TYPCIAL)

TEMP. GAUGE (TYPICAL)

NOTES:

1. PROVIDE A MINIMUM OF (4) WELLS FOR

ATC SENSORS AND PROBES. COORDINATE

CLOSELY WITH OWNER AND ATC

SUBCONTRACTOR.

INSTALL 6" VICTAULICFLANGE ON CHILLERCONNECTIONS.(TYPICAL FOR 2)

ARDEN PROJECT NUMBER DRAWING NUMBER REVISION NUMBER

DRAWING NAME:

PROJECT NAME:

SCALE:

NORTH ARROW REGISTRATION

GRAPHICS SCALE

DRAWING NOTES

GENERAL NOTES

CONFIDENTIALITY STATEMENT

THIS DOCUMENT IS THE PROPERTY OF ARDEN ENGINEERINGCONSTRUCTORS, LLC. INFORMATION AND DATA CONTAINED HEREIN AREPROPRIETARY AND CONFIDENTIAL. THIS INFORMATION SHOULD NOT BE

DISCLOSED TO ANY THIRD PARTY WITHOUT THE PRIOR WRITTENCONSENT OF ARDEN ENGINEERING CONSTRUCTORS, LLC

505 NARRAGANSETT PARK DRPAWTUCKET, RI 02861WWW.ARDENENG.COM

TEL (401) 727-3500FAX (401) 727-3540

ISSUED FOR BID

E

12" = 1'-0"

CCRI CHILLER REPLACEMENTPROJECT

CHILLED WATER FLOWDIAGRAMS

46245 H2.1

REV. DATE DRF.'D DES.'D PURPOSE OF ISSUE/REVISION

A 2/26/15 JDL TAE CLIENT REVIEW

B 3/10/15 JDL TAE REISSUED FOR CLIENT REVIEW

C 3/12/15 JDL TAE ISSUED FOR STATE REVIEW

D 5/01/15 JDL TAE REISSUED FOR CLIENT REVIEW

E 5/08/15 JDL TAE ISSUED FOR BID

Page 3: CHILLER REPLACEMENT PROJECT

EXISTING CHILLER(CH-1)

EXISTING CHILLER(CH-2)

2

H3.0

6" CHWR TOBE REMOVED

EXISTING TRANERTAA-1254-YT01TO REMAIN

6" CHWS TOBE REMOVED

REMOVE EXISTING 6"CHILLED WATER RETURNDOWN TO 6" FROMFINISHED GRADE

REMOVE EXISTING 6"CHILLED WATER SUPPLYDOWN TO 6" FROMFINISHED GRADE

EXISTING CHILLER TO BEREMOVED AND DISPOSALED

OFF SITE. REFIGERATION TO BEREMOVED AND DISPOSALED

OFF SITE.

EXISTING PAD TO BEREMOVED, DISPOSALEDAND REINSTALLED ASPART OF ALTERNATE #3PRICING. ALL SOILTESTING ANDCOMPACTION COSTSALONG WITH TESTINGAND INSPECTION OFCONCRETE COSTS TO BEINCLUDED IN ALTERNATE#3 PRICING.

Level 210' - 0"

Level 10' - 0"

Level 210' - 0"

6"ø

CHWS

6"ø

CHWR

EXISTING 6" CHWR(FROM BUILDING)

EXISTING 6" CHWS(TO BUILDING)

ARDEN PROJECT NUMBER DRAWING NUMBER REVISION NUMBER

DRAWING NAME:

PROJECT NAME:

SCALE:

NORTH ARROW REGISTRATION

GRAPHICS SCALE

DRAWING NOTES

GENERAL NOTES

CONFIDENTIALITY STATEMENT

THIS DOCUMENT IS THE PROPERTY OF ARDEN ENGINEERINGCONSTRUCTORS, LLC. INFORMATION AND DATA CONTAINED HEREIN AREPROPRIETARY AND CONFIDENTIAL. THIS INFORMATION SHOULD NOT BE

DISCLOSED TO ANY THIRD PARTY WITHOUT THE PRIOR WRITTENCONSENT OF ARDEN ENGINEERING CONSTRUCTORS, LLC

505 NARRAGANSETT PARK DRPAWTUCKET, RI 02861WWW.ARDENENG.COM

TEL (401) 727-3500FAX (401) 727-3540

ISSUED FOR BID

E

1/2" = 1'-0"

CCRI CHILLER REPLACEMENTPROJECT

PIPING DEMOLITION PLANSAND SECTION

46245 H3.0

1/2" = 1'-0"CHILLER PIPING - DEMOLITION PLAN

1/2" = 1'-0"SECTION 2

1. PRE-BALANCE OF THE CHILLED WATER SYSTEM IS REQUIREDBEFORE ANY DEMO. SEE BALANCING SPEC FOR ADDITIONALREQUIREMENTS.

REV. DATE DRF.'D DES.'D PURPOSE OF ISSUE/REVISION

A 2/26/15 JDL TAE CLIENT REVIEW

B 3/10/15 JDL TAE REISSUED FOR CLIENT REVIEW

C 3/12/15 JDL TAE ISSUED FOR STATE REVIEW

D 5/01/15 JDL TAE REISSUED FOR CLIENT REVIEW

E 5/08/15 JDL TAE ISSUED FOR BID

2' 0' 2' 4'

SCALE: 1/2" = 1'-0"

Page 4: CHILLER REPLACEMENT PROJECT

EXISTING CHILLER(CH-1)

NEW CHILLER(CH-2)

1

H5.1

6"ø CHWR

6"ø CHWS

CONNECT NEW 6" CHWRTO EXISTING 6" CHWR

CONNECT NEW 6" CHWS TOEXISTING 6" CHWS

NEW 6" CHWR(INLET CONNECTION)

NEW PIPE SUPPORT.SEE DETAIL DWG H7.1CONTRACTOR TO CONFIRMLOCATION & QUANTITYBASED ON PIPE SUPPORTREQUIREMENTS

PURCHASE NEW CONDENSORCOIL PROTECTION SCREENSFROM CHILLER MANUFACTURERAND INSTALL IN FIELD

NEW 6" CHWS(OUTLET CONNECTION)

CONTRACTOR SHALL BERESPONSIBLE FOR ANYUNDERGROUND DAMAGE THATOCCURS AS A RESULT OFINSTALLING ANY NEWCONCRETE FOOTINGS FOR THEPIPE SUPPORTS

ALTERNATE #26" DIAMETER CONCRETEBOLLARD, 6'-0" MINIMUMLENGTH, PAINTEDYELLOW. INSTALLBELOW FROST LINE PERMANUFACTURERSRECOMMENDATION(TYPICAL).

4' -

0"

MA

X

Level 10' - 0"

Level 210' - 0"

6"ø CHWS6"ø CHWR

8' -

0"

4" CHWRINLET (HIGH)

1/2" = 1'-0"CHILLER PIPING - NEW WORK PLAN

ARDEN PROJECT NUMBER DRAWING NUMBER REVISION NUMBER

DRAWING NAME:

PROJECT NAME:

SCALE:

NORTH ARROW REGISTRATION

GRAPHICS SCALE

DRAWING NOTES

GENERAL NOTES

CONFIDENTIALITY STATEMENT

THIS DOCUMENT IS THE PROPERTY OF ARDEN ENGINEERINGCONSTRUCTORS, LLC. INFORMATION AND DATA CONTAINED HEREIN AREPROPRIETARY AND CONFIDENTIAL. THIS INFORMATION SHOULD NOT BE

DISCLOSED TO ANY THIRD PARTY WITHOUT THE PRIOR WRITTENCONSENT OF ARDEN ENGINEERING CONSTRUCTORS, LLC

505 NARRAGANSETT PARK DRPAWTUCKET, RI 02861WWW.ARDENENG.COM

TEL (401) 727-3500FAX (401) 727-3540

ISSUED FOR BID

E

1/2" = 1'-0"

CCRI CHILLER REPLACEMENTPROJECT

PIPING NEW WORK PLANS ANDSECTION

46245 H5.1 1/2" = 1'-0"SECTION 1

BEFORE REMOVAL OF ANY PIPING, CONTRACTOR SHALL CONFIRMCHILLED WATER SUPPLY AND CHILLED WATER RETURN INSIDEAND OUTSIDE OF THE BUILDING AND MARK THE EXISTING PIPINGAT THE GROUND LEVEL BEFORE REMOVAL.

LABEL EXISTING PIPING: "CHWR FROM BLDG" AND "CHWS TOBLDG"

REV. DATE DRF.'D DES.'D PURPOSE OF ISSUE/REVISION

A 2/26/15 JDL TAE CLIENT REVIEW

B 3/10/15 JDL TAE REISSUED FOR CLIENT REVIEW

C 3/12/15 JDL TAE ISSUED FOR STATE REVIEW

D 5/01/15 JDL TAE REISSUED FOR CLIENT REVIEW

E 5/08/15 JDL TAE ISSUED FOR BID

2' 0' 2' 4'

SCALE: 1/2" = 1'-0"

Page 5: CHILLER REPLACEMENT PROJECT

ALTERNATE #4INSTALL CHAIN LINK PRIVACY SLATS FENCESCREEN 3000SERIES SINGLE WALL SLAT ON 205' OF 8' FENCING(INCLUDING GATES) AROUND CHILLERS. SUBMIT SAMPLEAND COLOR CHART TO CCRI & ENGINEER FOR APPROVAL.

CHILLER TO BE INSTALLED ON RUBBERISOLATIONS PROVIDED WITH CHILLER

ARDEN PROJECT NUMBER DRAWING NUMBER REVISION NUMBER

DRAWING NAME:

PROJECT NAME:

SCALE:

NORTH ARROW REGISTRATION

GRAPHICS SCALE

DRAWING NOTES

GENERAL NOTES

CONFIDENTIALITY STATEMENT

THIS DOCUMENT IS THE PROPERTY OF ARDEN ENGINEERINGCONSTRUCTORS, LLC. INFORMATION AND DATA CONTAINED HEREIN AREPROPRIETARY AND CONFIDENTIAL. THIS INFORMATION SHOULD NOT BE

DISCLOSED TO ANY THIRD PARTY WITHOUT THE PRIOR WRITTENCONSENT OF ARDEN ENGINEERING CONSTRUCTORS, LLC

505 NARRAGANSETT PARK DRPAWTUCKET, RI 02861WWW.ARDENENG.COM

TEL (401) 727-3500FAX (401) 727-3540

ISSUED FOR BID

E

CCRI CHILLER REPLACEMENTPROJECT

PIPING ISOMETRIC VIEWS

46245 H5.2

NEW WORK ISOMETRIC VIEW - 1

NEW WORK ISOMETRIC VIEW - 2 NEW WORK ISOMETRIC VIEW - 3

1/2 " = 1' -0"

1/2" = 1' -0" 1/2" = 1' -0"

1. REFER TO DWG. H2.1 FOR ADDITIONAL PIPING INLINE DEVICESAND VALVE REQUIREMENTS.

REV. DATE DRF.'D DES.'D PURPOSE OF ISSUE/REVISION

A 2/26/15 JDL TAE CLIENT REVIEW

B 3/10/15 JDL TAE REISSUED FOR CLIENT REVIEW

C 3/12/15 JDL TAE ISSUED FOR STATE REVIEW

D 5/01/15 JDL TAE REISSUED FOR CLIENT REVIEW

E 5/08/15 JDL TAE ISSUED FOR BID

2' 0' 2' 4'

SCALE: 1/2" = 1'-0"

Page 6: CHILLER REPLACEMENT PROJECT

RE-CONNECT CHEMICALBYPASS FEEDER LINES

CHWP-1

300

CHWP-2

300

AS-1

300

FM

001

MOUNT IN 6" VERTICAL CHWSPIPE APPROX. 15'-0" FROMFINISHED FLOOR. SEE SPECSFOR TYPE.

FLOW METER DIGITALDISPLAY. MOUNT 6'-0"FROM FINISHED FLOOR

NEW PUMP VFD's.RELOCATE EXISTINGTHERMOSTAT AS NEEEDTO MAKE SPACE

EXISTING TRIDIUMCONTROL PANELS

REFER TO DETAIL ONH7.1 FOR PUMP TRIM

6"ø CHWR

6"ø CHWS

6"ø CHWR 6"ø CHWS

NEW FIELD CONTROLLERFOR CHILLER PLANT

CONTRACTOR TO CONFIRM ADEQUATESPACE IS BEING PROVIDED BEFOREPURCHASING PUMP. SUBMIT DETAILEDPIPING DRAWING TO ENGINEER FORAPPROVAL.

REMOVEEXISTING PUMPS

REMOVE EXISTINGAIR SEPARATOR

EXISTING TRIDIUMCONTROL PANELS

6"ø CHWR

6"ø CHWS

6"ø CHWS

6"ø CHWR

EXISTING TRANECONTROL PANEL

ARDEN PROJECT NUMBER DRAWING NUMBER REVISION NUMBER

DRAWING NAME:

PROJECT NAME:

SCALE:

NORTH ARROW REGISTRATION

GRAPHICS SCALE

DRAWING NOTES

GENERAL NOTES

CONFIDENTIALITY STATEMENT

THIS DOCUMENT IS THE PROPERTY OF ARDEN ENGINEERINGCONSTRUCTORS, LLC. INFORMATION AND DATA CONTAINED HEREIN AREPROPRIETARY AND CONFIDENTIAL. THIS INFORMATION SHOULD NOT BE

DISCLOSED TO ANY THIRD PARTY WITHOUT THE PRIOR WRITTENCONSENT OF ARDEN ENGINEERING CONSTRUCTORS, LLC

505 NARRAGANSETT PARK DRPAWTUCKET, RI 02861WWW.ARDENENG.COM

TEL (401) 727-3500FAX (401) 727-3540

ISSUED FOR BID

E

1/2" = 1'-0"

CCRI CHILLER REPLACEMENTPROJECT

MECHANICAL RM PIPING DEMOAND NEW WORK PLANS

46245 H5.3

1/2" = 1'-0"MECHANICAL ROOM NEW WORK PLAN

1/2" = 1'-0"MECHANICAL ROOM DEMO PLAN

REV. DATE DRF.'D DES.'D PURPOSE OF ISSUE/REVISION

A 2/26/15 JDL TAE CLIENT REVIEW

B 3/10/15 JDL TAE REISSUED FOR CLIENT REVIEW

C 3/12/15 JDL TAE ISSUED FOR STATE REVIEW

D 5/01/15 JDL TAE REISSUED FOR CLIENT REVIEW

E 5/08/15 JDL TAE ISSUED FOR BID

2' 0' 2' 4'

SCALE: 1/2" = 1'-0"

Page 7: CHILLER REPLACEMENT PROJECT

6"ø CHWR

6"ø CHWS

6"ø

CH

WR

6"ø

CH

WS

6"ø

CH

WR

6"ø

CH

WS

EXISTING CHWR

EXISTING CHWS

PIPE EL. 10'-6"FROM FINISHEDGRADE

EXISTING PIPING TO BE REMOVEDDOWN TO PIT WALL. APPROXIMATELY4'-6" BELOW FLOOR TO POINT OFCONNECTION. PATCH AND SEAL OLDPIPE WALL PENETRATIONS.

PIPE EL. 8'-0"FROM FINISHED

GRADE

PIPE EL. 10'-6"FROM FINISHEDGRADE

PIPE EL. 14'-0 "FROM FINISHEDGRADE

PIPE HANGERSAS NEEDED

ARDEN PROJECT NUMBER DRAWING NUMBER REVISION NUMBER

DRAWING NAME:

PROJECT NAME:

SCALE:

NORTH ARROW REGISTRATION

GRAPHICS SCALE

DRAWING NOTES

GENERAL NOTES

CONFIDENTIALITY STATEMENT

THIS DOCUMENT IS THE PROPERTY OF ARDEN ENGINEERINGCONSTRUCTORS, LLC. INFORMATION AND DATA CONTAINED HEREIN AREPROPRIETARY AND CONFIDENTIAL. THIS INFORMATION SHOULD NOT BE

DISCLOSED TO ANY THIRD PARTY WITHOUT THE PRIOR WRITTENCONSENT OF ARDEN ENGINEERING CONSTRUCTORS, LLC

505 NARRAGANSETT PARK DRPAWTUCKET, RI 02861WWW.ARDENENG.COM

TEL (401) 727-3500FAX (401) 727-3540

ISSUED FOR BID

E

1/2" = 1'-0"

CCRI CHILLER REPLACEMENTPROJECT

PIPING NEW WORK PLANS -ALTERNATE #1

46245 H5.4

1/2" = 1'-0"

CHILLER PIPING - NEW WORK PLAN -ALTERNATE #1

REV. DATE DRF.'D DES.'D PURPOSE OF ISSUE/REVISION

A 2/26/15 JDL TAE CLIENT REVIEW

B 3/10/15 JDL TAE REISSUED FOR CLIENT REVIEW

C 3/12/15 JDL TAE ISSUED FOR STATE REVIEW

D 5/01/15 JDL TAE REISSUED FOR CLIENT REVIEW

E 5/08/15 JDL TAE ISSUED FOR BID

2' 0' 2' 4'

SCALE: 1/2" = 1'-0"

Page 8: CHILLER REPLACEMENT PROJECT

ARDEN PROJECT NUMBER DRAWING NUMBER REVISION NUMBER

DRAWING NAME:

PROJECT NAME:

SCALE:

NORTH ARROW REGISTRATION

GRAPHICS SCALE

DRAWING NOTES

GENERAL NOTES

CONFIDENTIALITY STATEMENT

THIS DOCUMENT IS THE PROPERTY OF ARDEN ENGINEERINGCONSTRUCTORS, LLC. INFORMATION AND DATA CONTAINED HEREIN AREPROPRIETARY AND CONFIDENTIAL. THIS INFORMATION SHOULD NOT BE

DISCLOSED TO ANY THIRD PARTY WITHOUT THE PRIOR WRITTENCONSENT OF ARDEN ENGINEERING CONSTRUCTORS, LLC

505 NARRAGANSETT PARK DRPAWTUCKET, RI 02861WWW.ARDENENG.COM

TEL (401) 727-3500FAX (401) 727-3540

ISSUED FOR BID

E

CCRI CHILLER REPLACEMENTPROJECT

PIPING ISOMETRIC VIEWS -ALTERNATE #1

46245 H5.5

NEW WORK ISO VIEW 1 - ALTERNATE #1

NEW WORK ISO VIEW 2 - ALTERNATE #1

REV. DATE DRF.'D DES.'D PURPOSE OF ISSUE/REVISION

A 2/26/15 JDL TAE CLIENT REVIEW

B 3/10/15 JDL TAE REISSUED FOR CLIENT REVIEW

C 3/12/15 JDL TAE ISSUED FOR STATE REVIEW

D 5/01/15 JDL TAE REISSUED FOR CLIENT REVIEW

E 5/08/15 JDL TAE ISSUED FOR BID

2' 0' 2' 4'

SCALE: 1/2" = 1'-0"

Page 9: CHILLER REPLACEMENT PROJECT

AIR COOLED CHILLER SCHEDULE

TAG NO.

PROVIDE WITH THE FOLLOWING:

A. SINGLE POINT POWER CONNECTION

B. DUAL REFRIGERANT CIRCUITS

C. SUCTION SERVICE VALVES

D. 150 PSI NEMA-3 (SEALED) FLOW SWITCH (FLD)

E. 15A 115V CONVENIENCE OUTLET (60 HZ)

F.

G. START UP WITH FACTORY TECHNICIAN

H. LOW AMBIENT OPTION

I. CIRCUIT BREAKER

J. ELASTOMERIC VIBRATION ISOLATORS

DESIGNBASIS

MODEL NO. BUILDING SERVED AREA LOCATEDDESIGNDUTY

CHILLER TYPE

GENERAL DATA

REFRIGERANT TYPEREFRIGERANT

CHARGE

FULL LOADEFFICIENCY @

ARI CONDITIONSIPLV

COMPRESSORQUANTITY

CONDENSERFAN QUANTITY

GPMEWT(°F)

LWT(°F)

FOULINGFACTOR

EVAPORATOR DATA

% PROPYLENEGLYCOL (BY

VOLUME)

PRESSUREDROP

(FT. WATER)MCA

RATED LOADAMPS (EACH

COMP.)

ELECTRICAL DATA

LOCKED ROTORAMPS (EACH

COMP.)VOLTS PHASE HZ

REMARKS

CH-2 TRANE CGAM130 CCRI OUTSIDE 130 TONS AIR COOLED SCROLL R410A 224 LBS 10.3 16.6 6 10 290 54 44 0.0001 0 7.90 261.10 133 460 3 60

OPERATINGWEIGHT

(LBS.)

8,000

MOCP

300 215 1

ARRANGEMENT

2 PASS

1

T.O. CONC. PAD

GRADE

8" MIN.COMPACTEDGRAVEL

6" THICK REINFORCEDCONCRETESLAB W/ #4 @ 12" O.C. EACH WAY

CONT. #4@ BOT.

6" 6"

1'-0"

FOUNDATION NOTES:

1. ALL SOIL CONTAINING ORGANIC OR UNSUITABLE BEARING MATERIAL SHALL BE CLEARED FROM THE SLAB FOOTPRINT.

2. ALL SOIL SUPPORTED SLABS SHALL BE FOUNDED UPON COMPACTED NATURAL SUBGRADE OR COMPACTED BANK RUN GRAVEL FILL WITH A SAFE BEARING CAPACITY OF

NOT LESS THAN 3000 PSF.

3. A MODIFIED PROCTOR TEST SHALL BE PERFORMED BY A SOILS TESTING LAB ON EACH TYPE OF SOIL TO BE COMPACTED.

4. SOIL SHALL BE COMPACTED TO NOT LESS THAN 95% OF MAXIMUM DRY DENSITY PER ASTM D1557 IN LIFTS NOT TO EXCEED 6" LOOSE DEPTH.

5. FIELD DENSITY TESTS SHALL BE PERFORMED BY AN INDEPENDENT SOILS TESTING LAB TO VERIFY COMPACTION.

6. NO SLABS SHALL BE POURED INTO OR AGAINST SUBGRADE CONTAINING FREE WATER OR ICE.

CONCRETE NOTES:

1. ALL CONCRETE SHALL CONTAIN AN APPROVED AIR ENTRAINING ADMIXTURE AND SHALL HAVE A COMPRESSIVE STRENGTH OF NOT LESS THAN 4000 PSI. AIR CONTENT

SHALL BE 6% TO8%.

2. A SET OF FOUR (4) CONCRETE TESTS CYLINDERS SHALL BE TAKEN BY AN INDEPENDENT CONCRETE TESTING LAB ON EACH DAY. ONE CYLINDER SHALL BE BROKEN

AT 7 DAYS, TWO AT 28 DAYS, AND ONE AT 56 DAYS. A COPY OF ALL TEST REPORTS SHALL BE FILED WITH THEARCHITECT.

3. NO CALCIUM CHLORIDE SHALL BE USED IN ANY CONCRETE.

4. ALL REINFORCING BARS SHALL BE ASTM A-615 GRADE 60 UNLESS NOTED OTHERWISE.

K. "Y" DELTA STARTER

L. REFER TO SPECIFICATION 42645-15685 FOR ADDITIONAL REQUIREMENTS

PUMP SCHEDULE

TAG NO.DESIGNBASIS

MODEL NUMBER PUMP TYPE

DESCRIPTION

SERVICEFLOW(GPM)

HEAD(FT.)

PUMPEFFICIENCY

PUMP DATA

IMPELLERDIAMETER

(IN.)

CONNECTIONSIZES

(SUCT. & DISCH.)

MOTORBHP

MINIMUMMOTOR

HP

PUMPRPM

POWERV-Hz-∅

MOTOR DATA

REMARKSLOCATION

% PROPYLENEGLYCOL

PROVIDE WITH THE FOLLOWING:

1. PREMIUM EFF. TEFCMOTORS

OTHER ACCEPTABLE MANUFACTURERS:

1. TACO

2. BELL AND GOSSETT

3 MOTORS TO BE VFD COMPATIBLE WITH GROUNDING BRUSH.

MINIMUMMOTOR

EFFICIENCY

1 2 3CHILLED WATER SYSTEM 290 105 10.50 3" x 4" 10.20 15 1760 460-3-6073% 0BASE MOUNTED 89.5%CHWP-1 BELL & GOSSETT MECHANICAL ROOM1510 - 3E

1 2 3CHILLED WATER SYSTEM 290 105 10.50 3" x 4" 10.20 15 1760 460-3-6073% 0BASE MOUNTED 89.5%CHWP-2 BELL & GOSSETT MECHANICAL ROOM1510 - 3E

TUBING

1/4" SS

LUG BODYBUTTERFLY VALVESEE PLANS FOR LOCATION

FULL SIZE SUCTIONDIFFUSER W/STRAINER6" x 4"

EXISTING CONCRETEHOUSE KEEPING PAD

COUPLINGGUARD

3" x 6" INCREASERAS REQUIRED

FLEX CONNECTORSMASON MODEL SFDEJWITH CONTROL PODS

GLOBE TYPE SILENTCHECK VALVE

SPOOLPIECE

LINE SIZE BALANCING VALVE. STRAIGHT RUNREQUIREMENTS: 10 PIPE DIAMETERS UPSTREAMAND 2 PIPE DIAMETERS DOWNSTREAM. SEENOTE 2 AND SPECS. TRIPLE DUTY TYPE VALVESWILL NOT BE ACCEPTABLE.

SPRING HANGERS FIRST 3 HANGERS OR 50'HORIZONTAL HANGERS ADJUSTED FOR NOLOAD ON PUMP FITTINGS

NOTES:

1. PROVIDE ABRASIVE SEPARATORS FOR MECHANICAL SEALS.

2. PROVIDE 3'-0" MIN. STRAIGHT RUN OF PIPE UPSTREAM AND

2'-0" MIN. DOWNSTREAM OF BALANCING VALVE.

3. ALL NEW BASE MOUNTED PUMPS SHALL BE GROUTED AND

BOLTED IN PLACE AS RECOMMENDED BY PUMP

MANUFACTURER'S INSTALLATION AND OPERATING MANUAL.

PIPING SUB-CONTRACTOR TO PROVIDE AND INSTALL GROUT.

BLOW DOWN

1 2

4

4

4 PUMP BASE SIZE CANNOT EXCEED SPECIFIED DUE TOCONFLICT WITH EXISTING EQUIPMENT.

MAXIMUMPUMP BASEDIMENSIONS

42 1/4" x 16"

42 1/4" x 16"

6" Ø6" Ø

3" Ø

6" Ø

4"Ø

6" Ø

NOTE:

1. CONTRACTOR TO SUBMIT PAD DETAIL WITH R.I. P.E. STRUCTURAL STAMP.

M.

(5) YEAR PARTS AND LABOR COMPRESSOR WARRANTY FROM DATE OF ACCEPTANCE OF CHILLER SYSTEM (ESTIMATED TO BE APRIL 1st, 2016).

PROVIDE (2) YEARS OF PM SERVICE FOR THE CHILLER SYSTEM BEGINNING AFTER CHILLER STARTUP AND COMMISSIONING.SERVICE SHALL BE PERFORMED BY A FACTORY AUTHORIZED VENDOR PER THE MANUFACTURERS OPERATION & MAINTENANCE MANUAL AS A MINIMUM.SERVICE TO INCLUDE ANNUAL CONDENSER COIL CLEANING, STARTUP OPERATION AND SEASONAL SHUTDOWN WITH MID-SEASON OPERATIONAL (INCLUDING OIL ANALYSIS).THIS SHALL INCLUDE 24 HOUR - 7DAYS/WEEK EMERGENCY SERVICE COVERAGE.

2. P.E. THAT DESIGNS PAD SHALL WITNESS AND APPROVE THE INSTALLATION OF THE CONCRETE PAD INCLUDING APPROVAL OF THE CONCRETE BEFORE IT IS POURED IN PLACE.4"

Level 210' - 0"

Level 10' - 0"

Level 210' - 0"

10' -

0"

4' - 8"

GALVANIZED CLEVISPIPE HANGER

4" HSS - TUBE STEEL

8" x 8" x 1" BASE PLATE

0' -

6"

6" ABOVE GRADE

12" Ø x 3'6"CONCRETE COLUMN

ALL EXPOSED PIPESUPPORTS &FASTENERS TO BEGALVANIZED STEEL

ARDEN PROJECT NUMBER DRAWING NUMBER REVISION NUMBER

DRAWING NAME:

PROJECT NAME:

SCALE:

NORTH ARROW REGISTRATION

GRAPHICS SCALE

DRAWING NOTES

GENERAL NOTES

CONFIDENTIALITY STATEMENT

THIS DOCUMENT IS THE PROPERTY OF ARDEN ENGINEERINGCONSTRUCTORS, LLC. INFORMATION AND DATA CONTAINED HEREIN AREPROPRIETARY AND CONFIDENTIAL. THIS INFORMATION SHOULD NOT BE

DISCLOSED TO ANY THIRD PARTY WITHOUT THE PRIOR WRITTENCONSENT OF ARDEN ENGINEERING CONSTRUCTORS, LLC

505 NARRAGANSETT PARK DRPAWTUCKET, RI 02861WWW.ARDENENG.COM

TEL (401) 727-3500FAX (401) 727-3540

ISSUED FOR BID

E

As indicated

CCRI CHILLER REPLACEMENTPROJECT

HVAC SCHEDULES ANDDETAILS

46245 H7.1

3/4" = 1'-0"TYPICAL PIPE SUPPORT DETAIL TYPICAL CONCRETE PAD DETAIL - ALTERNATE #3 TYPICAL BASE MOUNTED PUMP DETAIL

SCALE: NONE SCALE: NONE

AIR SEPARATOR SCHEDULE

TAG NO.DESIGNBASIS

MODEL NO. AREA SERVEDSEPARATOR

SIZE

MAX.FLOW(GPM)

WPD(FT.)

TANKHEIGHT

(IN.)

TANKDIAMETER

(IN.)

CONNECTION

TYPE

REMARKS

GENERAL DATA

AS-1 BELL & GOSSETT R-GFB 6" 700 1.0 44 1/16" 18" FLANGECHILLED WATER

1 INTEGRAL AIR VENT & BLOWDOWN

VALVE

1 2

2 125 PSIG ASME TANK

DESIGNFLOW(GPM)

300 3

3 ADDITIONAL ACCEPTABLE MANUFACTURERS:

A. TACO

B. ARMSTRONG

NOTE: DETAIL SHOWN FOR ESTIMATING PURPOSES ONLY.CONTRACTOR SHALL HIRE A RHODE ISLAND P.E.STRUCTURAL ENGINEER TO DESIGN PIPE SUPPORTS.SUBMIT DETAIL TO ENGINEER OF RECORD FOR APPROVAL

REV. DATE DRF.'D DES.'D PURPOSE OF ISSUE/REVISION

A 2/26/15 JDL TAE CLIENT REVIEW

B 3/10/15 JDL TAE REISSUED FOR CLIENT REVIEW

C 3/12/15 JDL TAE ISSUED FOR STATE REVIEW

D 5/01/15 JDL TAE REISSUED FOR CLIENT REVIEW

E 5/08/15 JDL TAE ISSUED FOR BID

Page 10: CHILLER REPLACEMENT PROJECT

6" CHWS

PIXXX

PIXXX

HVAC - CHILLED WATER SYSTEM CONTROL DIAGRAMSCALE: NONE

TIXXX

TIXXX

TIXXX

TI 001

AI

TI001

TI 002

AI

TI002

6" CHWR

BALANCE TO 300 GPM

6" CHWS

PIXXX

PIXXX

TIXXX

TIXXX

TIXXX

TI 003

AI

TI003

TI 004

AI

TI004

6" CHWR

BALANCE TO 300 GPM

6" CHWS

6" CHWS

6" CHWR

CH

WR

FR

OM

BLD

G.

EXISTING CHILLER TO REMAIN (ACC-1)

NEW CHILLER (ACC-2)

AI

CV001

AI

CV002

EXISTING TRANE CONTROLLER ANDCHILLER CONTROL POINTS TO BEINTEGRATED INTO THE EXISTINGTRIDIUM BUILDING CONTROL SYSTEM

EXISTING TRANECHILLERCONTROLPANEL TO BEREMOVED

NEW FIELDCONTROLLERFOR CHILLERS

TRIDIUMFRONT END

NEW HARD WIREINTERLOCKS INTOCHILLED WATERPUMPS

DI

DO DO

DI

CONTROLPANEL

CHILLER/PUMP HARDWIRE INTERLOCKS

CHILLER/PUMP HARDWIRE INTEROCKS

PIXXX

PIXXX

0-160 PSIG

CHWS TO BLDG.

FT001

DISP.PANEL

CONTROLPANEL

CHILLER/PUMP HARDWIRE INTERLOCKS

M

CHWP-1

VFD

M

CHWP-2

VFD

6" CHWS

6" CHWS

6" CHWS

6" CHWS

(250-600 GPM)

DI

DO

AI

AO

DI

AI

AO

DI

FM001

AI

NEW CHILLED WATER FLOW METERPROVIDED BY THE ATC SUB AND INSTALLEDBY THE PIPING SUB. ATC SUB TO PROVIDEWELDOLETS OR THREADOLETS AS NEEDEDTO THE PIPING SUB. ATC SUB TO VERIFYLOCATION OF THE FLOW METER TO ENSUREIT HAS THE PROPER UPSTREAM ANDDOWNSTREAM DIAMETERS FOR ANACCURATE READING. SEE PLANS FORLOCATION.

ARDEN PROJECT NUMBER DRAWING NUMBER REVISION NUMBER

DRAWING NAME:

PROJECT NAME:

SCALE:

NORTH ARROW REGISTRATION

GRAPHICS SCALE

DRAWING NOTES

GENERAL NOTES

CONFIDENTIALITY STATEMENT

THIS DOCUMENT IS THE PROPERTY OF ARDEN ENGINEERINGCONSTRUCTORS, LLC. INFORMATION AND DATA CONTAINED HEREIN AREPROPRIETARY AND CONFIDENTIAL. THIS INFORMATION SHOULD NOT BE

DISCLOSED TO ANY THIRD PARTY WITHOUT THE PRIOR WRITTENCONSENT OF ARDEN ENGINEERING CONSTRUCTORS, LLC

505 NARRAGANSETT PARK DRPAWTUCKET, RI 02861WWW.ARDENENG.COM

TEL (401) 727-3500FAX (401) 727-3540

ISSUED FOR BID

E

12" = 1'-0"

CCRI CHILLER REPLACEMENTPROJECT

HVAC CONTROL DIAGRAMSHEET 1

46245 H9.1

CHILLED WATER SYSTEM CONTROL SEQUENCE

1. CHILLER CONTROLS

A. THE PACKAGED AIR COOLED CHILLERS SHALL BE CONTROLLED BY THEIR OWN INTEGRAL CONTROL PACKAGE SET UP TO MAINTAIN A LEAVING WATER TEMPERATURE OF 42°F. TEMPERATURE SETPOINT SHALL BE DONE VIA THE BMS.

B. THE BMS SHALL ENABLE AND DISABLE EACH CHILLER FROM THE FRONT END ALONG WITH THE ABILITY TO STAGE ON EACH CHILLER. UPON DISABLING OR ENABLING A CHILLER, THE RESPECTIVE CHILLER ISOLATION CONTROL VALVES SHALL OPERATE PER THE FOLLOWING:

1. CV-1 SHALL BE OPENED AND CV-2 CLOSED WHEN CH-1 IS ENABLED.2. CV-2 SHALL BE OPENED AND CV-1 CLOSED WHEN CH-2 IS ENABLED.3. ONCE ENABLED THE LAG CHILLER ISOLATION VALVE SHALL OPEN (50% -

AJUSTABLE). AT THE SAME TIME THE LEAD CHILLER SHALL BE INITIATED FOR SHUTDOWN. ONCE THE CHILLER HAS SAFELY SHUT DOWN, THE RESPECTIVE ISOLATION VALVE SHALL CLOSE AND THE LAG CHILLER ISOLATION VALVE SHALL FULLY OPEN. ONCE THE LAG CHILLER DETECTS FLOW, THE CHILLER SHALL BEGIN TO STAGE ON COOLING.

C. THE BMS SHALL LEAD/LAG THE CHILLERS AND PROGRAM AN EQUAL RUNTIME SCHEDULE FOR EACH CHILLER.

D. IF THE LEAD CHILLER FAILS, THE LAG CHILLER SHALL AUTOMATICALLY BE ENABLED. FAILURE SHALL BE DETERMINED VIA A HIGH LEAVING WATER TEMPERATURE OF 50°F (ADJUSTABLE).

E. NEW TEMPERATURE SENSORS SHALL BE INSTALLED FOR THE CHILLER SUPPLY AND RETURN TEMPERATURES AS INDICATED ON THIS DRAWING (TT-001 AND TT-004)

F. PROVIDE SOFTWARE FIELD DEVICES AND FRONT END MODIFICATIONS AS REQUIRED TO SEND E-MAIL ALERTS (24/7 - 7 DAYS/WEEK) IF A CHILLER/PUMP FAILURE OCCURS.

2. NEW CHILLED WATER PUMP CONTROL (CHWP-1 AND 2)

A. VFD'S SHALL BE PROVIDED FOR EACH PUMP. THE LEAD PUMP SHALL OPERATE CONTINUOUSLY AND BE CONTROLLED TO MAINTAIN A GPM FLOW RATE OF 290.

B. THE MINIMUM PUMP SPEED OF THE VFD'S WILL BE SET TO MAINTAIN A MINIMUM FLOW OF 290 GPM THRU THE LEAD CHILLER AS MEASURED FROM THE FLOW METER FM-001 SERVING THE MAIN CHILLER LOOP.

C. THE VFD'S SHALL HAVE THE ABILITY TO LEAD/LAG CONTROL THE PUMPS AND PROGRAM AN EQUAL RUNTIME SCHEDULED FOR EACH PUMP SUCH THAT THEY SWITCHOVER EVERY WEEK.

D. THE BMS MAY OVERRIDE THE LEAD LAG PUMP STAGING IN THE OPERATOR WORKSTATION. THE OPERATOR HAS THE ABILITY TO OVERRIDE ANY PROGRAM FUNCTION (i.e. PUMP START/STOP AND SPEED SETTING).

E. THE CHILLER PUMPS CHWP-1 & CHWP-2 SHALL BE STARTED & STOPPED VIA THE TRIDIUM CONTROL PANEL AND HARD WIRE INTERLOCKS INTO THE CHILLER PANELS (IF NEEDED). ATC SUBCONTRACTOR TO WORK WITH THE CHILLER START-UP TECHNICIAN.

3. EXISTING TRANE CHILLER CONTROLS

A. THE EXISTING TRANE CHILLER CONTROL PANEL SHALL BE REMOVED AND ALL CHILLER CONTROL POINTS MOVED ONTO THE TRIDIUM BUILDING CONTROL SYSTEM.

ATC SCOPE OF WORK SEQUENCE

1. HVAC CONTROLS AND ELECTRICAL

A. HVAC CONTROLS AND ELECTRICAL SCOPE OF WORK

1. PROVIDE AND INSTALL ALL CONTROL DEVICES, WIRING, INTERLOCKS, RELAYS, TRANSFORMERS, FLOW SWITCHES, TEMPERATURE SENSORS, HIGH LIMITS, LOW WATER CUT-OFFS, PANELS, ETC. INSTALLATION, START UP, AND COMMISSIONING FOR FULLY OPERATIONAL CONTROL SYSTEMS.2. PROVIDE AND INSTALL ALL CONTROL DEVICES AS INDICATED ON THE HVAC

CONTROL DIAGRAMS.3. PROVIDE AND INSTALL POWER WIRING FOR ALL NEW CONTROL PANELS, PUMPS, FANS AND FIELD DEVICES AS INDICATED ON THE CONTROL DIAGRAM.4. CONNECT INTO THE LOCAL 120V-PH ELECTRICAL PANELS. PROVIDE ALL NEW

CIRCUIT BREAKERS NEEDED FOR THE NEW INSTALLATION.5. CONTROLS CONTRACTOR SHALL HAVE AT LEAST 5 YEARS EXPERIENCE INSTALLING DDC BLDG AUTOMATION SYSTEMS.6. INSTALLATION OF ALL UNDERGROUND CONTROL WIRING (IN CONDUIT) FROM

OUTSIDE CHILLER AREA TO INSIDE THE BUILDING. ALL EXCAVATING, BACKFILLING, ETC. TO INSTALL THE CONTROL WIRING SHALL BE THE RESPONSIBILITY OF THE

ATC CONTRACTOR.

B. CONTROL WIRING

1. ALL ELECTRIC WIRING, LOW VOLTAGE POWER WIRING, AND WIRING CONNECTIONS REQUIRED FOR THE INSTALLATION OF THE TEMPERATURE CONTROL SYSTEM, AS SPECIFIED HEREIN, SHALL BE PROVIDED BY THE INSTALLING

CONTRACTOR UNLESS SPECIFICALLY SHOWN ON THE ELECTRICAL DRAWINGS.2. ALL POWER AND CONTROL WIRING SHALL COMPLY WITH ALL REQUIREMENTS OF THE LOCAL AND NATIONAL ELECTRICAL CODE.3. ALL CONTROL WIRING SHALL BE INSTALLED TO MEET STATE AND LOCAL CODES. INSTALL CONTROL WIRING IN CONDUIT EXPOSED IN MECHANICAL ROOMS.4. ALL POWER WIRING SHALL BE RUN IN CONDUIT.5. ALL POWER WIRING SHALL BE INSTALLED AND SIZED BY THE NATIONAL ELECTRIC CODE.6. ALL CONTROL AND POWER WIRING SHALL BE INSTALLED BY A LICENSED ELECTRICIAN IN THE STATE OF RHODE ISLAND WITH THE PROPER PROJECT

PERMITS. THE FINAL INSTALLATION SHALL BE APPROVED BY THE CITY ELECTRICAL INSPECTOR.

7. CONDUIT: - NO CONDUIT, FOR ANY PART OF THE ATC SYSTEM, SHALL BE SMALLER THAN 1/2"

IN SIZE. NO CONDUIT SHALL HAVE MORE THAN (4) 90° BENDS IN ANY ONE RUN AND WHERE NECESSARY, PULL BOXES SHALL BE PROVIDED.

- FLEXIBLE STEEL CONDUIT SHALL BE USED FOR CONNECTION TO ALL ATC EQUIPMENT/DEVICES AND MOTORS. ALL FLEXIBLE CONNECTIONS SHALL INCLUDE A GROUNDING CONDUCTOR FROM THE OUTLET BOX TO THE EQUIPMENT BEING

CONNECTED. FLEXIBLE STEEL CONDUIT EXPOSED TO THE WEATHER SHALL BE LIQUID TIGHT.

C. SUBMITTALS REQUIRED

1. SUBCONTRACTOR QUALIFICATIONS2. COMPUTER GENERATED CONTROL DIAGRAMS AND CONTROL SEQUENCES3. CATALOG CUT SHEETS ON ALL FIELD DEVICES AND WIRING4. COMMISIONING, START UP PROCEDURES, AND SIGN OFF SHEETS SHOWING PIONT BY POINT CHECK OUT

D. ACCEPTABLE MANUFACTURERS

1. TRIDIUM OPEN PROTOCOL CONTROLS TO MATCH EXISTING TRIDIUM NIAGRA FRONT END. PROVIDE BACNET MSTP INTERFACE CAPABILITY.

REV. DATE DRF.'D DES.'D PURPOSE OF ISSUE/REVISION

A 2/26/15 JDL TAE CLIENT REVIEW

B 3/10/15 JDL TAE REISSUED FOR CLIENT REVIEW

C 3/12/15 JDL TAE ISSUED FOR STATE REVIEW

D 5/01/15 JDL TAE REISSUED FOR CLIENT REVIEW

E 5/08/15 JDL TAE ISSUED FOR BID

Page 11: CHILLER REPLACEMENT PROJECT

ELECTRICAL - POWER PLAN

SCALE:

1

4

" =1' - 0"

46245

CCRI

CHILLER REPLACEMENT PROJECT

File

P

ath

: J:\D

WG

\P

20

14

\1

12

6\A

10

\M

EP

\E

le

ctrica

l\2

01

41

12

6A

10

_E

LE

01

.d

wg

La

yo

ut: E

1.1

P

lo

tte

d: W

ed

ne

sd

ay, M

ay 0

6, 2

01

5 - 1

1:1

A

M U

se

r: S

IR

ON

S

Plo

tte

r: N

ON

E C

TB

F

ile

: F

O 2

00

8 M

ON

O.C

TB

E

1/4" = 1'-0"

Electrical Power Plan

E1.1

20141126.A10