© 2008 Chevron Corporation Upstream and Gas Upstream and Gas George Kirkland George Kirkland Executive Vice President Executive Vice President Upstream & Gas Upstream & Gas

description

 

Transcript of Chevron Upstream & Gas

Page 1: Chevron Upstream & Gas

© 2008 Chevron Corporation

Upstream and GasUpstream and GasGeorge KirklandGeorge KirklandExecutive Vice PresidentExecutive Vice PresidentUpstream & GasUpstream & Gas

Page 2: Chevron Upstream & Gas

2© 2008 Chevron Corporation

Delivering on Our 2007 Commitments

2.6 MMBOED Production Target 2.6 MMBOED Production Target

Bibiyana StartupBibiyana Startup

Tengiz Staged Oil StartupTengiz Staged Oil Startup

Agbami ProgressAgbami Progress

Blind Faith Progress Blind Faith Progress

FradeFrade ProgressProgress

Nigeria GTL ProgressNigeria GTL Progress

Tahiti ProgressTahiti Progress

Page 3: Chevron Upstream & Gas

3© 2008 Chevron Corporation

Additional 2007 Accomplishments

Superior Safety PerformanceSuperior Safety Performance

Thailand Contract ExtensionThailand Contract Extension

Angola LNG FIDAngola LNG FID

Chuandongbei PSC SigningChuandongbei PSC Signing

Agbami FPSO Arrival on LocationAgbami FPSO Arrival on Location

Gorgon Environmental ApprovalsGorgon Environmental Approvals

Exploration SuccessExploration Success

Competitive Margins and Returns Competitive Margins and Returns

NWS Train 5 ProgressNWS Train 5 Progress

Reserves ReplacementReserves Replacement

Page 4: Chevron Upstream & Gas

4© 2008 Chevron Corporation

Net BOE Production2007 vs. 2006

2,619

2,667

(43)

(62) (16)

73

2006 Actual Empresa MixtaImpact

Price Base Production

Major CapitalProjects

2007 Actual

Thousands of Barrels Equivalent Per Day

Page 5: Chevron Upstream & Gas

5© 2008 Chevron Corporation

Delivering Strong Earnings per Barrel and Competitive ROCE

0%

10%

20%

30%

40%

50%

2003 2004 2005 2006 2007$0

$5

$10

$15

$20

2003 2004 2005 2006 2007

Competitive ROCE 1Earnings/BOE (A/T)

Competitor Group: XOM, BP, COP and RDSCompetitive ROCE calculated based on Chevron estimates and public information handled on a consistent basis.Excludes special items. Reconciliation to non-GAAP earnings measure for Chevron is available at www.chevron.com under Investors.

1 2007 ROCE updated on March 26, 2008

2007 Rank: #2 2006 Rank: #2

$/barrel ROCE

Page 6: Chevron Upstream & Gas

6© 2008 Chevron Corporation

Profitable Profitable GrowthGrowth

Effective Effective ExecutionExecution

RightRightStrategiesStrategies

Page 7: Chevron Upstream & Gas

7© 2008 Chevron Corporation

Right Right StrategiesStrategies

Page 8: Chevron Upstream & Gas

8© 2008 Chevron Corporation

Upstream Has the Right Strategies

Grow profitably in core areas Grow profitably in core areas and build new legacy positionsand build new legacy positions

Achieve worldAchieve world--class operational class operational performance performance

Maximize and grow theMaximize and grow theBase Business Base Business

Lead the industry in selection and Lead the industry in selection and execution of Major Capital Projects execution of Major Capital Projects

Achieve superior Exploration Achieve superior Exploration performance performance

Identify, capture and effectively Identify, capture and effectively incorporate new core positions incorporate new core positions

Page 9: Chevron Upstream & Gas

9© 2008 Chevron Corporation

Positioned With a StrongWorldwide Portfolio

11 billion BOE net 11 billion BOE net proved reservesproved reserves

2.7 million BOED 2.7 million BOED net production net production capacitycapacity

Leading positions Leading positions in key oil and gas in key oil and gas basinsbasins

Europe, Eurasia and Middle EastEurope, Eurasia and Middle East620 MBOED620 MBOED

Africa andAfrica andLatin AmericaLatin America580 MBOED580 MBOED

AsiaAsia--PacificPacific700 MBOED700 MBOED

North AmericaNorth America800 MBOED800 MBOED

Regional Exploration & Production CompaniesRegional Exploration & Production Companies

Page 10: Chevron Upstream & Gas

10© 2008 Chevron Corporation

Exploration StrategyFocus and Impact

Gulf of Mexico Gulf of Mexico DeepwaterDeepwater

West Africa West Africa Deepwater Deepwater

Northwest Northwest AustraliaAustralia

Brazil Brazil DeepwaterDeepwater

East Coast East Coast CanadaCanada

West of West of ShetlandsShetlands

Gulf of Gulf of ThailandThailand

CanadaCanada

New EntryNew Entry

West West GreenlandGreenland

LibyaLibya

AlaskaAlaska

Focus AreasFocus Areas

Test AreasTest Areas

NorwayNorway

Page 11: Chevron Upstream & Gas

11© 2008 Chevron Corporation

0

10

20

30

40

50

60

70

YE 2004 YE 2007

Growing a Diversified Resource* Portfolio

* Resource is defined as unrisked proved, probable and possible reserves plus potential recoverable resources contingent on commerciality. Includes oil volumes associated with Athabasca Oil Sands mining. Crude oil extracted through bitumen mining operations is not considered to be an oil and gas producing activity by the Securities and Exchange Commission.

Resource DistributionResource Distribution

0

10

20

30

40

50

60

70

AfricaAfrica

AmericasAmericas

Europe, Eurasia Europe, Eurasia and Middle Eastand Middle East

AsiaAsia--PacificPacific

Billion BOEBillion BOEResource GrowthResource GrowthBillion BOEBillion BOE

12% 12%

Page 12: Chevron Upstream & Gas

12© 2008 Chevron Corporation

Proved Reserve Changes2004–2007 and 2010 Projected

11,252 10,777

1,465

6052,748

1,413

YE 2004 Production Price Effect Unocal NetAdditions

YE 2007 ProjectedYE 2010

~11,300

Does not include oil volumes associated with Athabasca Oil Sands mining. Crude oil extracted through bitumen mining operations is not considered to be an oil and gas producing activity by the Securities and Exchange Commission.

Millions of Barrels

Page 13: Chevron Upstream & Gas

13© 2008 Chevron Corporation

Proved Reserve Changes2007–2010 Projection

10,777

1,100

3,000 2,400

YE 2007Actual

Production MCP Base Adds &Contract

Extensions

YE 2010Projection

~11,300

Does not include oil volumes associated with Athabasca Oil Sands mining. Crude oil extracted through bitumen mining operations is not considered to be an oil and gas producing activity by the Securities and Exchange Commission.

Millions of Barrels

Page 14: Chevron Upstream & Gas

14© 2008 Chevron Corporation

Over 140 Tcf of EquityNatural Gas Resources*

Gas portfolio is growing and becoming a key component Gas portfolio is growing and becoming a key component of Chevronof Chevron’’s overall production.s overall production.

AmericasAmericas35 Tcf35 Tcf

AfricaAfrica26 Tcf26 Tcf

AsiaAsia--PacificPacific67 Tcf67 Tcf

Europe, Eurasia Europe, Eurasia and Middle Eastand Middle East

18 Tcf18 Tcf

Circles represent geographic coverage and not the size of the resource.

* Unrisked

Gas Production as % of Total ChevronNet Production

25%

30%

35%

40%

45%

2007 20202010 2015

Page 15: Chevron Upstream & Gas

15© 2008 Chevron Corporation

Growing the Gas Business

Commercialize our equity Commercialize our equity resource base while growing a resource base while growing a highhigh--impact global gas businessimpact global gas business

Progressing the queue of more than Progressing the queue of more than 10 world10 world--class gas projectsclass gas projects

Building a global portfolio ofBuilding a global portfolio ofLNG supplyLNG supply

Progressing the construction of our Progressing the construction of our first GTL plantfirst GTL plant

Enabling gas business growth Enabling gas business growth through midstream capabilitiesthrough midstream capabilities

Page 16: Chevron Upstream & Gas

16© 2008 Chevron Corporation

Gas Business Achievements 2007

Angola LNG FID Angola LNG FID

Gorgon LNG environmental Gorgon LNG environmental approval and capacity expansionapproval and capacity expansion

Bibiyana startup Bibiyana startup

Thailand contract extensionThailand contract extensionand gas sales agreement signed and gas sales agreement signed with PTT with PTT

Chuandongbei sour gas PSC Chuandongbei sour gas PSC signed with CNPCsigned with CNPC

Piceance tight gas entered Piceance tight gas entered development phasedevelopment phase

Angola LNG Plant site schematic

Site works for the Angola LNG Plant

Page 17: Chevron Upstream & Gas

17© 2008 Chevron Corporation

Effective Effective ExecutionExecution

Page 18: Chevron Upstream & Gas

18© 2008 Chevron Corporation

Leader in Exploration Results

Chevron Chevron ““leads its peers on our underlying exploration reserve leads its peers on our underlying exploration reserve replacement metric, having replaced an outstanding 120% of its replacement metric, having replaced an outstanding 120% of its production between 2002 and 2006 through new field production between 2002 and 2006 through new field exploration success alone.exploration success alone.”” RADAR report by Wood Mackenzie, January 2008RADAR report by Wood Mackenzie, January 2008

*Wood Mackenzie reserve replacement metric does not reflect the Company’s reported proved reserves.

Reserve* Replacement Through Exploration, 2002-2006

0

20

40

60

80

100

120

140 Chevron

BPTotal

ShellExxonMobil

COP

Percent

Page 19: Chevron Upstream & Gas

19© 2008 Chevron Corporation

Consistent Exploration Success

20042004

20032003

20022002

20052005

20062006

Average Exploration success rate for 2002Average Exploration success rate for 2002––2007 is 42%2007 is 42%

20072007

Year-End Mean Resource Estimates

012345678

2002 2003 2004 2005 2006 2007

Cumulative Resources Cumulative Resources Added From ExplorationAdded From Exploration

Billions of Barrels Billions of Barrels of Oil Equivalentof Oil Equivalent

Page 20: Chevron Upstream & Gas

20© 2008 Chevron Corporation

Exploration Finding Costs Are Among the Lowest

Underlying Finding CostUnderlying Finding Cost$/BOE$/BOE

Wood Mackenzie, December 2007 (Exploration Costs/Resources Found)

Competitor Range

CompetitorsXOMBPRDS

COP

0

1

2

3

4

5

6

7

8

9

2002 2003 2004 2005 2006

Page 21: Chevron Upstream & Gas

21© 2008 Chevron Corporation

Key 2008 Exploration Activities

RosebankRosebank

OrphanOrphan

Northwest Northwest AustraliaAustralia

DeepwaterDeepwaterGulf of MexicoGulf of Mexico

White HillsWhite Hills

NigeriaNigeria

AngolaAngola

Ells RiverElls River

Gulf of Gulf of ThailandThailand

BrazilBrazil

VenezuelaVenezuela

LibyaLibya

CongoCongo

Norway BarentsNorway Barents

Appraisal WellsAppraisal Wells

SeismicSeismic

Exploration WellsExploration Wells

Page 22: Chevron Upstream & Gas

22© 2008 Chevron Corporation

Cost Management

Definite cost increases, Definite cost increases, but not uniformbut not uniform

Function of local markets Function of local markets and varies between and varies between certain itemscertain items

Combating increases Combating increases through:through:

Effective contractingEffective contracting

Standardization of Standardization of designs and materialsdesigns and materials

ModularizationModularization

Technology advancesTechnology advances

Despite cost increases, our Despite cost increases, our opportunity queue remains robustopportunity queue remains robustIHS/CERA Upstream Capital Costs IHS/CERA Upstream Capital Costs Index (2000 = 100)Index (2000 = 100)

200200

180180

160160

140140

120120

100100

808020002000 20022002 20042004 20062006 20082008

3Q 2006: 1673Q 2006: 167

3Q 2007: 1983Q 2007: 198

Source: Cambridge Energy Research Associates

Page 23: Chevron Upstream & Gas

23© 2008 Chevron Corporation

0

100

200

300

400

500

2003 2004 2005 2006 2007 2008Forecast

0

2

4

6

Superior Contracting Strategies Have Cushioned Rising Deepwater Rig Rates

Drilling units rated for >7,500 ft water depthMarket data sources for similar type of rig: GDC, Fearnley Offshore, Rig Logix

Market Average Rate

Chevron Average Contract Rate

Equivalent Rig Years Equivalent Rig Years Under ContractUnder Contract

Worldwide Deepwater Rig Rates Worldwide Deepwater Rig Rates $M/day$M/day

Page 24: Chevron Upstream & Gas

24© 2008 Chevron Corporation

Upstream Costs Have Been Among the Lowest

8

12

16

20

24

28

2002 2003 2004 2005 2006 2007

$/BOE

Source: AG Edwards; includes production costs, exploration expense, DD&A and other expenses

3/103/10 3/103/10 2/102/10 3/103/10

RankingRanking

$19.40$19.40

2/102/10

Competitor Range

CompetitorsBPCOPRDSXOMHES

MROMUROXYTOT

Page 25: Chevron Upstream & Gas

25© 2008 Chevron Corporation

Disciplined Base Business Focus

Duri Duri SteamfloodSteamflood, Indonesia, Indonesia

180

190

200

210

220

230

240

250

2002 2003 2004 2005 2006 2007

16% decline16% decline

3% decline3% decline

Production MBOEPDProduction MBOEPD

PNZPNZ

120

140

160

180

200

2002 2003 2004 2005 2006 2007

10% decline10% decline

1% decline1% decline

Production MBOEPDProduction MBOEPD

San Joaquin Valley Business UnitSan Joaquin Valley Business Unit

200

220

240

260

280

2002 2003 2004 2005 2006 2007

6% decline6% decline

2% decline2% decline

Production MBOPDProduction MBOPD

0

40

80

120

160

200

2002 2003 2004 2005 2006 2007

McAllen Ranch Field McAllen Ranch Field

30% decline30% decline

Production MMCFPDProduction MMCFPD

Page 26: Chevron Upstream & Gas

26© 2008 Chevron Corporation

Global Leader inThermal Recovery Processes

WorldWorld’’s largest thermal operations: s largest thermal operations: San Joaquin Valley and Duri Field San Joaquin Valley and Duri Field

WellWell--positioned for future positioned for future opportunities, such as Ells River, opportunities, such as Ells River, PetropiarPetropiar ((HamacaHamaca) and PNZ) and PNZ

Heavy Oil Center of Excellence Heavy Oil Center of Excellence develops and deploys technology develops and deploys technology applications, tools and best applications, tools and best

practicespractices

Page 27: Chevron Upstream & Gas

27© 2008 Chevron Corporation

Profitable Profitable GrowthGrowth

Page 28: Chevron Upstream & Gas

28© 2008 Chevron Corporation

A Leading Portfolio of Projects

ACG IIACG II--IIIIII

TCO SGI/SGPTCO SGI/SGPKarachaganak IIIKarachaganak IIITengiz ExpansionTengiz Expansion

AOSP Expansion 1AOSP Expansion 1AOSP Expansion 2AOSP Expansion 2

Moho BilondoMoho BilondoTombua LandanaTombua LandanaAngola LNG Angola LNG LucapaLucapa

North DuriNorth Duri

PiceancePiceance

NWS Train 5 NWS Train 5 Greater GorgonGreater GorgonWheatstoneWheatstone

HebronHebron

PetropiarPetropiar UpgraderUpgraderPlataformaPlataforma DeltanaDeltana Platong IIPlatong II

Vietnam GasVietnam Gas

Chuandongbei GasChuandongbei Gas

Blind FaithBlind FaithTahitiTahiti

PerdidoPerdidoBig Foot Big Foot

JackJackSt.MaloSt.Malo

Tubular BellsTubular Bells

AgbamiAgbamiNigeria GTLNigeria GTL

UsanUsanBonga SW AparoBonga SW Aparo

NsikoNsikoOlokolaOlokola

Nigeria EGP 3Nigeria EGP 3

AmauligakAmauligak

All projects shown are >$1B Chevron share

Gendalo Gendalo -- GehemGehem

Rosebank LochnagarRosebank Lochnagar

FradeFradePapa TerraPapa Terra

Page 29: Chevron Upstream & Gas

29© 2008 Chevron Corporation

0

400

800

1200

2004

Net Production - MBOEPD

MCPBase

A Leading Portfolio of Projects2004-2007

ACG IIACG II--IIIIII

TCO SGI/SGPTCO SGI/SGPKarachaganak IIIKarachaganak IIITengiz ExpansionTengiz Expansion

AOSP Expansion 1AOSP Expansion 1AOSP Expansion 2AOSP Expansion 2

Moho BilondoMoho BilondoTombua LandanaTombua LandanaAngola LNG Angola LNG LucapaLucapa

North DuriNorth Duri

PiceancePiceance

NWS Train 5 NWS Train 5 Greater GorgonGreater GorgonWheatstoneWheatstone

HebronHebron

PetropiarPetropiar UpgraderUpgraderPlataformaPlataforma DeltanaDeltana Platong IIPlatong II

Vietnam GasVietnam Gas

Chuandongbei GasChuandongbei Gas

Blind FaithBlind FaithTahitiTahiti

PerdidoPerdidoBig Foot Big Foot

JackJackSt.MaloSt.Malo

Tubular BellsTubular Bells

AgbamiAgbamiNigeria GTLNigeria GTL

UsanUsanBonga SW AparoBonga SW Aparo

NsikoNsikoOlokolaOlokola

Nigeria EGP 3Nigeria EGP 3

AmauligakAmauligak

All projects shown are >$1B Chevron share

Gendalo Gendalo -- GehemGehem

Rosebank LochnagarRosebank Lochnagar

FradeFradePapa TerraPapa Terra

2007

Page 30: Chevron Upstream & Gas

30© 2008 Chevron Corporation

0

400

800

1200

2004

Net Production - MBOEPD

MCPBase

A Leading Portfolio of Projects2008-2009

ACG IIACG II--IIIIII

TCO SGI/SGPTCO SGI/SGPKarachaganak IIIKarachaganak IIITengiz ExpansionTengiz Expansion

AOSP Expansion 1AOSP Expansion 1AOSP Expansion 2AOSP Expansion 2

FradeFradePapa TerraPapa Terra

Moho BilondoMoho BilondoTombua LandanaTombua Landana

Angola LNG Angola LNG LucapaLucapa

North DuriNorth Duri

PiceancePiceance

NWS Train 5NWS Train 5Greater GorgonGreater GorgonWheatstoneWheatstone

HebronHebron

PetropiarPetropiar UpgraderUpgraderPlataformaPlataforma DeltanaDeltana Platong IIPlatong II

Vietnam GasVietnam Gas

Chuandongbei GasChuandongbei Gas

Blind FaithBlind FaithTahitiTahiti

PerdidoPerdidoBig Foot Big Foot

JackJackSt.MaloSt.Malo

Tubular BellsTubular Bells

AgbamiAgbamiNigeria EGP 3Nigeria EGP 3

Nigeria GTLNigeria GTLUsanUsan

Bonga SW AparoBonga SW AparoNsikoNsiko

OlokolaOlokola

AmauligakAmauligak

All projects shown are >$1B Chevron share

Gendalo Gendalo -- GehemGehem

Rosebank LochnagarRosebank Lochnagar

2009

2008

Page 31: Chevron Upstream & Gas

31© 2008 Chevron Corporation

A Leading Portfolio of Projects2010-2011

ACG IIACG II--IIIIII

TCO SGI/SGPTCO SGI/SGPKarachaganak IIIKarachaganak IIITengiz ExpansionTengiz Expansion

AOSP Expansion 1AOSP Expansion 1AOSP Expansion 2AOSP Expansion 2

FradeFradePapa TerraPapa Terra

Moho BilondoMoho BilondoTombua LandanaTombua LandanaAngola LNG Angola LNG LucapaLucapa

North DuriNorth Duri

NWS Train 5NWS Train 5Greater GorgonGreater GorgonWheatstoneWheatstone

HebronHebron

PetropiarPetropiar UpgraderUpgraderPlataformaPlataforma DeltanaDeltana Platong IIPlatong II

Vietnam GasVietnam Gas

Chuandongbei GasChuandongbei Gas

Blind FaithBlind FaithTahitiTahiti

PerdidoPerdidoBig Foot Big Foot

JackJackSt.MaloSt.Malo

Tubular BellsTubular Bells

AgbamiAgbamiNigeria EGP 3Nigeria EGP 3

Nigeria GTLNigeria GTLUsanUsan

Bonga SW AparoBonga SW AparoNsikoNsiko

OlokolaOlokola

AmauligakAmauligak

All projects shown are >$1B Chevron share

Gendalo Gendalo -- GehemGehem

Rosebank LochnagarRosebank Lochnagar

PiceancePiceance

2011

2010

0

400

800

1200

2004

Net Production - MBOEPD

MCPBase

Page 32: Chevron Upstream & Gas

32© 2008 Chevron Corporation

Execution Focus2008 & 2009 Startup Projects

Blind Faith Blind Faith –– Gulf of MexicoGulf of MexicoDrill and complete 3 wells in initial Drill and complete 3 wells in initial development plandevelopment plan

Set topsides on hull and complete integrationSet topsides on hull and complete integration

Tow to location 1Q 2008Tow to location 1Q 2008

Drill and complete 4Drill and complete 4thth well 2Q 2008well 2Q 2008

First oil 2Q 2008First oil 2Q 2008

Tahiti Tahiti –– Gulf of MexicoGulf of MexicoDrill all 6 wells in initial development planDrill all 6 wells in initial development plan

Topsides modules ready to installTopsides modules ready to install

Tow spar hull to field 1Q 2008Tow spar hull to field 1Q 2008

Subsea installation Phase 1 complete 2Q 2008Subsea installation Phase 1 complete 2Q 2008

Set topsides on hull 3Q 2008Set topsides on hull 3Q 2008

Subsea installation Phase 2 complete 1Q 2009Subsea installation Phase 2 complete 1Q 2009

First oil 3Q 2009First oil 3Q 2009

Page 33: Chevron Upstream & Gas

33© 2008 Chevron Corporation

Execution Focus2008 Startup Projects

Agbami Agbami –– NigeriaNigeria

FPSO arrived in Nigeria at yearFPSO arrived in Nigeria at year--end 2007end 2007

FPSO and FPSO and subseasubsea hookup in progresshookup in progress

Complete 5 producers and 1 injector by Complete 5 producers and 1 injector by first production datefirst production date

First oil by 3Q 2008 First oil by 3Q 2008

Tengiz Sour Gas Injection/Tengiz Sour Gas Injection/2nd Generation Plant 2nd Generation Plant –– KazakhstanKazakhstan

Staged oil startup and sour gas injectionStaged oil startup and sour gas injection

Construction and commissioning of oil, Construction and commissioning of oil, gas and sulfur plants 3Q 2008gas and sulfur plants 3Q 2008

Full production facilities startup 3Q 2008Full production facilities startup 3Q 2008

Page 34: Chevron Upstream & Gas

34© 2008 Chevron Corporation

Global Leader inSour Oil & Gas Processing

WyomingWyoming

Carter CreekCarter CreekSour Gas Plant Sour Gas Plant

Excellent safety, Excellent safety, reliability and reliability and environmental environmental recordrecord

TengizTengiz

Sour Production Sour Production FacilitiesFacilities

One of a kind with One of a kind with excellent excellent performanceperformance

ChinaChina

Chuandongbei Chuandongbei Project Project

New oNew opportunity pportunity to apply our sour to apply our sour production production capabilities and capabilities and technologiestechnologies

Page 35: Chevron Upstream & Gas

35© 2008 Chevron Corporation

0

200

400

600

800

'05 '06 '07 '08 '09 '10 '11

Significant Position in Asia-Pacific

20072007--2011 Growth2011 Growth

NWS Train 5 NWS Train 5

Chuandongbei Gas Project Chuandongbei Gas Project

BibiyanaBibiyana

North Duri North Duri SteamfloodSteamflood

Platong IIPlatong II

2012+ Growth2012+ Growth

GorgonGorgon

Wheatstone Wheatstone

Vietnam Gas DevelopmentVietnam Gas Development

Gendalo Gendalo –– GehemGehem

Net Production MBOEPDNet Production MBOEPD

basebase growthgrowth

Page 36: Chevron Upstream & Gas

36© 2008 Chevron Corporation

Strong Presence in the Caspian and Middle East Regions

20072007--2011 Growth 2011 Growth

Tengiz SGI/SGPTengiz SGI/SGP

AzeriAzeri--ChiragChirag--GuneshliGuneshliPhase IIIPhase III

PNZ PNZ –– Large Scale Large Scale SteamfloodSteamflood PilotPilot

2012+ Growth2012+ Growth

Tengiz ExpansionTengiz Expansion

Karachaganak III ExpansionKarachaganak III Expansion

0

200

400

600

'05 '06 '07 '08 '09 '10 '11

Net Production MBOEPDNet Production MBOEPD

basebase growthgrowth

Page 37: Chevron Upstream & Gas

37© 2008 Chevron Corporation

New Projects Will Increase Production in West Africa

20072007--2011 Growth2011 Growth

AgbamiAgbami

Tombua LandanaTombua Landana

Moho BilondoMoho Bilondo

UsanUsan

Nigeria GTLNigeria GTL

Nigeria EGP 3Nigeria EGP 3

2012+ Growth2012+ Growth

Angola LNGAngola LNG

Bonga SW/AparoBonga SW/Aparo

Olokola LNGOlokola LNG

NegageNegage

LucapaLucapa0

200

400

600

800

'05 '06 '07 '08 '09 '10 '11

Net Production MBOEPDNet Production MBOEPD

basebase growthgrowth

Page 38: Chevron Upstream & Gas

38© 2008 Chevron Corporation

Deepwater Brazil Adding toLatin America’s Growth

20072007--2011 Growth2011 Growth

FradeFrade

PapaPapa--TerraTerra

2012+ Growth2012+ Growth

PlataformaPlataforma DeltanaDeltana

Starfish Starfish

PetropiarPetropiar ExpansionExpansion

0

100

200

300

'05 '06 '07 '08 '09 '10 '11

Net Production MBOEPDNet Production MBOEPD

basebase growthgrowth

Page 39: Chevron Upstream & Gas

39© 2008 Chevron Corporation

Sustaining North American Production

20072007--2011 Growth2011 Growth

Blind FaithBlind Faith

Tahiti Tahiti

PiceancePiceance

San San ArdoArdo

PerdidoPerdido

AOSP Expansion 1AOSP Expansion 1

2012+ Growth2012+ Growth

Big Foot Big Foot

TongaTonga

JackJack

St. St. MaloMalo

0

200

400

600

800

1000

'05 '06 '07 '08 '09 '10 '11

Tubular Bells Tubular Bells

AOSP Expansion 2 AOSP Expansion 2

HebronHebron

AmauligakAmauligak

Net Production MBOEPDNet Production MBOEPD

basebase growthgrowth

Page 40: Chevron Upstream & Gas

40© 2008 Chevron Corporation

Production Growth Driven by a Steady Queue of Projects

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

2007 2010

Net Production MBOED@ $70/bbl

ConstConst7070100100√√PiceancePiceance

ConstConst35357575√√Nigeria GTLNigeria GTL

ConstConst1351355858√√TahitiTahiti

ConstConst90905252√√FradeFrade

ConstConst45451616--2525CallanishCallanish--BrodgarBrodgar

20082008

ConstConst3403401010ACG IIIACG III

ConstConst1001002020AOSP Expansion IAOSP Expansion I

ConstConst1401404040√√Nigeria EGP 3Nigeria EGP 3

ConstConst90903232Moho BilondoMoho Bilondo

ConstConst70707575√√Blind FaithBlind Faith

ConstConst7070100100√√N Duri SteamfloodN Duri Steamflood

ConstConst95951717NWS Train 5NWS Train 5

ProdProd1515100100√√San ArdoSan Ardo

ProdProd85859898√√BibiyanaBibiyana

130130

100100

250250

250250

100% Peak 100% Peak Production Production MBOEPDMBOEPD

ConstConst3131√√Tombua LandanaTombua Landana20092009

ConstConst6868√√AgbamiAgbami

ConstConst3333--6060PerdidoPerdido20102010

ProdProd5050√√Tengiz SGI/SGPTengiz SGI/SGP20072007

Current Current Project Project PhasePhase

WIWI%%

Chevron Chevron OperatorOperatorProjectProjectStartupStartup

Page 41: Chevron Upstream & Gas

41© 2008 Chevron Corporation

Our Continued Commitment to Earnings and Returns

20092009TombuaTombua--Landana StartupLandana Startup

20092009Frade StartupFrade Startup

20092009Tahiti StartupTahiti Startup

20082008NWS Train 5 StartupNWS Train 5 Startup

20082008Agbami StartupAgbami Startup

20082008Blind Faith StartupBlind Faith Startup

20082008TCO SGP Full CapacityTCO SGP Full Capacity

20082008--20102010Reserves ReplacementReserves ReplacementRatio >100%Ratio >100%

20052005--20102010Production CAGR >3%Production CAGR >3%

Page 42: Chevron Upstream & Gas

© 2008 Chevron Corporation

AppendixAppendix

Page 43: Chevron Upstream & Gas

43© 2008 Chevron Corporation

Upstream Major Capital ProjectsAsia-Pacific Region

20072007ProductionProduction85850.30.398.098.0ChevronChevronBangladeshBangladeshBibiyana Gas DevelopmentBibiyana Gas Development

TBDTBDDesignDesignTBDTBDTBDTBD80.080.0ChevronChevronIndonesiaIndonesiaGendalo Gendalo -- GehemGehem

TBDTBDEvaluationEvaluationTBDTBDTBDTBD100100ChevronChevronAustraliaAustraliaWheatstoneWheatstone

20082008ConstructionConstruction70701.31.3100100ChevronChevronIndonesiaIndonesiaNorth Duri Steamflood North Duri Steamflood Development (all phases)Development (all phases)

20122012EvaluationEvaluation85854.34.342.9*42.9*ChevronChevronVietnamVietnamVietnam Gas DevelopmentVietnam Gas Development

TBDTBDDesignDesign440440CapacityCapacityTBDTBD50.050.0ChevronChevronAustraliaAustraliaGreater Gorgon Offshore Greater Gorgon Offshore

Development & LNGDevelopment & LNG

TBDTBDDesignDesign8080TBDTBD49.049.0ChevronChevronChinaChinaChuandongbei Gas AreaChuandongbei Gas Area

20112011ConstructionConstruction65653.13.169.8*69.8*ChevronChevronThailandThailandPlatong IIPlatong II

20082008ConstructionConstruction95952.12.116.716.7OtherOtherAustraliaAustraliaNWS Train 5NWS Train 5

StartupStartupCurrent Current PhasePhase

Peak Prod Peak Prod MBOEDMBOED

C&E C&E $Billion$BillionWI %WI %OperatorOperatorLocationLocationProjectProject

*Represents a weighted average of Chevron’s interest across multiple blocksC&E is estimated 100% gross project C&E Peak production is estimated 100% gross production when project is at its maximum level

Page 44: Chevron Upstream & Gas

44© 2008 Chevron Corporation

Upstream Major Capital ProjectsCaspian and Middle East Regions

20072007ConstructionConstruction10100.20.250.050.0ChevronChevronPNZPNZLargeLarge--Scale Scale SteamfloodSteamflood PilotPilot

TBDTBDDesignDesignTBDTBDTBDTBD50.050.0ChevronChevronKazakhstanKazakhstanTengiz ExpansionTengiz Expansion

20082008ConstructionConstruction340340Refer to Refer to OperatorOperator

10.310.3OtherOtherAzerbaijanAzerbaijanAzeriAzeri--ChiragChirag--Guneshli (ACG) Guneshli (ACG) Development IIIDevelopment III

2012+2012+EvaluationEvaluation235235Refer to Refer to OperatorOperator

20.020.0OtherOtherKazakhstanKazakhstanKarachaganak Expansion IIIKarachaganak Expansion III

20072007ProductionProduction2502507.27.250.050.0ChevronChevronKazakhstanKazakhstanTengiz Sour Gas Injection/ Tengiz Sour Gas Injection/ Second Generation PlantSecond Generation Plant

StartupStartupCurrent Current PhasePhase

Peak Prod Peak Prod MBOEDMBOED

C&E C&E $Billion$BillionWI %WI %OperatorOperatorLocationLocationProjectProject

C&E is estimated 100% gross project C&E Peak production is estimated 100% gross production when project is at its maximum level

Page 45: Chevron Upstream & Gas

45© 2008 Chevron Corporation

Upstream Major Capital ProjectsWest Africa Region – Angola/Congo

TBDTBDEvaluationEvaluationTBDTBDTBDTBD31.031.0ChevronChevronAngolaAngolaNegageNegage

TBDTBDEvaluationEvaluationTBDTBDTBDTBD31.031.0ChevronChevronAngolaAngolaLucapaLucapa

20122012ConstructionConstruction110110TBDTBD36.436.4ChevronChevron

(co(co--operator)operator)AngolaAngolaAngola LNGAngola LNG

20082008ConstructionConstruction9090Refer to Refer to OperatorOperator

31.531.5OtherOtherCongoCongoMoho Bilondo Deepwater Moho Bilondo Deepwater DevelopmentDevelopment

20092009ConstructionConstruction1001003.83.831.031.0ChevronChevronAngolaAngolaTombua Landana Deepwater Tombua Landana Deepwater DevelopmentDevelopment

20062006ProductionProduction2002002.52.531.031.0ChevronChevronAngolaAngolaBenguela Belize Lobito Benguela Belize Lobito Tomboco (BBLT) Deepwater Tomboco (BBLT) Deepwater DevelopmentDevelopment

StartupStartupCurrent Current PhasePhase

Peak Prod Peak Prod MBOEDMBOED

C&E C&E $Billion$BillionWI %WI %OperatorOperatorLocationLocationProjectProject

C&E is estimated 100% gross project C&E Peak production is estimated 100% gross production when project is at its maximum level

Page 46: Chevron Upstream & Gas

46© 2008 Chevron Corporation

Upstream Major Capital ProjectsWest Africa Region – Nigeria

20092009ConstructionConstruction1401402.82.840.040.0ChevronChevronNigeriaNigeriaNigeria EGP3Nigeria EGP3

TBDTBDDesignDesign360360TBDTBD40.040.0ChevronChevronNigeriaNigeriaOlokola Gas SupplyOlokola Gas Supply

TBDTBDDesignDesign500 500

capacitycapacityTBDTBD19.519.5OtherOtherNigeriaNigeriaOlokola LNG PlantOlokola LNG Plant

20122012DesignDesign150150Refer to Refer to OperatorOperator

19.7*19.7*OtherOtherNigeriaNigeriaBonga SW/Aparo Deepwater Bonga SW/Aparo Deepwater DevelopmentDevelopment

20102010ConstructionConstruction35352.92.975.075.0ChevronChevronNigeriaNigeriaNigeria GTLNigeria GTL

20112011ConstructionConstruction180180Refer to Refer to OperatorOperator

30.030.0OtherOtherNigeriaNigeriaUsan Deepwater Usan Deepwater DevelopmentDevelopment

20082008ConstructionConstruction2502505.45.468.268.2ChevronChevronNigeriaNigeriaAgbami Deepwater Agbami Deepwater DevelopmentDevelopment

StartupStartupCurrent Current PhasePhase

Peak Prod Peak Prod MBOEDMBOED

C&E C&E $Billion$BillionWI %WI %OperatorOperatorLocationLocationProjectProject

*Equity is pending execution of the pre-unit agreement.C&E is estimated 100% gross project C&E Peak production is estimated 100% gross production when project is at its maximum level

Page 47: Chevron Upstream & Gas

47© 2008 Chevron Corporation

Upstream Major Capital ProjectsLatin America Region

20112011EvaluationEvaluation8080TBDTBD37.537.5OtherOtherBrazilBrazilPapaPapa--Terra BCTerra BC--20 Deepwater 20 Deepwater DevelopmentDevelopment

TBDTBDEvaluationEvaluationTBDTBDTBDTBD60.060.0ChevronChevronVenezuelaVenezuelaPlataformaPlataforma DeltanaDeltana

TBDTBDEvaluationEvaluationTBDTBDTBDTBD30.030.0OtherOtherVenezuelaVenezuelaPetropiarPetropiar ExpansionExpansion

TBDTBDEvaluationEvaluationTBDTBDTBDTBD50.050.0OtherOtherTrinidad Trinidad

and and TobagoTobago

StarfishStarfish

20092009ConstructionConstruction90902.82.851.751.7ChevronChevronBrazilBrazilFrade Deepwater Frade Deepwater DevelopmentDevelopment

StartupStartupCurrent Current PhasePhase

Peak Prod Peak Prod MBOEDMBOED

C&E C&E $Billion$BillionWI %WI %OperatorOperatorLocationLocationProjectProject

C&E is estimated 100% gross project C&E Peak production is estimated 100% gross production when project is at its maximum level

Page 48: Chevron Upstream & Gas

48© 2008 Chevron Corporation

Upstream Major Capital ProjectsNorth America Region

TBDTBDEvaluationEvaluationTBDTBDTBDTBD30.030.0OtherOtherGOMGOMTubular BellsTubular Bells

TBDTBDEvaluationEvaluationTBDTBDTBDTBD28.028.0ChevronChevronCanadaCanadaHebronHebron

TBDTBDEvaluationEvaluationTBDTBDTBDTBD20.020.0OtherOtherCanadaCanadaAOSP Expansion 2AOSP Expansion 2

TBDTBDEvaulationEvaulationTBDTBDTBDTBD20.520.5ChevronChevronGOMGOMTongaTonga

TBDTBDEvaluationEvaluationTBDTBDTBDTBD50.050.0ChevronChevronGOMGOMJackJack

TBDTBDEvaluationEvaluationTBDTBDTBDTBD41.341.3ChevronChevronGOMGOMSt. St. MaloMalo

20072007ProductionProduction15150.30.3100100ChevronChevronSJVSJVSan Ardo SteamfloodSan Ardo Steamflood

20092009ConstructionConstruction70707.37.3100100ChevronChevronMid Mid

ContinentContinentPiceancePiceance

TBDTBDEvaluationEvaluationTBDTBDTBDTBD60.060.0ChevronChevronGOMGOMBig FootBig Foot

20102010ConstructionConstruction10010010.210.220.020.0OtherOtherCanadaCanadaAthabasca Oil Sands Project Athabasca Oil Sands Project (AOSP) Expansion 1(AOSP) Expansion 1

TBDTBDEvaluationEvaluationTBDTBDTBDTBD32.532.5OtherOtherCanadaCanadaAmauligakAmauligak

20102010ConstructionConstruction1301304.54.533.3 33.3 ––60.060.0

OtherOtherGOMGOMPerdido Region DeepwaterPerdido Region Deepwater

20082008ConstructionConstruction70701.41.47575ChevronChevronGOMGOMBlind Faith DeepwaterBlind Faith Deepwater

20092009ConstructionConstruction1351354.74.758.058.0ChevronChevronGOMGOMTahiti DeepwaterTahiti Deepwater

StartupStartupCurrent Current PhasePhase

Peak Prod Peak Prod MBOEDMBOED

C&E C&E $Billion$BillionWI %WI %OperatorOperatorLocationLocationProjectProject

C&E is estimated 100% gross project C&E Peak production is estimated 100% gross production when project is at its maximum level