Check Points for Labour Contract house construction

1
Labour Contractor Scope Earth work Excavation & Foundation Trenches of soil Basement filling Column Structure Main Building Brick wall R.C.C work: Roof, columns, Plinth and roof beams Ring rod for column Double mat in concrete slab Plinth level: Ground level____ & roof height___ Plastering of wall thickness?? Staircase head room Staircase Sunshades R.C. lofts Wardrobe per room Lentil level roof Inner roof border cornice Staircase All Sunshade work Ground Floor filling work Balcony All wooden frame fixing Electrical box fixing Elevation & Front Elevation Roof tank Roof muddy Overhead Tank Putty Works: Interiors areas Putty Works:Exterior front Elevation Areas Granite Slabs fixing-Kitchen areas Handrail Fixing - Staircase Areas and upper living Cut-Off Areas Barbendering Masonry & centering work Curing and Other Civil works Cleaning and maintaining the site and beside buildings Additional Works with extra LABOUR Compound Wall height?? Rs.120/- per Running foot R.C.C underground Sump Rs.07/- per litre Parapet wall at terrace floor (Rate for Ground floor only), free of cost If the construction goes first floor Rs.60/-per running foot underground Septic Tank & Drainage Rs.05/- per litre Weathering course over terrace Rs.40/- per square foot Tools & Equipment under Labour Contracor Scope Survey Poles Mixer Machine rent Column boxes Centering materials Scaffoldings and all masonry tools Vibrator Machine & not limited to this if anything extra @ Rs.290/Sq.foot (Car Park area @ Rs.200/Sq.foot) Labour Contractor Scope PDF Creator - PDF4Free v3.0 http://www.pdf4free.com

description

Check Points for Labour Contract house construction

Transcript of Check Points for Labour Contract house construction

Labour Contractor ScopeEarth work Excavation & Foundation Trenches of soilBasement fillingColumn StructureMain Building Brick wallR.C.C work: Roof, columns, Plinth and roof beamsRing rod for columnDouble mat in concrete slabPlinth level: Ground level____ & roof height___Plastering of wall thickness??Staircase head roomStaircaseSunshadesR.C. loftsWardrobe per roomLentil level roofInner roof border corniceStaircaseAll Sunshade workGround Floor filling workBalconyAll wooden frame fixingElectrical box fixingElevation & Front ElevationRoof tankRoof muddyOverhead TankPutty Works: Interiors areasPutty Works:Exterior front Elevation AreasGranite Slabs fixing-Kitchen areasHandrail Fixing - Staircase Areas and upper living Cut-Off AreasBarbenderingMasonry & centering workCuring and Other Civil worksCleaning and maintaining the site and beside buildings

Additional Works with extra LABOURCompound Wall height?? Rs.120/- per Running footR.C.C underground Sump Rs.07/- per litreParapet wall at terrace floor (Rate for Ground floor only), free ofcost If the construction goes first floor

Rs.60/-per running foot

underground Septic Tank & Drainage Rs.05/- per litreWeathering course over terrace Rs.40/- per square foot

Tools & Equipment under Labour Contracor ScopeSurvey PolesMixer Machine rentColumn boxesCentering materialsScaffoldings and all masonry toolsVibrator Machine& not limited to this if anything extra

@ Rs.290/Sq.foot(Car Park area @

Rs.200/Sq.foot)

Labour Contractor Scope