Labour Contractor ScopeEarth work Excavation & Foundation Trenches of soilBasement fillingColumn StructureMain Building Brick wallR.C.C work: Roof, columns, Plinth and roof beamsRing rod for columnDouble mat in concrete slabPlinth level: Ground level____ & roof height___Plastering of wall thickness??Staircase head roomStaircaseSunshadesR.C. loftsWardrobe per roomLentil level roofInner roof border corniceStaircaseAll Sunshade workGround Floor filling workBalconyAll wooden frame fixingElectrical box fixingElevation & Front ElevationRoof tankRoof muddyOverhead TankPutty Works: Interiors areasPutty Works:Exterior front Elevation AreasGranite Slabs fixing-Kitchen areasHandrail Fixing - Staircase Areas and upper living Cut-Off AreasBarbenderingMasonry & centering workCuring and Other Civil worksCleaning and maintaining the site and beside buildings
Additional Works with extra LABOURCompound Wall height?? Rs.120/- per Running footR.C.C underground Sump Rs.07/- per litreParapet wall at terrace floor (Rate for Ground floor only), free ofcost If the construction goes first floor
Rs.60/-per running foot
underground Septic Tank & Drainage Rs.05/- per litreWeathering course over terrace Rs.40/- per square foot
Tools & Equipment under Labour Contracor ScopeSurvey PolesMixer Machine rentColumn boxesCentering materialsScaffoldings and all masonry toolsVibrator Machine& not limited to this if anything extra
@ Rs.290/Sq.foot(Car Park area @
Rs.200/Sq.foot)
Labour Contractor Scope