CHAVEZ PREP PUBLIC CHARTER SCHOOL · 2013-06-30 · CHAVEZ PREP - GYMNASIUM CFA Concept Review...

12
CHAVEZ PREP - GYMNASIUM CFA Concept Review Submission 03 January 2013 Project Overview: A new gymnasium addition added to the east side of the existing Chavez Prep. Project Address: 770 Kenyon Street NW Washington, DC 20010 Project Scope: A new gymnasium is proposed to be added to the east side of the existing Chavez Prep School. The addition would be connected to the second level of the existing school, and constructed above the existing parking lot. The existing quantity of parking spaces would be maintained. CHAVEZ PREP PUBLIC CHARTER SCHOOL GYMNASIUM ADDITION Commission of Fine Arts - Concept Review CO-APPLICANT - OWNER Cesar Chavez Public Charter Schools 709 12th Street SE Washington DC, 20003 Contact: Jeff Cooper - C.O.O. TEL: 202-723-3975 CO-APPLICANT - ARCHITECT Stoiber + Associates 1621 Connecticut Ave NW Suite 2001 Washington DC, 20009 Contact: Nick Mroczkowski, RA TEL: 202-986-4700 x 203 Existing Site Proposed Rendering

Transcript of CHAVEZ PREP PUBLIC CHARTER SCHOOL · 2013-06-30 · CHAVEZ PREP - GYMNASIUM CFA Concept Review...

Page 1: CHAVEZ PREP PUBLIC CHARTER SCHOOL · 2013-06-30 · CHAVEZ PREP - GYMNASIUM CFA Concept Review Submission 03 January 2013 Project Overview: A new gymnasium addition added to the east

CHAVEZ PREP - GYMNASIUMCFA Concept Review Submission

03 January 2013

Project Overview:

A new gymnasium addition added to the east side of the existing Chavez Prep.

Project Address:

770 Kenyon Street NWWashington, DC 20010

Project Scope:

A new gymnasium is proposed to be added to the east side of the existing Chavez Prep School. The addition would be connected to the second level of the existing school, and constructed above the existing parking lot.

The existing quantity of parking spaces would be maintained.

CHAVEZ PREP PUBLIC CHARTER SCHOOLGYMNASIUM ADDITION

Commission of Fine Arts - Concept Review

CO-APPLICANT - OWNER

Cesar Chavez Public Charter Schools709 12th Street SEWashington DC, 20003Contact: Jeff Cooper - C.O.O.TEL: 202-723-3975

CO-APPLICANT - ARCHITECT

Stoiber + Associates1621 Connecticut Ave NWSuite 2001Washington DC, 20009Contact: Nick Mroczkowski, RATEL: 202-986-4700 x 203

Existing Site

Proposed Rendering

Page 2: CHAVEZ PREP PUBLIC CHARTER SCHOOL · 2013-06-30 · CHAVEZ PREP - GYMNASIUM CFA Concept Review Submission 03 January 2013 Project Overview: A new gymnasium addition added to the east

CHAVEZ PREP - GYMNASIUMCFA Concept Review Submission

03 January 2013

Item

Table of Contents and Vicinity Map

Letter Requesting Review

Existing Photographs

Existing Site Plan / Ground Floor Plan and Topography

Proposed Site Plan / Ground Floor Plan and Topography

Existing Second Floor Plan

Proposed Second Floor Plan

Existing Roof Plan

Proposed Roof Plan

Existing and Proposed North Elevation

Proposed Rendering and Proposed Materials

Sheet

2

3

4

5

6

7

8

9

10

11

12

22

Vicinity MapScale: N.T.S.

N

Page 3: CHAVEZ PREP PUBLIC CHARTER SCHOOL · 2013-06-30 · CHAVEZ PREP - GYMNASIUM CFA Concept Review Submission 03 January 2013 Project Overview: A new gymnasium addition added to the east

CHAVEZ PREP - GYMNASIUMCFA Concept Review Submission

03 January 2013

33

Page 4: CHAVEZ PREP PUBLIC CHARTER SCHOOL · 2013-06-30 · CHAVEZ PREP - GYMNASIUM CFA Concept Review Submission 03 January 2013 Project Overview: A new gymnasium addition added to the east

CHAVEZ PREP - GYMNASIUMCFA Concept Review Submission

03 January 2013

44

View 1 - Kenyon Street Looking West View 2 - Kenyon Street Looking South View 3 - Kenyon Street Looking East

View 4 - Rear Alley / Parking Lot Looking West View 5 - Rear Alley / Parking Lot Looking East View 6 - Adjacent Rowhouse Facade

View 3 View 2

View 1

View 5 View 4

View 6

Key PlanScale: N.T.S.

N

Page 5: CHAVEZ PREP PUBLIC CHARTER SCHOOL · 2013-06-30 · CHAVEZ PREP - GYMNASIUM CFA Concept Review Submission 03 January 2013 Project Overview: A new gymnasium addition added to the east

CHAVEZ PREP - GYMNASIUMCFA Concept Review Submission

03 January 2013

55

Site Plan / Ground Floor Plan - ExistingScale: 1:250

N

Page 6: CHAVEZ PREP PUBLIC CHARTER SCHOOL · 2013-06-30 · CHAVEZ PREP - GYMNASIUM CFA Concept Review Submission 03 January 2013 Project Overview: A new gymnasium addition added to the east

CHAVEZ PREP - GYMNASIUMCFA Concept Review Submission

03 January 2013

66

Site Plan / Ground Floor Plan - ProposedScale: 1:250

N

Page 7: CHAVEZ PREP PUBLIC CHARTER SCHOOL · 2013-06-30 · CHAVEZ PREP - GYMNASIUM CFA Concept Review Submission 03 January 2013 Project Overview: A new gymnasium addition added to the east

CHAVEZ PREP - GYMNASIUMCFA Concept Review Submission

03 January 2013

77

Second Floor Plan - ExistingScale: 1:250

N

Page 8: CHAVEZ PREP PUBLIC CHARTER SCHOOL · 2013-06-30 · CHAVEZ PREP - GYMNASIUM CFA Concept Review Submission 03 January 2013 Project Overview: A new gymnasium addition added to the east

CHAVEZ PREP - GYMNASIUMCFA Concept Review Submission

03 January 2013

Second Floor Plan - ProposedScale: 1:250

N

88

Page 9: CHAVEZ PREP PUBLIC CHARTER SCHOOL · 2013-06-30 · CHAVEZ PREP - GYMNASIUM CFA Concept Review Submission 03 January 2013 Project Overview: A new gymnasium addition added to the east

CHAVEZ PREP - GYMNASIUMCFA Concept Review Submission

03 January 2013

Roof Plan - ExistingScale: 1:250

N

99

Page 10: CHAVEZ PREP PUBLIC CHARTER SCHOOL · 2013-06-30 · CHAVEZ PREP - GYMNASIUM CFA Concept Review Submission 03 January 2013 Project Overview: A new gymnasium addition added to the east

CHAVEZ PREP - GYMNASIUMCFA Concept Review Submission

03 January 2013

Roof Plan - ProposedScale: 1:250

N

1010

Page 11: CHAVEZ PREP PUBLIC CHARTER SCHOOL · 2013-06-30 · CHAVEZ PREP - GYMNASIUM CFA Concept Review Submission 03 January 2013 Project Overview: A new gymnasium addition added to the east

CHAVEZ PREP - GYMNASIUMCFA Concept Review Submission

03 January 2013

Kenyon Street Elevation - ExistingScale: 1:250

N

1111

Kenyon Street Elevation - ProposedScale: 1:250

N

Page 12: CHAVEZ PREP PUBLIC CHARTER SCHOOL · 2013-06-30 · CHAVEZ PREP - GYMNASIUM CFA Concept Review Submission 03 January 2013 Project Overview: A new gymnasium addition added to the east

CHAVEZ PREP - GYMNASIUMCFA Concept Review Submission

03 January 2013

Proposed Exterior Rendering

1212

Proposed Materials

Metal Parapet

Metal Panel

Brickto match existing Bruce School

Translucent Glazing

Precast Concrete Base

Precast Concrete Trim and Sills