![Page 1: Charles Vuong & David Nguyen - Trackwork Services Alliance - Case study session: Quality in the construction and installation of turnouts](https://reader033.fdocuments.us/reader033/viewer/2022052311/55894b34d8b42a45648b4732/html5/thumbnails/1.jpg)
Quality In The Construction of
Turnouts
Trackwork Services Alliance
Charles Vuong & David Nguyen
22 - 23/05/14
![Page 2: Charles Vuong & David Nguyen - Trackwork Services Alliance - Case study session: Quality in the construction and installation of turnouts](https://reader033.fdocuments.us/reader033/viewer/2022052311/55894b34d8b42a45648b4732/html5/thumbnails/2.jpg)
Quality In the Construction Of Turnouts
Agenda
1. TSA – Who we are? What do we do?
2. How is quality ultimately achieved in construction through:
• Design
• Procurement/Manufacturing
• Prebuild
• Construction
3. Case study – Lithgow
4. Conclusion
![Page 3: Charles Vuong & David Nguyen - Trackwork Services Alliance - Case study session: Quality in the construction and installation of turnouts](https://reader033.fdocuments.us/reader033/viewer/2022052311/55894b34d8b42a45648b4732/html5/thumbnails/3.jpg)
TSA – Who We Are?
![Page 4: Charles Vuong & David Nguyen - Trackwork Services Alliance - Case study session: Quality in the construction and installation of turnouts](https://reader033.fdocuments.us/reader033/viewer/2022052311/55894b34d8b42a45648b4732/html5/thumbnails/4.jpg)
TSA – What we do?
Objectives:
1. Service delivery of turnout renewals
2. Rail industry objectives
![Page 5: Charles Vuong & David Nguyen - Trackwork Services Alliance - Case study session: Quality in the construction and installation of turnouts](https://reader033.fdocuments.us/reader033/viewer/2022052311/55894b34d8b42a45648b4732/html5/thumbnails/5.jpg)
Construction Methods
How Quality Is Achieved in Construction
Work Methodology
Increased efficiency
Quality Assurance
Culture and
Behaviours
![Page 6: Charles Vuong & David Nguyen - Trackwork Services Alliance - Case study session: Quality in the construction and installation of turnouts](https://reader033.fdocuments.us/reader033/viewer/2022052311/55894b34d8b42a45648b4732/html5/thumbnails/6.jpg)
How Quality Is Achieved in Construction
Quality of the end product will be influenced by:
![Page 7: Charles Vuong & David Nguyen - Trackwork Services Alliance - Case study session: Quality in the construction and installation of turnouts](https://reader033.fdocuments.us/reader033/viewer/2022052311/55894b34d8b42a45648b4732/html5/thumbnails/7.jpg)
Fix it here
![Page 8: Charles Vuong & David Nguyen - Trackwork Services Alliance - Case study session: Quality in the construction and installation of turnouts](https://reader033.fdocuments.us/reader033/viewer/2022052311/55894b34d8b42a45648b4732/html5/thumbnails/8.jpg)
How Quality Is Achieved in Construction
Design:
• Design for constructability
• Design for manufacturability
How?
• Constructor input / feedback at design stage
• Greater accessibility between constructors and
designers
• Collaborative design
![Page 9: Charles Vuong & David Nguyen - Trackwork Services Alliance - Case study session: Quality in the construction and installation of turnouts](https://reader033.fdocuments.us/reader033/viewer/2022052311/55894b34d8b42a45648b4732/html5/thumbnails/9.jpg)
How Quality Is Achieved
Manufacturing:
• Suitability of ordered components to site
• Manufacturing tolerances and design requirements are
met
• Compliance to design
How?
Site inspections before procurement
Manufacturing quality inspections
![Page 10: Charles Vuong & David Nguyen - Trackwork Services Alliance - Case study session: Quality in the construction and installation of turnouts](https://reader033.fdocuments.us/reader033/viewer/2022052311/55894b34d8b42a45648b4732/html5/thumbnails/10.jpg)
How Quality Is Achieved
Manufacturing:
• Procurement of materials to suit site requirements
Turnout to be
renewed
End of stockrail
(Aluminothermic weld)
Existing joint (flash butt)
600mm from end of stockrail
Plain line track not
to be renewed
Glued Insulated Joint
Cost:• Closure
• Weld
• Time
Impact on Quality
(additional weld in
track)
![Page 11: Charles Vuong & David Nguyen - Trackwork Services Alliance - Case study session: Quality in the construction and installation of turnouts](https://reader033.fdocuments.us/reader033/viewer/2022052311/55894b34d8b42a45648b4732/html5/thumbnails/11.jpg)
How Quality Is Achieved
Cost:• Truck Costs: $1400
• Modification of plates: $5750
• Safe Working: $1000
• Site Supervisor: $1300
• Labour: $1500
Total Cost = ~$11,000
Manufacturing:
• Ensuring No Manufacturing Defects through Inspections
![Page 12: Charles Vuong & David Nguyen - Trackwork Services Alliance - Case study session: Quality in the construction and installation of turnouts](https://reader033.fdocuments.us/reader033/viewer/2022052311/55894b34d8b42a45648b4732/html5/thumbnails/12.jpg)
How Quality Is Achieved
Prebuild
![Page 13: Charles Vuong & David Nguyen - Trackwork Services Alliance - Case study session: Quality in the construction and installation of turnouts](https://reader033.fdocuments.us/reader033/viewer/2022052311/55894b34d8b42a45648b4732/html5/thumbnails/13.jpg)
Case Study: Lithgow 77A/B, 78A/B, 79 &
81A/B Turnout Renewal
![Page 14: Charles Vuong & David Nguyen - Trackwork Services Alliance - Case study session: Quality in the construction and installation of turnouts](https://reader033.fdocuments.us/reader033/viewer/2022052311/55894b34d8b42a45648b4732/html5/thumbnails/14.jpg)
Quality In DesignCase Study: Lithgow 77A/B, 78A/B, 79 & 81A/B
![Page 15: Charles Vuong & David Nguyen - Trackwork Services Alliance - Case study session: Quality in the construction and installation of turnouts](https://reader033.fdocuments.us/reader033/viewer/2022052311/55894b34d8b42a45648b4732/html5/thumbnails/15.jpg)
Quality In Design
![Page 16: Charles Vuong & David Nguyen - Trackwork Services Alliance - Case study session: Quality in the construction and installation of turnouts](https://reader033.fdocuments.us/reader033/viewer/2022052311/55894b34d8b42a45648b4732/html5/thumbnails/16.jpg)
Quality In Manufacturing
Manufacturing inspection conducted:
1. Victoria
2. New South Wales
3. Queensland
Case Study: Lithgow 77A/B, 78A/B, 79 & 81A/B
![Page 17: Charles Vuong & David Nguyen - Trackwork Services Alliance - Case study session: Quality in the construction and installation of turnouts](https://reader033.fdocuments.us/reader033/viewer/2022052311/55894b34d8b42a45648b4732/html5/thumbnails/17.jpg)
Quality In Manufacturing
Customised Inspection Checksheet:
• Actual measurements recorded
• Acceptance only once manufacturing
tolerances and design requirements met
• Rectification list provided to manufacturer’s
post inspection
![Page 18: Charles Vuong & David Nguyen - Trackwork Services Alliance - Case study session: Quality in the construction and installation of turnouts](https://reader033.fdocuments.us/reader033/viewer/2022052311/55894b34d8b42a45648b4732/html5/thumbnails/18.jpg)
Quality In PrebuildPrebuild on level surface
• Entire shift prior to prebuild used to level surface
![Page 19: Charles Vuong & David Nguyen - Trackwork Services Alliance - Case study session: Quality in the construction and installation of turnouts](https://reader033.fdocuments.us/reader033/viewer/2022052311/55894b34d8b42a45648b4732/html5/thumbnails/19.jpg)
Quality In Prebuild
Self performing team
![Page 20: Charles Vuong & David Nguyen - Trackwork Services Alliance - Case study session: Quality in the construction and installation of turnouts](https://reader033.fdocuments.us/reader033/viewer/2022052311/55894b34d8b42a45648b4732/html5/thumbnails/20.jpg)
Quality In PrebuildPrebuild 16th – 24th January, 6 weeks & prebuild inspections: prior to welding
![Page 21: Charles Vuong & David Nguyen - Trackwork Services Alliance - Case study session: Quality in the construction and installation of turnouts](https://reader033.fdocuments.us/reader033/viewer/2022052311/55894b34d8b42a45648b4732/html5/thumbnails/21.jpg)
Quality In Construction
Lithgow 77A/B, 78A/B, 79 & 81A/B Points Renewal
![Page 22: Charles Vuong & David Nguyen - Trackwork Services Alliance - Case study session: Quality in the construction and installation of turnouts](https://reader033.fdocuments.us/reader033/viewer/2022052311/55894b34d8b42a45648b4732/html5/thumbnails/22.jpg)
Quality In Construction
Track Scope of Works
• Renewal of 7 point ends
• Full depth recondition
• Installation with PEM LEM’s
• Welding
• Resurfacing
![Page 23: Charles Vuong & David Nguyen - Trackwork Services Alliance - Case study session: Quality in the construction and installation of turnouts](https://reader033.fdocuments.us/reader033/viewer/2022052311/55894b34d8b42a45648b4732/html5/thumbnails/23.jpg)
Quality In Construction
Signalling Scope of Works
• Replace existing points motors
• Replace existing ESML with EOL
• Circuit modifications
• Relocation of signals
![Page 24: Charles Vuong & David Nguyen - Trackwork Services Alliance - Case study session: Quality in the construction and installation of turnouts](https://reader033.fdocuments.us/reader033/viewer/2022052311/55894b34d8b42a45648b4732/html5/thumbnails/24.jpg)
Quality In Construction
OHW Scope of Works
• Major OHW adjustments to
suit new track arrangement
• Installation 22off OHW
footings
• Erection 11off new OHW
structures
• Removal 6off redundant
OHW structures
![Page 25: Charles Vuong & David Nguyen - Trackwork Services Alliance - Case study session: Quality in the construction and installation of turnouts](https://reader033.fdocuments.us/reader033/viewer/2022052311/55894b34d8b42a45648b4732/html5/thumbnails/25.jpg)
Quality In Construction
• Safe & reliable product at end of possession
• No late possession handback
![Page 26: Charles Vuong & David Nguyen - Trackwork Services Alliance - Case study session: Quality in the construction and installation of turnouts](https://reader033.fdocuments.us/reader033/viewer/2022052311/55894b34d8b42a45648b4732/html5/thumbnails/26.jpg)
Quality In ConstructionQuality During Construction:
• Prior testing of material
• Allowing for contingency
• Customised ITP’s
• Live Survey
• NCR tracking
• PEM LEM
![Page 27: Charles Vuong & David Nguyen - Trackwork Services Alliance - Case study session: Quality in the construction and installation of turnouts](https://reader033.fdocuments.us/reader033/viewer/2022052311/55894b34d8b42a45648b4732/html5/thumbnails/27.jpg)
Quality In Construction
![Page 28: Charles Vuong & David Nguyen - Trackwork Services Alliance - Case study session: Quality in the construction and installation of turnouts](https://reader033.fdocuments.us/reader033/viewer/2022052311/55894b34d8b42a45648b4732/html5/thumbnails/28.jpg)
Quality In the Construction Of Turnouts
Outcomes
– Reduction in number of defects
– Reduced the risk of late possession handback
– Reduction in the cost of rework
– Increased scope deliverables
![Page 29: Charles Vuong & David Nguyen - Trackwork Services Alliance - Case study session: Quality in the construction and installation of turnouts](https://reader033.fdocuments.us/reader033/viewer/2022052311/55894b34d8b42a45648b4732/html5/thumbnails/29.jpg)
THANK YOU