This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility item by visual observation only; they do not test the operation of equipment or perform destructive testing of walls, ceilings or floors. Each facility item is ranked on a 7-point scale: rank 7 means the item is in new or in good condition and no work is required while rank 1 means the item has failed and has lead to an immediate life safety condition¹. The remaining ranks choices generally mean that the item requires regular maintenance (rank 5 or 6) or full replacement (rank 2, 3 or 4). For additional detail and definition on rank values as they relate to each assessed item, please visit the "CPS Guide to Biennial Facility Assessments" found on the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/About_CPS/Policies_and_guidelines/Pages/facilitystandards.aspx. Definitions for Quantity, Unit, Cost and Campus Total can be found at the end of this report.
Facility Assessment Report
Building Name Year Constructed Building Area (Sq Ft) Assessed Need Number of Floors
Campus Summary
Main 1934 384,200 $13,752,2114
6-Classroom Modular 0 7,060 $240,9711
6-Classroom Modular 0 7,060 $240,7591
SITE $1,849,288
Campus Total $16,083,228398,320
Building: Main
Category: Building Exterior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Entrance
Entrance Control - Audio and Video #1- E- Main 6EA1 $702
Entrance Control - Audio and Video #7- NW 6EA1 $702
Exterior Doors - Exterior AMP Door #1- E- Main 6EA6 $4,044
Exterior Doors - Exterior AMP Door #18- SE 6EA2 $1,348
Exterior Doors - Exterior AMP Door #2- NE 6EA2 $1,348
Exterior Doors - Exterior FRP Door #10- SW 6EA2 $1,263
Exterior Doors - Exterior FRP Door #11- SW 6EA2 $1,263
Exterior Doors - Exterior FRP Door #12- S 6EA2 $1,263
Exterior Doors - Exterior FRP Door #17- S 6EA2 $1,263
Exterior Doors - Exterior FRP Door #3- N 6EA2 $1,263
Exterior Doors - Exterior FRP Door #4- NE 6EA2 $1,263
Exterior Doors - Exterior FRP Door #5- NE- BR 6EA1 $631
Exterior Doors - Exterior FRP Door #6- NW 6EA2 $1,263
Exterior Doors - Exterior FRP Door #7- NW 6EA2 $1,263
Exterior Doors - Exterior FRP Door #8- NW 6EA2 $1,263
Exterior Doors - Exterior FRP Door #9-W 6EA2 $1,263
Exterior Doors - Exterior Steel Door #4.2- Garage 6EA1 $481
Exterior Doors - Exterior Steel Door Roof access doors 6EA5 $2,403
Page 1 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Building Exterior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Entrance
Exterior Doors - Overhead Rolling/ Garage Door #2.5- N- Book Rm #115 6EA1 $1,433
Exterior Doors - Overhead Rolling/ Garage Door #4.1- Garage 6EA1 $1,433
Exterior Doors - Overhead Rolling/ Garage Door #4.3- Garage 6EA1 $1,433
Exterior Doors - Side lite #5- NE- BR 6EA1 $313
Exterior Doors - Transom Lite #1- E- Main 6EA6 $1,880
Exterior Doors - Transom Lite #10- SW 6EA2 $627
Exterior Doors - Transom Lite #11- SW 6EA2 $627
Exterior Doors - Transom Lite #12- S 6EA4 $1,253
Exterior Doors - Transom Lite #17- S 6EA2 $627
Exterior Doors - Transom Lite #18- SE 6EA2 $627
Exterior Doors - Transom Lite #2- NE 6EA2 $627
Exterior Doors - Transom Lite #2.5- N- Book Rm #115 6EA2 $627
Exterior Doors - Transom Lite #3- N 6EA2 $627
Exterior Doors - Transom Lite #4- NE 6EA2 $627
Exterior Doors - Transom Lite #6- NW 6EA4 $1,253
Exterior Doors - Transom Lite #7- NW 6EA2 $627
Exterior Doors - Transom Lite #8- NW 6EA2 $627
Exterior Doors - Transom Lite #9-W 6EA4 $1,253
Exterior Stairs - Concrete #1- E- Main 6LF370 $30,254
Exterior Stairs - Concrete #18- SE 6LF128 $10,466
Exterior Stairs - Concrete #2- NE 6LF48 $3,925
Exterior Stairs - Concrete #2- NE spalling5LF80 $8,766
Exterior Stairs - Concrete #3- N cracks5LF10 $1,096
Exterior Stairs - Stone #1- E- Main 6LF24 $2,712
Exterior Stairs - Stone #17- S open joints & cracks5LF88 $23,863
Exterior Stairs - Stone #18- SE 6LF6 $678
Exterior Stairs - Stone #2- NE 6LF6 $678
Exterior Stairs - Stone #3- N 6LF80 $9,039
Stair Handrail - Steel_Stair Handrail #1- E- Main 6LF100 $867
Stair Handrail - Steel_Stair Handrail #17- S 6LF10 $87
Stair Handrail - Steel_Stair Handrail #18- SE 6LF33 $286
Stair Handrail - Steel_Stair Handrail #2- NE 6LF32 $277
Stair Handrail - Steel_Stair Handrail #3- N 6LF8 $69
Foundation
Foundation - Concrete Entire Building 7LF2,050 $0
Foundation - Concrete Entire Building Seepage6LF20 $3,884
Foundation - Concrete Entire Building Seepage6LF40 $7,769
Page 2 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Building Exterior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Foundation
Foundation - Concrete Entire Building Seepage6LF10 $0
Foundation - Concrete Entire Building Seepage6LF10 $0
Superstructure - Steel with Clay Tile Arch Entire Building 7SF384,120 $0
Lighting
Exterior Lighting - Parapet or Roof Mounted Entire Building 6EA13 $6,975
Exterior Lighting - Wall Mounted Entire Building 6EA44 $12,705
Roof System
Cell Tower N Roof 6EA1 $736
Chimney - Brick Chimney- Concrete/ Mortar Liner N Roof No liner, has straps6LF140 $133,656
Coping - Metal Service Garage Roof 6LF116 $3,726
Coping - Stone Center Roof 6LF408 $13,104
Coping - Stone E Roof 6LF335 $10,759
Coping - Stone Green House Roof 6LF110 $3,533
Coping - Stone Low S Roof 6LF50 $1,606
Coping - Stone N Roof 6LF1,078 $34,623
Coping - Stone S Roof 6LF1,080 $34,687
Coping - Stone W Roof 6LF805 $25,855
Downspouts - Exterior Downspouts Service Garage Roof 6LF10 $332
Downspouts - Interior Downspouts Center Roof 6LF208 $6,913
Downspouts - Interior Downspouts E Roof 6LF256 $8,508
Downspouts - Interior Downspouts Green House Roof 6LF34 $1,130
Downspouts - Interior Downspouts Low S Roof 6LF10 $332
Downspouts - Interior Downspouts N Courtyard Roof 6LF40 $1,329
Downspouts - Interior Downspouts N Roof 6LF312 $10,369
Downspouts - Interior Downspouts S Courtyard Roof 6LF40 $1,329
Downspouts - Interior Downspouts S Roof 6LF312 $10,369
Downspouts - Interior Downspouts W Roof 6LF384 $12,762
Parapet - 16" - 30" Height Center Roof 6LF408 $16,301
Parapet - 16" - 30" Height E Roof 6LF305 $12,186
Parapet - 16" - 30" Height Green House Roof 6LF110 $4,395
Parapet - 16" - 30" Height Low S Roof 6LF50 $1,998
Parapet - 16" - 30" Height N Roof 6LF968 $38,676
Parapet - 16" - 30" Height S Roof 6LF970 $38,756
Parapet - 16" - 30" Height W Roof 6LF665 $26,570
Parapet - Parapet > 30" E Roof 6LF30 $1,918
Parapet - Parapet > 30" N Roof 6LF110 $7,031
Page 3 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Building Exterior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Roof System
Parapet - Parapet > 30" S Roof 6LF110 $7,031
Parapet - Parapet > 30" W Roof 6LF140 $8,949
Roof Structure - Steel with Clay Tile Arch Center Roof 7SF10,110 $0
Roof Structure - Steel with Clay Tile Arch E Roof 7SF6,167 $0
Roof Structure - Steel with Clay Tile Arch Green House Roof 7SF690 $0
Roof Structure - Steel with Clay Tile Arch Low S Roof 7SF136 $0
Roof Structure - Steel with Clay Tile Arch N Courtyard Roof 7SF1,782 $0
Roof Structure - Steel with Clay Tile Arch N Roof 7SF27,158 $0
Roof Structure - Steel with Clay Tile Arch S Courtyard Roof 7SF1,782 $0
Roof Structure - Steel with Clay Tile Arch S Roof 7SF25,926 $0
Roof Structure - Steel with Clay Tile Arch Service Garage Roof 7SF835 $0
Roof Structure - Steel with Clay Tile Arch W Roof 7SF25,055 $0
Roof - Modified Bitumen Center Roof 6SF10,110 $95,129
Roof - Modified Bitumen E Roof 6SF6,167 $58,028
Roof - Modified Bitumen Green House Roof Not accessible6SF690 $6,492
Roof - Modified Bitumen Low S Roof Not accessible6SF136 $1,280
Roof - Modified Bitumen N Courtyard Roof 6SF1,782 $16,768
Roof - Modified Bitumen N Roof Some minor water ponding6SF27,158 $255,540
Roof - Modified Bitumen S Courtyard Roof Off Room 2276SF1,782 $16,768
Roof - Modified Bitumen S Roof 6SF25,926 $243,948
Roof - Modified Bitumen Service Garage Roof 6SF835 $7,857
Roof - Modified Bitumen W Roof Some water ponding6SF25,055 $235,753
Walls
Cheek-Wall - Concrete Entire Building 6SF64 $656
Cheek-Wall - Concrete Entire Building 6SF32 $328
Cheek-Wall - Concrete Entire Building 6SF32 $328
Cheek-Wall - Stone Entire Building Gaps5SF80 $1,904
Cheek-Wall - Stone Entire Building 6SF80 $820
Cheek-Wall - Stone Entire Building 6SF208 $2,133
Cheek-Wall - Stone Entire Building 6SF80 $820
Cheek-Wall - Stone Entire Building 6SF80 $820
Cornice - Masonry Projecting Limestone Entire Building 6LF2,050 $71,089
Exterior Walls - Brick Entire Building Vertical cracking at pler5SF4 $95
Exterior Walls - Brick Entire Building 6SF106,600 $716,459
Exterior Walls - Stone-Cast Entire Building Some open joints6SF4,100 $27,556
Exterior Walls - Stone-Cast Entire Building Spalling4SF4 $726
Exterior Walls - Stone-Cut Entire Building Stone sills at windows6SF2,900 $19,491
Page 4 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Building Exterior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Walls
Windows
Guard - Guards perforated Entire Building / 1st Floor Some rust occuring6SF9,548 $121,927
Lintels - Steel Entire Building 6LF3,388 $98,350
Lintels - Stone Entire Building 6LF696 $0
Skylite - Glass Double-Pane Entire Building 6SF450 $10,753
Skylite - Glass Single-Pane Entire Building 6SF190 $4,540
Skylite - Glass Single-Pane Entire Building 6SF168 $4,014
Windows - Decorative Entire Building 6SF260 $1,941
Windows - Sash Aluminum Double-pane Entire Building 6SF31,467 $234,889
Windows - Wood- Double-pane Entire Building 6SF912 $6,808
Building Exterior Subtotal: $2,908,678
Building: Main
Category: Electrical System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Emergency System
Automatic Transfer Switch Basement Location: Storage Room6EA1 $408
Automatic Transfer Switch Basement Location: Storage Room6EA1 $408
Emergency A/C Power - Auditoium and Aisle Lighting Entire Building / 1st Floor 6SF2,711 $1,434
Emergency A/C Power - Corridors and Stairs Entire Building 6SF53,790 $16,153
Emergency A/C Power - Gym Entire Building / 3rd Floor 6SF16,526 $6,144
Emergency A/C Power - Lunchrooms Entire Building / 1st Floor 6SF9,933 $3,693
Emergency A/C Power - Multipurpose Room Entire Building / 1st Floor 6SF1,226 $456
Emergency A/C Power - Pool Entire Building / 2nd Floor 6SF3,176 $1,181
Emergency A/C Power - Students Toilets Entire Building 6SF4,003 $1,488
Emergency Battery Packs - Auditoium and Aisle Lighting 1st, 2nd and 3rd Floor / 1st Floor Non Functional When Tested (Includes Auditorium & 2nd Floor Balcony)
6EA14 $2,835
Emergency Battery Packs - Gym 1st, 2nd and 3rd Floor / 3rd Floor Non Functional When Tested 6EA3 $608
Emergency Battery Packs - Pool 1st, 2nd and 3rd Floor / 2nd Floor 6EA2 $405
Emergency Generator- Outdoor- Diesel - 60 - 100 KW North Countyard / North Courtyard 7EA1 $0
Exit Signs - Auditoium Entire Building / 1st Floor Included Auditorium & 2nd Floor Balcony (Bulb Out 1st Floor in one sign)
7EA9 $0
Exit Signs - Corridors and Stairs Entire Building 7EA28 $0
Exit Signs - Gym Entire Building / 3rd Floor One Lens Broken7EA7 $0
Exit Signs - Gym Entire Building / 3rd Floor One Lens Broken6EA1 $157
Exit Signs - Lunchroom Entire Building / 1st Floor Includes Serving Area7EA4 $0
Page 5 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Electrical System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Emergency System
Exit Signs - Multipurpose Room Entire Building / 1st Floor 7EA6 $0
Exit Signs - Pool Entire Building / 2nd Floor Non Functional When Tested2EA2 $1,136
Security System - CCTV Entire Building 6SF384,200 $115,375
Security System - Intrusion Detection Entire Building 5SF384,200 $384,584
Main Service
Independent Electrical Service for emergency power Basement and 1st Floor / 1st Floor Location: Electrical Room7EA1 $0
Independent Electrical Service for emergency power Basement and 1st Floor / Basement Location: Electrical Room7EA1 $0
Main Electrical Service - 1600 A 120/208/3PH Basement 6EA1 $5,641
Main Electrical Service - 1600 A 277/480/3PH Basement 7EA1 $0
Main Electrical Service - 2001 to 3000 A 120/240/3PH Basement 6EA1 $10,867
PA System Entire Building 6SF384,200 $126,363
Power Distribution
Lighting and Power Panels - 100 A Entire Building / 1st Floor Location: Corridor (Main)7EA1 $0
Lighting and Power Panels - 100 A Entire Building / 2nd Floor Location: Room 2257EA1 $0
Lighting and Power Panels - 100 A Entire Building / 2nd Floor Location: Room 2167EA1 $0
Lighting and Power Panels - 100 A Entire Building / 2nd Floor Location: Main Corridor4EA1 $4,849
Lighting and Power Panels - 100 A Entire Building / 2nd Floor Location: Room 2147EA1 $0
Lighting and Power Panels - 100 A Entire Building / 3rd Floor Location: Main Corridor7EA1 $0
Lighting and Power Panels - 100 A Entire Building / 3rd Floor Location: Girl's Gym7EA1 $0
Lighting and Power Panels - 100 A Entire Building / 3rd Floor Location: Room 3164EA1 $4,849
Lighting and Power Panels - 100 A Entire Building / 3rd Floor Location: Main Corridor7EA1 $0
Lighting and Power Panels - 100 A Entire Building / 3rd Floor Location: Room 3234EA1 $4,849
Lighting and Power Panels - 100 A Entire Building / 3rd Floor Location: Main Corridor7EA1 $0
Lighting and Power Panels - 100 A Entire Building / 3rd Floor Location: Room 3204EA1 $4,849
Lighting and Power Panels - 100 A Entire Building / 3rd Floor Location: Room 3144EA1 $4,849
Lighting and Power Panels - 100 A Entire Building / 3rd Floor Location: Girl's Gym7EA1 $0
Lighting and Power Panels - 100 A Entire Building / Basement Location: Mechanical Chase7EA1 $0
Lighting and Power Panels - 100 A Entire Building / Basement Location: Electrical Room7EA1 $0
Lighting and Power Panels - 100 A Entire Building / Basement Location: Storage Room7EA1 $0
Lighting and Power Panels - 100 A Entire Building / Basement Location: Mechanical Chase7EA1 $0
Lighting and Power Panels - 100 A Entire Building / Basement Location: Mechanical Chase7EA1 $0
Lighting and Power Panels - 100 A Entire Building / Boiler Room 4EA1 $4,849
Lighting and Power Panels - 100 A Entire Building / Boiler Room 4EA1 $4,849
Lighting and Power Panels - Above 100 A Entire Building / 1st Floor Location: Room 1147EA1 $0
Lighting and Power Panels - Above 100 A Entire Building / 1st Floor Location: Room 1127EA1 $0
Lighting and Power Panels - Above 100 A Entire Building / 1st Floor Location: Corridor (Main) CCT: 13 & 14 Blank Covers Missing
7EA1 $0
Page 6 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Electrical System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Power Distribution
Lighting and Power Panels - Above 100 A Entire Building / 1st Floor Location: Room 1227EA1 $0
Lighting and Power Panels - Above 100 A Entire Building / 1st Floor Location: Corridor (Main)7EA1 $0
Lighting and Power Panels - Above 100 A Entire Building / 1st Floor Location: Corridor (Main)7EA1 $0
Lighting and Power Panels - Above 100 A Entire Building / 1st Floor Location: Kitchen4EA1 $6,578
Lighting and Power Panels - Above 100 A Entire Building / 1st Floor Location: Room 1147EA1 $0
Lighting and Power Panels - Above 100 A Entire Building / 1st Floor Location: Corridor (Main)7EA1 $0
Lighting and Power Panels - Above 100 A Entire Building / 1st Floor Location: Kitchen4EA1 $6,578
Lighting and Power Panels - Above 100 A Entire Building / 1st Floor Location: Kitchen4EA1 $6,578
Lighting and Power Panels - Above 100 A Entire Building / 2nd Floor Location: Pool7EA1 $0
Lighting and Power Panels - Above 100 A Entire Building / Basement Location: Electrical Room7EA1 $0
Lighting and Power Panels - Above 100 A Entire Building / Basement Location: Mechanical Chase (CCT No. 2 & No. 8 Tripped)
6EA1 $497
Lighting and Power Panels - Above 100 A Entire Building / Basement Location: Electrical Room7EA1 $0
Lighting and Power Panels - Above 100 A Entire Building / Boiler Room 7EA1 $0
Lighting and Power Panels - Above 100 A Entire Building / Boiler Room 7EA1 $0
Lighting and Power Panels - Above 100 A Entire Building / Electrical Room 7EA1 $0
Lighting and Power Panels - Above 100 A Entire Building / Electrical Room 7EA1 $0
Lighting and Power Panels - Above 100 A Entire Building / Electrical Room 7EA1 $0
Main Distribution Panels - 400 - 600 amp Entire Building / Basement Location: Electrical Room7EA1 $0
Main Distribution Panels - 400 - 600 amp Entire Building / Basement Location: Electrical Room7EA1 $0
Main Distribution Panels - 400 - 600 amp Entire Building / Basement Location: Electrical Room7EA1 $0
Main Distribution Panels - 400 - 600 amp Entire Building / Basement Location: Mechanical Chase7EA1 $0
Main Distribution Panels - 400 - 600 amp Entire Building / Basement Location: Electrical Room7EA1 $0
Main Distribution Panels - 400 - 600 amp Entire Building / Basement Location: Storage Room7EA1 $0
Main Distribution Panels - 400 - 600 amp Entire Building / Basement LOcation: Mechanical Chase6EA1 $528
Main Distribution Panels - 400 - 600 amp Entire Building / Basement Location: Mechanical Chase (Side Cover Off & Wires are Exposed)
6EA1 $528
Main Distribution Panels - 400 - 600 amp Entire Building / Basement Location: Mechanical Chase7EA1 $0
Main Distribution Panels - 400 - 600 amp Entire Building / Basement Location: Mechanical Chase7EA1 $0
Main Distribution Panels - 400 - 600 amp Entire Building / Basement Location: Mechanical Chase7EA1 $0
Main Distribution Panels - 400 - 600 amp Entire Building / Basement Location: Mechanical Chase7EA1 $0
Main Distribution Panels - 400 - 600 amp Entire Building / Basement Location: Electrical Room7EA1 $0
Main Distribution Panels - 400 - 600 amp Entire Building / Boiler Room 7EA1 $0
Main Distribution Panels - 400 - 600 amp Entire Building / Boiler Room 4EA1 $13,694
Main Distribution Panels - Less than 400 amp Entire Building / Basement Location: Mechanical Chase7EA1 $0
Main Distribution Panels - Less than 400 amp Entire Building / Mechanical Room 7EA1 $0
Main Distribution Panels - Less than 400 amp Entire Building / Mechanical Room 7EA1 $0
Transformers - 120/240 - 120/208 Entire Building / Basement Location: Electrical Room7EA1 $0
Page 7 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Electrical System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Power Distribution
Transformers - 120/240 - 120/208 Entire Building / Basement Location: Electrical Room7EA1 $0
Transformers - 120/240 - 120/208 Entire Building / Basement Location: Electrical Room7EA1 $0
Electrical System Subtotal: $748,263
Building: Main
Category: Safty System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Fire Alarm
Fire Alarm Panel Basement Services & Links all three buildings together4EA1 $49,477
Fire Alarm Strobe Lights Basement / Entire Building 4SF384,200 $521,936
Fire Alarm_System Basement / Entire Building 4SF384,200 $763,674
Safty System Subtotal: $1,335,087
Building: Main
Category: Mechanical System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Air Conditioning
Chemical Pot Feeder Mechanical Room and Roof / Mechanical Room
Location: Upper Level - Boiler Room6EA1 $725
Chiller-Water Cooled- Cetrifugal - 100-200 tons Mechanical Room and Roof /
Mechanical Room
Location: Upper Level - Boiler Room6EA1 $9,010
Chiller-Water Cooled- Cetrifugal - 100-200 tons Mechanical Room and Roof /
Mechanical Room
Location: Upper Level - Boiler Room6EA1 $9,010
Condensing Unit- Roof Mounted - 11-20 tons Lower Roof 5EA1 $11,065
Condensing Unit- Roof Mounted - 11-20 tons Lower Roof 5EA1 $11,065
Condensing Unit- Roof Mounted - 5-10 tons Lower Roof Serves: ROTC (Room 128)5EA1 $9,590
Cooling Tower - Closed Cell Mechanical Room and Roof / Roof 201 to 300 Tons6EA2 $9,938
Glycol Feed Mechanical Room and Roof / Mechanical Room
Location: Upper Level - Boiler Room6EA1 $490
Pipes - Chilled Water Pipe- Steel Mechanical Room and Roof / Entire Building
Location: Upper Level - Boiler Room6LF895 $1,689
Pressure Fill System Mechanical Room and Roof /
Mechanical Room
Location: Upper Level - Boiler Room6EA1 $1,405
Air Handling Systems
Air Handling Unit- Built Up- Multi Zone- Daul Temperature Coils - 15001 - 25000 cfm
Basement 6EA1 $5,788
Page 8 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Mechanical System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Air Handling Systems
Air Handling Unit- Built Up- Multi Zone- Daul Temperature Coils -
15001 - 25000 cfm
Basement 6EA1 $5,788
Air Handling Unit- Built Up- Multi Zone- Daul Temperature Coils - 15001 - 25000 cfm
Basement 6EA1 $5,788
Air Handling Unit- Built Up- Multi Zone- Daul Temperature Coils - 15001 - 25000 cfm
Basement 6EA1 $5,788
Air Handling Unit- Built Up- Multi Zone- Daul Temperature Coils - 15001 - 25000 cfm
Basement 6EA1 $5,788
Air Handling Unit- Built Up- Multi Zone- Daul Temperature Coils - 25001 - 35000 cfm
Basement 6EA1 $6,511
Air Handling Unit- Built Up- Multi Zone- Daul Temperature Coils -
25001 - 35000 cfm
Basement 6EA1 $6,511
Air Handling Unit- Built Up- Multi Zone- Daul Temperature Coils - 25001 - 35000 cfm
Basement 6EA1 $6,511
Air Handling Unit- Built Up- Multi Zone- Daul Temperature Coils - 25001 - 35000 cfm
Basement 6EA1 $6,511
Air Handling Unit- Built Up- Multi Zone- Daul Temperature Coils - 8001 - 15000 cfm
Basement 6EA1 $4,341
Air Handling Unit- Built Up- Multi Zone- Daul Temperature Coils - 8001 - 15000 cfm
Basement 6EA1 $4,341
Air Intake Basement / Roof 6EA11 $63,411
Auxiliaries - 15001 - 25000 cfm Basement 6EA1 $5,788
Auxiliaries - 15001 - 25000 cfm Basement 6EA1 $5,788
Auxiliaries - 15001 - 25000 cfm Basement 6EA1 $5,788
Auxiliaries - 15001 - 25000 cfm Basement 6EA1 $5,788
Auxiliaries - 15001 - 25000 cfm Basement 6EA1 $5,788
Auxiliaries - 25001 - 35000 cfm Basement 6EA1 $6,511
Auxiliaries - 25001 - 35000 cfm Basement 6EA1 $6,511
Auxiliaries - 25001 - 35000 cfm Basement 6EA1 $6,511
Auxiliaries - 25001 - 35000 cfm Basement 6EA1 $6,511
Auxiliaries - 8001 - 15000 cfm Basement 6EA1 $4,341
Auxiliaries - 8001 - 15000 cfm Basement 6EA1 $4,341
Fan Coil Unit- Celing Mounted - Electric 1st Floor 4EA3 $27,448
Indoor Return Fans- Centrifugal Squirrel Cage - Greater than 20000
CFM
Boiler Room 6EA1 $2,433
Indoor Return Fans- Centrifugal Squirrel Cage - Less than 5000 CFM Boiler Room 6EA1 $1,282
Outdoor Return Fans- Air Handling Unit Type - 10001 - 20000 CFM Roof 6EA1 $1,591
Outdoor Return Fans- Air Handling Unit Type - 10001 - 20000 CFM Roof 6EA1 $1,591
Outdoor Return Fans- Air Handling Unit Type - 10001 - 20000 CFM Roof 6EA1 $1,591
Outdoor Return Fans- Air Handling Unit Type - 10001 - 20000 CFM Roof 6EA1 $1,591
Page 9 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Mechanical System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Air Handling Systems
Outdoor Return Fans- Air Handling Unit Type - 10001 - 20000 CFM Roof 6EA1 $1,591
Outdoor Return Fans- Air Handling Unit Type - 10001 - 20000 CFM Roof 6EA1 $1,591
Return Duct Work - Indoor- Vertical Shaft and Ducts Basement / Entire Building 6LF350 $0
Roof Top Unit-Multi Zone-Roof Mounted- Gas Heating and DX Cooling w/ Self Contained Compressor - 31 - 45 tons
Roof Condensate Drain Frozen, No Trap & No Drain Line
7EA1 $0
Zone Dampers Basement 6EA127 $105,795
Boiler Systems
Boiler Auxiliary- Scotch Marine- Steam Low Pressure Boiler - 151 - 200 HP
Boiler Room 6EA1 $2,545
Boiler Auxiliary- Scotch Marine- Steam Low Pressure Boiler - 151 - 200
HP
Boiler Room 6EA1 $2,545
Chemical Feed System Boiler Room 6EA1 $1,078
Combustion Dampers Boiler Room 6EA3 $1,227
Condensate Pump Boiler Room / Basement Location: Passage Way6EA1 $2,021
Condensate Pump Boiler Room / Entire Building 6EA5 $10,105
Feed Water Pumps and Tank Boiler Room 6EA1 $2,545
Feed Water Pumps and Tank Boiler Room 4EA1 $92,964
Non Condensing- Fire Tube- Scotch Marine- Steam- Low Pressure Boiler - 151 - 200 HP
Boiler Room 6EA1 $2,545
Non Condensing- Fire Tube- Scotch Marine- Steam- Low Pressure Boiler - 151 - 200 HP
Boiler Room 6EA1 $2,545
Piping - Steam Pipe- Steel Boiler Room / Entire Building 5LF2,000 $29,973
Steam Traps Boiler Room / Basement Leaking & Malfunctioning5EA170 $223,533
Heat Exchangers
Heat Exchanger - Steam to Hot Water Shell Type Mechanical Room MBH = 40786EA1 $0
Heating Devices
Cabinet Heaters - With Steam Coil Entire Building 4EA4 $15,405
Cabinet Heaters - With Steam Coil Entire Building 6EA6 $2,140
Fin Tube - Hot Water Entire Building / 1st Floor 4LF4 $643
Fin Tube - Hot Water Entire Building 6LF68 $642
Radiators - Steam Entire Building Leaking & Corrosion Present5EA2 $3,351
Radiators - Steam Entire Building 6EA73 $20,280
Unit Heater - Electric Entire Building Yard Storage6EA5 $1,389
Wall Heater - Electric Entire Building Includes: Restrooms, Storage Rooms, Electrical/Mechanical Rooms, Kitchen etc.
4EA30 $32,476
Mechanical Plumbing
Chilled Water Pump - 21 - 50 HP Mechanical Room 6EA2 $2,485
Page 10 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Mechanical System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Mechanical Plumbing
Condensate-Steel or Galvanized Entire Building 4LF1,890 $616,297
Condenser Pump - 21 - 50 HP Mechanical Room 6EA2 $2,485
Daul Temperature Pump - 10 - 20 HP Basement and Mechanical Room /
Basement
6EA9 $11,181
Daul Temperature Pump - 21 - 50 HP Basement and Mechanical Room / Mechanical Room
6EA2 $2,485
Hydronic Supply and Return - Steel Entire Building 6LF3,976 $305,264
Temperature Control
DDC System Entire Building 6SF384,200 $219,762
Thermostats - DDC Entire Building 7EA101 $0
Ventilation
Exhaust Fans- Indoor - 1501 - 8000 CFM Entire Building Under Roof Deck6EA1 $592
Exhaust Fans- Roof Mounted - 500 - 1500 CFM Entire Building / Lower Roof Above: Boiler Room6EA1 $592
Exhaust Fans- Roof Mounted - 500 - 1500 CFM Entire Building / Lower Roof Above: Boiler Room6EA1 $592
Exhaust Fans- Roof Mounted - 500 - 1500 CFM Entire Building / Lower Roof Unit Disconnected (No Longer Used)4EA1 $4,245
Exhaust Fans- Roof Mounted - 500 - 1500 CFM Entire Building / Lower Roof 6EA1 $592
Exhaust Fans- Roof Mounted - 500 - 1500 CFM Entire Building / Roof 6EA2 $1,185
Exhaust Fans- Roof Mounted - 500 - 1500 CFM Entire Building / Roof 6EA1 $592
Lab Exhaust Hood Entire Building / 1st Floor Location: Room 1147EA2 $0
Lab Exhaust Hood Entire Building / 3rd Floor Location: Room 3207EA1 $0
Roof Mounted Duct Work Entire Building / Roof 6LF30 $11,371
Type I Exhaust Hood- Culinary Arts Entire Building / 1st Floor Kitchen Hood6EA1 $1,248
Type I Exhaust Hood- Kitchen Entire Building / 1st Floor Diswasher Hood6EA1 $1,248
Mechanical System Subtotal: $2,033,396
Building: Main
Category: Plumbing System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Hot Water
Electric Heater - Less than 20 KW 1st Floor Kitchen6EA1 $682
Gas Heater - 150000 - 300000 BTU/HR 1st Floor and Boiler Room / 1st Floor Location: Kitchen6EA1 $310
Gas Heater - 300001 - 600000 BTU/HR 1st Floor and Boiler Room / Boiler Room Location: Boiler Room7EA2 $0
Gas Heater - Less than 150000 BTU/HR 1st Floor and Boiler Room / 1st Floor Location: Kitchen (Pwr Vent: U9E75334 PVC
Vent)
6EA1 $310
Hot Water Storage Tank_Gas - 201 - 500 Gallons 1st Floor and Boiler Room / Boiler Room Approx: 250/Tank7EA2 $0
Page 11 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Plumbing System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Piping
Domestic Piping-Cold Water from Risers to Fixtures Entire Building 6SF384,200 $76,917
Domestic Piping-Cold Water Horizontal Lines Entire Building 6SF384,200 $93,399
Domestic Piping-Cold Water Risers Entire Building 6SF384,200 $71,423
Domestic Piping-Hot Water from Risers to Fixtures Entire Building 6SF384,200 $60,435
Domestic Piping-Hot Water Horizontal Lines Entire Building 6SF384,200 $71,423
Domestic Piping-Hot Water Return Lines Entire Building 6SF384,200 $54,941
Domestic Piping-Hot Water Return Risers Entire Building 6SF384,200 $54,941
Sanitary Piping Entire Building 6SF384,200 $351,620
Storm Piping Entire Building 6SF384,200 $335,138
Vent Piping Entire Building 6SF384,200 $258,221
Pool Systems
Pool Drain Piping Basement Leaking & Corrosion Present6LF100 $2,863
Pool Filtration System including Pump Basement Leaking & Corrosion Present6EA1 $12,330
Pool Hot Water Heater - Gas Fired Basement 6EA1 $310
Pool Supply and Return Piping Basement Leaking & Corrosion Present6LF200 $9,610
Pumps
Pumps - Domestic Booster Pump-Duplex Basement, Boiler Room, Mechanical
Room / Mechanical Room
Location: Pump Room6EA1 $1,977
Pumps - Sump-Simplex Basement, Boiler Room, Mechanical Room / Basement
Location: Mechanical Chase6EA1 $745
Pumps - Sump-Simplex Basement, Boiler Room, Mechanical Room / Boiler Room
6EA1 $745
Pumps - Sump-Simplex Basement, Boiler Room, Mechanical Room / Mechanical Room
Location: Pump Room6EA1 $745
Plumbing System Subtotal: $1,459,082
Building: Main
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #101 (Regular Classroom)
AC Units 1st Floor 6EA1 $496
Casework 1st Floor 6LF10 $253
Ceiling - Lay-in 1st Floor 6SF742 $2,228
Doors - Transom Window 1st Floor 6SF9 $152
Doors - Wood Doors inclu hw 1st Floor 6EA1 $301
Floor - Wood 1st Floor 6SF742 $5,231
Page 12 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #101 (Regular Classroom)
Lighting - Pendent/Surface 1st Floor 7EA15 $0
Marker Board 1st Floor 7LF24 $0
Walls - Plaster/Drywall 1st Floor damage throughout5SF1,188 $9,004
Classroom #103 (Regular Classroom)
Casework 1st Floor 6LF8 $202
Ceiling - Lay-in 1st Floor 6SF729 $2,189
Doors - Transom Window 1st Floor 6SF16 $271
Doors - Wood Doors inclu hw 1st Floor 6EA2 $602
Floor - Wood 1st Floor 6SF729 $5,139
Lighting - Lay-in 1st Floor 7EA15 $0
Marker Board 1st Floor 7LF22 $0
Walls - Plaster/Drywall 1st Floor 6SF1,028 $2,837
Classroom #105 (Regular Classroom)
Casework 1st Floor 6LF8 $202
Ceiling - Lay-in 1st Floor 6SF756 $2,270
Doors - Transom Window 1st Floor 6SF16 $271
Doors - Wood Doors inclu hw 1st Floor 6EA2 $602
Floor - Wood 1st Floor 6SF756 $5,330
Lighting - Lay-in 1st Floor 7EA15 $0
Marker Board 1st Floor 7LF22 $0
Walls - Plaster/Drywall 1st Floor 6SF1,030 $2,843
Classroom #107 (Regular Classroom)
Casework 1st Floor 6LF8 $202
Ceiling - Lay-in 1st Floor 6SF727 $2,183
Doors - Transom Window 1st Floor 6SF16 $271
Doors - Wood Doors inclu hw 1st Floor 6EA2 $602
Floor - Wood 1st Floor 6SF727 $5,125
Lighting - Lay-in 1st Floor data boxes coming off wall7EA15 $0
Marker Board 1st Floor 7LF22 $0
Walls - Plaster/Drywall 1st Floor 6SF1,033 $2,851
Classroom #109 (Regular Classroom)
Casework 1st Floor 6LF8 $202
Ceiling - Lay-in 1st Floor 6SF724 $2,174
Ceiling - Lay-in 1st Floor cracks / stains5SF5 $40
Doors - Transom Window 1st Floor 6SF16 $271
Page 13 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #109 (Regular Classroom)
Doors - Wood Doors inclu hw 1st Floor 6EA2 $602
Floor - Wood 1st Floor 6SF729 $5,139
Lighting - Lay-in 1st Floor 7EA15 $0
Marker Board 1st Floor 7LF22 $0
Walls - Plaster/Drywall 1st Floor 6SF1,028 $2,837
Classroom #111 (Regular Classroom)
Casework 1st Floor 6LF8 $202
Ceiling - Lay-in 1st Floor 6SF918 $2,757
Ceiling - Lay-in 1st Floor stained5SF5 $40
Doors - Transom Window 1st Floor 6SF16 $271
Doors - Wood Doors inclu hw 1st Floor 6EA2 $602
Floor - Wood 1st Floor 6SF923 $6,507
Lighting - Lay-in 1st Floor 7EA15 $0
Marker Board 1st Floor 7LF22 $0
Walls - Plaster/Drywall 1st Floor 6SF1,169 $3,226
Classroom #112 (Science Lab Level 1)
Casework 1st Floor 6LF133 $3,359
Ceiling - Lay-in 1st Floor 6SF1,148 $3,447
Doors - Transom Window 1st Floor 6SF10 $169
Doors - Wood Doors inclu hw 1st Floor 6EA1 $301
Eye Wash Station 1st Floor 6EA1 $336
Floor - Tile/Sheet 1st Floor 6SF1,138 $1,139
Floor - Tile/Sheet 1st Floor bubbling up / loose5SF10 $58
Fume Hood 1st Floor 6EA1 $816
Gas Line 1st Floor 6EA8 $4,073
Lighting - Lay-in 1st Floor not workig4EA1 $336
Lighting - Lay-in 1st Floor 7EA23 $0
Marker Board 1st Floor 7LF10 $0
Science Lab Shower 1st Floor 6EA1 $379
Walls - Plaster/Drywall 1st Floor 6SF1,190 $3,284
Work Sink 1st Floor 6EA10 $3,790
Classroom #113 (Computer Lab)
AC Units 1st Floor 6EA1 $496
Casework 1st Floor 6LF10 $253
Ceiling - Splined 1st Floor 6SF767 $625
Ceiling - Splined 1st Floor water damaged5SF6 $58
Page 14 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #113 (Computer Lab)
Doors - Transom Window 1st Floor 6SF9 $152
Doors - Wood Doors inclu hw 1st Floor 6EA1 $301
Floor - Concrete 1st Floor 6SF773 $409
Lighting - Pendent/Surface 1st Floor 7EA18 $0
Marker Board 1st Floor 7LF6 $0
Walls - Plaster/Drywall 1st Floor 6SF380 $1,049
Walls - Structural Glazed Tile 1st Floor 6SF1,404 $4,417
Work Sink 1st Floor 6EA1 $379
Classroom #114 (Science Lab Level 1)
Casework 1st Floor 6LF123 $3,106
Ceiling - Lay-in 1st Floor 6SF1,100 $3,303
Doors - Transom Window 1st Floor 6SF16 $271
Doors - Wood Doors inclu hw 1st Floor 6EA2 $602
Eye Wash Station 1st Floor 6EA1 $336
Floor - Tile/Sheet 1st Floor 6SF1,100 $1,101
Fume Hood 1st Floor 6EA1 $816
Gas Line 1st Floor 6EA23 $11,710
Lighting - Lay-in 1st Floor 7EA12 $0
Marker Board 1st Floor 7LF10 $0
Science Lab Shower 1st Floor 6EA1 $379
Walls - Plaster/Drywall 1st Floor 6SF1,145 $3,160
Walls - Plaster/Drywall 1st Floor hole5SF5 $26
Work Sink 1st Floor 6EA14 $5,306
Classroom #115 (Store Room)
Ceiling - Splined 1st Floor 6SF1,489 $1,214
Doors - Transom Window 1st Floor 6SF1,489 $25,211
Doors - Wood Doors inclu hw 1st Floor 6EA1 $301
Floor - Concrete 1st Floor 6SF1,489 $788
Lighting - Pendent/Surface 1st Floor 7EA20 $0
Walls - Structural Glazed Tile 1st Floor 6SF2,728 $8,582
Classroom #116 (Regular Classroom)
Casework 1st Floor 6LF6 $152
Ceiling - Lay-in 1st Floor 6SF540 $1,622
Doors - Transom Window 1st Floor 6SF8 $135
Doors - Wood Doors inclu hw 1st Floor 6EA1 $301
Floor - Tile 1st Floor 6SF540 $1,181
Page 15 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #116 (Regular Classroom)
Lighting - Lay-in 1st Floor 7EA12 $0
Marker Board 1st Floor 6LF15 $321
Walls - Plaster/Drywall 1st Floor 6SF807 $2,227
Walls - Plaster/Drywall 1st Floor cracks / holes5SF5 $26
Classroom #121 JROTC (Other Instructional Use)
Casework 1st Floor 6LF12 $303
Ceiling - Lay-in 1st Floor 6SF1,333 $4,003
Ceiling - Lay-in 1st Floor water damaged 5SF5 $40
Doors - Transom Window 1st Floor 6SF36 $610
Doors - Wood Doors inclu hw 1st Floor 6EA4 $1,204
Floor - Wood 1st Floor 6SF1,338 $9,433
Lighting - Lay-in 1st Floor 7EA26 $0
Marker Board 1st Floor 7LF24 $0
Walls - Plaster/Drywall 1st Floor 6SF525 $1,449
Walls - Plaster/Drywall 1st Floor NO OCCUPANCY PLACARD CARD POSTED 6SF1 $4
Walls - Structural Glazed Tile 1st Floor 6SF1,050 $3,303
Classroom #127 (Computer Lab)
Ceiling - Splined 1st Floor 6SF932 $760
Doors - Wood Doors inclu hw 1st Floor 6EA4 $1,204
Floor - Tile 1st Floor damaged5SF15 $86
Floor - Tile 1st Floor 6SF932 $2,039
Lighting - Pendent/Surface 1st Floor 7EA8 $0
Marker Board 1st Floor 7LF3 $0
Walls - Plaster/Drywall 1st Floor 6SF1,433 $3,955
Walls - Structural Glazed Tile 1st Floor 6SF192 $604
Classroom #130 (Regular Classroom)
Casework 5th Floor 6LF8 $202
Ceiling - Lay-in 5th Floor 6SF732 $2,198
Ceiling - Lay-in 5th Floor stained / cracked5SF10 $80
Chalk Board 5th Floor 4LF8 $734
Doors - Transom Window 5th Floor 6SF16 $271
Doors - Wood Doors inclu hw 5th Floor 6EA2 $602
Floor - Tile 5th Floor 6SF737 $1,612
Floor - Tile 5th Floor cracked / missing tiles5SF5 $29
Lighting - Lay-in 5th Floor outlet junction box damaged7EA15 $0
Marker Board 5th Floor 7LF22 $0
Page 16 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #130 (Regular Classroom)
Walls - Plaster/Drywall 5th Floor 6SF1,071 $2,956
Classroom #132 (Regular Classroom)
Casework 1st Floor 6LF8 $202
Ceiling - Lay-in 1st Floor 6SF787 $2,363
Ceiling - Lay-in 1st Floor cracked5SF5 $40
Doors - Transom Window 1st Floor 6SF16 $271
Doors - Wood Doors inclu hw 1st Floor 6EA2 $602
Floor - Tile 1st Floor 6SF792 $1,733
Lighting - Lay-in 1st Floor Not working4EA1 $336
Lighting - Lay-in 1st Floor 7EA14 $0
Marker Board 1st Floor 7LF22 $0
Walls - Plaster/Drywall 1st Floor 6SF1,079 $2,978
Classroom #201 (Computer Lab)
AC Units 2nd Floor 6EA2 $991
AC Units 2nd Floor missing covers & not working4EA2 $12,173
Casework 2nd Floor 6LF64 $1,616
Ceiling - Splined 2nd Floor 6SF1,489 $1,214
Doors - Transom Window 2nd Floor 6SF27 $457
Doors - Wood Doors inclu hw 2nd Floor 6EA3 $903
Floor - Tile 2nd Floor 6SF1,489 $3,258
Lighting - Pendent/Surface 2nd Floor 7EA32 $0
Marker Board 2nd Floor 7LF8 $0
Walls - Plaster/Drywall 2nd Floor 6SF2,272 $6,270
Classroom #202 (Regular Classroom)
Casework 2nd Floor 6LF10 $253
Ceiling - Lay-in 2nd Floor 6SF742 $2,228
Doors - Transom Window 2nd Floor 6SF9 $152
Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301
Floor - Tile 2nd Floor 6SF742 $1,623
Lighting - Lay-in 2nd Floor 7EA15 $0
Marker Board 2nd Floor 7LF24 $0
Walls - Plaster/Drywall 2nd Floor 6SF1,188 $3,279
Classroom #203 (Regular Classroom)
Casework 2nd Floor 6LF10 $253
Ceiling - Lay-in 2nd Floor 6SF742 $2,228
Page 17 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #203 (Regular Classroom)
Doors - Transom Window 2nd Floor 6SF18 $305
Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602
Floor - Tile 2nd Floor 6SF742 $1,623
Lighting - Lay-in 2nd Floor 7EA15 $0
Marker Board 2nd Floor 7LF24 $0
Walls - Plaster/Drywall 2nd Floor damaged5SF1 $5
Walls - Plaster/Drywall 2nd Floor 6SF1,187 $3,276
Classroom #204 (Regular Classroom)
Casework 2nd Floor 6LF10 $253
Ceiling - Lay-in 2nd Floor 6SF742 $2,228
Doors - Transom Window 2nd Floor 6SF18 $305
Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602
Floor - Wood 2nd Floor 6SF742 $5,231
Lighting - Pendent/Surface 2nd Floor 7EA15 $0
Marker Board 2nd Floor 7LF24 $0
Walls - Plaster/Drywall 2nd Floor 6SF1,176 $3,246
Classroom #205 (Regular Classroom)
Casework 2nd Floor 6LF10 $253
Ceiling - Lay-in 2nd Floor 6SF742 $2,228
Doors - Transom Window 2nd Floor 6SF18 $305
Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602
Floor - Wood 2nd Floor 6SF742 $5,231
Lighting - Pendent/Surface 2nd Floor 7EA15 $0
Marker Board 2nd Floor 7LF24 $0
Walls - Plaster/Drywall 2nd Floor 7SF1,200 $0
Classroom #206 (Regular Classroom)
Casework 2nd Floor 6LF10 $253
Ceiling - Lay-in 2nd Floor 6SF742 $2,228
Doors - Transom Window 2nd Floor 6SF18 $305
Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602
Floor - Wood 2nd Floor 6SF742 $5,231
Lighting - Lay-in 2nd Floor 7EA15 $0
Marker Board 2nd Floor 7LF24 $0
Walls - Plaster/Drywall 2nd Floor 6SF1,188 $3,279
Page 18 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #207 (Regular Classroom)
Casework 2nd Floor 6LF10 $253
Ceiling - Lay-in 2nd Floor 6SF742 $2,228
Doors - Transom Window 2nd Floor 6SF18 $305
Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602
Floor - Wood 2nd Floor 6SF742 $5,231
Lighting - Lay-in 2nd Floor 7EA15 $0
Marker Board 2nd Floor 7LF24 $0
Walls - Plaster/Drywall 2nd Floor 6SF1,200 $3,312
Classroom #208 (Regular Classroom)
Casework 2nd Floor 6LF10 $253
Ceiling - Lay-in 2nd Floor 6SF742 $2,228
Doors - Transom Window 2nd Floor 6SF18 $305
Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602
Floor - Wood 2nd Floor 6SF742 $5,231
Lighting - Lay-in 2nd Floor 7EA15 $0
Marker Board 2nd Floor 7LF24 $0
Walls - Plaster/Drywall 2nd Floor 6SF1,188 $3,279
Classroom #209 (Computer Lab)
Casework 2nd Floor 6LF10 $253
Ceiling - Lay-in 2nd Floor 6SF742 $2,228
Doors - Transom Window 2nd Floor 6SF18 $305
Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602
Floor - Wood 2nd Floor 6SF742 $5,231
Lighting - Lay-in 2nd Floor 7EA15 $0
Marker Board 2nd Floor 7LF24 $0
Walls - Plaster/Drywall 2nd Floor 6SF1,200 $3,312
Classroom #211 (Computer Lab)
AC Units 2nd Floor 6EA1 $496
Casework 2nd Floor 6LF15 $379
Ceiling - Lay-in 2nd Floor 6SF1,155 $3,468
Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602
Floor - Tile 2nd Floor 6SF394 $862
Floor - Wood 2nd Floor 6SF761 $5,365
Lighting - Pendent/Surface 2nd Floor 7EA23 $0
Lighting - Pendent/Surface 2nd Floor not working5EA1 $183
Marker Board 2nd Floor 7LF6 $0
Page 19 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #211 (Computer Lab)
Storage/ Closet 2nd Floor ceiling has water damage5SF120 $1,936
Walls - Plaster/Drywall 2nd Floor 6SF1,585 $4,374
Walls - Plaster/Drywall 2nd Floor wall is damaged where room was opened up to
adjoining room
5SF5 $26
Work Sink 2nd Floor skreen printing sink6EA1 $379
Classroom #212 (Regular Classroom)
Casework 2nd Floor 6LF10 $253
Ceiling - Plaster/Drywall 2nd Floor 6SF742 $2,568
Doors - Transom Window 2nd Floor 6SF18 $305
Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602
Floor - Tile 2nd Floor 6SF717 $1,569
Floor - Tile 2nd Floor damaged5SF25 $144
Lighting - Pendent/Surface 2nd Floor 7EA12 $0
Marker Board 2nd Floor 7LF24 $0
Walls - Plaster/Drywall 2nd Floor 6SF1,460 $4,029
Classroom #213 (Regular Classroom)
Casework 2nd Floor 6LF10 $253
Ceiling - Lay-in 2nd Floor water stains5SF3 $24
Ceiling - Lay-in 2nd Floor 6SF739 $2,219
Doors - Transom Window 2nd Floor 6SF18 $305
Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602
Floor - Wood 2nd Floor 6SF742 $5,231
Lighting - Lay-in 2nd Floor 7EA15 $0
Marker Board 2nd Floor 7LF24 $0
Walls - Plaster/Drywall 2nd Floor 6SF1,200 $3,312
Classroom #214 (Science)
Casework 2nd Floor 6LF18 $455
Ceiling - Lay-in 2nd Floor 6SF1,065 $3,198
Doors - Transom Window 2nd Floor 6SF9 $152
Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301
Floor - Tile/Sheet 2nd Floor 6SF1,065 $1,066
Lighting - Lay-in 2nd Floor 7EA21 $0
Marker Board 2nd Floor 7LF26 $0
Walls - Plaster/Drywall 2nd Floor 6SF1,441 $3,977
Work Sink 2nd Floor 6EA3 $1,137
Page 20 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #215 (Regular Classroom)
Casework 2nd Floor 6LF10 $253
Ceiling - Lay-in 2nd Floor 6SF742 $2,228
Doors - Transom Window 2nd Floor 6SF18 $305
Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602
Floor - Wood 2nd Floor 6SF742 $5,231
Lighting - Lay-in 2nd Floor 7EA15 $0
Marker Board 2nd Floor 7LF24 $0
Walls - Plaster/Drywall 2nd Floor 6SF1,200 $3,312
Classroom #216 (Science)
Casework 2nd Floor 6LF64 $1,616
Ceiling - Lay-in 2nd Floor 6SF1,039 $3,120
Doors - Transom Window 2nd Floor 6SF18 $305
Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602
Floor - Tile/Sheet 2nd Floor 6SF1,039 $1,040
Lighting - Lay-in 2nd Floor 7EA21 $0
Marker Board 2nd Floor 7LF30 $0
Walls - Plaster/Drywall 2nd Floor 6SF1,095 $3,022
Work Sink 2nd Floor 6EA3 $1,137
Classroom #218 (Regular Classroom)
Casework 2nd Floor 6LF6 $152
Ceiling - Lay-in 2nd Floor 6SF550 $1,652
Doors - Transom Window 2nd Floor 6SF9 $152
Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301
Floor - Tile 2nd Floor 6SF550 $1,203
Lighting - Lay-in 2nd Floor 7EA12 $0
Marker Board 2nd Floor 7LF26 $0
Walls - Plaster/Drywall 2nd Floor 6SF1,034 $2,854
Classroom #220 (Computer Lab)
AC Units 2nd Floor 6EA1 $496
Casework 2nd Floor 6LF15 $379
Ceiling - Lay-in 2nd Floor 6SF925 $2,778
Chalk Board 2nd Floor 4LF3 $275
Doors - Transom Window 2nd Floor 6SF9 $152
Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602
Floor - Tile 2nd Floor 6SF925 $2,024
Lighting - Lay-in 2nd Floor 7EA20 $0
Page 21 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #220 (Computer Lab)
Marker Board 2nd Floor 7LF16 $0
Walls - Plaster/Drywall 2nd Floor 6SF1,381 $3,811
Walls - Plaster/Drywall 2nd Floor damaged5SF10 $51
Classroom #221 (Regular Classroom)
Casework 2nd Floor 6LF10 $253
Ceiling - Lay-in 2nd Floor 6SF742 $2,228
Doors - Transom Window 2nd Floor 6SF18 $305
Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602
Floor - Wood 2nd Floor 6SF742 $5,231
Lighting - Lay-in 2nd Floor 7EA15 $0
Marker Board 2nd Floor 7LF24 $0
Walls - Plaster/Drywall 2nd Floor 6SF1,200 $3,312
Classroom #222 (Computer Lab)
AC Units 2nd Floor no cover4EA1 $6,086
Ceiling - Lay-in 2nd Floor 6SF742 $2,228
Chalk Board 2nd Floor 4LF8 $734
Doors - Transom Window 2nd Floor 6SF18 $305
Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602
Floor - Wood 2nd Floor 6SF742 $5,231
Lighting - Lay-in 2nd Floor 7EA15 $0
Marker Board 2nd Floor 7LF20 $0
Walls - Plaster/Drywall 2nd Floor 6SF1,200 $3,312
Classroom #224 (Regular Classroom)
Casework 2nd Floor 6LF10 $253
Ceiling - Lay-in 2nd Floor 6SF742 $2,228
Doors - Transom Window 2nd Floor 6SF9 $152
Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602
Floor - Wood 2nd Floor 6SF742 $5,231
Lighting - Lay-in 2nd Floor 7EA15 $0
Marker Board 2nd Floor 7LF24 $0
Walls - Plaster/Drywall 2nd Floor 6SF1,200 $3,312
Classroom #225 (Regular Classroom)
Casework 2nd Floor 6LF10 $253
Ceiling - Lay-in 2nd Floor 6SF742 $2,228
Doors - Transom Window 2nd Floor 6SF9 $152
Page 22 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #225 (Regular Classroom)
Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301
Floor - Tile 2nd Floor 6SF742 $1,623
Lighting - Lay-in 2nd Floor 7EA15 $0
Marker Board 2nd Floor 7LF24 $0
Walls - Plaster/Drywall 2nd Floor 6SF1,188 $3,279
Classroom #226 (Regular Classroom)
AC Units 2nd Floor no cover4EA1 $6,086
Casework 2nd Floor 6LF10 $253
Ceiling - Lay-in 2nd Floor water damage5SF2 $16
Ceiling - Lay-in 2nd Floor 6SF740 $2,222
Doors - Transom Window 2nd Floor 6SF18 $305
Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602
Floor - Wood 2nd Floor 6SF742 $5,231
Lighting - Lay-in 2nd Floor 7EA15 $0
Marker Board 2nd Floor 7LF24 $0
Walls - Plaster/Drywall 2nd Floor 6SF1,200 $3,312
Classroom #227 (Computer Lab)
AC Units 2nd Floor 6EA1 $496
Ceiling - Lay-in 2nd Floor 6SF1,084 $3,255
Doors - Transom Window 2nd Floor 6SF18 $305
Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602
Floor - Wood 2nd Floor 6SF1,084 $7,642
Lighting - Lay-in 2nd Floor 7EA20 $0
Marker Board 2nd Floor 7LF16 $0
Walls - Plaster/Drywall 2nd Floor 6SF936 $2,583
Walls - Structural Glazed Tile 2nd Floor 6SF900 $2,831
Wireless System 2nd Floor 6EA1 $372
Classroom #228 (Computer Lab)
AC Units 2nd Floor 6EA1 $496
Ceiling - Lay-in 2nd Floor 6SF1,084 $3,255
Doors - Transom Window 2nd Floor 6SF18 $305
Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602
Floor - Wood 2nd Floor 6SF1,084 $7,642
Lighting - Lay-in 2nd Floor 7EA20 $0
Marker Board 2nd Floor 7LF16 $0
Walls - Plaster/Drywall 2nd Floor 6SF936 $2,583
Page 23 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #228 (Computer Lab)
Walls - Structural Glazed Tile 2nd Floor 6SF800 $2,517
Wireless System 2nd Floor 6EA1 $372
Classroom #300 (Computer Lab)
AC Units 3rd Floor 6EA1 $496
Casework 3rd Floor 6LF22 $556
Ceiling - Lay-in 3rd Floor 6SF1,016 $3,051
Chalk Board 3rd Floor 4LF4 $367
Doors - Transom Window 3rd Floor 6SF9 $152
Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301
Floor - Wood 3rd Floor 6SF1,016 $7,163
Lighting - Lay-in 3rd Floor 7EA24 $0
Marker Board 3rd Floor 7LF14 $0
Walls - Plaster/Drywall 3rd Floor 6SF1,413 $3,900
Classroom #301 (Regular Classroom)
Ceiling - Lay-in 3rd Floor Cracks5SF2 $16
Ceiling - Lay-in 3rd Floor 6SF728 $2,186
Chalk Board 3rd Floor 4LF5 $459
Doors - Transom Window 3rd Floor Broken, missing glass panel5SF10 $423
Doors - Wood Doors inclu hw 3rd Floor 6EA2 $602
Floor - Wood 3rd Floor 6SF730 $5,146
Lighting - Lay-in 3rd Floor 6EA15 $1,785
Marker Board 3rd Floor 7LF23 $0
Storage/ Closet 3rd Floor 6SF20 $145
Walls - Plaster/Drywall 3rd Floor 6SF1,188 $3,279
Classroom #302 (Regular Classroom)
Casework 3rd Floor 6LF10 $253
Ceiling - Lay-in 3rd Floor water damaged5SF3 $24
Ceiling - Lay-in 3rd Floor 6SF742 $2,228
Doors - Transom Window 3rd Floor 6SF18 $305
Doors - Wood Doors inclu hw 3rd Floor 6EA2 $602
Floor - Wood 3rd Floor 6SF742 $5,231
Lighting - Lay-in 3rd Floor 7EA15 $0
Marker Board 3rd Floor 7LF24 $0
Walls - Plaster/Drywall 3rd Floor 6SF1,200 $3,312
Page 24 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #303 (Regular Classroom)
Ceiling - Lay-in 3rd Floor 6SF550 $1,652
Doors - Transom Window 3rd Floor 6SF10 $169
Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301
Floor - Wood 3rd Floor 6SF550 $3,877
Lighting - Lay-in 3rd Floor 6EA15 $1,785
Marker Board 3rd Floor 7LF23 $0
Storage/ Closet 3rd Floor 6SF20 $145
Walls - Plaster/Drywall 3rd Floor 6SF1,030 $2,843
Classroom #304 (Regular Classroom)
Casework 3rd Floor 6LF10 $253
Ceiling - Lay-in 3rd Floor 6SF742 $2,228
Chalk Board 3rd Floor 4LF6 $551
Doors - Transom Window 3rd Floor 6SF18 $305
Doors - Wood Doors inclu hw 3rd Floor 6EA2 $602
Floor - Wood 3rd Floor 6SF742 $5,231
Lighting - Lay-in 3rd Floor 7EA15 $0
Marker Board 3rd Floor 7LF30 $0
Walls - Plaster/Drywall 3rd Floor 6SF1,186 $3,273
Walls - Plaster/Drywall 3rd Floor efflorecense & damaged5SF14 $71
Classroom #305 (Regular Classroom)
Ceiling - Lay-in 3rd Floor Cracks5SF8 $64
Ceiling - Lay-in 3rd Floor 6SF542 $1,628
Doors - Transom Window 3rd Floor 6SF10 $169
Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301
Floor - Wood 3rd Floor 6SF550 $3,877
Lighting - Lay-in 3rd Floor 6EA13 $1,547
Storage/ Closet 3rd Floor 6SF20 $145
Walls - Plaster/Drywall 3rd Floor 6SF1,030 $2,843
Classroom #306 (Regular Classroom)
Casework 3rd Floor 6LF10 $253
Ceiling - Lay-in 3rd Floor 6SF742 $2,228
Ceiling - Lay-in 3rd Floor water damaged5SF5 $40
Doors - Transom Window 3rd Floor 6SF18 $305
Doors - Wood Doors inclu hw 3rd Floor 6EA2 $602
Floor - Wood 3rd Floor 6SF742 $5,231
Lighting - Lay-in 3rd Floor 7EA14 $0
Page 25 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #306 (Regular Classroom)
Marker Board 3rd Floor 7LF24 $0
Walls - Plaster/Drywall 3rd Floor 6SF1,200 $3,312
Classroom #307 (Regular Classroom)
Casework 3rd Floor 6LF15 $379
Ceiling - Plaster/Drywall 3rd Floor 6SF550 $1,903
Doors - Steel Doors incl hw 3rd Floor 6EA1 $301
Doors - Transom Window 3rd Floor 6SF9 $152
Floor - Wood 3rd Floor 6SF550 $3,877
Lighting - Pendent/Surface 3rd Floor 7EA8 $0
Marker Board 3rd Floor 7LF16 $0
Walls - Plaster/Drywall 3rd Floor 6SF1,191 $3,287
Walls - Tile Ceramic/ Porcelain 3rd Floor backsplash6SF24 $54
Work Sink 3rd Floor 6EA1 $379
Classroom #308 (Regular Classroom)
Casework 3rd Floor 6LF10 $253
Ceiling - Lay-in 3rd Floor 6SF742 $2,228
Doors - Transom Window 3rd Floor 6SF18 $305
Doors - Wood Doors inclu hw 3rd Floor 6EA2 $602
Floor - Wood 3rd Floor 6SF742 $5,231
Lighting - Lay-in 3rd Floor 7EA14 $0
Marker Board 3rd Floor 7LF48 $0
Walls - Plaster/Drywall 3rd Floor cracked5SF6 $31
Walls - Plaster/Drywall 3rd Floor 6SF1,194 $3,295
Classroom #310 (Regular Classroom)
Casework 3rd Floor 6LF10 $253
Ceiling - Lay-in 3rd Floor 6SF742 $2,228
Ceiling - Lay-in 3rd Floor water damaged5SF22 $176
Doors - Transom Window 3rd Floor 6SF18 $305
Doors - Wood Doors inclu hw 3rd Floor 6EA2 $602
Floor - Wood 3rd Floor 6SF742 $5,231
Lighting - Lay-in 3rd Floor 7EA14 $0
Marker Board 3rd Floor 7LF24 $0
Walls - Plaster/Drywall 3rd Floor 6SF1,980 $5,465
Walls - Plaster/Drywall 3rd Floor water damaged5SF20 $102
Page 26 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #311 (Art Room)
AC Units 3rd Floor cover missing4EA1 $6,086
Casework 3rd Floor 6LF42 $1,061
Ceiling - Plaster/Drywall 3rd Floor peeling throughout5SF1,255 $11,504
Chalk Board 3rd Floor 4LF10 $918
Doors - Transom Window 3rd Floor glass is broken5SF9 $381
Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301
Floor - Tile 3rd Floor missing tiles5SF15 $86
Floor - Tile 3rd Floor 6SF1,255 $2,746
Instructional Surface 3rd Floor 6LF18 $606
Kiln 3rd Floor 6EA2 $4,642
Lighting - Pendent/Surface 3rd Floor 7EA20 $0
Marker Board 3rd Floor 7LF40 $0
Walls - Plaster/Drywall 3rd Floor crack5SF3 $15
Walls - Plaster/Drywall 3rd Floor 6SF1,797 $4,960
Walls - Tile Ceramic/ Porcelain 3rd Floor backsplash6SF40 $90
Work Sink 3rd Floor 6EA1 $379
Classroom #312 (Regular Classroom)
Casework 3rd Floor 6LF10 $253
Ceiling - Plaster/Drywall 3rd Floor 6SF742 $2,568
Doors - Transom Window 3rd Floor 6SF9 $152
Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301
Floor - Tile 3rd Floor damaged throughout5SF742 $3,332
Lighting - Pendent/Surface 3rd Floor 7EA12 $0
Marker Board 3rd Floor 7LF24 $0
Walls - Plaster/Drywall 3rd Floor 6SF1,417 $3,911
Classroom #313 (Art Room)
Casework 3rd Floor 6LF34 $859
Ceiling - Lay-in 3rd Floor 6SF855 $2,568
Chalk Board 3rd Floor 4LF15 $1,377
Doors - Transom Window 3rd Floor 6SF18 $305
Doors - Wood Doors inclu hw 3rd Floor 6EA2 $602
Floor - Wood 3rd Floor 6SF855 $6,028
Lighting - Lay-in 3rd Floor 7EA20 $0
Marker Board 3rd Floor 7LF6 $0
Walls - Plaster/Drywall 3rd Floor 6SF1,308 $3,610
Walls - Tile Ceramic/ Porcelain 3rd Floor backsplash6SF12 $27
Page 27 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #313 (Art Room)
Work Sink 3rd Floor 6EA1 $379
Classroom #314 (Science)
Casework 3rd Floor 6LF18 $455
Ceiling - Lay-in 3rd Floor 6SF1,059 $3,180
Ceiling - Plaster/Drywall 3rd Floor water damaged5SF6 $55
Doors - Transom Window 3rd Floor 6SF9 $152
Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301
Eye Wash Station 3rd Floor 6EA1 $336
Floor - Tile/Sheet 3rd Floor 6SF1,065 $1,066
Lighting - Lay-in 3rd Floor 7EA21 $0
Lighting - Wall Mounted 3rd Floor approx 10-12 outlets don't work5EA1 $169
Marker Board 3rd Floor 7LF26 $0
Walls - Plaster/Drywall 3rd Floor 6SF1,441 $3,977
Work Sink 3rd Floor 6EA3 $1,137
Classroom #315 (Art Room)
Casework 3rd Floor 6LF34 $859
Ceiling - Lay-in 3rd Floor 6SF855 $2,568
Ceiling - Lay-in 3rd Floor water damaged5SF10 $80
Chalk Board 3rd Floor 4LF15 $1,377
Doors - Transom Window 3rd Floor 6SF18 $305
Doors - Wood Doors inclu hw 3rd Floor 6EA2 $602
Floor - Wood 3rd Floor 6SF855 $6,028
Lighting - Lay-in 3rd Floor 7EA20 $0
Marker Board 3rd Floor 7LF6 $0
Walls - Plaster/Drywall 3rd Floor 6SF1,308 $3,610
Walls - Tile Ceramic/ Porcelain 3rd Floor sink backsplash6SF12 $27
Work Sink 3rd Floor 6EA1 $379
Classroom #316 (Science)
Casework 3rd Floor 6LF64 $1,616
Ceiling - Lay-in 3rd Floor 6SF1,039 $3,120
Doors - Transom Window 3rd Floor 6SF18 $305
Doors - Wood Doors inclu hw 3rd Floor 6EA2 $602
Eye Wash Station 3rd Floor 6EA1 $336
Floor - Tile/Sheet 3rd Floor 6SF1,039 $1,040
Lighting - Lay-in 3rd Floor 7EA21 $0
Lighting - Wall Mounted 3rd Floor Of 56 outlets on the desk, only 8 of them work5EA1 $169
Page 28 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #316 (Science)
Walls - Plaster/Drywall 3rd Floor 6SF1,463 $4,038
Work Sink 3rd Floor 6EA3 $1,137
Classroom #318 (Regular Classroom)
Casework 3rd Floor 6LF6 $152
Ceiling - Lay-in 3rd Floor 6SF550 $1,652
Doors - Transom Window 3rd Floor 6SF9 $152
Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301
Floor - Tile 3rd Floor 6SF550 $1,203
Lighting - Lay-in 3rd Floor 7EA12 $0
Marker Board 3rd Floor 7LF26 $0
Walls - Plaster/Drywall 3rd Floor 6SF1,034 $2,854
Classroom #319 (Regular Classroom)
AC Units 3rd Floor 6EA1 $496
Casework 3rd Floor 6LF15 $379
Ceiling - Lay-in 3rd Floor 6SF710 $2,132
Chalk Board 3rd Floor 4LF4 $367
Doors - Transom Window 3rd Floor 6SF9 $152
Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301
Floor - Tile 3rd Floor damaged throughout5SF710 $3,188
Lighting - Lay-in 3rd Floor 7EA15 $0
Marker Board 3rd Floor 7LF24 $0
Walls - Plaster/Drywall 3rd Floor damaged5SF13 $66
Walls - Plaster/Drywall 3rd Floor 6SF1,320 $3,643
Classroom #320 (Science)
Casework 3rd Floor 6LF50 $1,263
Ceiling - Plaster/Drywall 3rd Floor water damaged5SF10 $125
Ceiling - Plaster/Drywall 3rd Floor 6SF908 $3,142
Chalk Board 3rd Floor 4LF36 $3,305
Doors - Transom Window 3rd Floor 6SF9 $152
Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301
Eye Wash Station 3rd Floor 6EA1 $336
Floor - Tile 3rd Floor 6SF908 $1,987
Floor - Tile 3rd Floor damaged5SF10 $58
Gas Line 3rd Floor 6EA3 $1,527
Lighting - Pendent/Surface 3rd Floor 7EA16 $0
Storage/ Closet 3rd Floor 6SF100 $725
Page 29 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #320 (Science)
Walls - Plaster/Drywall 3rd Floor 6SF1,616 $4,460
Walls - Plaster/Drywall 3rd Floor damaged 5SF2 $10
Work Sink 3rd Floor 1 sink has a broken faucet 6EA3 $1,137
Classroom #321 (Regular Classroom)
Ceiling - Lay-in 3rd Floor 6SF705 $2,117
Ceiling - Lay-in 3rd Floor Water damage5SF10 $80
Doors - Transom Window 3rd Floor 6SF20 $339
Doors - Wood Doors inclu hw 3rd Floor 6EA2 $602
Floor - Wood 3rd Floor 6SF715 $5,041
Lighting - Chandelier, Incandescent 3rd Floor 6EA15 $7,163
Marker Board 3rd Floor 7LF23 $0
Storage/ Closet 3rd Floor 6SF20 $145
Walls - Plaster/Drywall 3rd Floor 6SF1,150 $3,174
Walls - Plaster/Drywall 3rd Floor Water damage, peeling5SF25 $128
Classroom #322 (Science Classroom)
AC Units 3rd Floor 6EA1 $496
Ceiling - Plaster/Drywall 3rd Floor 6SF1,072 $3,710
Chalk Board 3rd Floor 4LF24 $2,203
Doors - Transom Window 3rd Floor 6SF10 $169
Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301
Floor - Tile/Sheet 3rd Floor 6SF1,072 $1,073
Lighting - Chandelier, Incandescent 3rd Floor 6EA20 $9,551
Storage/ Closet 3rd Floor 6SF66 $479
Walls - Plaster/Drywall 3rd Floor 6SF1,310 $3,615
Work Sink 3rd Floor 6EA2 $758
Classroom #323 (Regular Classroom)
Ceiling - Lay-in 3rd Floor 6SF725 $2,177
Doors - Transom Window 3rd Floor 6SF20 $339
Doors - Wood Doors inclu hw 3rd Floor 6EA2 $602
Floor - Wood 3rd Floor 6SF725 $5,111
Lighting - Lay-in 3rd Floor 6EA15 $1,785
Marker Board 3rd Floor 7LF23 $0
Storage/ Closet 3rd Floor 6SF20 $145
Walls - Plaster/Drywall 3rd Floor 6SF1,185 $3,270
Page 30 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #325 (Regular Classroom)
Ceiling - Lay-in 3rd Floor 6SF1,086 $3,261
Chalk Board 3rd Floor 4LF36 $3,305
Doors - Transom Window 3rd Floor 6SF20 $339
Doors - Wood Doors inclu hw 3rd Floor 6EA2 $602
Floor - Wood 3rd Floor 6SF1,086 $7,656
Lighting - Lay-in 3rd Floor 6EA23 $2,736
Marker Board 3rd Floor 7LF13 $0
Storage/ Closet 3rd Floor 6SF20 $145
Walls - Plaster/Drywall 3rd Floor 6SF1,450 $4,002
Classroom #326 (Computer Lab)
AC Units 3rd Floor 6EA2 $991
Casework 3rd Floor 6LF22 $556
Ceiling - Lay-in 3rd Floor water damage on ceiling5SF3 $24
Ceiling - Lay-in 3rd Floor 6SF827 $2,483
Chalk Board 3rd Floor 4LF16 $1,469
Doors - Transom Window 3rd Floor 6SF18 $305
Doors - Wood Doors inclu hw 3rd Floor 6EA2 $602
Floor - Wood 3rd Floor 6SF830 $5,851
Lighting - Lay-in 3rd Floor 7EA16 $0
Marker Board 3rd Floor 7LF16 $0
Walls - Plaster/Drywall 3rd Floor damaged5SF4 $20
Walls - Plaster/Drywall 3rd Floor 6SF1,309 $3,613
Classroom #328 (Regular Classroom)
AC Units 3rd Floor 6EA2 $991
Ceiling - Lay-in 3rd Floor 6SF1,100 $3,303
Doors - Transom Window 3rd Floor 6SF20 $339
Doors - Wood Doors inclu hw 3rd Floor 6EA2 $602
Floor - Tile/Sheet 3rd Floor 6SF1,100 $1,101
Lighting - Chandelier, Incandescent 3rd Floor 6EA30 $14,327
Marker Board 3rd Floor 7LF24 $0
Storage/ Closet 3rd Floor 6SF30 $218
Walls - Plaster/Drywall 3rd Floor 6SF146 $403
Classroom #330 (Computer Lab)
Ceiling - Lay-in 3rd Floor 6SF1,100 $3,303
Doors - Transom Window 3rd Floor 6SF20 $339
Doors - Wood Doors inclu hw 3rd Floor 6EA2 $602
Page 31 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #330 (Computer Lab)
Floor - Wood 3rd Floor 6SF1,100 $7,755
Lighting - Lay-in 3rd Floor 6EA24 $2,855
Marker Board 3rd Floor 7LF23 $0
Storage/ Closet 3rd Floor 6SF20 $145
Walls - Plaster/Drywall 3rd Floor 6SF1,460 $4,029
Wireless System 3rd Floor 6EA1 $372
Classroom #332 (Regular Classroom)
Casework 3rd Floor 6LF10 $253
Ceiling - Lay-in 3rd Floor damaged5SF2 $16
Ceiling - Lay-in 3rd Floor 6SF740 $2,222
Doors - Transom Window 3rd Floor 6SF18 $305
Doors - Wood Doors inclu hw 3rd Floor 6EA2 $602
Floor - Wood 3rd Floor 6SF742 $5,231
Lighting - Lay-in 3rd Floor 7EA14 $0
Marker Board 3rd Floor 7LF24 $0
Walls - Plaster/Drywall 3rd Floor damaged5SF15 $77
Walls - Plaster/Drywall 3rd Floor 6SF1,185 $3,270
Classroom #333 (Computer Lab)
AC Units 3rd Floor 6EA1 $496
Ceiling - Lay-in 3rd Floor 6SF645 $1,937
Doors - Transom Window 3rd Floor 6SF10 $169
Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301
Floor - Wood 3rd Floor 6SF645 $4,547
Lighting - Lay-in 3rd Floor 6EA16 $1,904
Walls - Plaster/Drywall 3rd Floor 6SF1,112 $3,069
Walls - Plaster/Drywall 3rd Floor Water damage5SF5 $26
Wireless System 3rd Floor 6EA1 $372
Classroom #353 (Regular Classroom)
Ceiling - Lay-in 3rd Floor 6SF550 $1,652
Doors - Transom Window 3rd Floor 6SF10 $169
Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301
Floor - Wood 3rd Floor 6SF550 $3,877
Lighting - Lay-in 3rd Floor 6EA12 $1,428
Storage/ Closet 3rd Floor 6SF20 $145
Walls - Plaster/Drywall 3rd Floor 6SF1,030 $2,843
Page 32 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #355 (Regular Classroom)
Casework 3rd Floor 6LF6 $152
Ceiling - Lay-in 3rd Floor 6SF550 $1,652
Doors - Transom Window 3rd Floor 6SF9 $152
Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301
Floor - Wood 3rd Floor 6SF550 $3,877
Lighting - Lay-in 3rd Floor 7EA12 $0
Marker Board 3rd Floor 7LF16 $0
Walls - Plaster/Drywall 3rd Floor 6SF996 $2,749
Walls - Tile Ceramic/ Porcelain 3rd Floor 6SF27 $61
Classroom #357 (Art Room)
Casework 3rd Floor 6LF6 $152
Ceiling - Plaster/Drywall 3rd Floor 6SF515 $1,782
Ceiling - Plaster/Drywall 3rd Floor peeling & water damaged5SF35 $437
Doors - Steel Doors incl hw 3rd Floor 6EA1 $301
Floor - Wood 3rd Floor 6SF550 $3,877
Lighting - Pendent/Surface 3rd Floor 7EA8 $0
Marker Board 3rd Floor 7LF24 $0
Walls - Plaster/Drywall 3rd Floor 6SF1,213 $3,348
Walls - Plaster/Drywall 3rd Floor damaged5SF3 $15
Classroom #399 (Computer Lab)
AC Units 3rd Floor 6EA1 $496
Ceiling - Lay-in 3rd Floor 6SF950 $2,853
Chalk Board 3rd Floor 4LF4 $367
Doors - Transom Window 3rd Floor 6SF10 $169
Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301
Floor - Wood 3rd Floor 6SF950 $6,697
Lighting - Lay-in 3rd Floor 6EA24 $2,855
Marker Board 3rd Floor 7LF14 $0
Storage/ Closet 3rd Floor 6SF20 $145
Walls - Plaster/Drywall 3rd Floor 6SF1,356 $3,742
Wireless System 3rd Floor 6EA1 $372
Classroom #400 (Music Room)
Casework 4th Floor 6LF30 $758
Ceiling - Lay-in 4th Floor 6SF1,800 $5,405
Chalk Board 4th Floor 4LF16 $1,469
Doors - Wood Doors inclu hw 4th Floor 6EA2 $602
Page 33 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #400 (Music Room)
Floor - Wood 4th Floor 6SF1,800 $12,690
Lighting - Lay-in 4th Floor 7EA35 $0
Marker Board 4th Floor 7LF32 $0
Walls - Plaster/Drywall 4th Floor 6SF2,249 $6,207
Classroom #401 (Music Room)
Casework 4th Floor 6LF30 $758
Ceiling - Lay-in 4th Floor 6SF1,800 $5,405
Doors - Wood Doors inclu hw 4th Floor 6EA2 $602
Floor - Tile 4th Floor 6SF1,796 $3,929
Floor - Tile 4th Floor damaged5SF4 $23
Lighting - Lay-in 4th Floor 7EA35 $0
Marker Board 4th Floor 7LF26 $0
Walls - Plaster/Drywall 4th Floor 6SF2,249 $6,207
Classrooms Subtotal: $1,037,457
Building: Main
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Administrative Suites/Offices
AC Unit 1st - 102 Principle 6EA1 $496
Ceiling - Lay-in 1st - 102 Principle 6SF373 $1,120
Doors - Wood Doors inclu hw 1st - 102 Principle 6EA1 $301
Floor - Carpet 1st - 102 Principle 6SF373 $795
Lighting - Lay-in 1st - 102 Principle 5 - recessed cans7EA9 $0
Power Distribution 1st - 102 Principle 6EA2 $4,250
Storage/ Closet 1st - 102 Principle 6SF7 $51
Walls - Plaster/Drywall 1st - 102 Principle 6SF625 $1,725
Walls - Plaster/Drywall 1st - 102 Principle wood paneling6SF260 $851
AC Unit 1st - 104 Main Office 6EA2 $991
Ceiling - Lay-in 1st - 104 Main Office 6SF898 $2,697
Doors - Side-lite 1st - 104 Main Office 6SF40 $669
Doors - Transom Window 1st - 104 Main Office 6SF48 $813
Doors - Wood Doors inclu hw 1st - 104 Main Office 6EA2 $602
Floor - Carpet 1st - 104 Main Office 6SF688 $1,466
Floor - Tile 1st - 104 Main Office 6SF210 $459
Page 34 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Administrative Suites/Offices
Lighting - Lay-in 1st - 104 Main Office 7EA18 $0
Power Distribution 1st - 104 Main Office 6EA8 $16,999
Storage/ Closet 1st - 104 Main Office 6SF34 $247
Walls - Plaster/Drywall 1st - 104 Main Office 6SF2,266 $6,254
AC Unit 1st - 104A 6EA2 $991
Ceiling - Lay-in 1st - 104A 6SF415 $1,246
Doors - Transom Window 1st - 104A 6SF8 $135
Doors - Wood Doors inclu hw 1st - 104A 6EA1 $301
Floor - Carpet 1st - 104A 6SF415 $884
Lighting - Lay-in 1st - 104A 7EA6 $0
Power Distribution 1st - 104A 6EA12 $25,499
Storage/ Closet 1st - 104A 6SF31 $225
Walls - Plaster/Drywall 1st - 104A 6SF1,558 $4,300
Work SInk 1st - 104A 6EA1 $508
AC Unit 1st - 106A-B 6EA1 $496
Ceiling - Lay-in 1st - 106A-B 6SF305 $916
Doors - Transom Window 1st - 106A-B 6SF8 $135
Doors - Wood Doors inclu hw 1st - 106A-B 6EA1 $301
Floor - Carpet 1st - 106A-B 6SF305 $650
Lighting - Lay-in 1st - 106A-B 7EA7 $0
Power Distribution 1st - 106A-B 6EA12 $25,499
Storage/ Closet 1st - 106A-B 6SF3 $22
Walls - Plaster/Drywall 1st - 106A-B 6SF1,050 $2,898
Ceiling - Lay-in 1st - 112A inside 112 6SF304 $913
Doors - Wood Doors inclu hw 1st - 112A inside 112 6EA2 $602
Floor - Tile/Sheet 1st - 112A inside 112 6SF304 $304
Lighting - Lay-in 1st - 112A inside 112 7EA7 $0
Power Distribution 1st - 112A inside 112 6EA20 $42,498
Storage/ Closet 1st - 112A inside 112 6SF46 $334
Walls - Plaster/Drywall 1st - 112A inside 112 6SF755 $2,084
Work SInk 1st - 112A inside 112 6EA1 $508
Ceiling - Lay-in 1st - 114A inside 114 6SF127 $381
Doors - Wood Doors inclu hw 1st - 114A inside 114 6EA1 $301
Floor - Tile/Sheet 1st - 114A inside 114 6SF127 $127
Lighting - Lay-in 1st - 114A inside 114 7EA3 $0
Power Distribution 1st - 114A inside 114 6EA6 $12,749
Walls - Plaster/Drywall 1st - 114A inside 114 6SF329 $908
Page 35 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Administrative Suites/Offices
Work SInk 1st - 114A inside 114 6EA1 $508
AC Unit 1st - 118 6EA1 $496
Ceiling - Lay-in 1st - 118 6SF726 $2,180
Doors - Transom Window 1st - 118 6SF16 $271
Doors - Wood Doors inclu hw 1st - 118 6EA2 $602
Floor - Carpet 1st - 118 6SF726 $1,547
Lighting - Lay-in 1st - 118 7EA16 $0
Power Distribution 1st - 118 6EA8 $16,999
Storage/ Closet 1st - 118 6SF89 $645
Walls - Plaster/Drywall 1st - 118 radiator coming off wall6SF1,209 $3,337
Ceiling - Lay-in 1st - 120A 6SF188 $565
Doors - Transom Window 1st - 120A 6SF8 $135
Doors - Wood Doors inclu hw 1st - 120A 6EA1 $301
Floor - Carpet 1st - 120A 6SF188 $401
Lighting - Lay-in 1st - 120A 7EA4 $0
Power Distribution 1st - 120A 6EA6 $12,749
Walls - Plaster/Drywall 1st - 120A 6SF627 $1,730
Ceiling - Lay-in 1st - 120B 6SF210 $631
Doors - Transom Window 1st - 120B 6SF8 $135
Doors - Wood Doors inclu hw 1st - 120B 6EA1 $301
Floor - Carpet 1st - 120B 6SF210 $447
Lighting - Lay-in 1st - 120B 7EA4 $0
Power Distribution 1st - 120B 6EA8 $16,999
Walls - Plaster/Drywall 1st - 120B 6SF639 $1,764
AC Unit 1st - Assistant Principle 1 inside 120A 6EA1 $496
Ceiling - Lay-in 1st - Assistant Principle 1 inside 120A 6SF93 $279
Doors - Wood Doors inclu hw 1st - Assistant Principle 1 inside 120A 6EA1 $301
Floor - Carpet 1st - Assistant Principle 1 inside 120A 6SF93 $198
Lighting - Lay-in 1st - Assistant Principle 1 inside 120A 7EA2 $0
Power Distribution 1st - Assistant Principle 1 inside 120A 6EA4 $8,500
Walls - Plaster/Drywall 1st - Assistant Principle 1 inside 120A 6SF443 $1,223
AC Unit 1st - Assistant Principle 2 inside 120A 6EA1 $496
Ceiling - Lay-in 1st - Assistant Principle 2 inside 120A 6SF96 $288
Doors - Wood Doors inclu hw 1st - Assistant Principle 2 inside 120A 6EA1 $301
Floor - Carpet 1st - Assistant Principle 2 inside 120A 6SF96 $205
Lighting - Lay-in 1st - Assistant Principle 2 inside 120A 7EA2 $0
Power Distribution 1st - Assistant Principle 2 inside 120A 6EA2 $4,250
Page 36 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Administrative Suites/Offices
Walls - Plaster/Drywall 1st - Assistant Principle 2 inside 120A 6SF448 $1,236
Ceiling - Lay-in 1st - Assistant Principle inside 120B 6SF108 $324
Doors - Side-lite 1st - Assistant Principle inside 120B 6SF30 $502
Doors - Wood Doors inclu hw 1st - Assistant Principle inside 120B 6EA1 $301
Floor - Carpet 1st - Assistant Principle inside 120B 6SF108 $230
Lighting - Lay-in 1st - Assistant Principle inside 120B 7EA2 $0
Power Distribution 1st - Assistant Principle inside 120B 6EA2 $4,250
Walls - Plaster/Drywall 1st - Assistant Principle inside 120B 6SF294 $811
AC Unit 1st - Attendance Office inside 106A-B 6EA1 $496
Ceiling - Lay-in 1st - Attendance Office inside 106A-B 6SF251 $754
Doors - Wood Doors inclu hw 1st - Attendance Office inside 106A-B 6EA1 $301
Floor - Carpet 1st - Attendance Office inside 106A-B 6SF251 $535
Lighting - Lay-in 1st - Attendance Office inside 106A-B 7EA4 $0
Power Distribution 1st - Attendance Office inside 106A-B 6EA6 $12,749
Walls - Plaster/Drywall 1st - Attendance Office inside 106A-B 6SF476 $1,314
Walls - Plaster/Drywall 1st - Attendance Office inside 106A-B wood paneling6SF225 $737
AC Unit 1st - Principle Assistant 6EA1 $496
Ceiling - Lay-in 1st - Principle Assistant 6SF192 $577
Doors - Wood Doors inclu hw 1st - Principle Assistant 6EA2 $602
Floor - Carpet 1st - Principle Assistant 6SF192 $409
Lighting - Lay-in 1st - Principle Assistant 7EA4 $0
Power Distribution 1st - Principle Assistant 6EA5 $10,624
Storage/ Closet 1st - Principle Assistant 6SF18 $131
Walls - Plaster/Drywall 1st - Principle Assistant 6SF587 $1,620
AC Unit 1st- Rm 199A- Special Ed Meeting Rm cover missing 4EA1 $6,086
Ceiling - Lay-in 1st- Rm 199A- Special Ed Meeting Rm 6SF102 $306
Ceiling - Lay-in 1st- Rm 199A- Special Ed Meeting Rm water damaged5SF6 $48
Doors - Wood Doors inclu hw 1st- Rm 199A- Special Ed Meeting Rm 6EA1 $301
Floor - Tile 1st- Rm 199A- Special Ed Meeting Rm 6SF108 $236
Lighting - Lay-in 1st- Rm 199A- Special Ed Meeting Rm 7EA4 $0
Power Distribution 1st- Rm 199A- Special Ed Meeting Rm 6EA4 $8,500
Walls - Plaster/Drywall 1st- Rm 199A- Special Ed Meeting Rm 6SF468 $1,292
AC Unit 1st- 108 6EA2 $991
Ceiling - Lay-in 1st- 108 6SF1,160 $3,483
Doors - Transom Window 1st- 108 6SF16 $271
Doors - Wood Doors inclu hw 1st- 108 6EA2 $602
Floor - Carpet 1st- 108 6SF1,160 $2,472
Page 37 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Administrative Suites/Offices
Lighting - Lay-in 1st- 108 7EA25 $0
Power Distribution 1st- 108 6EA20 $42,498
Storage/ Closet 1st- 108 6SF9 $65
Walls - Plaster/Drywall 1st- 108 interior wall partitions with wood paneling6SF472 $1,546
Walls - Plaster/Drywall 1st- 108 6SF1,611 $4,446
AC Unit 1st- 127A- Teacher Work Room 6EA4 $1,982
Ceiling - Splined 1st- 127A- Teacher Work Room 6SF2,003 $1,633
Ceiling - Splined 1st- 127A- Teacher Work Room damaged5SF30 $290
Doors - Transom Window 1st- 127A- Teacher Work Room 6SF1 $17
Doors - Wood Doors inclu hw 1st- 127A- Teacher Work Room 6EA2 $602
Floor - Tile 1st- 127A- Teacher Work Room 6SF2,033 $4,448
Lighting - Pendent/Surface 1st- 127A- Teacher Work Room 7EA22 $0
Power Distribution 1st- 127A- Teacher Work Room 6EA22 $46,747
Walls - Plaster/Drywall 1st- 127A- Teacher Work Room 6SF2,624 $7,242
Walls - Structural Glazed Tile 1st- 127A- Teacher Work Room 6SF924 $2,907
Ceiling - Splined 1st- Kitchen Manager's Office 6SF111 $90
Doors - Side-lite 1st- Kitchen Manager's Office 6SF9 $150
Doors - Transom Window 1st- Kitchen Manager's Office 6SF9 $152
Doors - Wood Doors inclu hw 1st- Kitchen Manager's Office 6EA1 $301
Floor - Tile 1st- Kitchen Manager's Office 6SF111 $243
Lighting - Pendent/Surface 1st- Kitchen Manager's Office 7EA2 $0
Power Distribution 1st- Kitchen Manager's Office 6EA6 $12,749
Walls - Plaster/Drywall 1st- Kitchen Manager's Office 6SF546 $1,507
Ceiling - Lay-in 1st- Rm 100A- Police Office 6SF239 $718
Doors - Wood Doors inclu hw 1st- Rm 100A- Police Office 6EA1 $301
Floor - Carpet 1st- Rm 100A- Police Office 6SF239 $509
Lighting - Pendent/Surface 1st- Rm 100A- Police Office 7EA3 $0
Power Distribution 1st- Rm 100A- Police Office 6EA6 $12,749
Walls - Plaster/Drywall 1st- Rm 100A- Police Office 6SF1,137 $3,138
Ceiling - Lay-in 1st- Rm 100B- Security Office 6SF239 $718
Doors - Wood Doors inclu hw 1st- Rm 100B- Security Office 6EA1 $301
Floor - Carpet 1st- Rm 100B- Security Office 6SF239 $509
Lighting - Pendent/Surface 1st- Rm 100B- Security Office 7EA3 $0
Power Distribution 1st- Rm 100B- Security Office 6EA6 $12,749
Walls - Plaster/Drywall 1st- Rm 100B- Security Office 6SF1,137 $3,138
AC Unit 1st- Rm 113A- Lab office 6EA1 $496
Ceiling - Splined 1st- Rm 113A- Lab office appears to be water damaged5SF8 $77
Page 38 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Administrative Suites/Offices
Ceiling - Splined 1st- Rm 113A- Lab office 6SF405 $330
Doors - Wood Doors inclu hw 1st- Rm 113A- Lab office 6EA1 $301
Floor - Concrete 1st- Rm 113A- Lab office 6SF413 $219
Lighting - Pendent/Surface 1st- Rm 113A- Lab office 7EA8 $0
Power Distribution 1st- Rm 113A- Lab office 6EA8 $16,999
Storage/ Closet 1st- Rm 113A- Lab office 6SF377 $2,733
Walls - Plaster/Drywall 1st- Rm 113A- Lab office 6SF410 $1,132
Walls - Plaster/Drywall 1st- Rm 113A- Lab office appears to be water damaged5SF10 $51
Walls - Structural Glazed Tile 1st- Rm 113A- Lab office 6SF916 $2,882
AC Unit 1st- Rm 123- ROTC Office 6EA1 $496
Ceiling - Lay-in 1st- Rm 123- ROTC Office 6SF138 $414
Doors - Wood Doors inclu hw 1st- Rm 123- ROTC Office 6EA2 $602
Floor - Wood 1st- Rm 123- ROTC Office 6SF138 $973
Lighting - Lay-in 1st- Rm 123- ROTC Office 7EA2 $0
Power Distribution 1st- Rm 123- ROTC Office 6EA8 $16,999
Storage/ Closet 1st- Rm 123- ROTC Office 6SF36 $261
Walls - Metal Panel 1st- Rm 123- ROTC Office wood panel6SF320 $2,389
Walls - Plaster/Drywall 1st- Rm 123- ROTC Office 6SF160 $442
Ceiling - Splined 1st- Rm 124B- Vacant Office 6SF154 $126
Doors - Wood Doors inclu hw 1st- Rm 124B- Vacant Office 6EA1 $301
Floor - Carpet 1st- Rm 124B- Vacant Office 6SF129 $275
Floor - Tile 1st- Rm 124B- Vacant Office 6SF25 $55
Lighting - Chandelier, Incandescent 1st- Rm 124B- Vacant Office ceiling fans with lights7EA2 $0
Power Distribution 1st- Rm 124B- Vacant Office 6EA4 $8,500
Walls - Plaster/Drywall 1st- Rm 124B- Vacant Office 6SF780 $2,153
Work SInk 1st- Rm 124B- Vacant Office 6EA1 $508
AC Unit 1st- Rm 125- Engineer's Office missing cover4EA1 $6,086
Ceiling - Plaster/Drywall 1st- Rm 125- Engineer's Office 6SF349 $1,208
Doors - Wood Doors inclu hw 1st- Rm 125- Engineer's Office 6EA2 $602
Floor - Concrete 1st- Rm 125- Engineer's Office 6SF122 $65
Floor - Wood 1st- Rm 125- Engineer's Office 6SF227 $1,600
Lighting - Pendent/Surface 1st- Rm 125- Engineer's Office 7EA4 $0
Power Distribution 1st- Rm 125- Engineer's Office 6EA8 $16,999
Storage/ Closet 1st- Rm 125- Engineer's Office 6SF11 $80
Walls - Plaster/Drywall 1st- Rm 125- Engineer's Office 6SF1,259 $3,475
Ceiling - Plaster/Drywall 1st- Rm 136A 6SF81 $280
Doors - Wood Doors inclu hw 1st- Rm 136A 6EA1 $301
Page 39 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Administrative Suites/Offices
Floor - Tile 1st- Rm 136A 6SF81 $177
Lighting - Pendent/Surface 1st- Rm 136A 7EA1 $0
Power Distribution 1st- Rm 136A 6EA2 $4,250
Storage/ Closet 1st- Rm 136A The part on map labeled as Rm 136 is actually storage.
6SF294 $2,132
Walls - Plaster/Drywall 1st- Rm 136A 6SF450 $1,242
Ceiling - Plaster/Drywall 1st- Rm 136B 6SF81 $280
Doors - Wood Doors inclu hw 1st- Rm 136B 6EA1 $301
Floor - Tile 1st- Rm 136B 6SF81 $177
Lighting - Pendent/Surface 1st- Rm 136B 7EA1 $0
Power Distribution 1st- Rm 136B 6EA2 $4,250
Walls - Plaster/Drywall 1st- Rm 136B 6SF450 $1,242
AC Unit 1st- Rm 167- Parent's Room 6EA2 $991
Ceiling - Splined 1st- Rm 167- Parent's Room water stained tiles5SF16 $155
Ceiling - Splined 1st- Rm 167- Parent's Room 6SF400 $326
Doors - Wood Doors inclu hw 1st- Rm 167- Parent's Room 6EA1 $301
Floor - Tile 1st- Rm 167- Parent's Room 6SF416 $910
Lighting - Pendent/Surface 1st- Rm 167- Parent's Room 7EA4 $0
Power Distribution 1st- Rm 167- Parent's Room 6EA6 $12,749
Walls - Plaster/Drywall 1st- Rm 167- Parent's Room 6SF637 $1,758
Walls - Structural Glazed Tile 1st- Rm 167- Parent's Room 6SF180 $566
AC Unit 1st- Rm 177- Utility 6EA2 $991
Ceiling - Splined 1st- Rm 177- Utility 6SF416 $339
Floor - Tile 1st- Rm 177- Utility 6SF416 $910
Lighting - Pendent/Surface 1st- Rm 177- Utility 7EA4 $0
Power Distribution 1st- Rm 177- Utility 6EA6 $12,749
Walls - Plaster/Drywall 1st- Rm 177- Utility 6SF637 $1,758
Walls - Plaster/Drywall 1st- Rm 177- Utility peeling & a hole5SF5 $26
Walls - Structural Glazed Tile 1st- Rm 177- Utility 6SF180 $566
Ceiling - Lay-in 1st- Rm 199- Special Ed 6SF475 $1,426
Doors - Transom Window 1st- Rm 199- Special Ed 6SF9 $152
Doors - Wood Doors inclu hw 1st- Rm 199- Special Ed 6EA1 $301
Floor - Tile 1st- Rm 199- Special Ed cracked5SF25 $144
Floor - Tile 1st- Rm 199- Special Ed 6SF450 $985
Lighting - Lay-in 1st- Rm 199- Special Ed 7EA10 $0
Power Distribution 1st- Rm 199- Special Ed 6EA10 $21,249
Walls - Plaster/Drywall 1st- Rm 199- Special Ed 6SF963 $2,658
Ceiling - Plaster/Drywall 1st- Student Services 6SF270 $934
Page 40 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Administrative Suites/Offices
Doors - Wood Doors inclu hw 1st- Student Services 6EA2 $602
Floor - Tile 1st- Student Services damaged5SF5 $29
Floor - Tile 1st- Student Services 6SF265 $580
Lighting - Lay-in 1st- Student Services recessed cans7EA4 $0
Lighting - Pendent/Surface 1st- Student Services 7EA4 $0
Power Distribution 1st- Student Services 6EA10 $21,249
Storage/ Closet 1st- Student Services 6SF364 $2,639
Walls - Plaster/Drywall 1st- Student Services 6SF786 $2,169
Ceiling - Plaster/Drywall 2nd Floor - Coach's Office 6SF302 $1,045
Doors - Wood Doors inclu hw 2nd Floor - Coach's Office 6EA1 $301
Floor - Tile/Sheet 2nd Floor - Coach's Office 6SF302 $302
Lighting - Pendent/Surface 2nd Floor - Coach's Office 6EA2 $248
Power Distribution 2nd Floor - Coach's Office 6EA6 $12,749
Storage/ Closet 2nd Floor - Coach's Office 6SF30 $218
Walls - Plaster/Drywall 2nd Floor - Coach's Office 6SF903 $2,492
Ceiling - Lay-in 2nd Floor - Pool Office 6SF155 $465
Doors - Steel Doors incl hw 2nd Floor - Pool Office 6EA1 $301
Floor - Tile 2nd Floor - Pool Office 6SF155 $339
Lighting - Lay-in 2nd Floor - Pool Office 6EA2 $238
Power Distribution 2nd Floor - Pool Office 6EA4 $8,500
Walls - Structural Glazed Tile 2nd Floor - Pool Office 6SF400 $1,258
AC Unit 2nd- Rm 211A- Digital Media Office not on a dedicated circuit4EA1 $6,086
Ceiling - Lay-in 2nd- Rm 211A- Digital Media Office 6SF274 $823
Doors - Side-lite 2nd- Rm 211A- Digital Media Office 6SF9 $150
Doors - Wood Doors inclu hw 2nd- Rm 211A- Digital Media Office 6EA1 $301
Floor - Wood 2nd- Rm 211A- Digital Media Office 6SF274 $1,932
Lighting - Lay-in 2nd- Rm 211A- Digital Media Office 7EA2 $0
Power Distribution 2nd- Rm 211A- Digital Media Office 6EA8 $16,999
Walls - Plaster/Drywall 2nd- Rm 211A- Digital Media Office 6SF731 $2,017
Ceiling - Lay-in 2nd- Rm 219- Art Therapy 6SF367 $1,102
Doors - Transom Window 2nd- Rm 219- Art Therapy 6SF9 $152
Doors - Wood Doors inclu hw 2nd- Rm 219- Art Therapy 6EA1 $301
Floor - Tile/Sheet 2nd- Rm 219- Art Therapy damaged5SF3 $17
Floor - Tile/Sheet 2nd- Rm 219- Art Therapy 6SF364 $364
Lighting - Lay-in 2nd- Rm 219- Art Therapy 7EA8 $0
Power Distribution 2nd- Rm 219- Art Therapy 6EA18 $38,248
Walls - Plaster/Drywall 2nd- Rm 219- Art Therapy 6SF1,027 $2,834
Page 41 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Administrative Suites/Offices
AC Unit 2nd- Rm 220A- Social Studies Office 6EA1 $496
Ceiling - Lay-in 2nd- Rm 220A- Social Studies Office 6SF338 $1,015
Ceiling - Lay-in 2nd- Rm 220A- Social Studies Office water stained6SF8 $33
Doors - Transom Window 2nd- Rm 220A- Social Studies Office 6SF9 $152
Doors - Wood Doors inclu hw 2nd- Rm 220A- Social Studies Office 6EA1 $301
Floor - Tile 2nd- Rm 220A- Social Studies Office damaged5SF13 $75
Floor - Tile 2nd- Rm 220A- Social Studies Office 6SF333 $729
Lighting - Lay-in 2nd- Rm 220A- Social Studies Office 7EA5 $0
Power Distribution 2nd- Rm 220A- Social Studies Office 6EA8 $16,999
Walls - Plaster/Drywall 2nd- Rm 220A- Social Studies Office 6SF1,027 $2,834
Ceiling - Plaster/Drywall 2nd- Rm 224A- EFI Office 6SF214 $741
Doors - Transom Window 2nd- Rm 224A- EFI Office 6SF18 $305
Doors - Wood Doors inclu hw 2nd- Rm 224A- EFI Office 6EA2 $602
Floor - Tile 2nd- Rm 224A- EFI Office 6SF214 $468
Lighting - Pendent/Surface 2nd- Rm 224A- EFI Office 7EA2 $0
Power Distribution 2nd- Rm 224A- EFI Office 6EA6 $12,749
Storage/ Closet 2nd- Rm 224A- EFI Office 121SqFt was a restroom, but plumbing has been dismantled & room is used for storage
6SF144 $1,044
Walls - Plaster/Drywall 2nd- Rm 224A- EFI Office 6SF949 $2,619
AC Unit 2nd- Rm 229- Social Work Office not on a dedicated circuit4EA1 $6,086
Ceiling - Lay-in 2nd- Rm 229- Social Work Office damaged5SF8 $64
Ceiling - Lay-in 2nd- Rm 229- Social Work Office 6SF306 $919
Doors - Transom Window 2nd- Rm 229- Social Work Office 6SF9 $152
Doors - Wood Doors inclu hw 2nd- Rm 229- Social Work Office 6EA1 $301
Floor - Tile 2nd- Rm 229- Social Work Office 6SF314 $687
Lighting - Lay-in 2nd- Rm 229- Social Work Office 7EA6 $0
Power Distribution 2nd- Rm 229- Social Work Office 6EA8 $16,999
Walls - Plaster/Drywall 2nd- Rm 229- Social Work Office 6SF864 $2,385
AC Unit 2nd- Rm 230- Teacher Work Room cover missing4EA1 $6,086
Ceiling - Lay-in 2nd- Rm 230- Teacher Work Room 6SF367 $1,102
Doors - Transom Window 2nd- Rm 230- Teacher Work Room 6SF9 $152
Doors - Wood Doors inclu hw 2nd- Rm 230- Teacher Work Room 6EA1 $301
Floor - Tile 2nd- Rm 230- Teacher Work Room damaged5SF4 $23
Floor - Tile 2nd- Rm 230- Teacher Work Room 6SF363 $794
Lighting - Lay-in 2nd- Rm 230- Teacher Work Room 7EA6 $0
Power Distribution 2nd- Rm 230- Teacher Work Room 6EA8 $16,999
Walls - Plaster/Drywall 2nd- Rm 230- Teacher Work Room 6SF1,027 $2,834
Ceiling - Plaster/Drywall 3rd- 2nd Boy's PE Office (331A) 6SF204 $706
Page 42 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Administrative Suites/Offices
Doors - Side-lite 3rd- 2nd Boy's PE Office (331A) 6SF18 $301
Doors - Wood Doors inclu hw 3rd- 2nd Boy's PE Office (331A) 6EA1 $301
Floor - Tile 3rd- 2nd Boy's PE Office (331A) damaged throughout5SF204 $916
Lighting - Pendent/Surface 3rd- 2nd Boy's PE Office (331A) 7EA2 $0
Power Distribution 3rd- 2nd Boy's PE Office (331A) 6EA6 $12,749
Walls - Plaster/Drywall 3rd- 2nd Boy's PE Office (331A) 6SF675 $1,863
Work SInk 3rd- 2nd Boy's PE Office (331A) not working5EA1 $1,508
Ceiling - Plaster/Drywall 3rd- Boy's PE Office peeling5SF2 $25
Ceiling - Plaster/Drywall 3rd- Boy's PE Office 6SF275 $952
Doors - Side-lite 3rd- Boy's PE Office 6SF9 $150
Doors - Wood Doors inclu hw 3rd- Boy's PE Office 6EA2 $602
Floor - Wood 3rd- Boy's PE Office 6SF277 $1,953
Lighting - Pendent/Surface 3rd- Boy's PE Office 7EA2 $0
Power Distribution 3rd- Boy's PE Office 6EA10 $21,249
Walls - Plaster/Drywall 3rd- Boy's PE Office 6SF675 $1,863
Ceiling - Plaster/Drywall 3rd- Girls Gym Office/Kitchen 6SF201 $696
Doors - Side-lite 3rd- Girls Gym Office/Kitchen 6SF18 $301
Doors - Wood Doors inclu hw 3rd- Girls Gym Office/Kitchen 6EA1 $301
Floor - Wood 3rd- Girls Gym Office/Kitchen 6SF201 $1,417
Lighting - Pendent/Surface 3rd- Girls Gym Office/Kitchen 7EA2 $0
Power Distribution 3rd- Girls Gym Office/Kitchen 6EA8 $16,999
Walls - Plaster/Drywall 3rd- Girls Gym Office/Kitchen 6SF585 $1,615
Work SInk 3rd- Girls Gym Office/Kitchen 6EA1 $508
Ceiling - Plaster/Drywall 3rd- Girl's PE Office peeling5SF20 $250
Ceiling - Plaster/Drywall 3rd- Girl's PE Office 6SF257 $889
Doors - Side-lite 3rd- Girl's PE Office 6SF9 $150
Doors - Wood Doors inclu hw 3rd- Girl's PE Office 6EA2 $602
Floor - Wood 3rd- Girl's PE Office 6SF277 $1,953
Lighting - Pendent/Surface 3rd- Girl's PE Office 7EA2 $0
Power Distribution 3rd- Girl's PE Office 6EA14 $29,748
Walls - Plaster/Drywall 3rd- Girl's PE Office 6SF675 $1,863
Ceiling - Plaster/Drywall 3rd- Rm 309- Art Work Room 6SF367 $1,270
Doors - Transom Window 3rd- Rm 309- Art Work Room 6SF9 $152
Doors - Wood Doors inclu hw 3rd- Rm 309- Art Work Room 6EA1 $301
Floor - Tile 3rd- Rm 309- Art Work Room damaged throughout5SF367 $1,648
Lighting - Pendent/Surface 3rd- Rm 309- Art Work Room 7EA4 $0
Power Distribution 3rd- Rm 309- Art Work Room outlets not working5EA6 $23,110
Page 43 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Administrative Suites/Offices
Power Distribution 3rd- Rm 309- Art Work Room 6EA4 $8,500
Walls - Plaster/Drywall 3rd- Rm 309- Art Work Room 6SF1,027 $2,834
AC Unit 3rd- Rm 319A- Math Office not on a dedicated circuit4EA1 $6,086
Ceiling - Lay-in 3rd- Rm 319A- Math Office 6SF368 $1,105
Doors - Transom Window 3rd- Rm 319A- Math Office 6SF9 $152
Doors - Wood Doors inclu hw 3rd- Rm 319A- Math Office 6EA1 $301
Floor - Tile 3rd- Rm 319A- Math Office damaged throughout5SF368 $1,652
Lighting - Lay-in 3rd- Rm 319A- Math Office 7EA5 $0
Power Distribution 3rd- Rm 319A- Math Office 6EA8 $16,999
Walls - Plaster/Drywall 3rd- Rm 319A- Math Office 6SF864 $2,385
Ceiling - Lay-in 4th- Rm 400A- Orchestra Office 6SF167 $502
Floor - Tile 4th- Rm 400A- Orchestra Office 6SF167 $365
Lighting - Lay-in 4th- Rm 400A- Orchestra Office 7EA4 $0
Power Distribution 4th- Rm 400A- Orchestra Office 6EA6 $12,749
Walls - Plaster/Drywall 4th- Rm 400A- Orchestra Office 6SF530 $1,463
Work SInk 4th- Rm 400A- Orchestra Office 6EA1 $508
Ceiling - Lay-in 4th- Rm 401A- Band Office 6SF167 $502
Floor - Tile 4th- Rm 401A- Band Office 6SF167 $365
Lighting - Lay-in 4th- Rm 401A- Band Office 7EA4 $0
Power Distribution 4th- Rm 401A- Band Office 6EA6 $12,749
Walls - Plaster/Drywall 4th- Rm 401A- Band Office 6SF530 $1,463
Work SInk 4th- Rm 401A- Band Office 6EA1 $508
Ceiling - Plaster/Drywall 6SF106 $367
Doors - Steel Doors incl hw 6EA2 $602
Floor - Tile 6SF106 $232
Lighting - Pendent/Surface 6EA1 $124
Power Distribution 6EA4 $8,500
Walls - Plaster/Drywall 6SF535 $1,477
Auditorium & Theater
Ceiling - Lay-in 1st- Rm 122 Small Auditorium 6SF1,570 $4,715
Ceiling - Lay-in 1st- Rm 122 Small Auditorium water stained5SF10 $80
Ceiling - Plaster/Drywall 1st- Rm 122 Small Auditorium water damaged above stage5SF5 $158
Ceiling - Plaster/Drywall 1st- Rm 122 Small Auditorium 6SF620 $5,169
Ceiling - Splined 1st- Rm 122 Small Auditorium 6SF500 $408
Ceiling - Splined 1st- Rm 122 Small Auditorium water damaged5SF6 $58
Doors - Wood Doors inclu hw 1st- Rm 122 Small Auditorium 6EA4 $1,204
Floor - Carpet 1st- Rm 122 Small Auditorium 6SF2,086 $4,445
Page 44 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Auditorium & Theater
Floor - Wood 1st- Rm 122 Small Auditorium stage & hallway6SF625 $4,406
Lighting - Chandelier, Incandescent 1st- Rm 122 Small Auditorium 7EA5 $0
Lighting - Lay-in 1st- Rm 122 Small Auditorium 7EA32 $0
Lighting - Pendent/Surface 1st- Rm 122 Small Auditorium 7EA2 $0
Lighting - Wall Mounted 1st- Rm 122 Small Auditorium cove lighting7EA36 $0
Main Floor Seating 1st- Rm 122 Small Auditorium 6EA142 $24,696
Sound System 1st- Rm 122 Small Auditorium 6EA1 $10,721
Stage 1st- Rm 122 Small Auditorium 6SF425 $2,455
Stage Curtain 1st- Rm 122 Small Auditorium 6EA4 $0
Stage Lighting System 1st- Rm 122 Small Auditorium 6EA1 $8,077
Stage-Stairs - Wood 1st- Rm 122 Small Auditorium 6LF20 $235
Walls - Concrete Block 1st- Rm 122 Small Auditorium NO OCCUPANCY PLACARD POSTED5SF1 $10
Walls - Plaster/Drywall 1st- Rm 122 Small Auditorium 6SF5,406 $25,743
Clinic
Ceiling - Lay-in 1st- Rm 119- Nurse 6SF415 $1,246
Doors - Transom Window 1st- Rm 119- Nurse glass is broken5SF9 $381
Doors - Wood Doors inclu hw 1st- Rm 119- Nurse door hinges are broken & need replacing5EA1 $1,174
Floor - Tile/Sheet 1st- Rm 119- Nurse 6SF415 $415
Lighting - Lay-in 1st- Rm 119- Nurse 7EA10 $0
Walls - Plaster/Drywall 1st- Rm 119- Nurse 6SF907 $2,503
Gymnasia
Ceiling - Plaster/Drywall 2nd Floor - Weigh Room 6SF2,302 $12,707
Doors - Steel Doors incl hw 2nd Floor - Weigh Room 6EA2 $602
Floor - Weight/ Fitness Room Floor Matting 2nd Floor - Weigh Room 6SF2,302 $12,048
Lighting - Pendent/Surface 2nd Floor - Weigh Room 6EA30 $3,717
Storage/ Closet 2nd Floor - Weigh Room 6SF195 $1,414
Walls - Structural Glazed Tile 2nd Floor - Weigh Room 6SF2,495 $7,849
Ceiling - Plaster/Drywall 3rd- Rm 331 peeling 5SF100 $2,003
Ceiling - Plaster/Drywall 3rd- Rm 331 6SF10,535 $58,151
Doors - Transom Window 3rd- Rm 331 6SF36 $610
Doors - Wood Doors inclu hw 3rd- Rm 331 6EA2 $602
Floor - Concrete 3rd- Rm 331 balcony 6SF3,425 $1,812
Floor - Terrazzo 3rd- Rm 331 6SF99 $217
Floor - Wood 3rd- Rm 331 6SF7,110 $50,125
Lighting - Metal Halide/Sodium Vapor 3rd- Rm 331 7EA15 $0
Lighting - Pendent/Surface 3rd- Rm 331 7EA21 $0
Page 45 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Gymnasia
Scoreboards 3rd- Rm 331 6EA1 $2,244
Stage-Stairs - Terrazzo 3rd- Rm 331 stairs to balcony6LF25 $191
Storage/ Closet 3rd- Rm 331 peeling paint5SF404 $6,517
Storage/ Closet 3rd- Rm 331 6SF404 $2,929
Walls - Plaster/Drywall 3rd- Rm 331 Bench seating in balcony is for 228 people.
Occupancy card says 187 people may occupy
balcony.
5SF1 $8
Walls - Structural Glazed Tile 3rd- Rm 331 6SF7,014 $22,066
Bleacher Seating 3rd- Rm 334 Room for 88 people on balcony benches- occupany card allows up to 93.
6EA88 $2,547
Ceiling - Plaster/Drywall 3rd- Rm 334 6SF5,488 $30,293
Ceiling - Plaster/Drywall 3rd- Rm 334 water damage5SF25 $501
Doors - Wood Doors inclu hw 3rd- Rm 334 6EA2 $602
Floor - Concrete 3rd- Rm 334 balcony floor6SF1,450 $767
Floor - Wood 3rd- Rm 334 6SF4,063 $28,644
Lighting - Metal Halide/Sodium Vapor 3rd- Rm 334 7EA8 $0
Lighting - Pendent/Surface 3rd- Rm 334 7EA8 $0
Lighting - Pendent/Surface 3rd- Rm 334 cover missing6EA1 $124
Scoreboards 3rd- Rm 334 6EA1 $2,244
Storage/ Closet 3rd- Rm 334 Room is on otherside of hall. Minor peeling on ceiling
6SF328 $2,378
Walls - Structural Glazed Tile 3rd- Rm 334 6SF5,740 $18,058
Ceiling - Plaster/Drywall 3rd- Rm 336 6SF3,378 $18,646
Doors - Wood Doors inclu hw 3rd- Rm 336 6EA2 $602
Floor - Wood 3rd- Rm 336 6SF3,378 $23,815
Lighting - Metal Halide/Sodium Vapor 3rd- Rm 336 7EA8 $0
Lighting - Pendent/Surface 3rd- Rm 336 7EA3 $0
Storage/ Closet 3rd- Rm 336 door is broken6SF181 $1,312
Walls - Structural Glazed Tile 3rd- Rm 336 6SF5,148 $16,196
Kitchen
Ceiling - Lay-in 1st- Dishwashing Rm 6SF766 $2,300
Doors - Transom Window 1st- Dishwashing Rm 6SF18 $305
Doors - Wood Doors inclu hw 1st- Dishwashing Rm 6EA2 $602
Floor - Weight/ Fitness Room Floor Matting 1st- Dishwashing Rm Rubber Floor Tiles6SF766 $4,009
Lighting - Lay-in 1st- Dishwashing Rm 7EA12 $0
Walls - Structural Glazed Tile 1st- Dishwashing Rm 6SF1,111 $3,495
Ceiling - Lay-in 1st Floor 6SF1,693 $5,084
Doors - Transom Window 1st Floor 6SF18 $305
Page 46 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Kitchen
Doors - Wood Doors inclu hw 1st Floor 6EA2 $602
Floor - Tile 1st Floor 6SF1,693 $3,704
Lighting - Lay-in 1st Floor 7EA26 $0
Storage/ Closet 1st Floor 6SF569 $4,125
Walls - Structural Glazed Tile 1st Floor 6SF1,750 $5,506
Library
AC Unit 2nd Floor 6EA3 $1,487
Casework 2nd Floor 6LF144 $3,637
Ceiling - Plaster/Drywall 2nd Floor water damage5SF3 $37
Ceiling - Plaster/Drywall 2nd Floor 6SF357 $1,235
Ceiling - Splined 2nd Floor 6SF2,130 $1,736
Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602
Floor - Carpet 2nd Floor 6SF2,202 $4,692
Floor - Tile 2nd Floor damaged throughout5SF144 $647
Lighting - Pendent/Surface 2nd Floor 7EA56 $0
Storage/ Closet 2nd Floor 6SF146 $1,059
Walls - Plaster/Drywall 2nd Floor 6SF2,723 $7,515
Locker/Shower Room
Accessories 1st- Kitchen Staff Locker Rm 6SF96 $376
Ceiling - Exposed 1st- Kitchen Staff Locker Rm 6SF143 $213
Ceiling - Plaster/ Drywall 1st- Kitchen Staff Locker Rm 6SF138 $478
Doors - Wood Doors inclu hw 1st- Kitchen Staff Locker Rm 6EA2 $602
Floor - Tile Ceramic/ Porcelain 1st- Kitchen Staff Locker Rm 6SF96 $203
Floor - Tile/Sheet 1st- Kitchen Staff Locker Rm 6SF185 $185
Lavatory 1st- Kitchen Staff Locker Rm 6EA1 $320
Lighting - Pendent/Surface 1st- Kitchen Staff Locker Rm 7EA4 $0
Partitions 1st- Kitchen Staff Locker Rm 6EA1 $297
Student Lockers - One Tier 1st- Kitchen Staff Locker Rm 6EA16 $1,485
Walls - Plaster/Drywall 1st- Kitchen Staff Locker Rm 6SF1,129 $3,116
Walls - Plaster/Drywall 1st- Kitchen Staff Locker Rm water damaged5SF15 $77
Walls - Tile Ceramic/ Porcelain 1st- Kitchen Staff Locker Rm 6SF18 $121
Walls - Tile Ceramic/ Porcelain 1st- Kitchen Staff Locker Rm Stone6SF78 $176
Water Closet 1st- Kitchen Staff Locker Rm 6EA1 $336
Ceiling - Plaster/ Drywall 1st- Rm 129- Custodial Staff Locker
Room
6SF314 $1,087
Doors - Transom Window 1st- Rm 129- Custodial Staff Locker Room
6SF9 $152
Page 47 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Locker/Shower Room
Doors - Wood Doors inclu hw 1st- Rm 129- Custodial Staff Locker
Room
6EA1 $301
Floor - Concrete 1st- Rm 129- Custodial Staff Locker Room
6SF314 $166
Lavatory 1st- Rm 129- Custodial Staff Locker Room
missing4EA1 $7,342
Lighting - Pendent/Surface 1st- Rm 129- Custodial Staff Locker Room
7EA3 $0
Partitions 1st- Rm 129- Custodial Staff Locker Room
missing doors5EA2 $1,502
Student Lockers - One Tier 1st- Rm 129- Custodial Staff Locker
Room
6EA4 $371
Student Lockers - Two Tier 1st- Rm 129- Custodial Staff Locker Room
6EA40 $1,857
Walls - Plaster/Drywall 1st- Rm 129- Custodial Staff Locker Room
6SF877 $2,420
Walls - Tile Ceramic/ Porcelain 1st- Rm 129- Custodial Staff Locker Room
stone6SF75 $169
Walls - Tile Ceramic/ Porcelain 1st- Rm 129- Custodial Staff Locker Room
6SF36 $241
Water Closet 1st- Rm 129- Custodial Staff Locker
Room
missing4EA2 $15,339
Accessories 2nd Floor 6SF5,010 $19,630
Accessories 2nd Floor 6SF1,650 $6,465
Benches, ped mounted 2nd Floor 6LF50 $5,444
Benches, ped mounted 2nd Floor 6LF315 $34,297
Ceiling - Plaster/ Drywall 2nd Floor peeling6SF5,010 $17,338
Ceiling - Plaster/ Drywall 2nd Floor 6SF1,650 $5,710
Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602
Floor Drain 2nd Floor 6EA32 $33,893
Floor - Tile Ceramic/ Porcelain 2nd Floor 6SF5,010 $10,603
Floor - Tile/Sheet 2nd Floor 6SF1,650 $1,652
Lighting - Pendent/Surface 2nd Floor 6EA34 $4,212
Lighting - Pendent/Surface 2nd Floor 6EA16 $1,982
Showers 2nd Floor 6EA56 $17,439
Storage/ Closet 2nd Floor 6SF250 $1,813
Student Lockers - One Tier 2nd Floor 6EA476 $44,190
Student Lockers - One Tier 2nd Floor 6EA1,358 $126,071
Walls - Structural Glazed Tile 2nd Floor 6SF3,680 $11,577
Walls - Structural Glazed Tile 2nd Floor 6SF2,112 $6,644
Page 48 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Locker/Shower Room
Accessories 3rd- Boy's PE Coach Locker Rm 6SF127 $498
Ceiling - Plaster/ Drywall 3rd- Boy's PE Coach Locker Rm peeling5SF127 $1,213
Doors - Wood Doors inclu hw 3rd- Boy's PE Coach Locker Rm 6EA1 $301
Floor Drain 3rd- Boy's PE Coach Locker Rm 6EA2 $2,118
Floor - Tile Ceramic/ Porcelain 3rd- Boy's PE Coach Locker Rm 6SF127 $269
Lavatory 3rd- Boy's PE Coach Locker Rm 6EA1 $320
Lighting - Pendent/Surface 3rd- Boy's PE Coach Locker Rm 7EA1 $0
Partitions 3rd- Boy's PE Coach Locker Rm door is delaminating5EA1 $751
Showers 3rd- Boy's PE Coach Locker Rm 6EA1 $311
Student Lockers - One Tier 3rd- Boy's PE Coach Locker Rm 6EA8 $743
Urinals 3rd- Boy's PE Coach Locker Rm 6EA1 $336
Walls - Plaster/Drywall 3rd- Boy's PE Coach Locker Rm peeling5SF330 $2,501
Walls - Tile Ceramic/ Porcelain 3rd- Boy's PE Coach Locker Rm stone6SF117 $264
Walls - Tile Ceramic/ Porcelain 3rd- Boy's PE Coach Locker Rm stone- damaged5SF3 $63
Water Closet 3rd- Boy's PE Coach Locker Rm 6EA1 $336
Accessories 3rd- Girl's PE Coach Locker Rm 6SF127 $498
Ceiling - Plaster/ Drywall 3rd- Girl's PE Coach Locker Rm 6SF125 $433
Ceiling - Plaster/ Drywall 3rd- Girl's PE Coach Locker Rm water damaged5SF2 $26
Doors - Wood Doors inclu hw 3rd- Girl's PE Coach Locker Rm 6EA1 $301
Floor Drain 3rd- Girl's PE Coach Locker Rm 6EA2 $2,118
Floor - Tile Ceramic/ Porcelain 3rd- Girl's PE Coach Locker Rm 6SF126 $267
Floor - Tile Ceramic/ Porcelain 3rd- Girl's PE Coach Locker Rm hole in floor5SF1 $21
Lavatory 3rd- Girl's PE Coach Locker Rm 6EA1 $320
Lighting - Pendent/Surface 3rd- Girl's PE Coach Locker Rm 7EA1 $0
Partitions 3rd- Girl's PE Coach Locker Rm 6EA1 $297
Showers 3rd- Girl's PE Coach Locker Rm 6EA1 $311
Student Lockers - One Tier 3rd- Girl's PE Coach Locker Rm 6EA5 $464
Walls - Plaster/Drywall 3rd- Girl's PE Coach Locker Rm 6SF330 $911
Walls - Tile Ceramic/ Porcelain 3rd- Girl's PE Coach Locker Rm stone6SF120 $271
Water Closet 3rd- Girl's PE Coach Locker Rm 6EA1 $336
Lunch & Multipurpose Room
Ceiling - Splined 1st Floor 6SF5,424 $4,421
Ceiling - Splined 1st Floor missing &/or water damaged5SF79 $764
Doors - Wood Doors inclu hw 1st Floor 6EA11 $3,311
Floor - Tile 1st Floor 6SF5,503 $12,040
Lighting - Pendent/Surface 1st Floor 6EA48 $5,947
Walls - Plaster/Drywall 1st Floor 6SF1,930 $5,327
Page 49 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Lunch & Multipurpose Room
Walls - Structural Glazed Tile 1st Floor 6SF1,930 $6,072
Ceiling - Lay-in 1st- Rm 128- Alumni Hall water stains on tile5SF4 $32
Ceiling - Lay-in 1st- Rm 128- Alumni Hall 6SF1,222 $3,670
Doors - Wood Doors inclu hw 1st- Rm 128- Alumni Hall 6EA2 $602
Floor - Carpet 1st- Rm 128- Alumni Hall 6SF1,226 $2,612
Lighting - Lay-in 1st- Rm 128- Alumni Hall mix of lay-in & recessed cans7EA51 $0
Lighting - Wall Mounted 1st- Rm 128- Alumni Hall cove lights7EA32 $0
Storage/ Closet 1st- Rm 128- Alumni Hall 6SF193 $1,399
Walls - Metal Panel 1st- Rm 128- Alumni Hall Wood panel6SF1,212 $9,047
Walls - Plaster/Drywall 1st- Rm 128- Alumni Hall 6SF606 $1,672
Ceiling - Lay-in 1st- Servery 6SF1,015 $3,048
Ceiling - Splined 1st- Servery 6SF2,695 $2,197
Doors - Transom Window 1st- Servery 6SF18 $305
Doors - Wood Doors inclu hw 1st- Servery 6EA4 $1,204
Floor - Tile 1st- Servery 6SF3,710 $8,117
Lighting - Lay-in 1st- Servery 7EA20 $0
Lighting - Pendent/Surface 1st- Servery 7EA56 $0
Serving Line 1st- Servery 6LF180 $10,713
Walls - Plaster/Drywall 1st- Servery 6SF876 $2,418
Walls - Structural Glazed Tile 1st- Servery 6SF1,752 $5,512
Ceiling - Splined 1st- Teacher Lunchroom 6SF720 $587
Doors - Side-lite 1st- Teacher Lunchroom 6SF240 $4,012
Doors - Transom Window 1st- Teacher Lunchroom 6SF135 $2,286
Doors - Wood Doors inclu hw 1st- Teacher Lunchroom 6EA3 $903
Floor - Tile 1st- Teacher Lunchroom 6SF720 $1,575
Lighting - Pendent/Surface 1st- Teacher Lunchroom 7EA8 $0
Walls - Plaster/Drywall 1st- Teacher Lunchroom 6SF352 $971
Walls - Structural Glazed Tile 1st- Teacher Lunchroom 6SF705 $2,218
MDF_IDF
AC Unit 1st- Rm 126 missing cover4EA1 $6,086
Doors - Wood Doors inclu hw 1st- Rm 126 6EA1 $301
Finishes 1st- Rm 126 6SF265 $1,891
AC Unit 2nd- IDF inside room 220 6EA1 $496
Doors - Wood Doors inclu hw 2nd- IDF inside room 220 6EA2 $602
Finishes 2nd- IDF inside room 220 some floor ties missing or damaged6SF174 $1,242
Page 50 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Mechanical/ Service Rooms
Janitor's Closet 1st Floor 6SF73 $523
Mechanical/ Service Rooms 1st Floor 6SF310 $2,221
Mechanical/ Service Rooms 1st Floor Rm 117 Freight Elevator room has water damage
& peeling paint.
5SF366 $5,904
Storage Room 1st Floor 6SF703 $5,037
Vaults 1st Floor inside 104A & 113A & ROTC6SF664 $4,757
Janitor's Closet 2nd Floor 6SF21 $150
Janitor's Closet 2nd Floor water damaged ceiling5SF51 $823
Mechanical/ Service Rooms 2nd Floor elec closets6SF116 $831
Mechanical/ Service Rooms 2nd Floor Rm 217 Freight Elevator room has water damage
& peeling paint, plus door jamb & transom are
broken.
5SF366 $5,904
Storage Room 2nd Floor 6SF206 $1,476
Vaults 2nd Floor rm 216/2146SF148 $1,060
Air Intake Plenums 3rd Floor FAI6SF23 $142
Boiler Room 3rd Floor Chiller Room above Boiler Rm 6SF1,231 $8,819
Janitor's Closet 3rd Floor 6SF91 $652
Mechanical/ Service Rooms 3rd Floor Rm 317 Freight Elevator room has water damage & peeling paint & floor needs refinishing
5SF366 $5,904
Mechanical/ Service Rooms 3rd Floor Elec closet6SF116 $831
Storage Room 3rd Floor 6SF171 $1,225
Vaults 3rd Floor Rm 316/3146SF148 $1,060
Air Intake Plenums 4th Floor Fan room : located off balcony for Gym 3316SF516 $3,195
Mechanical/ Service Rooms 4th Floor Electric Closet by Rm 400 - damaged plaster 5SF41 $661
Vaults 4th Floor by Rm 4016SF43 $308
Air Intake Plenums Basement 6SF1,193 $7,387
Air Tunnel Basement several water stains along walls / floors6SF11,589 $71,758
Auditorium Plenums Basement 6SF2,021 $12,514
Boiler Room Basement 6SF3,434 $24,602
Crawl Space - Unfinished Basement 6SF22,595 $139,906
Interior Stairs Basement concrete / steel6LF80 $722
Mechanical/ Service Rooms Basement Switch Board room ceiling damaged / walls
peeling all over
5SF27,124 $437,521
Storage Room Basement 6SF3,711 $26,587
Storage Room Basement ROTC old riffle range (now storage) has minor
peeling at stairs wall & ceiling
6SF1,727 $12,373
Pool & Natatorium
Bleachers Seating/Plank Seating 2nd Floor 6EA5 $145
Page 51 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Pool & Natatorium
Ceiling - Lay-In 2nd Floor 6SF3,176 $9,538
Doors - Steel Doors incl hw 2nd Floor 6EA2 $602
Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602
Floor - Concrete 2nd Floor 6SF3,176 $1,680
Lighting - Lay-in 2nd Floor 6EA12 $1,428
Pool Deck 2nd Floor 6SF1,666 $15,819
Pool Deck Drains 2nd Floor 6EA6 $2,532
Walls - Structural Glazed Tile 2nd Floor 6SF2,705 $8,510
Prep Room
Ceiling - Lay-in 3rd- Rm 314A 6SF144 $432
Doors - Side-lite 3rd- Rm 314A 6SF9 $150
Doors - Steel Doors incl hw 3rd- Rm 314A 6EA1 $301
Floor - Tile/Sheet 3rd- Rm 314A 6SF144 $144
Lighting - Lay-in 3rd- Rm 314A 7EA2 $0
Walls - Plaster/Drywall 3rd- Rm 314A 6SF545 $1,504
Work Sink 3rd- Rm 314A 6EA1 $379
Ceiling - Lay-in 3rd- Rm 316A 6SF144 $432
Doors - Side-lite 3rd- Rm 316A 6SF9 $150
Doors - Steel Doors incl hw 3rd- Rm 316A 6EA1 $301
Floor - Tile/Sheet 3rd- Rm 316A 6SF144 $144
Lighting - Lay-in 3rd- Rm 316A 7EA2 $0
Walls - Plaster/Drywall 3rd- Rm 316A 6SF545 $1,504
Work Sink 3rd- Rm 316A 6EA1 $379
Ceiling - Plaster/Drywall 3rd- Rm 320A damaged5SF197 $1,806
Doors - Side-lite 3rd- Rm 320A 6SF40 $669
Doors - Wood Doors inclu hw 3rd- Rm 320A 6EA2 $602
Floor - Tile/Sheet 3rd- Rm 320A 6SF197 $197
Lighting - Pendent/Surface 3rd- Rm 320A 7EA4 $0
Walls - Plaster/Drywall 3rd- Rm 320A 6SF728 $2,009
Work Sink 3rd- Rm 320A 6EA1 $379
Restroom
Accessories 1st- Boy's NE 6SF223 $2,057
Ceiling - Plaster/Drywall 1st- Boy's NE 6SF223 $772
Floor Drain 1st- Boy's NE 6EA1 $1,059
Floor - Tile Ceramic/ Porcelain 1st- Boy's NE 6SF223 $472
Hand Dryer 1st- Boy's NE 6EA1 $230
Page 52 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Restroom
Lavatory 1st- Boy's NE 6EA1 $320
Lighting - Pendent/Surface 1st- Boy's NE 7EA4 $0
Partitions 1st- Boy's NE door missing5EA1 $751
Urinals 1st- Boy's NE 6EA5 $1,680
Walls - Plaster/Drywall 1st- Boy's NE 6SF153 $422
Walls - Tile Ceramic/ Porcelain 1st- Boy's NE 6SF606 $1,369
Water Closet 1st- Boy's NE 6EA1 $336
Accessories 1st- Boy's SE 6SF223 $2,057
Ceiling - Plaster/Drywall 1st- Boy's SE 6SF223 $772
Floor Drain 1st- Boy's SE 6EA1 $1,059
Floor - Tile Ceramic/ Porcelain 1st- Boy's SE 6SF223 $472
Hand Dryer 1st- Boy's SE 6EA1 $230
Lavatory 1st- Boy's SE 6EA1 $320
Lighting - Pendent/Surface 1st- Boy's SE 7EA4 $0
Partitions 1st- Boy's SE 6EA2 $594
Urinals 1st- Boy's SE 6EA5 $1,680
Walls - Plaster/Drywall 1st- Boy's SE 6SF153 $422
Walls - Tile Ceramic/ Porcelain 1st- Boy's SE 6SF606 $1,369
Water Closet 1st- Boy's SE 6EA2 $672
Accessories 1st- Engineer Office 6SF149 $1,374
Ceiling - Plaster/Drywall 1st- Engineer Office 6SF149 $516
Doors - Wood Doors inclu hw 1st- Engineer Office 6EA1 $301
Floor Drain 1st- Engineer Office 6EA2 $2,118
Floor - Tile Ceramic/ Porcelain 1st- Engineer Office 6SF149 $315
Lavatory 1st- Engineer Office 6EA1 $320
Lighting - Pendent/Surface 1st- Engineer Office 7EA2 $0
Lighting - Wall Mounted 1st- Engineer Office 7EA1 $0
Partitions 1st- Engineer Office 6EA1 $297
Showers 1st- Engineer Office 6EA1 $311
Walls - Plaster/Drywall 1st- Engineer Office 6SF475 $1,311
Walls - Tile 1st- Engineer Office Stone6SF120 $263
Walls - Tile Ceramic/ Porcelain 1st- Engineer Office 6SF42 $95
Water Closet 1st- Engineer Office 6EA1 $336
Accessories 1st- Girl's NE 6SF294 $2,712
Ceiling - Plaster/Drywall 1st- Girl's NE 6SF294 $1,017
Floor Drain 1st- Girl's NE 6EA1 $1,059
Floor - Tile Ceramic/ Porcelain 1st- Girl's NE 6SF294 $622
Page 53 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Restroom
Hand Dryer 1st- Girl's NE 6EA2 $460
Lavatory 1st- Girl's NE 6EA1 $320
Lighting - Pendent/Surface 1st- Girl's NE 7EA5 $0
Partitions 1st- Girl's NE 6EA6 $1,782
Walls - Plaster/Drywall 1st- Girl's NE water damaged5SF5 $26
Walls - Plaster/Drywall 1st- Girl's NE 6SF195 $538
Walls - Tile Ceramic/ Porcelain 1st- Girl's NE 6SF586 $1,324
Water Closet 1st- Girl's NE 6EA7 $2,352
Accessories 1st- Girl's SE 6SF294 $2,712
Ceiling - Plaster/Drywall 1st- Girl's SE 6SF294 $1,017
Floor Drain 1st- Girl's SE 6EA1 $1,059
Floor - Tile Ceramic/ Porcelain 1st- Girl's SE 6SF294 $622
Hand Dryer 1st- Girl's SE 6EA2 $460
Lavatory 1st- Girl's SE 6EA1 $320
Lighting - Pendent/Surface 1st- Girl's SE 7EA7 $0
Partitions 1st- Girl's SE 6EA5 $1,485
Walls - Plaster/Drywall 1st- Girl's SE 6SF246 $679
Walls - Tile Ceramic/ Porcelain 1st- Girl's SE 6SF607 $1,371
Water Closet 1st- Girl's SE 6EA6 $2,016
Accessories 1st- inside 102 Principle 6SF119 $1,098
Ceiling - Plaster/Drywall 1st- inside 102 Principle 6SF119 $412
Doors - Wood Doors inclu hw 1st- inside 102 Principle 6EA1 $301
Floor - Carpet 1st- inside 102 Principle 6SF119 $254
Lavatory 1st- inside 102 Principle 6EA1 $320
Lighting - Lay-in 1st- inside 102 Principle recessed cans7EA2 $0
Walls - Plaster/Drywall 1st- inside 102 Principle 6SF64 $177
Walls - Tile Ceramic/ Porcelain 1st- inside 102 Principle 6SF106 $239
Water Closet 1st- inside 102 Principle 6EA1 $336
Accessories 1st- Men's (across from Auditorium) 6SF105 $968
Ceiling - Plaster/Drywall 1st- Men's (across from Auditorium) 6SF105 $363
Doors - Wood Doors inclu hw 1st- Men's (across from Auditorium) 6EA2 $602
Floor - Tile 1st- Men's (across from Auditorium) 6SF105 $230
Floor - Tile Ceramic/ Porcelain 1st- Men's (across from Auditorium) 6SF170 $360
Hand Dryer 1st- Men's (across from Auditorium) 6EA1 $230
Lavatory 1st- Men's (across from Auditorium) 6EA2 $639
Lighting - Pendent/Surface 1st- Men's (across from Auditorium) 7EA3 $0
Partitions 1st- Men's (across from Auditorium) 6EA2 $594
Page 54 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Restroom
Urinals 1st- Men's (across from Auditorium) 6EA2 $672
Walls - Plaster/Drywall 1st- Men's (across from Auditorium) 6SF975 $2,691
Walls - Tile Ceramic/ Porcelain 1st- Men's (across from Auditorium) Stone6SF172 $389
Water Closet 1st- Men's (across from Auditorium) 6EA2 $672
Accessories 1st- Men's (by EngineerOffice) 6SF112 $1,033
Ceiling - Plaster/Drywall 1st- Men's (by EngineerOffice) 6SF112 $388
Doors - Wood Doors inclu hw 1st- Men's (by EngineerOffice) 6EA1 $301
Floor Drain 1st- Men's (by EngineerOffice) 6EA1 $1,059
Floor - Tile Ceramic/ Porcelain 1st- Men's (by EngineerOffice) 6SF112 $237
Lavatory 1st- Men's (by EngineerOffice) 6EA1 $320
Lighting - Pendent/Surface 1st- Men's (by EngineerOffice) 7EA1 $0
Partitions 1st- Men's (by EngineerOffice) 6EA1 $297
Walls - Plaster/Drywall 1st- Men's (by EngineerOffice) 6SF611 $1,686
Water Closet 1st- Men's (by EngineerOffice) 6EA1 $336
Accessories 1st- Men's in Fire Panel Room paper towel holder falling off wall6SF26 $240
Ceiling - Plaster/Drywall 1st- Men's in Fire Panel Room 6SF26 $90
Doors - Wood Doors inclu hw 1st- Men's in Fire Panel Room 6EA1 $301
Floor - Tile Ceramic/ Porcelain 1st- Men's in Fire Panel Room 6SF26 $55
Lavatory 1st- Men's in Fire Panel Room 6EA1 $320
Lighting - Pendent/Surface 1st- Men's in Fire Panel Room 7EA1 $0
Lighting - Wall Mounted 1st- Men's in Fire Panel Room 7EA1 $0
Walls - Plaster/Drywall 1st- Men's in Fire Panel Room 6SF240 $662
Water Closet 1st- Men's in Fire Panel Room 6EA1 $336
Accessories 1st- Women's (across from Auditorium) 6SF105 $968
Ceiling - Plaster/Drywall 1st- Women's (across from Auditorium) 6SF275 $952
Doors - Wood Doors inclu hw 1st- Women's (across from Auditorium) 6EA2 $602
Floor - Tile 1st- Women's (across from Auditorium) 6SF101 $221
Floor - Tile 1st- Women's (across from Auditorium) damaged5SF4 $23
Floor - Tile Ceramic/ Porcelain 1st- Women's (across from Auditorium) 6SF170 $360
Hand Dryer 1st- Women's (across from Auditorium) 6EA1 $230
Lavatory 1st- Women's (across from Auditorium) 6EA2 $639
Lighting - Pendent/Surface 1st- Women's (across from Auditorium) 7EA3 $0
Partitions 1st- Women's (across from Auditorium) 6EA2 $594
Walls - Plaster/Drywall 1st- Women's (across from Auditorium) 6SF975 $2,691
Walls - Tile Ceramic/ Porcelain 1st- Women's (across from Auditorium) Stone6SF172 $389
Water Closet 1st- Women's (across from Auditorium) 6EA2 $672
Accessories 1st- Women's (by EngineerOffice) 6SF207 $1,909
Page 55 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Restroom
Ceiling - Plaster/Drywall 1st- Women's (by EngineerOffice) 6SF207 $716
Doors - Wood Doors inclu hw 1st- Women's (by EngineerOffice) 6EA1 $301
Floor - Tile Ceramic/ Porcelain 1st- Women's (by EngineerOffice) 6SF207 $438
Lavatory 1st- Women's (by EngineerOffice) 6EA1 $320
Lighting - Pendent/Surface 1st- Women's (by EngineerOffice) 7EA2 $0
Partitions 1st- Women's (by EngineerOffice) 6EA2 $594
Walls - Plaster/Drywall 1st- Women's (by EngineerOffice) 6SF845 $2,332
Water Closet 1st- Women's (by EngineerOffice) 6EA2 $672
Accessories 2nd- Boy's NE 6SF223 $2,057
Ceiling - Plaster/Drywall 2nd- Boy's NE 6SF223 $772
Floor Drain 2nd- Boy's NE 6EA1 $1,059
Floor - Tile Ceramic/ Porcelain 2nd- Boy's NE 6SF223 $472
Hand Dryer 2nd- Boy's NE 6EA1 $230
Lavatory 2nd- Boy's NE 6EA1 $320
Lighting - Pendent/Surface 2nd- Boy's NE 7EA4 $0
Partitions 2nd- Boy's NE door missing5EA1 $751
Urinals 2nd- Boy's NE 6EA5 $1,680
Walls - Plaster/Drywall 2nd- Boy's NE 6SF153 $422
Walls - Tile Ceramic/ Porcelain 2nd- Boy's NE 6SF606 $1,369
Water Closet 2nd- Boy's NE 6EA1 $336
Accessories 2nd- Boy's SE 6SF223 $2,057
Ceiling - Plaster/Drywall 2nd- Boy's SE 6SF223 $772
Floor Drain 2nd- Boy's SE 6EA1 $1,059
Floor - Tile Ceramic/ Porcelain 2nd- Boy's SE 6SF223 $472
Hand Dryer 2nd- Boy's SE 6EA1 $230
Lavatory 2nd- Boy's SE 6EA1 $320
Lighting - Pendent/Surface 2nd- Boy's SE 7EA4 $0
Partitions 2nd- Boy's SE 6EA2 $594
Urinals 2nd- Boy's SE 6EA5 $1,680
Walls - Plaster/Drywall 2nd- Boy's SE 6SF153 $422
Walls - Tile Ceramic/ Porcelain 2nd- Boy's SE 6SF606 $1,369
Water Closet 2nd- Boy's SE 6EA1 $336
Water Closet 2nd- Boy's SE toilet out of order5EA1 $1,344
Accessories 2nd Floor - Girl's Locker Room Restroom 6SF282 $2,601
Ceiling - Plaster/Drywall 2nd Floor - Girl's Locker Room Restroom 6SF282 $976
Doors - Steel Doors incl hw 2nd Floor - Girl's Locker Room Restroom 6EA1 $301
Floor Drain 2nd Floor - Girl's Locker Room Restroom 6EA1 $1,059
Page 56 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Restroom
Floor - Tile 2nd Floor - Girl's Locker Room Restroom 6SF282 $617
Hand Dryer 2nd Floor - Girl's Locker Room Restroom 6EA2 $460
Lavatory 2nd Floor - Girl's Locker Room Restroom 6EA2 $639
Lighting - Pendent/Surface 2nd Floor - Girl's Locker Room Restroom 6EA4 $496
Partitions 2nd Floor - Girl's Locker Room Restroom 6EA4 $1,188
Walls - Structural Glazed Tile 2nd Floor - Girl's Locker Room Restroom 6SF875 $2,753
Water Closet 2nd Floor - Girl's Locker Room Restroom 6EA4 $1,344
Accessories 2nd Floor- Hair Drying Room in Locker Room
6SF252 $2,324
Benches 2nd Floor- Hair Drying Room in Locker
Room
6LF15 $217
Ceiling - Plaster/Drywall 2nd Floor- Hair Drying Room in Locker
Room
6SF252 $872
Doors - Steel Doors incl hw 2nd Floor- Hair Drying Room in Locker Room
6EA1 $301
Floor - Tile 2nd Floor- Hair Drying Room in Locker Room
6SF252 $551
Hand Dryer 2nd Floor- Hair Drying Room in Locker Room
6EA14 $3,221
Lighting - Pendent/Surface 2nd Floor- Hair Drying Room in Locker
Room
6EA2 $248
Walls - Plaster/Drywall 2nd Floor- Hair Drying Room in Locker
Room
6SF825 $2,277
Accessories 2nd Floor 6SF123 $1,134
Accessories 2nd Floor 6SF118 $1,088
Accessories 2nd Floor 6SF340 $3,136
Ceiling - Plaster/Drywall 2nd Floor 6SF340 $1,177
Ceiling - Plaster/Drywall 2nd Floor 6SF123 $426
Ceiling - Plaster/Drywall 2nd Floor 6SF118 $408
Doors - Steel Doors incl hw 2nd Floor 6EA1 $301
Doors - Steel Doors incl hw 2nd Floor 6EA1 $301
Doors - Steel Doors incl hw 2nd Floor 6EA1 $301
Floor Drain 2nd Floor 6EA4 $4,237
Floor Drain 2nd Floor 6EA1 $1,059
Floor Drain 2nd Floor 6EA1 $1,059
Floor - Tile 2nd Floor 6SF340 $744
Floor - Tile 2nd Floor 6SF123 $269
Floor - Tile 2nd Floor 6SF118 $258
Hand Dryer 2nd Floor 6EA2 $460
Hand Dryer 2nd Floor 6EA1 $230
Page 57 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Restroom
Hand Dryer 2nd Floor 6EA1 $230
Lavatory 2nd Floor 6EA2 $639
Lavatory 2nd Floor 6EA3 $959
Lavatory 2nd Floor 6EA2 $639
Lighting - Lay-in 2nd Floor 6EA1 $119
Lighting - Lay-in 2nd Floor 6EA1 $119
Lighting - Pendent/Surface 2nd Floor 6EA4 $496
Partitions 2nd Floor 6EA2 $594
Partitions 2nd Floor 6EA1 $297
Partitions 2nd Floor 6EA2 $594
Showers 2nd Floor 6EA16 $4,983
Urinals 2nd Floor 6EA3 $1,008
Urinals 2nd Floor 6EA1 $336
Walls - Plaster/Drywall 2nd Floor 6SF288 $795
Walls - Plaster/Drywall 2nd Floor 6SF285 $787
Walls - Structural Glazed Tile 2nd Floor 6SF958 $3,014
Walls - Structural Glazed Tile 2nd Floor 6SF288 $906
Walls - Structural Glazed Tile 2nd Floor 6SF285 $897
Water Closet 2nd Floor 6EA2 $672
Water Closet 2nd Floor 6EA2 $672
Water Closet 2nd Floor 6EA1 $336
Accessories 2nd- Girl's NE 6SF294 $2,712
Ceiling - Plaster/Drywall 2nd- Girl's NE 6SF294 $1,017
Floor Drain 2nd- Girl's NE 6EA1 $1,059
Floor - Tile Ceramic/ Porcelain 2nd- Girl's NE 6SF294 $622
Hand Dryer 2nd- Girl's NE 6EA2 $460
Lavatory 2nd- Girl's NE 6EA1 $320
Lighting - Pendent/Surface 2nd- Girl's NE 7EA5 $0
Partitions 2nd- Girl's NE 6EA6 $1,782
Walls - Plaster/Drywall 2nd- Girl's NE 6SF200 $552
Walls - Tile Ceramic/ Porcelain 2nd- Girl's NE 6SF586 $1,324
Water Closet 2nd- Girl's NE 6EA7 $2,352
Accessories 2nd- Girl's SE 6SF294 $2,712
Ceiling - Plaster/Drywall 2nd- Girl's SE 6SF294 $1,017
Floor Drain 2nd- Girl's SE 6EA1 $1,059
Floor - Tile Ceramic/ Porcelain 2nd- Girl's SE 6SF294 $622
Hand Dryer 2nd- Girl's SE 6EA2 $460
Page 58 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Restroom
Lavatory 2nd- Girl's SE 6EA1 $320
Lighting - Pendent/Surface 2nd- Girl's SE 7EA7 $0
Partitions 2nd- Girl's SE 6EA5 $1,485
Walls - Plaster/Drywall 2nd- Girl's SE 6SF246 $679
Walls - Tile Ceramic/ Porcelain 2nd- Girl's SE 6SF607 $1,371
Water Closet 2nd- Girl's SE 6EA6 $2,016
Accessories 2nd- Inside Rm 229 6SF60 $553
Ceiling - Plaster/Drywall 2nd- Inside Rm 229 6SF60 $208
Doors - Wood Doors inclu hw 2nd- Inside Rm 229 6EA1 $301
Floor Drain 2nd- Inside Rm 229 6EA1 $1,059
Floor - Tile Ceramic/ Porcelain 2nd- Inside Rm 229 6SF60 $127
Lavatory 2nd- Inside Rm 229 6EA1 $320
Lighting - Pendent/Surface 2nd- Inside Rm 229 7EA1 $0
Partitions 2nd- Inside Rm 229 6EA1 $297
Walls - Plaster/Drywall 2nd- Inside Rm 229 6SF255 $704
Walls - Tile Ceramic/ Porcelain 2nd- Inside Rm 229 6SF96 $217
Water Closet 2nd- Inside Rm 229 6EA1 $336
Accessories 3rd- Boy's Gym Toilet 6SF107 $987
Ceiling - Plaster/Drywall 3rd- Boy's Gym Toilet 6SF107 $370
Doors - Wood Doors inclu hw 3rd- Boy's Gym Toilet 6EA1 $301
Floor Drain 3rd- Boy's Gym Toilet 6EA1 $1,059
Floor - Tile Ceramic/ Porcelain 3rd- Boy's Gym Toilet 6SF107 $226
Lavatory 3rd- Boy's Gym Toilet 6EA1 $320
Lighting - Pendent/Surface 3rd- Boy's Gym Toilet 7EA1 $0
Partitions 3rd- Boy's Gym Toilet door is missing5EA1 $751
Urinals 3rd- Boy's Gym Toilet 6EA2 $672
Walls - Plaster/Drywall 3rd- Boy's Gym Toilet 6SF295 $814
Walls - Tile Ceramic/ Porcelain 3rd- Boy's Gym Toilet stone6SF120 $271
Water Closet 3rd- Boy's Gym Toilet 6EA1 $336
Accessories 3rd- Boy's NE 6SF223 $2,057
Ceiling - Plaster/Drywall 3rd- Boy's NE 6SF223 $772
Floor Drain 3rd- Boy's NE 6EA1 $1,059
Floor - Tile Ceramic/ Porcelain 3rd- Boy's NE 6SF223 $472
Hand Dryer 3rd- Boy's NE 6EA1 $230
Lavatory 3rd- Boy's NE 6EA1 $320
Lighting - Pendent/Surface 3rd- Boy's NE 7EA4 $0
Partitions 3rd- Boy's NE door missing5EA1 $751
Page 59 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Restroom
Urinals 3rd- Boy's NE 6EA5 $1,680
Walls - Plaster/Drywall 3rd- Boy's NE 6SF153 $422
Walls - Tile Ceramic/ Porcelain 3rd- Boy's NE 6SF606 $1,369
Water Closet 3rd- Boy's NE 6EA1 $336
Accessories 3rd- Boy's SE 6SF223 $2,057
Ceiling - Plaster/Drywall 3rd- Boy's SE 6SF223 $772
Floor Drain 3rd- Boy's SE 6EA1 $1,059
Floor - Tile Ceramic/ Porcelain 3rd- Boy's SE 6SF223 $472
Hand Dryer 3rd- Boy's SE 6EA1 $230
Lavatory 3rd- Boy's SE 6EA1 $320
Lighting - Pendent/Surface 3rd- Boy's SE 7EA4 $0
Partitions 3rd- Boy's SE 6EA2 $594
Urinals 3rd- Boy's SE 6EA5 $1,680
Walls - Plaster/Drywall 3rd- Boy's SE 6SF153 $422
Walls - Tile Ceramic/ Porcelain 3rd- Boy's SE 6SF606 $1,369
Water Closet 3rd- Boy's SE 6EA2 $672
Accessories 3rd- Girl's NE 6SF294 $2,712
Ceiling - Plaster/Drywall 3rd- Girl's NE 6SF294 $1,017
Floor Drain 3rd- Girl's NE 6EA1 $1,059
Floor - Tile Ceramic/ Porcelain 3rd- Girl's NE 6SF294 $622
Hand Dryer 3rd- Girl's NE 6EA2 $460
Lavatory 3rd- Girl's NE 6EA1 $320
Lighting - Pendent/Surface 3rd- Girl's NE 7EA5 $0
Partitions 3rd- Girl's NE 6EA6 $1,782
Walls - Plaster/Drywall 3rd- Girl's NE 6SF200 $552
Walls - Tile Ceramic/ Porcelain 3rd- Girl's NE 6SF586 $1,324
Water Closet 3rd- Girl's NE 6EA7 $2,352
Accessories 3rd- Girl's SE 6SF294 $2,712
Ceiling - Plaster/Drywall 3rd- Girl's SE 6SF294 $1,017
Floor Drain 3rd- Girl's SE 6EA1 $1,059
Floor - Tile Ceramic/ Porcelain 3rd- Girl's SE 6SF294 $622
Hand Dryer 3rd- Girl's SE 6EA2 $460
Lavatory 3rd- Girl's SE 6EA1 $320
Lighting - Pendent/Surface 3rd- Girl's SE 7EA7 $0
Partitions 3rd- Girl's SE 6EA5 $1,485
Walls - Plaster/Drywall 3rd- Girl's SE 6SF246 $679
Walls - Tile Ceramic/ Porcelain 3rd- Girl's SE 6SF607 $1,371
Page 60 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Restroom
Water Closet 3rd- Girl's SE 6EA6 $2,016
Accessories 3rd- Men's 6SF127 $1,171
Ceiling - Plaster/Drywall 3rd- Men's 6SF126 $436
Ceiling - Plaster/Drywall 3rd- Men's peeling6SF1 $5
Doors - Transom Window 3rd- Men's 6SF1 $17
Doors - Wood Doors inclu hw 3rd- Men's 6EA1 $301
Floor Drain 3rd- Men's 6EA1 $1,059
Floor - Tile Ceramic/ Porcelain 3rd- Men's 6SF127 $269
Lavatory 3rd- Men's 6EA1 $320
Lighting - Pendent/Surface 3rd- Men's 7EA1 $0
Lighting - Wall Mounted 3rd- Men's 7EA1 $0
Partitions 3rd- Men's 6EA2 $594
Urinals 3rd- Men's 6EA1 $336
Walls - Plaster/Drywall 3rd- Men's 6SF494 $1,363
Walls - Tile Ceramic/ Porcelain 3rd- Men's 6SF18 $41
Water Closet 3rd- Men's 6EA2 $672
Accessories 3rd- Women's 6SF196 $1,808
Ceiling - Plaster/Drywall 3rd- Women's 6SF196 $678
Doors - Transom Window 3rd- Women's 6SF1 $17
Doors - Wood Doors inclu hw 3rd- Women's 6EA1 $301
Floor - Tile Ceramic/ Porcelain 3rd- Women's 6SF196 $415
Lavatory 3rd- Women's 6EA1 $320
Lighting - Pendent/Surface 3rd- Women's 7EA2 $0
Lighting - Wall Mounted 3rd- Women's 7EA1 $0
Partitions 3rd- Women's 6EA2 $594
Walls - Plaster/Drywall 3rd- Women's 6SF557 $1,537
Walls - Vinyl Coated Gypsum Panel 3rd- Women's Stone6SF60 $166
Water Closet 3rd- Women's 6EA2 $672
Rooms (Other Than Classrooms) Subtotal: $3,171,126
Building: Main
Category: Building Interior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Corridor
Ceiling - Lay-in 1st Floor 6SF11,547 $34,676
Ceiling - Plaster/Drywall 1st Floor 6SF7,444 $46,093
Page 61 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Building Interior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Corridor
Ceiling - Plaster/Drywall 1st Floor 5SF10 $174
Doors - Transom Window 1st Floor 6EA156 $2,641
Doors - Wood Doors include hw 1st Floor 6EA30 $9,030
Drinking Fountains - Single Fountain 1st Floor 6EA15 $4,136
Floor - Terrazzo 1st Floor 6SF5,114 $42,927
Floor - Tile/Sheet 1st Floor 5SF30 $173
Floor - Tile/Sheet 1st Floor 6SF14,033 $7,626
Lighting - Lay-in 1st Floor 7EA80 $0
Lighting - Pendent/Surface 1st Floor 7EA111 $0
Student Lockers - One Tier 1st Floor 6EA645 $59,879
Walls - Plaster/Drywall 1st Floor 6SF14,740 $65,342
Walls - Plaster/Drywall 1st Floor 5SF5 $50
Walls - Structural Glazed Tile 1st Floor 6SF15,313 $48,175
Walls - Tile Ceramic/ Porcelain 1st Floor 6SF1,332 $4,190
Ceiling - Lay-in 2nd Floor 6SF10,624 $31,904
Ceiling - Lay-in 2nd Floor 5SF30 $268
Ceiling - Plaster/Drywall 2nd Floor 6SF3,012 $18,650
Doors - Steel Doors incl hw 2nd Floor 6EA1 $301
Doors - Transom Window 2nd Floor 6EA64 $1,084
Doors - Wood Doors include hw 2nd Floor 6EA8 $2,408
Drinking Fountains - Single Fountain 2nd Floor 5EA1 $1,180
Drinking Fountains - Single Fountain 2nd Floor 6EA13 $3,585
Floor - Terrazzo 2nd Floor 6SF1,500 $12,591
Floor - Tile/Sheet 2nd Floor 5SF20 $115
Floor - Tile/Sheet 2nd Floor 6SF14,160 $7,695
Lighting - Lay-in 2nd Floor 7EA80 $0
Lighting - Pendent/Surface 2nd Floor 7EA5 $0
Student Lockers - One Tier 2nd Floor 6EA907 $84,202
Walls - Plaster/Drywall 2nd Floor 6SF14,697 $65,152
Walls - Structural Glazed Tile 2nd Floor 6SF14,959 $47,061
Ceiling - Lay-in 3rd Floor 6SF11,231 $33,727
Ceiling - Lay-in 3rd Floor 5SF10 $89
Ceiling - Plaster/Drywall 3rd Floor 6SF5,390 $33,374
Ceiling - Plaster/Drywall 3rd Floor 5SF5 $87
Doors - Transom Window 3rd Floor 6EA64 $1,084
Doors - Wood Doors include hw 3rd Floor 6EA12 $3,612
Drinking Fountains - Single Fountain 3rd Floor 6EA11 $3,033
Page 62 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Building Interior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Corridor
Drinking Fountains - Single Fountain 3rd Floor 5EA1 $1,180
Floor - Terrazzo 3rd Floor 6SF2,161 $18,140
Floor - Tile/Sheet 3rd Floor 6SF14,465 $7,860
Floor - Tile/Sheet 3rd Floor 5SF10 $58
Lighting - Lay-in 3rd Floor 7EA25 $0
Lighting - Pendent/Surface 3rd Floor 7EA174 $0
Student Lockers - One Tier 3rd Floor 6EA835 $77,518
Student Lockers - Two Tiers 3rd Floor 6EA80 $3,713
Walls - Plaster/Drywall 3rd Floor 6SF13,259 $58,777
Walls - Structural Glazed Tile 3rd Floor 6SF14,589 $45,897
Ceiling - Lay-in 4th Floor Only outside of Rm 400 & 4016SF60 $180
Floor - Tile/Sheet 4th Floor 6SF60 $33
Lighting - Lay-in 4th Floor 6EA2 $238
Walls - Plaster/Drywall 4th Floor 6SF500 $2,217
Safety
Camera Viewing Station 1st Floor IDF/MDF/Asst Principal/Security Desk/Principal6EA5 $3,413
Metal Dedector 1st Floor 2 at Main entrance & 1 at entrance by Rm1276EA3 $2,642
Security Cameras 1st Floor Interior, Not working5EA8 $5,502
Security Cameras 1st Floor 13 exterior & 115 interior6EA128 $24,837
Security Cameras 1st Floor Exterior6EA14 $2,717
Security Cameras 1st Floor Exterior, Not working5EA4 $2,751
Stairs
Ceiling - Plaster/Drywall Interior North of Balcony 6SF433 $3,170
Floor - Terrazzo Interior North of Balcony 6SF162 $1,360
Handrails Interior North of Balcony 6LF113 $979
Lighting - Pendent/Surface Interior North of Balcony 7EA4 $0
Stairs - Terrazzo Interior North of Balcony 6LF55 $510
Walls - Plaster/Drywall Interior North of Balcony 6SF659 $1,819
Walls - Structural Glazed Tile Interior North of Balcony 6SF659 $2,073
Ceiling - Plaster/Drywall Interior South of Balcony 6SF433 $3,170
Floor - Terrazzo Interior South of Balcony 6SF271 $2,275
Handrails Interior South of Balcony 6LF113 $979
Lighting - Pendent/Surface Interior South of Balcony 7EA4 $0
Stairs - Terrazzo Interior South of Balcony 6LF55 $510
Walls - Plaster/Drywall Interior South of Balcony 6SF659 $1,819
Walls - Structural Glazed Tile Interior South of Balcony 6SF659 $2,073
Page 63 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Building Interior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Stairs
Ceiling - Plaster/Drywall NE of Boys Gym 6SF211 $1,545
Floor - Terrazzo NE of Boys Gym 6SF191 $1,603
Handrails NE of Boys Gym 6LF174 $1,508
Lighting - Pendent/Surface NE of Boys Gym 7EA2 $0
Lighting - Wall Mounted NE of Boys Gym 7EA4 $0
Stairs - Terrazzo NE of Boys Gym 6LF90 $835
Walls - Plaster/Drywall NE of Boys Gym 6SF595 $1,642
Walls - Structural Glazed Tile NE of Boys Gym 6SF1,190 $3,744
Ceiling - Plaster/Drywall North of Main Vestibule 6SF529 $3,873
Floor - Terrazzo North of Main Vestibule 6SF366 $3,072
Handrails North of Main Vestibule 6LF180 $1,560
Lighting - Pendent/Surface North of Main Vestibule 7EA6 $0
Stairs - Terrazzo North of Main Vestibule 6LF80 $742
Walls - Plaster/Drywall North of Main Vestibule 6SF1,149 $3,171
Walls - Structural Glazed Tile North of Main Vestibule 6SF1,149 $3,615
Ceiling - Plaster/Drywall North 6SF433 $3,170
Floor - Terrazzo North 6SF271 $2,275
Handrails North 6LF113 $979
Lighting - Pendent/Surface North 7EA4 $0
Stairs - Terrazzo North 6LF55 $510
Walls - Plaster/Drywall North 6SF659 $1,819
Walls - Structural Glazed Tile North 6SF659 $2,073
Ceiling - Plaster/Drywall NW of Boys Gym 6SF92 $674
Floor - Tile NW of Boys Gym 6SF92 $50
Handrails NW of Boys Gym 6LF68 $589
Lighting - Pendent/Surface NW of Boys Gym 7EA2 $0
Stairs - Terrazzo NW of Boys Gym 6LF34 $316
Walls - Plaster/Drywall NW of Boys Gym 6SF320 $883
Walls - Structural Glazed Tile NW of Boys Gym 6SF1,020 $3,209
Ceiling - Plaster/Drywall SE of Girls Gym 6SF211 $1,545
Floor - Terrazzo SE of Girls Gym 6SF191 $1,603
Handrails SE of Girls Gym 6LF174 $1,508
Lighting - Pendent/Surface SE of Girls Gym 7EA2 $0
Lighting - Wall Mounted SE of Girls Gym 7EA4 $0
Stairs - Terrazzo SE of Girls Gym 6LF90 $835
Walls - Plaster/Drywall SE of Girls Gym 6SF595 $1,642
Walls - Structural Glazed Tile SE of Girls Gym 6SF1,190 $3,744
Page 64 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: Main
Category: Building Interior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Stairs
Ceiling - Plaster/Drywall South 6SF433 $3,170
Floor - Terrazzo South 6SF271 $2,275
Handrails South 6LF113 $979
Lighting - Pendent/Surface South 7EA4 $0
Ceiling - Plaster/Drywall South of Main Vestibule 6SF529 $3,873
Floor - Terrazzo South of Main Vestibule 6SF366 $3,072
Handrails South of Main Vestibule 6LF180 $1,560
Lighting - Pendent/Surface South of Main Vestibule 7EA6 $0
Stairs - Terrazzo South of Main Vestibule 6LF80 $742
Walls - Plaster/Drywall South of Main Vestibule 6SF1,149 $3,171
Walls - Structural Glazed Tile South of Main Vestibule 6SF1,149 $3,615
Stairs - Terrazzo South 6LF55 $510
Walls - Plaster/Drywall South 6SF659 $1,819
Walls - Structural Glazed Tile South 6SF659 $2,073
Ceiling - Plaster/Drywall SW of Girls Gym 6SF56 $410
Floor - Terrazzo SW of Girls Gym 6SF56 $470
Handrails SW of Girls Gym 6LF18 $156
Lighting - Pendent/Surface SW of Girls Gym 7EA1 $0
Stairs - Terrazzo SW of Girls Gym 6LF14 $130
Walls - Plaster/Drywall SW of Girls Gym 6SF240 $662
Walls - Structural Glazed Tile SW of Girls Gym 6SF680 $2,139
Vertical Conveyance
Elevator - Freight Elevator 6EA1 $19,238
Building Interior Subtotal: $1,059,122
Total Building Cost $13,752,211
Building: 6-Classroom Modular
Category: Building Exterior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Entrance
Exterior Doors - Exterior Steel Door #13 - N 6EA2 $961
Exterior Doors - Exterior Steel Door #13 - N 6EA2 $961
Exterior Doors - Exterior Steel Door #14 - N 6EA2 $961
Exterior Doors - Exterior Steel Door #14 - N 6EA2 $961
Page 65 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: 6-Classroom Modular
Category: Building Exterior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Entrance
Exterior Doors - Exterior Steel Door #15 - S 6EA2 $961
Exterior Doors - Exterior Steel Door #15 - S 6EA2 $961
Exterior Doors - Exterior Steel Door #16 - S 6EA2 $961
Exterior Doors - Exterior Steel Door #16 - S 6EA2 $961
Exterior Stairs - Concrete #15 - S 6LF15 $1,227
Exterior Stairs - Concrete #15 - S 6LF15 $1,227
Exterior Stairs - Concrete #16 - S 6LF15 $1,227
Exterior Stairs - Concrete #16 - S 6LF15 $1,227
Foundation
Foundation - Masonry Entire Building 7LF340 $0
Foundation - Masonry Entire Building 7LF340 $0
Foundation - Masonry Entire Building 7LF340 $0
Foundation - Masonry Entire Building 7LF340 $0
Superstructure - Steel Entire Building 7SF7,060 $0
Superstructure - Steel Entire Building 7SF7,060 $0
Superstructure - Steel Entire Building 7SF7,060 $0
Superstructure - Steel Entire Building 7SF7,060 $0
Lighting
Exterior Lighting - Wall Mounted Entire Building Replace fixtures-not working4EA10 $10,301
Exterior Lighting - Wall Mounted Entire Building Replace fixtures-not working4EA10 $10,301
Exterior Lighting - Wall Mounted Entire Building Replace fixtures-not working4EA10 $10,301
Exterior Lighting - Wall Mounted Entire Building Replace fixtures-not working4EA10 $10,301
Roof System
Coping - Metal Main Roof 6LF340 $10,920
Coping - Metal Main Roof 6LF340 $10,920
Coping - Metal Main Roof 6LF340 $10,920
Coping - Metal Main Roof 6LF340 $10,920
Downspouts - Exterior Downspouts Main Roof 6LF52 $1,728
Downspouts - Exterior Downspouts Main Roof 6LF52 $1,728
Downspouts - Exterior Downspouts Main Roof 6LF52 $1,728
Downspouts - Exterior Downspouts Main Roof 6LF52 $1,728
Roof Structure - Steel / Metal Deck/ Concrete Topping Main Roof 7SF7,060 $0
Roof Structure - Steel / Metal Deck/ Concrete Topping Main Roof 7SF7,060 $0
Roof Structure - Steel / Metal Deck/ Concrete Topping Main Roof 7SF7,060 $0
Roof Structure - Steel / Metal Deck/ Concrete Topping Main Roof 7SF7,060 $0
Roof - PVC Membrane Main Roof Some water ponding6SF7,060 $58,354
Page 66 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: 6-Classroom Modular
Category: Building Exterior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Roof System
Roof - PVC Membrane Main Roof Some water ponding6SF7,060 $58,354
Roof - PVC Membrane Main Roof Some water ponding6SF7,060 $58,354
Roof - PVC Membrane Main Roof Some water ponding6SF7,060 $58,354
Walls
Exterior Walls - Prefabricated Metal Panel Wall Entire Building 6SF4,420 $25,093
Exterior Walls - Prefabricated Metal Panel Wall Entire Building 6SF4,420 $25,093
Exterior Walls - Prefabricated Metal Panel Wall Entire Building 6SF4,420 $25,093
Exterior Walls - Prefabricated Metal Panel Wall Entire Building 6SF4,420 $25,093
Windows
Guard - Guards perforated Entire Building Rusting6SF320 $4,086
Guard - Guards perforated Entire Building Rusting6SF320 $4,086
Guard - Guards perforated Entire Building Rusting6SF320 $4,086
Guard - Guards perforated Entire Building Rusting6SF320 $4,086
Windows - Sash Aluminum Double-pane Entire Building 6SF320 $2,389
Windows - Sash Aluminum Double-pane Entire Building 6SF320 $2,389
Windows - Sash Aluminum Entire Building 6SF320 $2,389
Windows - Sash Aluminum Entire Building 6SF320 $2,389
Building Exterior Subtotal: $464,077
Building: 6-Classroom Modular
Category: Electrical System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Emergency System
Emergency Battery Packs - Corridors and Stairs Entire Building 6EA3 $608
Emergency Battery Packs - Corridors and Stairs Entire Building 6EA3 $608
Emergency Battery Packs - Corridors and Stairs Entire Building 6EA3 $608
Emergency Battery Packs - Corridors and Stairs Entire Building 6EA3 $608
Exit Signs - Corridors and Stairs 1st Floor 7EA2 $0
Exit Signs - Corridors and Stairs 1st Floor 7EA2 $0
Exit Signs - Corridors and Stairs Entire Building 7EA2 $0
Exit Signs - Corridors and Stairs Entire Building 7EA2 $0
Main Service
Independent Electrical Service for emergency power Mechanical Room 7EA1 $0
Independent Electrical Service for emergency power Mechanical Room 7EA1 $0
Page 67 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: 6-Classroom Modular
Category: Electrical System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Main Service
PA System Entire Building Location: Main Office (Serves all three buildings)6SF7,060 $2,322
PA System Entire Building Location: Main Office (Serves all three buildings)6SF7,060 $2,322
PA System Entire Building Location: Main Office (Serves all three buildings)6SF7,060 $2,322
PA System Entire Building Location: Main Office (Serves all three buildings)6SF7,060 $2,322
Power Distribution
Lighting and Power Panels - Above 100 A 1st Floor Location: Classroom 6047EA1 $0
Lighting and Power Panels - Above 100 A 1st Floor Location: Classroom 6057EA1 $0
Lighting and Power Panels - Above 100 A 1st Floor Location: Classroom 6057EA1 $0
Lighting and Power Panels - Above 100 A 1st Floor Location: IDF Room 602 (Storage Closet)7EA1 $0
Lighting and Power Panels - Above 100 A 1st Floor Location: IDF Room 602 (Storage Closet)7EA1 $0
Lighting and Power Panels - Above 100 A 1st Floor Location: Classroom 6017EA1 $0
Lighting and Power Panels - Above 100 A 1st Floor Location: Classroom 6017EA1 $0
Lighting and Power Panels - Above 100 A 1st Floor Location: Classroom 6037EA1 $0
Lighting and Power Panels - Above 100 A 1st Floor Location: Classroom 6037EA1 $0
Lighting and Power Panels - Above 100 A 1st Floor Location: Clalssroom 5017EA1 $0
Lighting and Power Panels - Above 100 A 1st Floor Location: Clalssroom 5017EA1 $0
Lighting and Power Panels - Above 100 A 1st Floor Location: Classrrom 5027EA1 $0
Lighting and Power Panels - Above 100 A 1st Floor Location: Classroom 6047EA1 $0
Lighting and Power Panels - Above 100 A 1st Floor Loation: Classroom 5047EA1 $0
Lighting and Power Panels - Above 100 A 1st Floor Location: MDF Room 502, Storage Closet7EA1 $0
Lighting and Power Panels - Above 100 A 1st Floor Location: MDF Room 502, Storage Closet7EA1 $0
Lighting and Power Panels - Above 100 A 1st Floor Location: Classroom 5067EA1 $0
Lighting and Power Panels - Above 100 A 1st Floor Location: Classroom 5067EA1 $0
Lighting and Power Panels - Above 100 A 1st Floor Location: Classroom 5057EA1 $0
Lighting and Power Panels - Above 100 A 1st Floor Location: Classrrom 5027EA1 $0
Lighting and Power Panels - Above 100 A 1st Floor Loation: Classroom 5047EA1 $0
Lighting and Power Panels - Above 100 A 1st Floor Location: Classroom 6027EA1 $0
Lighting and Power Panels - Above 100 A 1st Floor Location: Classroom 5037EA1 $0
Lighting and Power Panels - Above 100 A 1st Floor Location: Classroom 5037EA1 $0
Lighting and Power Panels - Above 100 A 1st Floor Location: Classrom 6067EA1 $0
Lighting and Power Panels - Above 100 A 1st Floor Location: Classrom 6067EA1 $0
Lighting and Power Panels - Above 100 A 1st Floor Location: Classroom 6027EA1 $0
Lighting and Power Panels - Above 100 A 1st Floor Location: Classroom 5057EA1 $0
Electrical System Subtotal: $11,718
Building: 6-Classroom Modular
Page 68 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: 6-Classroom Modular
Category: Safty System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Fire Alarm
Fire Alarm Panel 1st Floor Services & Links all three buildings together6EA1 $6,406
Fire Alarm Panel 1st Floor Services & Links all three buildings together6EA1 $6,406
Fire Alarm Panel 1st Floor Services & Links all three buildings together6EA1 $6,406
Fire Alarm Panel 1st Floor Services & Links all three buildings together6EA1 $6,406
Fire Alarm Strobe Lights 1st Floor / Entire Building 6SF7,060 $2,524
Fire Alarm Strobe Lights 1st Floor / Entire Building 6SF7,060 $2,524
Fire Alarm Strobe Lights 1st Floor / Entire Building 6SF7,060 $2,524
Fire Alarm Strobe Lights 1st Floor / Entire Building 6SF7,060 $2,524
Fire Alarm_System 1st Floor / Entire Building 6SF7,060 $3,433
Fire Alarm_System 1st Floor / Entire Building 6SF7,060 $3,433
Fire Alarm_System 1st Floor / Entire Building 6SF7,060 $3,433
Fire Alarm_System 1st Floor / Entire Building 6SF7,060 $3,433
Sprinkler System
Sprinkler Heads Entire Building 7SF7,060 $0
Sprinkler Heads Entire Building 7SF7,060 $0
Sprinkler Heads Entire Building 7SF7,060 $0
Sprinkler Heads Entire Building 7SF7,060 $0
Sprinkler Piping Entire Building 6SF7,060 $1,312
Sprinkler Piping Entire Building 6SF7,060 $1,312
Sprinkler Piping Entire Building 6SF7,060 $1,312
Sprinkler Piping Entire Building 6SF7,060 $1,312
Wet Sprinkler System Entire Building 6SF7,060 $1,817
Wet Sprinkler System Entire Building 6SF7,060 $1,817
Wet Sprinkler System Entire Building 6SF7,060 $1,817
Wet Sprinkler System Entire Building 6SF7,060 $1,817
Safty System Subtotal: $61,968
Building: 6-Classroom Modular
Category: Mechanical System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Temperature Control
Electric Thermostat Entire Building 6EA6 $0
Electric Thermostat Entire Building 6EA6 $0
Electric Thermostat Entire Building 6EA6 $0
Electric Thermostat Entire Building 6EA6 $0
Page 69 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: 6-Classroom Modular
Category: Mechanical System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Unit Ventilation
Unit Ventilators - Vertical Package Electric Heat & Self Contained
Cooling
Exterior walls One/Clasroom6EA6 $0
Unit Ventilators - Vertical Package Electric Heat & Self Contained Cooling
Exterior walls One/Clasroom6EA6 $0
Unit Ventilators - Vertical Package Electric Heat & Self Contained Cooling
Exterior walls One/Classroom6EA6 $0
Unit Ventilators - Vertical Package Electric Heat & Self Contained Cooling
Exterior walls One/Classroom6EA6 $0
Ventilation
Exhaust Fans- Roof Mounted - 500 - 1500 CFM Roof 6EA7 $4,147
Exhaust Fans- Roof Mounted - 500 - 1500 CFM Roof 6EA7 $4,147
Exhaust Fans- Roof Mounted - 500 - 1500 CFM Roof 6EA2 $1,185
Exhaust Fans- Roof Mounted - 500 - 1500 CFM Roof 6EA2 $1,185
Mechanical System Subtotal: $10,663
Building: 6-Classroom Modular
Category: Plumbing System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Hot Water
Electric Heater - Less than 20 KW Mechanical Room Location: Storage Room6EA1 $682
Electric Heater - Less than 20 KW Mechanical Room Location: Storage Room6EA1 $682
Electric Heater - Less than 20 KW Mechanical Room Location: Storage Room6EA1 $682
Electric Heater - Less than 20 KW Mechanical Room Location: Storage Room6EA1 $682
Piping
Domestic Piping-Cold Water from Risers to Fixtures Entire Building 6SF7,060 $1,413
Domestic Piping-Cold Water from Risers to Fixtures Entire Building 6SF7,060 $1,413
Domestic Piping-Cold Water from Risers to Fixtures Entire Building 6SF7,060 $1,413
Domestic Piping-Cold Water from Risers to Fixtures Entire Building 6SF7,060 $1,413
Domestic Piping-Cold Water Horizontal Lines Entire Building 6SF7,060 $1,716
Domestic Piping-Cold Water Horizontal Lines Entire Building 6SF7,060 $1,716
Domestic Piping-Cold Water Horizontal Lines Entire Building 6SF7,060 $1,716
Domestic Piping-Cold Water Horizontal Lines Entire Building 6SF7,060 $1,716
Domestic Piping-Cold Water Risers Entire Building 6SF7,060 $1,312
Domestic Piping-Cold Water Risers Entire Building 6SF7,060 $1,312
Domestic Piping-Cold Water Risers Entire Building 6SF7,060 $1,312
Domestic Piping-Cold Water Risers Entire Building 6SF7,060 $1,312
Page 70 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: 6-Classroom Modular
Category: Plumbing System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Piping
Domestic Piping-Hot Water from Risers to Fixtures Entire Building 6SF7,060 $1,111
Domestic Piping-Hot Water from Risers to Fixtures Entire Building 6SF7,060 $1,111
Domestic Piping-Hot Water from Risers to Fixtures Entire Building 6SF7,060 $1,111
Domestic Piping-Hot Water from Risers to Fixtures Entire Building 6SF7,060 $1,111
Domestic Piping-Hot Water Horizontal Lines Entire Building 6SF7,060 $1,312
Domestic Piping-Hot Water Horizontal Lines Entire Building 6SF7,060 $1,312
Domestic Piping-Hot Water Horizontal Lines Entire Building 6SF7,060 $1,312
Domestic Piping-Hot Water Horizontal Lines Entire Building 6SF7,060 $1,312
Domestic Piping-Hot Water Return Lines Entire Building 6SF7,060 $1,010
Domestic Piping-Hot Water Return Lines Entire Building 6SF7,060 $1,010
Domestic Piping-Hot Water Return Lines Entire Building 6SF7,060 $1,010
Domestic Piping-Hot Water Return Lines Entire Building 6SF7,060 $1,010
Domestic Piping-Hot Water Return Risers Entire Building 6SF7,060 $1,010
Domestic Piping-Hot Water Return Risers Entire Building 6SF7,060 $1,010
Domestic Piping-Hot Water Return Risers Entire Building 6SF7,060 $1,010
Domestic Piping-Hot Water Return Risers Entire Building 6SF7,060 $1,010
Sanitary Piping Entire Building 6SF7,060 $6,461
Sanitary Piping Entire Building 6SF7,060 $6,461
Sanitary Piping Entire Building 6SF7,060 $6,461
Sanitary Piping Entire Building 6SF7,060 $6,461
Storm Piping Entire Building 6SF7,060 $6,158
Storm Piping Entire Building 6SF7,060 $6,158
Storm Piping Entire Building 6SF7,060 $6,158
Storm Piping Entire Building 6SF7,060 $6,158
Vent Piping Entire Building 6SF7,060 $4,745
Vent Piping Entire Building 6SF7,060 $4,745
Vent Piping Entire Building 6SF7,060 $4,745
Vent Piping Entire Building 6SF7,060 $4,745
Plumbing System Subtotal: $107,725
Building: 6-Classroom Modular
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #501 (Office)
Casework 1st Floor 6LF22 $556
Casework 1st Floor 6LF22 $556
Page 71 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: 6-Classroom Modular
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #501 (Office)
Ceiling - Lay-in 1st Floor 6SF816 $2,450
Ceiling - Lay-in 1st Floor 6SF816 $2,450
Doors - Wood Doors inclu hw 1st Floor 6EA1 $301
Doors - Wood Doors inclu hw 1st Floor 6EA1 $301
Floor - Tile 1st Floor 6SF816 $1,785
Floor - Tile 1st Floor 6SF816 $1,785
Lighting - Lay-in 1st Floor 7EA16 $0
Lighting - Lay-in 1st Floor 7EA16 $0
Marker Board 1st Floor 7LF11 $0
Marker Board 1st Floor 7LF11 $0
Storage/ Closet 1st Floor 6SF71 $515
Storage/ Closet 1st Floor 6SF71 $515
Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF845 $2,332
Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF845 $2,332
Classroom #502 (Computer Lab)
Ceiling - Lay-in 1st Floor 6SF812 $2,438
Ceiling - Lay-in 1st Floor 6SF812 $2,438
Doors - Wood Doors inclu hw 1st Floor 6EA1 $301
Doors - Wood Doors inclu hw 1st Floor 6EA1 $301
Floor - Tile 1st Floor 6SF812 $1,777
Floor - Tile 1st Floor 6SF812 $1,777
Lighting - Lay-in 1st Floor 7EA16 $0
Lighting - Lay-in 1st Floor 7EA16 $0
Marker Board 1st Floor 7LF12 $0
Marker Board 1st Floor 7LF12 $0
Storage/ Closet 1st Floor IDP 6SF79 $573
Storage/ Closet 1st Floor IDP 6SF79 $573
Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF842 $2,324
Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF842 $2,324
Classroom #503 (Regular Classroom)
Ceiling - Lay-in 1st Floor 6SF812 $2,438
Ceiling - Lay-in 1st Floor 6SF812 $2,438
Doors - Wood Doors inclu hw 1st Floor 6EA1 $301
Doors - Wood Doors inclu hw 1st Floor 6EA1 $301
Floor - Tile 1st Floor 6SF812 $1,777
Floor - Tile 1st Floor 6SF812 $1,777
Page 72 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: 6-Classroom Modular
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #503 (Regular Classroom)
Lighting - Lay-in 1st Floor 7EA16 $0
Lighting - Lay-in 1st Floor 7EA16 $0
Marker Board 1st Floor 7LF11 $0
Marker Board 1st Floor 7LF11 $0
Storage/ Closet 1st Floor 1 cracked ceiling tile6SF73 $529
Storage/ Closet 1st Floor 1 cracked ceiling tile6SF73 $529
Student Lockers - Two Tiers 1st Floor 6EA30 $1,393
Student Lockers - Two Tiers 1st Floor 6EA30 $1,393
Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF839 $2,316
Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF839 $2,316
Classroom #504 (Regular Classroom)
Ceiling - Lay-in 1st Floor stains5SF5 $40
Ceiling - Lay-in 1st Floor stains5SF5 $40
Ceiling - Lay-in 1st Floor 6SF807 $2,423
Ceiling - Lay-in 1st Floor 6SF807 $2,423
Doors - Wood Doors inclu hw 1st Floor 6EA1 $301
Doors - Wood Doors inclu hw 1st Floor 6EA1 $301
Floor - Tile 1st Floor 6SF812 $1,777
Floor - Tile 1st Floor 6SF812 $1,777
Lighting - Lay-in 1st Floor 7EA16 $0
Lighting - Lay-in 1st Floor 7EA16 $0
Marker Board 1st Floor 7LF11 $0
Marker Board 1st Floor 7LF11 $0
Storage/ Closet 1st Floor 6SF81 $587
Storage/ Closet 1st Floor 6SF81 $587
Student Lockers - Two Tiers 1st Floor 6EA30 $1,393
Student Lockers - Two Tiers 1st Floor 6EA30 $1,393
Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF839 $2,316
Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF839 $2,316
Classroom #505 (Regular Classroom)
Ceiling - Lay-in 1st Floor 6SF819 $2,459
Ceiling - Lay-in 1st Floor 6SF819 $2,459
Doors - Wood Doors inclu hw 1st Floor 6EA1 $301
Doors - Wood Doors inclu hw 1st Floor 6EA1 $301
Floor - Tile 1st Floor 6SF814 $1,781
Floor - Tile 1st Floor 6SF814 $1,781
Page 73 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: 6-Classroom Modular
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #505 (Regular Classroom)
Floor - Tile 1st Floor damaged - cracked / holes5SF5 $29
Floor - Tile 1st Floor damaged - cracked / holes5SF5 $29
Lighting - Lay-in 1st Floor 7EA16 $0
Lighting - Lay-in 1st Floor 7EA16 $0
Marker Board 1st Floor 7LF11 $0
Marker Board 1st Floor 7LF11 $0
Student Lockers - Two Tiers 1st Floor 6EA30 $1,393
Student Lockers - Two Tiers 1st Floor 6EA30 $1,393
Walls - Vinyl Coated Gypsum Panel 1st Floor corner damaged / unfinished5SF5 $37
Walls - Vinyl Coated Gypsum Panel 1st Floor corner damaged / unfinished5SF5 $37
Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF839 $2,316
Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF839 $2,316
Classroom #506 (Regular Classroom)
Ceiling - Lay-in 1st Floor 6SF819 $2,459
Ceiling - Lay-in 1st Floor 6SF819 $2,459
Doors - Wood Doors inclu hw 1st Floor doesn't close properly5EA1 $1,174
Doors - Wood Doors inclu hw 1st Floor doesn't close properly5EA1 $1,174
Floor - Tile 1st Floor 6SF819 $1,792
Floor - Tile 1st Floor 6SF819 $1,792
Lighting - Lay-in 1st Floor 7EA16 $0
Lighting - Lay-in 1st Floor 7EA16 $0
Marker Board 1st Floor 7LF11 $0
Marker Board 1st Floor 7LF11 $0
Student Lockers - Two Tiers 1st Floor 6EA30 $1,393
Student Lockers - Two Tiers 1st Floor 6EA30 $1,393
Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF843 $2,327
Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF843 $2,327
Classroom #601 (Regular Classroom)
Ceiling - Lay-in 1st Floor stains5SF5 $40
Ceiling - Lay-in 1st Floor 6SF812 $2,438
Ceiling - Lay-in 1st Floor 6SF812 $2,438
Ceiling - Lay-in 1st Floor stains5SF5 $40
Doors - Wood Doors inclu hw 1st Floor 6EA1 $301
Doors - Wood Doors inclu hw 1st Floor 6EA1 $301
Floor - Tile 1st Floor 6SF817 $1,788
Floor - Tile 1st Floor 6SF817 $1,788
Page 74 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: 6-Classroom Modular
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #601 (Regular Classroom)
Lighting - Lay-in 1st Floor 7EA16 $0
Lighting - Lay-in 1st Floor 7EA16 $0
Marker Board 1st Floor 7LF11 $0
Marker Board 1st Floor 7LF11 $0
Storage/ Closet 1st Floor 6SF70 $508
Storage/ Closet 1st Floor 6SF70 $508
Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF839 $2,316
Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF839 $2,316
Classroom #602 (Regular Classroom)
Ceiling - Lay-in 1st Floor 6SF817 $2,453
Ceiling - Lay-in 1st Floor 6SF817 $2,453
Doors - Wood Doors inclu hw 1st Floor 6EA1 $301
Doors - Wood Doors inclu hw 1st Floor 6EA1 $301
Floor - Tile 1st Floor 6SF817 $1,788
Floor - Tile 1st Floor 6SF817 $1,788
Lighting - Lay-in 1st Floor 7EA16 $0
Lighting - Lay-in 1st Floor 7EA16 $0
Marker Board 1st Floor 7LF8 $0
Marker Board 1st Floor 7LF8 $0
Storage/ Closet 1st Floor IDP - Stain at ceiing6SF82 $595
Storage/ Closet 1st Floor IDP - Stain at ceiing6SF82 $595
Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF838 $2,313
Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF838 $2,313
Classroom #603 (Regular Classroom)
Ceiling - Lay-in 1st Floor 6SF811 $2,435
Ceiling - Lay-in 1st Floor 6SF811 $2,435
Ceiling - Lay-in 1st Floor stained / cracked tiles5SF6 $48
Ceiling - Lay-in 1st Floor stained / cracked tiles5SF6 $48
Doors - Wood Doors inclu hw 1st Floor 6EA1 $301
Doors - Wood Doors inclu hw 1st Floor 6EA1 $301
Floor - Tile 1st Floor 6SF817 $1,788
Floor - Tile 1st Floor 6SF817 $1,788
Lighting - Lay-in 1st Floor 7EA16 $0
Lighting - Lay-in 1st Floor 7EA16 $0
Marker Board 1st Floor 7LF11 $0
Marker Board 1st Floor 7LF11 $0
Page 75 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: 6-Classroom Modular
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #603 (Regular Classroom)
Storage/ Closet 1st Floor 6SF70 $508
Storage/ Closet 1st Floor 6SF70 $508
Student Lockers - Two Tiers 1st Floor 6EA30 $1,393
Student Lockers - Two Tiers 1st Floor 6EA30 $1,393
Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF844 $2,329
Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF844 $2,329
Classroom #604 (Regular Classroom)
Ceiling - Lay-in 1st Floor 6SF807 $2,423
Ceiling - Lay-in 1st Floor stained5SF10 $80
Ceiling - Lay-in 1st Floor stained5SF10 $80
Ceiling - Lay-in 1st Floor 6SF807 $2,423
Doors - Wood Doors inclu hw 1st Floor 6EA1 $301
Doors - Wood Doors inclu hw 1st Floor 6EA1 $301
Floor - Tile 1st Floor 6SF817 $1,788
Floor - Tile 1st Floor 6SF817 $1,788
Lighting - Lay-in 1st Floor 7EA16 $0
Lighting - Lay-in 1st Floor 7EA16 $0
Marker Board 1st Floor 7LF11 $0
Marker Board 1st Floor 7LF11 $0
Storage/ Closet 1st Floor ceiling tiles missing / stained6SF83 $602
Storage/ Closet 1st Floor ceiling tiles missing / stained6SF83 $602
Student Lockers - Two Tiers 1st Floor 6EA30 $1,393
Student Lockers - Two Tiers 1st Floor 6EA30 $1,393
Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF840 $2,318
Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF840 $2,318
Classroom #605 (Regular Classroom)
Ceiling - Lay-in 1st Floor 6SF817 $2,453
Ceiling - Lay-in 1st Floor 6SF817 $2,453
Doors - Wood Doors inclu hw 1st Floor 6EA1 $301
Doors - Wood Doors inclu hw 1st Floor 6EA1 $301
Floor - Tile 1st Floor 6SF817 $1,788
Floor - Tile 1st Floor 6SF817 $1,788
Lighting - Lay-in 1st Floor 7EA16 $0
Lighting - Lay-in 1st Floor 7EA16 $0
Marker Board 1st Floor 7LF11 $0
Marker Board 1st Floor 7LF11 $0
Page 76 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: 6-Classroom Modular
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #605 (Regular Classroom)
Student Lockers - Two Tiers 1st Floor 6EA30 $1,393
Student Lockers - Two Tiers 1st Floor 6EA30 $1,393
Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF841 $2,321
Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF841 $2,321
Classroom #606 (Regular Classroom)
Ceiling - Lay-in 1st Floor 6SF812 $2,438
Ceiling - Lay-in 1st Floor stains5SF5 $40
Ceiling - Lay-in 1st Floor stains5SF5 $40
Ceiling - Lay-in 1st Floor 6SF812 $2,438
Doors - Wood Doors inclu hw 1st Floor 6EA1 $301
Doors - Wood Doors inclu hw 1st Floor 6EA1 $301
Floor - Tile 1st Floor 6SF817 $1,788
Floor - Tile 1st Floor 6SF817 $1,788
Lighting - Lay-in 1st Floor 7EA16 $0
Lighting - Lay-in 1st Floor 7EA16 $0
Marker Board 1st Floor 7LF11 $0
Marker Board 1st Floor 7LF11 $0
Student Lockers - Two Tiers 1st Floor 6EA10 $464
Student Lockers - Two Tiers 1st Floor 6EA10 $464
Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF845 $2,332
Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF845 $2,332
Classrooms Subtotal: $197,129
Building: 6-Classroom Modular
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Mechanical/ Service Rooms
Mechanical/ Service Rooms 1st Floor 6SF104 $745
Mechanical/ Service Rooms 1st Floor 6SF104 $745
Mechanical/ Service Rooms 1st Floor 6SF110 $788
Mechanical/ Service Rooms 1st Floor 6SF110 $788
Restroom
Accessories 1st - Mens 6SF154 $1,420
Accessories 1st - Mens 6SF154 $1,420
Accessories 1st - Mens 6SF154 $1,420
Page 77 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: 6-Classroom Modular
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Restroom
Accessories 1st - Mens 6SF154 $1,420
Ceiling - Plaster/Drywall 1st - Mens Vinyl Coated6SF149 $516
Ceiling - Plaster/Drywall 1st - Mens Vinyl coated6SF154 $533
Ceiling - Plaster/Drywall 1st - Mens stained5SF5 $62
Ceiling - Plaster/Drywall 1st - Mens Vinyl Coated6SF149 $516
Ceiling - Plaster/Drywall 1st - Mens stained5SF5 $62
Ceiling - Plaster/Drywall 1st - Mens Vinyl coated6SF154 $533
Doors - Wood Doors inclu hw 1st - Mens 6EA1 $301
Doors - Wood Doors inclu hw 1st - Mens 6EA1 $301
Doors - Wood Doors inclu hw 1st - Mens 6EA1 $301
Doors - Wood Doors inclu hw 1st - Mens 6EA1 $301
Floor Drain 1st - Mens 6EA1 $1,059
Floor Drain 1st - Mens 6EA1 $1,059
Floor Drain 1st - Mens 6EA1 $1,059
Floor Drain 1st - Mens 6EA1 $1,059
Floor - Tile/Sheet 1st - Mens 6SF154 $154
Floor - Tile/Sheet 1st - Mens 6SF154 $154
Floor - Tile/Sheet 1st - Mens 6SF154 $154
Floor - Tile/Sheet 1st - Mens 6SF154 $154
Hand Dryer 1st - Mens 6EA1 $230
Hand Dryer 1st - Mens 6EA1 $230
Hand Dryer 1st - Mens 6EA1 $230
Hand Dryer 1st - Mens 6EA1 $230
Lavatory 1st - Mens 6EA2 $639
Lavatory 1st - Mens 6EA2 $639
Lavatory 1st - Mens 6EA2 $639
Lavatory 1st - Mens 6EA2 $639
Lighting - Pendent/Surface 1st - Mens 7EA1 $0
Lighting - Pendent/Surface 1st - Mens 7EA1 $0
Lighting - Pendent/Surface 1st - Mens 7EA1 $0
Lighting - Pendent/Surface 1st - Mens 7EA1 $0
Partitions 1st - Mens 6EA1 $297
Partitions 1st - Mens 6EA1 $297
Partitions 1st - Mens 6EA1 $297
Partitions 1st - Mens 6EA1 $297
Urinals 1st - Mens damaged - covered5EA2 $2,688
Urinals 1st - Mens damaged - covered5EA2 $2,688
Page 78 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: 6-Classroom Modular
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Restroom
Urinals 1st - Mens Damaged / covered5EA1 $1,344
Urinals 1st - Mens Damaged / covered5EA1 $1,344
Urinals 1st - Mens 6EA1 $336
Urinals 1st - Mens 6EA1 $336
Walls - Vinyl Coated Gypsum Panel 1st - Mens 6SF436 $1,203
Walls - Vinyl Coated Gypsum Panel 1st - Mens 6SF436 $1,203
Walls - Vinyl Coated Gypsum Panel 1st - Mens 6SF436 $1,203
Walls - Vinyl Coated Gypsum Panel 1st - Mens 6SF436 $1,203
Water Closet 1st - Mens 6EA2 $672
Water Closet 1st - Mens 6EA2 $672
Water Closet 1st - Mens 6EA2 $672
Water Closet 1st - Mens 6EA2 $672
Accessories 1st - Womens 6SF176 $1,623
Accessories 1st - Womens 6SF176 $1,623
Accessories 1st - Womens 6SF176 $1,623
Accessories 1st - Womens 6SF176 $1,623
Ceiling - Plaster/Drywall 1st - Womens Vinyl Coated6SF176 $609
Ceiling - Plaster/Drywall 1st - Womens Vinyl Coated6SF176 $609
Ceiling - Plaster/Drywall 1st - Womens Vinyl Coated6SF176 $609
Ceiling - Plaster/Drywall 1st - Womens Vinyl Coated6SF176 $609
Doors - Wood Doors inclu hw 1st - Womens 6EA1 $301
Doors - Wood Doors inclu hw 1st - Womens 6EA1 $301
Doors - Wood Doors inclu hw 1st - Womens 6EA1 $301
Doors - Wood Doors inclu hw 1st - Womens 6EA1 $301
Floor Drain 1st - Womens 6EA1 $1,059
Floor Drain 1st - Womens 6EA1 $1,059
Floor Drain 1st - Womens 6EA1 $1,059
Floor Drain 1st - Womens 6EA1 $1,059
Floor - Tile/Sheet 1st - Womens 6SF176 $176
Floor - Tile/Sheet 1st - Womens 6SF176 $176
Floor - Tile/Sheet 1st - Womens 6SF176 $176
Floor - Tile/Sheet 1st - Womens 6SF176 $176
Hand Dryer 1st - Womens 6EA1 $230
Hand Dryer 1st - Womens 6EA1 $230
Hand Dryer 1st - Womens 6EA1 $230
Hand Dryer 1st - Womens 6EA1 $230
Lavatory 1st - Womens 6EA2 $639
Page 79 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: 6-Classroom Modular
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Restroom
Lavatory 1st - Womens 6EA2 $639
Lavatory 1st - Womens 6EA2 $639
Lavatory 1st - Womens 6EA2 $639
Lighting - Pendent/Surface 1st - Womens 7EA2 $0
Lighting - Pendent/Surface 1st - Womens 7EA2 $0
Lighting - Pendent/Surface 1st - Womens 7EA2 $0
Lighting - Pendent/Surface 1st - Womens 7EA2 $0
Partitions 1st - Womens 6EA3 $891
Partitions 1st - Womens 6EA3 $891
Partitions 1st - Womens 6EA3 $891
Partitions 1st - Womens 6EA3 $891
Walls - Vinyl Coated Gypsum Panel 1st - Womens 6SF471 $1,300
Walls - Vinyl Coated Gypsum Panel 1st - Womens 6SF471 $1,300
Walls - Vinyl Coated Gypsum Panel 1st - Womens 6SF468 $1,292
Walls - Vinyl Coated Gypsum Panel 1st - Womens 6SF468 $1,292
Water Closet 1st - Womens 6EA4 $1,344
Water Closet 1st - Womens 6EA4 $1,344
Water Closet 1st - Womens 6EA4 $1,344
Water Closet 1st - Womens 6EA4 $1,344
Rooms (Other Than Classrooms) Subtotal: $70,602
Building: 6-Classroom Modular
Category: Building Interior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Corridor
Ceiling - Lay-in 1st Floor 5SF5 $45
Ceiling - Lay-in 1st Floor 5SF5 $45
Ceiling - Lay-in 1st Floor 6SF988 $2,967
Ceiling - Lay-in 1st Floor 6SF993 $2,982
Ceiling - Lay-in 1st Floor 6SF993 $2,982
Ceiling - Lay-in 1st Floor 6SF988 $2,967
Doors - Steel Doors incl hw 1st Floor 6EA4 $1,204
Doors - Steel Doors incl hw 1st Floor 6EA4 $1,204
Doors - Steel Doors incl hw 1st Floor 6EA4 $1,204
Doors - Steel Doors incl hw 1st Floor 6EA4 $1,204
Drinking Fountains - Single Fountain 1st Floor 6EA2 $551
Page 80 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Building: 6-Classroom Modular
Category: Building Interior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Corridor
Drinking Fountains - Single Fountain 1st Floor 6EA2 $551
Drinking Fountains - Single Fountain 1st Floor 6EA2 $551
Drinking Fountains - Single Fountain 1st Floor 6EA2 $551
Floor - Tile/Sheet 1st Floor 6SF993 $540
Floor - Tile/Sheet 1st Floor 6SF993 $540
Floor - Tile/Sheet 1st Floor 6SF993 $540
Floor - Tile/Sheet 1st Floor 6SF993 $540
Lighting - Lay-in 1st Floor 7EA10 $0
Lighting - Lay-in 1st Floor 7EA10 $0
Lighting - Lay-in 1st Floor 7EA10 $0
Lighting - Lay-in 1st Floor 7EA10 $0
Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF1,520 $4,195
Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF1,520 $4,195
Walls - Vinyl Coated Gypsum Panel 1st Floor 5SF5 $38
Walls - Vinyl Coated Gypsum Panel 1st Floor 5SF5 $38
Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF1,520 $4,195
Walls - Vinyl Coated Gypsum Panel 1st Floor 6SF1,520 $4,195
Safety
Security Cameras Entire Building 6EA2 $388
Security Cameras Entire Building 6EA2 $388
Security Cameras Entire Building 6EA2 $388
Security Cameras Entire Building 6EA2 $388
Building Interior Subtotal: $39,575
Total Building Cost $963,458
SITE
Category: Site
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Athletic
Metal Bleachers East 6LF30 $1,338
Surface - Natural East SE6SF20,778 $17,233
Surface - Natural East Cinder, grass on the track, damaged curb5SF30,086 $45,604
Surface - Natural East NE6SF8,790 $8,422
Surface - Natural East 6SF102,830 $85,287
Page 81 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
SITE
Category: Site
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Athletic
Civil/Drainage
Civil/ Drainage - Catch Basin Entire Site 7EA14 $0
Civil/ Drainage - Site Drain Entire Site SW basement well; clogged5EA1 $1,379
Civil/ Drainage - Site Drain Entire Site Basement wells6EA3 $931
Civil/ Drainage - Site Manhole Entire Site 7EA24 $0
Fencing
Fencing - Chain Link Entire Site Baseball diamonds6LF378 $7,097
Fencing - Guard Rail Entire Site 6LF50 $578
Fencing - New Standard Ornamental Entire Site NW at parking lot; bent5LF6 $0
Fencing - New Standard Ornamental Entire Site 6LF3,160 $100,814
Landscape
Benches Entire Site E6EA6 $2,580
Irrigation Entire Site Numerous leaks4SF139,780 $629,639
Landscape - Grass Entire Site 6SF102,045 $84,636
Landscape - Hardscape- Asphalt Entire Site SW; cracks5SF15,878 $72,431
Landscape - Hardscape- Concrete Entire Site E6SF13,020 $67,213
Parkway trees Entire Site 7EA58 $0
Planting Beds/ Area Entire Site 6SF1,150 $1,891
Retaining Wall - Concrete Entire Site SW basement wells; spalling, cracks5SF1,200 $88,220
Retaining Wall - Concrete Entire Site 6SF10,338 $242,299
Trash Receptacles Entire Site 6EA10 $3,123
Parking Lot
Concrete Curbs N Lot 6LF15 $193
Concrete Curbs NW Lot 6LF90 $1,156
Lighting - Pole Mounted N Lot E site6EA10 $14,525
Surface - Asphalt N Lot 6SF14,064 $33,988
Surface - Asphalt W Lot Deterioration numerous alligator cracking was
occurring
4SF22,181 $175,088
Surface NW Lot 618,859 $0
Trash Compactor W Lot 6EA2 $0
Trash Enclosure - Chain Links W Lot Loose poles5SF392 $12,416
Trash Enclosure - Masonry W Lot 6SF1,188 $46,871
Vehicular Screening N Lot 6LF15 $1,181
Vehicular Screening NW Lot 6LF90 $7,086
Page 82 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
SITE
Category: Site
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Playground
Equipment - Pre K 3-5 NE 6EA1 $3,546
Equipment - Swingset NE 6EA1 $1,182
Surface - Wood Chips NE 6SF3,480 $7,017
Service Garage
Service Garage - Free-Standing NE 6SF831 $7,629
Sidewalks
Sidewalks - Internal Walks Entire Site 6LF805 $9,670
Sidewalks - Internal Walks Entire Site Exit 7; water ponding, pitting5LF155 $7,725
Sidewalks - Internal Walks Entire Site Main entrance; water ponding5LF110 $6,355
Sidewalks - Internal Walks Entire Site SW; cracks, pitting5LF50 $2,889
Sidewalks - Internal Walks Entire Site SW site; cracks5LF10 $578
Sidewalks - Perimeter Sidewalks Entire Site 6SF23,225 $46,164
Signage
Flag Pole - Flag Pole Entire Site 6EA2 $3,314
Monument - Building Mounted Cut Letter Sign Entire Site Door #1, Door #3, Door #8, Door #106EA4 $0
Site Subtotal: $1,849,288
Total Site Cost $1,849,288
Campus Total ² ³
² As stated above, Total Assessed Campus Need does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Total Assessed Campus Need includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost.
³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below.
¹ It is very rare for assessors to find a feature in this condition. If assessors do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked “1” in this report; by the time the report is compiled, they have been resolved.
$16,564,957
Definitions
● Quantity means, for each item, the total number (or amount) of that item that exists and was evaluated.
Page 83 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
● Unit
means a basic estimate for each item needing some level of repair or replacement. Cost does not include all expenses that would be necessary to complete a repair or replacement project. This is because,
depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and
additional work triggered by building codes.
means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement “EA” for “each.” Other items, like chimneys, are measured in terms of linear feet (“LF”). Still other items, like flooring, are generally measured in square feet (“SF”).
● Cost
● For the same reason, the Total Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features.
● Campus Total also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to
alleviate overcrowding; these are viewed as separate capital needs.
Page 84 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Classroom Summary
Smart-
Board
Power
Strip
Window
Stop
Operable
Window
Area
Glazed
Window
Area
Noise
Level
Elect.
Outlets
Data
Outlets
Voice
Outlets
Area (SF)Floor Plan
Room
Number
Room
Number
Intended UsageCurrent Usage Room
Location
Main
YYY4084216261011,255311311Art RoomArt Room 3rd Floor
YYY40252402631855313313Art RoomArt Room 3rd Floor
NYY40252402631855315315Art RoomArt Room 3rd Floor
NYY40421081631550307357Art RoomArt Room 3rd Floor
NYY404413234231773113113Laboratory/ShopComputer Lab 1st Floor
NYN400026124932127127Lunch RoomComputer Lab 1st Floor
YYY407224015018021,489201201LibraryComputer Lab 2nd Floor
NYY40561444031742209209Regular ClassroomComputer Lab 2nd Floor
YYY40722041162911,155211211Art RoomComputer Lab 2nd Floor
YYY405816874161925220220Regular ClassroomComputer Lab 2nd Floor
YYY40561444031742202222Other Instructional UseComputer Lab 2nd Floor
YYY405614430311,084227227Other Instructional UseComputer Lab 2nd Floor
YYY405614450311,084228228GymnasiumComputer Lab 2nd Floor
YYY403085621411,016300300Multi Purpose RoomComputer Lab 3rd Floor
YYY4052156110551830326326Regular ClassroomComputer Lab 3rd Floor
YYY409619264311,100330330Regular ClassroomComputer Lab 3rd Floor
YYY40387544261645300333Multi Purpose RoomComputer Lab 3rd Floor
YYY40751506013950300399Regular ClassroomComputer Lab 3rd Floor
YNN4010331034331,800400400Music RoomMusic Room 4th Floor
YNN4010331034331,800401401Music RoomMusic Room 4th Floor
YYN400030141,338ROTC121 JROTCSpecial ProgramOther Instructional Use 1st Floor
YYY40441082231742101101Regular ClassroomRegular Classroom 1st Floor
YNN40941882,218411729103103Regular ClassroomRegular Classroom 1st Floor
YYN40941882642756105105Regular ClassroomRegular Classroom 1st Floor
YYN40941882241727107107Regular ClassroomRegular Classroom 1st Floor
YYN40941881842729109109Regular ClassroomRegular Classroom 1st Floor
YYN40941882042923111111Regular ClassroomRegular Classroom 1st Floor
NYN4070141621540116116Regular ClassroomRegular Classroom 1st Floor
YYN40941882621742130130Regular ClassroomRegular Classroom 5th Floor
YYN40941882436792132132Regular ClassroomRegular Classroom 1st Floor
NYY40561444031742202202Regular ClassroomRegular Classroom 2nd Floor
YYY40561442231742203203Regular ClassroomRegular Classroom 2nd Floor
NYY40561442231742204204Regular ClassroomRegular Classroom 2nd Floor
YYN40561442231742205205Regular ClassroomRegular Classroom 2nd Floor
YYY40561442231742206206Regular ClassroomRegular Classroom 2nd Floor
YYY40561442231742207207Regular ClassroomRegular Classroom 2nd Floor
YYY40561442231742208208Regular ClassroomRegular Classroom 2nd Floor
Page 85 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Classroom Summary
Smart-
Board
Power
Strip
Window
Stop
Operable
Window
Area
Glazed
Window
Area
Noise
Level
Elect.
Outlets
Data
Outlets
Voice
Outlets
Area (SF)Floor Plan
Room
Number
Room
Number
Intended UsageCurrent Usage Room
Location
Main
YYY40561442231742212212Regular ClassroomRegular Classroom 2nd Floor
YYY40561442231742213213Regular ClassroomRegular Classroom 2nd Floor
YYY405614422111742215215Regular ClassroomRegular Classroom 2nd Floor
YYY4042108811550218218Regular ClassroomRegular Classroom 2nd Floor
YYY40561442231742221221Regular ClassroomRegular Classroom 2nd Floor
YYY40561444031742224224Regular ClassroomRegular Classroom 2nd Floor
NYY40561444031742225225Regular ClassroomRegular Classroom 2nd Floor
NYY40561442231742226226Regular ClassroomRegular Classroom 2nd Floor
YYY40961922641730301301Regular ClassroomRegular Classroom 3rd Floor
YYY40561442641742302302Regular ClassroomRegular Classroom 3rd Floor
YYY40721444831550303303Regular ClassroomRegular Classroom 3rd Floor
YYY40561442641742304304Regular ClassroomRegular Classroom 3rd Floor
YYY40751442831550305305Regular ClassroomRegular Classroom 3rd Floor
YYY40561442641742306306Regular ClassroomRegular Classroom 3rd Floor
YYY40421082231550307307Regular ClassroomRegular Classroom 3rd Floor
YYY40561442641742308308Regular ClassroomRegular Classroom 3rd Floor
YYY40561442631742310310Regular ClassroomRegular Classroom 3rd Floor
NYY40561442231742312312Regular ClassroomRegular Classroom 3rd Floor
YYY4042108821550318318Regular ClassroomRegular Classroom 3rd Floor
YYY405614422154710319319Regular ClassroomRegular Classroom 3rd Floor
YYY40961922631715321321Regular ClassroomRegular Classroom 3rd Floor
NYY40961922831725323323Regular ClassroomRegular Classroom 3rd Floor
NYY409619216511,086325325Regular ClassroomRegular Classroom 3rd Floor
YYY4014428832311,100328328Regular ClassroomRegular Classroom 3rd Floor
YYY40561442631742332332Regular ClassroomRegular Classroom 3rd Floor
YYY407214410831550303353Regular ClassroomRegular Classroom 3rd Floor
YYY40421082421550305355Regular ClassroomRegular Classroom 3rd Floor
YYY407018074521,065214214ScienceScience 2nd Floor
YYY408421674321,039216216ScienceScience 2nd Floor
NYY407018074521,065314314ScienceScience 3rd Floor
YYY408421674321,039316316ScienceScience 3rd Floor
NYY40701805431918320320ScienceScience 3rd Floor
NNN4012024012211,072322322Science ClassroomScience Classroom 3rd Floor
NYN40141282601001,148112112Science Lab Level 1Science Lab Level 1 1st Floor
YNN4014128268511,100114114Science Lab Level 1Science Lab Level 1 1st Floor
NYY407224015018021,489115115Regular ClassroomStore Room 1st Floor
Page 86 of 87STEINMETZ HS Assessment Date: 11/20/14
Charles P Steinmetz College Preparatory HS3030 N Mobile Ave Chicago, IL 60634
Classroom Summary
Smart-
Board
Power
Strip
Window
Stop
Operable
Window
Area
Glazed
Window
Area
Noise
Level
Elect.
Outlets
Data
Outlets
Voice
Outlets
Area (SF)Floor Plan
Room
Number
Room
Number
Intended UsageCurrent Usage Room
Location
6-Classroom Modular
NYN4032641000812-502Regular ClassroomComputer Lab 1st Floor
NYN4032641016816-501Regular ClassroomOffice 1st Floor
NYN4032641200812-503Regular ClassroomRegular Classroom 1st Floor
NYN4032641210812-504Regular ClassroomRegular Classroom 1st Floor
NYN4032641214819-505Regular ClassroomRegular Classroom 1st Floor
NYN4032641306819-506Regular ClassroomRegular Classroom 1st Floor
NYN4032641201817-601Regular ClassroomRegular Classroom 1st Floor
NYN40326424123817-602Regular ClassroomRegular Classroom 1st Floor
NYN4032641212817-603Regular ClassroomRegular Classroom 1st Floor
NYN4032641204817-604Regular ClassroomRegular Classroom 1st Floor
NYN4032641202817-605Regular ClassroomRegular Classroom 1st Floor
NYN4032641212817-606Regular ClassroomRegular Classroom 1st Floor
Page 87 of 87STEINMETZ HS Assessment Date: 11/20/14