Transcript of Charge Report-Stereo a. and T.G.C.S. No. 285
For P.W. Officers only
No. Dated the
Forwarded to the Superintending Engineer _______________ Circle, to
transmission to Accountant-General, Haryana.
Executive Engineer
__________ Division
No. Dated the
Transmitted to Accountant-General, Haryana, with the remarks that the time
spent in the transfer of charge was/was not excessive.
Superintending Engineer
__________ Division
Note: - The charge certificate may be sent by the Executive Engineer to the
Accountant-General direct when no time has been spent in the transfer of charge
Stereo A. and T/G.C.S. No. 285
All charges among Gazetted Government Servants on of these certificates
should be at once filled up and dispatched by the same day’s post.
Certified that I _____________________ have this day before/after noon,
made over charge and that _________________________ received charge of the
office of ________________________________________________ both officers
being present with reference to the order of Commissioner & Secretary to
Haryana Govt. ___________________________________dated___________
transferring _________________________ granting _________ leaves/absence.
Signature of Govt. Servant making over charge
Certified that (in the case of Govt. Servant whose post is changed while
he is on leave or in transit). I received the order of transfer at _________________
on the _______________ of before/after noon.
Two specimen signatures are attached (for Govt. Servants attached to Shimla only) To be filled in Date of commencement of transfer of charge before/after noon. by P.W. Officers only
Date of completion of transfer of charge before/after noon. Dated _____________
Signature of Govt. Servant recieving charge