Chapter Overview 15 April 2010 North Star Chapter 1 Tonights Schedule 6:15 PM – Registration,...
-
Upload
destiny-coleman -
Category
Documents
-
view
213 -
download
1
Transcript of Chapter Overview 15 April 2010 North Star Chapter 1 Tonights Schedule 6:15 PM – Registration,...
Chapter Overview15 April 2010North Star Chapter
1
Tonight’s Schedule
• 6:15 PM – Registration, Networking, Pizza
• 6:45 PM – Welcome and Chapter Overview
Mark Elpers, Chapter President
• 7:00 PM – Projects Don’t Begin With Requirements
Kevin Forsberg, CEO Center For
Systems Management
• 8:30 PM – Adjourn
Chapter Overview15 April 2010North Star Chapter
2
2010 Program Themes
1. How SE Helps You Survive in a Down Economy
2. Practical Applications of SE
3. SE World Wide
4. How is SE Good For Me?
Chapter Overview15 April 2010North Star Chapter
3
14 January: “Leveraging Certification – Individually and for Your Organization” (Dave Walden/Sysnovation)
Medtronic18 February: “The Unscrambling Of Cross-town Commons” (MnDOT)
Boston Scientific - Maple Grove9 March: “System of Systems Engineering for Complex Medical
Systems” (Ken Hoyme) Boston Scientific - Arden Hills
15 April: “Projects Don’t Begin With Requirements” (Kevin Forsberg) BAE Systems
20 May: Review of Student Design Projects and Their Use of SE Wayzata High School
10 June: Dry run of papers for INCOSE 2010 plus “Systems Engineering Return On Investment” (Eric Honour)
University of St Thomas
2010 Calendar
Chapter Overview15 April 2010North Star Chapter
4
10 July: Summer Social & IS 2010 Debrief Minnetonka Boat Ride & TBD Restaurant12 August: Risk and Project Management (Hornbacher &
Associates)
Lockheed
9 September: “SE in Operating Systems”
City Water Works Tour
14 October: “SE in the Production Process”
Ford Assembly Plant Tour
11 November: “Architecture & MBSE”
Medtronic
9 December: Holiday Party
Venue TBD
2010 Calendar
Chapter Overview15 April 2010North Star Chapter
Communication
North Star Chapter Web Site:
www.incose.org/northstar
• North Star Newsletter – The Integrator– December 2009 issue viewable/downloadable on line
• North Star Chapter Meeting Information– Charts from past meetings are viewable and
downloadable on the website
Chapter Overview15 April 2010North Star Chapter
6
• Thank you for your participation in our chapter survey
• We’re sending it a second time just to get maximum response
• Don’t respond to this second one if you responded to the first
• We’ll use these results to guide our meeting & tutorial planning
Chapter Survey
Chapter Overview15 April 2010North Star Chapter
7
Chapter Survey
• Thank you for participating in our recent chapter interest survey!– 59 member and non-member participants responded– Respondent represented....
– a broad range of experience levels
– inputs from the consumer, commercial, industrial, med device, defense, healthcare and business/information industries
• Information is being analyzed to aid our chapter planning in regards to meetings and tutorials
Chapter Overview15 April 2010North Star Chapter
8
Chapter Survey
Chapter Overview15 April 2010North Star Chapter
9
• Ambassador chair is seeking assistance to help spread the word about
chapter events
• Volunteers are being sought from inside organizations to aid
communication of meetings and seminars
• Sign up a couple of ways
• Contribute your contact information via the survey
• Sign up at the meeting, see Ambassador Group sign up sheet at the table
• For more information contact [email protected]
Ambassador Group
Chapter Overview15 April 2010North Star Chapter
10
Event Calendar
Details online @http://www.incose.org
April 17, 2010: North Star Chapter Spring Tutorial, “Systems Management: The Integration of Systems Engineering and Project Management”, Kevin Forsberg (Location: BAE Systems)
Jul 11-15, 2010: INCOSE International Symposium (Chicago)
Oct 4-6, 2010: 4th Asia-Pacific Conference on SE (Keelung, Taiwan)
Chapter Overview15 April 2010North Star Chapter
For posting or seeking job opportunities:
• Go to: www.incose.org
– Select “Education and Careers”
– Select “Post a Job”
– Create an account
– Post job openings
– Select “View Jobs” to see the listings
Job Opportunities
11
Chapter Overview15 April 2010North Star Chapter
12
Why sign in?
• For the past several years we have had the chapter incentive
program to encourage attendance at our meetings.
• For 2010, two $25 gift certificates for any Restaurant will be
awarded to every member attending six or more regular meetings
or who brings one new member into the chapter. (Note – You
must be a member in good standing for the entire year to qualify)
• For guests or members attending for the first time, this also
insures your notification by email of all subsequent events.
Attendance
BE SURE AND SIGN THE ATTENDANCE LIST!
PLEASE WRITE SO WE CAN READ IT!!
Chapter Overview15 April 2010North Star Chapter
• Attendance at our meetings continues to grow…but so does the cost of Pizza
• We will continue to have networking time and serve appetizers and soft drinks
• We ask that you help us by making a voluntary donation• You decide if and the amount and place it in the gold box
(any amount helps)
13
Many thanks, your response to date has been most helpful
Donations
Chapter Overview15 April 2010North Star Chapter
14
MFESTS
Chapter Overview15 April 2010North Star Chapter
15
MFESTS
Chapter Overview15 April 2010North Star Chapter
It has been suggested that we could network better…
…please take a moment to introduce yourselves to those on your right and left!!!
16
Introductions
Chapter Overview15 April 2010North Star Chapter
• Dr. Kevin Forsberg draws on 27 years of industrial experience in systems engineering, project, and proposal management, and 26 years of successful consulting to both government and industry• Experience ranges from research projects, to development efforts, through to full-scale production implementation • Provided training and consulting to both government and commercial clients sine 1983• Specializes in systems, hardware and software project management, and the related processes, techniques, and skills essential to achieving predictable project performance• CEO and founder of the Center for Systems Management
Kevin Forsberg
17
Chapter Overview15 April 2010North Star Chapter
18
Backup Slides
Chapter Overview15 April 2010North Star Chapter
19
Program Themes Chapter Calendar Chapter Organization Chapter Communications INCOSE Event Calendar SE Certification Job Opportunities Applicable Project Life Cycle Phase Attendance Donations Speaker Introduction
Overview Agenda
Chapter Overview8 May 2008North Star Chapter
Chapter Overview14 January 2010
Professional Certification Program
International Council on Systems Engineering has established a multi-level Professional Certification Program to provide a formal method for recognizing the knowledge and experience of systems
engineers, regardless of where they may be in their career.
Chapter Overview15 April 2010North Star Chapter
2010Chapter Organization
INCOSE Certification Advisory Group (CAG)Eileen Arnold – Chair
CAG Project ManagerDave Walden
Contact Eileen Arnold
• Systems Science• SE Technical Process• Architecture• SE Management Process• Requirements• Risk • SE Support Processes • Measurement• Modeling & Tools• Specialty Engineering• Application Sectors
PresidentMark Elpers
SecretaryBob Hunter
TreasurerJohn Palmer
Dir. IndustryMark Feitel
President ElectPaul Frenz
Past President Neill RadkeJohn Palmer
Dir. Acad/Govt Neill Radke
North Star Leadership
CommunicationEileen Arnold
Technical Operations
Chapter Overview15 April 2010North Star Chapter
ISO 15288 Project Life Cycle
Stakeholder Requirements Definition
VerificationRequirements Analysis
Transition
Architectural Design
Validation
Implementation
Operation
Integration
Maintenance
Disposal
Project Planning Project Assessment Project Control
Decision Making Risk Management Configuration Management Information Management
Stakeholder Requirements Definition
VerificationRequirements Analysis
Transition
Architectural Design
Validation
Implementation
Operation
Integration
Maintenance
Disposal
Enterprise EnvironmentManagement
System Life Cycle Process Management
Quality Management
Resource ManagementInvestment ManagementSupply
Acquisition