Chapter 7 Chip Seal
Transcript of Chapter 7 Chip Seal
![Page 1: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/1.jpg)
Chapter 7Chip Seals
From… Maintenance TechnicalAdvisory Guide (MTAG)
![Page 2: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/2.jpg)
Managers’ Overview
From… Maintenance TechnicalAdvisory Guide (MTAG)
![Page 3: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/3.jpg)
Chip Seal
What is Chip Seal?Why use Chip Seal?When to use Chip Seal? Where to use Chip Seal?Chip Seal Variations
Chapter 7 – Chip Seals
![Page 4: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/4.jpg)
What is Chip Seal?Application of asphalt binder on existing pavement followed by a layer of aggregate chips. The treatment is then rolled to embed the aggregate into the binder.
Chapter 7 – Chip Seals
![Page 5: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/5.jpg)
Why to Use - Performance and CostPerformance• Typical treatment life: 5 to 10 years• Function of climate, existing pavement condition,
traffic, type of chip sealAverage cost• $2.50 to $5.00/yd2 (depending on oil price)
Chapter 7 – Chip Seals
![Page 6: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/6.jpg)
Where and When to Use
Surface for light to medium traffic (ADT<30,000)Waterproof layerSkid resistant surfaceSeal the surfaceAddress bleedingTemporary base course coverDefine shoulders
Chapter 7 – Chip Seals
![Page 7: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/7.jpg)
When NOT to Use!Structurally deficient pavementsCracks >1/4 in width unless sealedLarge number of potholesRutting >1/2 inRide quality needs significant improvement
Chapter 7 – Chip Seals
![Page 8: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/8.jpg)
Keys for Success
Proper surface preparationUse the right binder and clean aggregatesFollow the construction specs, including the need for traffic controlChip seal in good weather conditions
Chapter 7 – Chip Seals
![Page 9: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/9.jpg)
Sweeping (before and after)Sweeping (before and after)
RollingRollingAggregate Aggregate ApplicationApplication
Binder Binder ApplicationApplication
![Page 12: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/12.jpg)
Chip Seal VariationsApplications• Single chip seals• Double or triple chip seals• Cape seals• Fabric and chip seals• Scrub seals
Asphalt Binder Types• PME• PMA• AR
Chapter 7 – Chip Seals
![Page 13: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/13.jpg)
Chip Seal VariationsSingle Chip Seals
Existing Pavement Binder
![Page 14: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/14.jpg)
Chip Seal VariationsDouble Chip Seals
Second BinderApplication
Existing Pavement Binder
![Page 15: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/15.jpg)
Chip Seal VariationsCape Seals
Slurry Seal
Existing Pavement Binder
![Page 16: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/16.jpg)
Chip Seal VariationsFabric and Chip Seals
Slurry Seal
Existing PavementTackCoat
Paving Fabric
BinderApplication
![Page 17: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/17.jpg)
Chip Seal VariationsFabric and Chip Seals
Chapter 7 – Chip Seals
![Page 18: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/18.jpg)
Chip Seal CourseTraining Modules Available
1. Design, Materials & Specifications
2. Construction, QC & Trouble Shootings
Chapter 7 – Chip Seals
![Page 19: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/19.jpg)
Module 7-1
Design, Materials & Specifications
From… Maintenance Technical
Advisory Guide (MTAG)
![Page 20: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/20.jpg)
Topics to be covered
Chip Seal Design ProcessDesign Considerations - Quantity SelectionChip Seal Design MethodsMaterial Selection – Binder and Aggregate
Chapter 7 – Chip Seals
![Page 21: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/21.jpg)
Chip Seal Design Process
Assess existing pavement• Based on Traffic, climate (add table 7-2)
Select compatible binder and aggregateDetermine quantity
Chapter 7 – Chip Seals
![Page 22: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/22.jpg)
Determine Quantity
Residual asphalt content• Asphalt cement factor = 1.0• Emulsion factors range = 0.65 to 0.70
Aggregate application rate• Single chip layer• No more than 10% excess chips• 70% embedment recommended
Chapter 7 – Chip Seals
![Page 23: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/23.jpg)
Chip Seal Design Methods
McLeod procedureAsphalt Institute method
Chapter 7 – Chip Seals
![Page 24: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/24.jpg)
Asphalt Institute Method
1. Determine aggregate size and specific gravity
2. Aggregate and binder quantities from table
3. Adjust aggregate (if necessary)4. Adjust asphalt content based on
condition of road (if necessary)
Chapter 7 – Chip Seals
![Page 25: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/25.jpg)
Material Selection - Binder
Chapter 7 – Chip Seals 2-4.25
![Page 26: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/26.jpg)
Material Selection - Binder
Polymer-modified emulsionsPolymer-modified binderPolymer-modified rejuvenating emulsions (PMRE)Asphalt Rubber
Chapter 7 – Chip Seals
![Page 27: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/27.jpg)
Material Selection -Emulsion Ingredients
AsphaltWaterEmulsifying agent (surfactant)
Chapter 7 – Chip Seals
![Page 28: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/28.jpg)
Material SelectionAsphalt Rubber Chip Seal
Chapter 7 – Chip Seals 2-4.28
![Page 29: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/29.jpg)
Binder MaterialField Blended (min. 45 minutes and viscosity 1,500 cps-4,000) hot asphalt, extender oil, crumb rubber, and high natural.
AR binder application is usually .60 gal / square yard through an agitated distributor truck attached with a vapor recovery system.
AggregateChips are always hot pre-coated, and applied at 35-40 lbs. per square yard
Asphalt Rubber Chip Seals
Chapter 7 – Chip Seals
![Page 30: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/30.jpg)
Asphalt Rubber Chip Seal
![Page 31: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/31.jpg)
![Page 32: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/32.jpg)
Polymer Modified Asphalt Chip Seals
BinderTerminal Blended using hot asphalt, polymer and can use crumb rubber.
Application rate is 0.35 - 0.50 gals/sy depending on size of chip
ChipsChips can be 3/8” up to 1/2” (25-35 lbs. / sy)
Chips are required to be pre-coated and heated
Chapter 7 – Chip Seals
![Page 33: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/33.jpg)
![Page 34: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/34.jpg)
PolymerModified EmulsionChip Seals
Crack Seal before PM Emulsion Seal
![Page 35: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/35.jpg)
PMRE Scrub Seal
BinderPolymer modified emulsion with a solvent free rejuvenating agent additive
Application rate is 0.25 - 0.40 gals/sy depending on size of chip and degree of cracking.
ChipsChips can be 1/4” up to 1/2” (18-35 lbs. / sy)
Can be applied at temperatures down to 40o F
Crack filling is not required
Chapter 7 – Chip Seals
![Page 36: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/36.jpg)
Material Selection - Aggregates
Clean and durableOne size: 6 to 16 mm (0.25 to 0.6 in)Cubical shapeFlat and elongated particles limited to 25 to 30 percentFines limited to 1 to 2 percent
Chapter 7 – Chip Seals
![Page 37: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/37.jpg)
Material SelectionProblem With Flat Aggregates
Existing Pavement Binder
![Page 38: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/38.jpg)
Module 7-2
Construction and Inspection
From… Maintenance Technical
Advisory Guide (MTAG)
![Page 39: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/39.jpg)
Topics to be covered
Construction Procedures
Quality Control
Inspection
Troubleshooting
Chapter 7 – Chip Seals
![Page 40: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/40.jpg)
ConstructionConstruction
Chapter 7 – Chip Seals 2-4.40
![Page 41: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/41.jpg)
Construction - Conventional Chip Seal Procedure
1. Clean existing pavement2. Apply binder3. Spread aggregate4. Roll5. Allow binder to cure or cool6. Broom loose aggregate7. Apply a flush coat
Chapter 7 – Chip Seals
![Page 42: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/42.jpg)
Construction - Cleaning Existing Pavement
Chapter 7 – Chip Seals
![Page 43: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/43.jpg)
Construction - Start and Stop Application on Mat
![Page 44: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/44.jpg)
Construction - Binder Application
Chapter 7 – Chip Seals
![Page 45: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/45.jpg)
Construction - Binder Overlap
Spray Bar and Nozzles
Single Overlap hh
Roadway SurfaceDouble OverlapRoadway SurfaceTriple OverlapRoadway Surface
h
Chapter 7 – Chip Seals
![Page 46: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/46.jpg)
Construction - Binder ApplicationOverlap
Triple OverlapTriple Overlap
![Page 47: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/47.jpg)
Construction - Binder Application
![Page 48: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/48.jpg)
Construction - Aggregate Application
Chapter 7 – Chip Seals
![Page 49: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/49.jpg)
Construction - Aggregate Application
Chapter 7 – Chip Seals
![Page 50: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/50.jpg)
Construction - Rolling
Immediate rolling of aggregatePneumatic-tired rollersNo fewer than three passesFull coverage necessary before asphalt cures or cools
Chapter 7 – Chip Seals
![Page 51: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/51.jpg)
Construction - Rolling
![Page 52: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/52.jpg)
Construction - Rolling
![Page 53: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/53.jpg)
Construction - Curing of Emulsion
Time depends on temperature and relative humidityEmulsion break should begin just after first roller passOpen to traffic in about 2 hours
Chapter 7 – Chip Seals
![Page 54: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/54.jpg)
Construction – Cooling of Hot Binder
Time depends on temperature and relative humidityBinder should be cured prior to open to traffic. Time frame is more like 3 to 6 hours depending on climatic conditions
Chapter 7 – Chip Seals
![Page 55: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/55.jpg)
Construction - Brooming Loose Aggregate
Chapter 7 – Chip Seals
![Page 56: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/56.jpg)
Quality Control - Preliminary Responsibilities
Project reviewDocument reviewMaterial checks
Chapter 7 – Chip Seals
![Page 57: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/57.jpg)
Quality Control - Pre-Application Inspection
Surface preparationEquipment inspection• Asphalt distributor• Chip spreader• Haul trucks• Rollers• Brooms
Chapter 7 – Chip Seals
![Page 58: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/58.jpg)
Quality Control - Pre-Application Inspection (cont.)
Weather requirementsDetermining application ratesChecking application ratesTraffic control plan and setup
Chapter 7 – Chip Seals
![Page 59: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/59.jpg)
Quality Control - Project Inspection
Asphalt applicationAggregate applicationTruck operationRollingLongitudinal jointsTransverse jointsBrooming
Chapter 7 – Chip Seals
![Page 60: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/60.jpg)
Quality Control - Post-Application Inspection
CleanupOpening to traffic
Chapter 7 – Chip Seals
![Page 61: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/61.jpg)
Quality Control - Preliminary Responsibilities
Project reviewDocument reviewMaterial checks
Chapter 7 – Chip Seals
![Page 62: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/62.jpg)
Quality Control - Pre-Application Inspection
Surface preparationEquipment inspection• Asphalt distributor• Chip spreader• Haul trucks• Rollers• Brooms
Chapter 7 – Chip Seals
![Page 63: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/63.jpg)
Quality Control - Pre-Application Inspection (cont.)
Weather requirementsDetermining application ratesChecking application ratesTraffic control plan and setup
Chapter 7 – Chip Seals
![Page 64: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/64.jpg)
Quality Control - Project Inspection
Asphalt applicationAggregate applicationTruck operationRollingLongitudinal jointsTransverse jointsBrooming
Chapter 7 – Chip Seals
![Page 65: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/65.jpg)
Quality Control - Post-Application Inspection
CleanupOpening to traffic
Chapter 7 – Chip Seals
![Page 66: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/66.jpg)
Quality Control - Preliminary Responsibilities
Project reviewDocument reviewMaterial checks
Chapter 7 – Chip Seals
![Page 67: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/67.jpg)
Quality Control - Pre-Application Inspection
Surface preparationEquipment inspection• Asphalt distributor• Chip spreader• Haul trucks• Rollers• Brooms
Chapter 7 – Chip Seals
![Page 68: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/68.jpg)
Quality Control - Pre-Application Inspection (cont.)
Weather requirementsDetermining application ratesChecking application ratesTraffic control plan and setup
Chapter 7 – Chip Seals
![Page 69: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/69.jpg)
Quality Control - Project Inspection
Asphalt applicationAggregate applicationTruck operationRollingLongitudinal jointsTransverse jointsBrooming
Chapter 7 – Chip Seals
![Page 70: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/70.jpg)
Quality Control - Post-Application Inspection
CleanupOpening to traffic
Chapter 7 – Chip Seals
![Page 71: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/71.jpg)
TroubleshootingTroubleshooting
2-4.71
![Page 72: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/72.jpg)
TroubleshootingWhat is wrong here?
StreakingStreaking
![Page 73: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/73.jpg)
TroubleshootingWhat is wrong here?
Poor Longitudinal JointPoor Longitudinal Joint
![Page 74: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/74.jpg)
TroubleshootingWhat is wrong here?
BleedingBleeding
![Page 75: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/75.jpg)
TroubleshootingWhat is wrong here?
Loss of Cover AggregateLoss of Cover Aggregate
![Page 76: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/76.jpg)
TroubleshootingWhat is wrong here?
Non-uniform Aggregate CoverageNon-uniform Aggregate Coverage
![Page 77: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/77.jpg)
TroubleshootingPossible Construction Problems
Problem:Aggregate embedment > 80 percent
Potential causes? (Refer to Table 7-7)
Chapter 7 – Chip Seals
![Page 78: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/78.jpg)
TroubleshootingPossible Construction Problems
Problem:Aggregate embedment < 50 percent
Potential causes? (Refer to Table 7-7)
Chapter 7 – Chip Seals
![Page 79: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/79.jpg)
TroubleshootingWhat is wrong here?
Loss of aggregate due to inadequate curingLoss of aggregate due to inadequate curing
Chapter 7 – Chip Seals
![Page 80: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/80.jpg)
TroubleshootingWhat is wrong here?
Single OverlapSingle Overlap
Chapter 7 – Chip Seals
![Page 81: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/81.jpg)
TroubleshootingWhat happened here?
Chapter 7 – Chip Seals
![Page 82: Chapter 7 Chip Seal](https://reader035.fdocuments.us/reader035/viewer/2022062401/5891b6591a28abfa4d8b7adc/html5/thumbnails/82.jpg)
Thank You