Chapter 3
Preventive Maintenance : Concepts, Modeling and Analysis
![Page 2: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/2.jpg)
Chapter Objectives
1. Enable students to understand the Basic Tools for developing Pm
Programs.
2. Enable students to diagnose if a plant needs improvement in its PM program
![Page 3: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/3.jpg)
Chapter3 Objectives
3. Enable students to develop planned maintenance programs.
4. Enable students to formulate models to determine PM intervals
5. Enable students to formulate and solve inspection models.
![Page 4: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/4.jpg)
Preventive Maintenance
Preventive maintenance is a series of preplanned tasks performed to counteract known causes of potential failures of those functions.
![Page 5: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/5.jpg)
Preventive Maintenance
Preventive maintenance is the preferred approach to asset management:
It can prevent premature failure and
reduce its frequency It can reduce the severity of failure
and mitigate its consequences
It can provide warning of an impending or incipient failure to allow planned repair
It can reduce the overall cost of asset management
![Page 6: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/6.jpg)
Preventive maintenance
Condition
based
Statistically and reliability based
Off line On line Time based
Use based
Preventive maintenance
Condition
based
Statistically and reliability based
Off line On line Time based
Use based
![Page 7: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/7.jpg)
Why PM is Preferred
1. The frequency of premature failures can be reduced through proper lubrication, adjustments and cleaning.
2. If failure can not be prevented periodic inspections can help reduce its
severity.
![Page 8: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/8.jpg)
Why PM is Preferred
3. Warning of impeding failure can be detected by monitoring gradual
degradation of function or parameter.
4. The cost of planned maintenance is always cheaper than emergency
maintenance
![Page 9: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/9.jpg)
Critical Issues Regarding PM
1. What PM tasks should be performed to prevent failure?. Time based tasks. Condition based tasks
Discuss situation where each one is applicable.
![Page 10: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/10.jpg)
Diagnostic Technologies
The most commonly applied condition-based maintenance techniques are vibration analysis, oil analysis, thermography, ultrasonics, electrical effects and penetrants.
![Page 11: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/11.jpg)
Vibration analysis
Vibration can be defined as the movement of a mass from its point of rest through all positions back to the point of rest, where it is ready to repeat the cycle. The time it takes to do this is its period, and the number of repetitions of this cycle in a given time is its frequency
![Page 12: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/12.jpg)
Vibration analysis
The severity of vibration is determined by the amplitude - or maximum movement - its peak velocity and peak acceleration. Vibration analysis in condition monitoring, is accomplished by comparing vibration characteristics of current operation to a baseline, measured when the machinery was known to be operating normally. The selection of the specific parameters to be measured depends primarily on the frequency of the vibration.
![Page 13: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/13.jpg)
Vibration analysisVibration analysis techniques can be used to monitor the performance of mechanical equipment that rotates, reciprocates or has other dynamic actions. Examples include gearboxes, roller bearings, motors, pumps, fans, turbines, belt or chain drives, compressors, generators, conveyors, reciprocating engines and indexing machines
![Page 14: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/14.jpg)
Oil analysis
Ferrography and magnetic chip detection examine the iron-based wear particles in lubrication oils to determine the type and extent of wear, and can help determine the specific component that is wearing.
![Page 15: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/15.jpg)
Oil Analysis
Spectrometric oil analysis measures the presence and amounts of contaminants in the oil through atomic emission or absorption spectrometry.
![Page 16: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/16.jpg)
Oil analysisIt is useful for determining not only iron, but also other metallic and not metallic elements, which can be related to the composition of the various machine components, like bearings, bushings, piston rings, etc. It is useful when wear particles are initially being generated in the early stages of failure, as they are small.
![Page 17: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/17.jpg)
Oil analysis
Chromatography measures the changes in lubricant properties, including viscosity, flash point, pH, water content and insoluble, through selective absorption and analysis.
![Page 18: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/18.jpg)
Thermography
The most common uses for thermography, which measures the surface temperature through the measurement of infra-red radiation, are for determining poor electrical connections and hot spots, furnace and kiln refractory wear and critical boiler and turbine component overheating. An infra-red camera shows surface temperature variations, calibrated to provide the absolute temperature or temperature gradients through black and white or color variations.
![Page 19: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/19.jpg)
Ultrasonic
There are several techniques for ultrasonic testing, but they all are used to determine faults or anomalies in welds, coatings, piping, tubes, structures, shafts, etc. Cracks, gaps, buildups, erosion, corrosion and inclusions are discovered by transmitting ultrasonic pulses or waves through the material and assessing the resultant signature to determine the location and severity of the discontinuity. This technique is also used to measure flow rates.
![Page 20: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/20.jpg)
Electrical Effects Monitoring
There are several tests for corrosion using a simple electric circuit monitored by varying degrees of sophisticated instrumentation. The Corrator uses the electro-chemical polarization method in a vessel with corrosive liquid. The Corrometer uses the electrical resistance across a probe inserted in the active environment eg. refinery process equipment.
![Page 21: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/21.jpg)
Electrical Effects Monitoring
The most common for monitoring or testing motors or generators are voltage generators, including mergers. These measure the resistance of insulation, and apply a test voltage from 250 volts to 10,000 volts.
![Page 22: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/22.jpg)
Penetrants Electrostatic and liquid dye
penetrants are used to detect cracks and discontinuities on surfaces, caused in manufacturing, by wear, fatigue, maintenance and overhaul procedures, corrosion or general weathering. The penetrant is applied and allowed to penetrate into the anomalies. The surface is cleaned and the penetrant revealed through direct visual, fluorescent or electrostatic techniques.
![Page 23: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/23.jpg)
PLANNED MAINTENANCE
Maintenance work carried out with forethought control and record. It can be applied to any of maintenance provided that
(a) The maintenance policy has been considered carefully.
(b) The maintenance policy is planned in advance.
![Page 24: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/24.jpg)
PLANNED MAINTENANCE
(c) The work is controlled and directed to conform to the prearranged plan.
(d) Historical and statistical record are complied and maintained to assess the
results and provide guide for future policy.
![Page 25: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/25.jpg)
BENEFITS OF PLANNED MAINTENANCE
1. Greater Plant Availability
2. Less Costly
3. High Level of Output
4. Greater Utilization
5. Servicing and Adjustment is not overlooked
![Page 26: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/26.jpg)
BENEFITS OF PLANNED MAINTENANCE
6. Improved Budget Control
7. Improved Stocks and Spares Control
8. Provision of Information for Realistic Forecasts
9. Focusing Attn. on Frequently Recurring Jobs.
![Page 27: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/27.jpg)
ELEMENTS OF PLANNED MAINTENANCE (PM)
1. Leader
2. List of all Facilities and their
Importance (What)
3. Identification (Coding)
4. Facility Register
![Page 28: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/28.jpg)
ELEMENTS OF PLANNED MAINTENANCE (PM)
5. Maintenance Schedule
6. Job Specification
7. Control
8. History Record
![Page 29: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/29.jpg)
Facility Inventory
The facility inventory is a list of all facilities including all parts of a site and content. It is made for purpose of identification. An inventory sheet of all equipment should be developed showing equipment identification, description of facility, location, type and priority (importance).
![Page 30: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/30.jpg)
Identification (Coding)
It is essential to develop a system by which each equipment is identified uniquely. A coding system that help in this identification process should be established. The code should indicate location, machine type and machine number. This coding system differ from plant to plant and its design should reflect the nature of the facility.
![Page 31: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/31.jpg)
Facility Registor
The facility register is a file (electronic or hard copy) including technical detail about items that are included in the maintenance plan. These items are the first to be fed to the maintenance information system.
![Page 32: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/32.jpg)
Equipment RecordThe equipment (item) record should include, identification number, location, type of equipment, manufacturer, date of manufacturing, serial number, specification, size, capacity, speed, weight, power service requirement, connection details, foundation detail, overall dimension, clearance, reference drawing number, reference number for service manuals, interchangeability with other units, etc.
![Page 33: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/33.jpg)
Maintenance Schedule
A maintenance schedule must be developed for each equipment in the program. The schedule is a comprehensive list of maintenance tasks to be carried on the equipment.
![Page 34: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/34.jpg)
Maintenance ScheduleThe schedule include the name and identification number of the equipment, location, reference number of the schedule, detailed list of tasks to be carried out (inspections, preventive maintenance, replacements), the frequency of each task, the crafts needed to carry out the task, time for each task, special tools needed, material needed and details of any contract maintenance.
![Page 35: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/35.jpg)
Job Specification
The job specification is a document describing the procedure for each task.. The job specification should indicate: the identification number of the item (equipment), the location of the item, the maintenance schedule reference, the job specification reference number, the frequency of the job, crafts required for the job, the details of the task, components to be replaced, special tools and equipment needed, reference drawings, manuals and safety procedures to be followed.
![Page 36: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/36.jpg)
Maintenance Program
The maintenance program is a list allocating maintenance tasks to specific time period. When developing the maintenance program a great deal of coordination must be done in order to balance the work load and meet production requirements. This is the stage when the planned maintenance is scheduled for execution.
![Page 37: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/37.jpg)
Program Control
The maintenance program developed must be executed as planned. Close monitoring is needed in order to observe any deviation from the schedule. If deviations are observed a control action is needed
![Page 38: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/38.jpg)
A SYSTEMATIC SIX STEP METHOD(TOP-TO-BOTTOM)
1.Determine Critical Plant Units and Operation Windows.
2.Classify the Plant into Constituent Items.
3. Determine and Rank Effective Procedure.
![Page 39: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/39.jpg)
A SYSTEMATIC SIX STEP METHOD(TOP-TO-BOTTOM)
4.Establish Plan for Identified Work.
5. Establish a schedule for On-Line Maintenance
6.Establish Corrective Maintenance Guidance
![Page 40: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/40.jpg)
Mathematical Models for Optimum PM Polices
Two well known polices which are:
1. Age based policy (Type 1 policy)
2. Constant interval replacement polices
(type II policy)
![Page 41: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/41.jpg)
Age Based Policy
Policy I (age preventive replacement) is defined as follows: perform preventive replacement after tp hours of continuing operation without failure; tp could be finite or infinite. In case of an infinite tp no preventive maintenance (replacement) is scheduled. If the system fails prior to tp hours having elapsed, perform maintenance (replacement) at the time of failure and reschedule the preventive maintenance after tp operation hours.
![Page 42: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/42.jpg)
Notation
Cp = cost of preventive maintenance
Cf = cost of breakdown (failure)
maintenance f(t) = time to failure probability density
function (p.d.f.). F(t) = equipment or system failure
distribution, it is the integral of f(t) r(t) = failure rate function
![Page 43: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/43.jpg)
Notations
N(tp) = number of failures in the interval
(0,tp); N(tp) is a random variable.
H(tp) = expected number of failures in the
interval (0,tp).
R(t) = reliability or survival function. M(tp)= expected value of the truncated
distribution with p.d.f. f(t) truncated at tp.
M(tp) =
C(tp) = expected cost per cycle
UC(tp) = expected cost per unit time.
)(1/)( ptRdtttf
![Page 44: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/44.jpg)
Failurereplacement
Preventivereplacement
Failurereplacement
Preventivereplacement
Time
0
Failure replacement
tp
Failure replacement
tp
Age Based Policy
![Page 45: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/45.jpg)
Model Development
length cycle Expected
cycleper cost expected Total)( ptUC
)](1[)()( pfppp tRCtRCtC
Expected Cycle Length = tp R(tp)+M(tp)(1-R(tp))
Expected Cycle Length = tp R(tp)+M(tp)(1-R(tp))
)](1/[)()( pp tRdtttftM
![Page 46: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/46.jpg)
Golden Section Method 1. Choose an allowable final tolerance
level, , and assume the initial interval where the minimum lies is [a1,b1,] = [a,b] and let
1 = a1+(1-)(b1-a1), 1 = a1+(b1-a1), =
0.618. Evaluate g(1) and g(1), let k=1
and go to step 2.
2. If bk-ak <, stop as the optimal solution
is . Otherwise, if g( k)>g( k) go to step
3, and if go to step 4
![Page 47: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/47.jpg)
Golden Section Continued 3. Let ak+1=k and bk+1=bk, furthermore, let k+1=k
and let k+1=ak+1+(bk+1-ak+1). Evaluate g(k+1,), and go to step 5.
4. Let ak+1=ak and bk+1= k, furthermore let k+1=k and let k+1= ak+1+(1-)(bk+1- ak+1), evaluate g( k+1), and go to step 5.
5. Replace k by k+1 and go to step 1.
For more on the properties and the convergence of the above algorithm see Bazarra et al. [4].
![Page 48: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/48.jpg)
Example on Policy 1
An equipment has a time to failure density function f(t) that follows a uniform distribution between [0,10] weeks. The cost of preventive replacement is $5 and the cost of failure replacement is $50. Determine tp, the optimal time of preventive
replacement.
![Page 49: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/49.jpg)
Cost Function
pt
t
t
tRtMtRt
tRCtRCtUC
p
p
pppp
pfppp
2p
p
pp
p
20
1-t
4.5t+5 =
10
1
2
t+]1/10t-[1t
10
150+)1/10t-5(1
=
)](1)[()(
)](1[)()(
![Page 50: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/50.jpg)
Applying Golden Section
68.7
27038.4
81.32)18.6()( ,18.7
3.09038
22.19=UC(3.82)=)UC(
6.18=10*0.618+0= 3.82=10*0.382+0=
0.382=-1 0.618,= ],10,0[],,[
11
11
11
UCUC
ba
)()( 11 UCUC the next interval is )()( UCUC
![Page 51: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/51.jpg)
![Page 52: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/52.jpg)
Inspection Models
Inspection is the process of gathering information about the state of an equipment in order to catch and correct failure before it happens.
- Why Do Inspection?
![Page 53: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/53.jpg)
Inspection Modelsf(t) = the density function of the time to failure of the equipment.
Ci = cost of inspection
Cu = the cost per unit associated with undetected equipment failure
Tr = repair time
EC(x1,x2,...,xn) = total expected cost per cycle
ET(x1,x2,...,xn) = expected cycle length
UEC(x1,x2,...,xn) = total expected cost per unit time
![Page 54: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/54.jpg)
Model Development
The inspection policy is to conduct an inspection at times x1,x2,x3,...,xn until failure is detected, when failure is detected the equipment is brought to a new condition through maintenance and the production cycle beings. The horizon we have is infinite
![Page 55: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/55.jpg)
Model Development
The objective is to determine x1,x2,...,xn that minimizes UE(x1,x2,x3,...,xn). If failure happened between xi-1, xi, at time ti, the cost of the cycle would be
KCi + Cu(xi – ti) +Cr
![Page 56: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/56.jpg)
Model Development
The expected cost is:
i
i
x
x ruui dttfCtxCiC1
)()])([
![Page 57: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/57.jpg)
Model Development
0)()(
0)()(1
),...,,,('
as obtained is unit timeper cost expected The
)()0
(),...,,,(ET
11 1
11
321
11321
kdttftx
x xT
k
xx dttftxCCkC
xxxxC
dttftk
xx xTxxxx
kk kr
kk kuir
n
kk krn
![Page 58: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/58.jpg)
Profit Maximizing ModelThe model is formulated for a machine that is used in a production process. The machine has a general failure distribution. Inspections will reveal the condition of the machine and may result in reducing the severity of failure. Repairing a machine failed a cost of replacing Cr is incurred. The cost of inspection is Ci The question how often this machine should be inspected to maximize profit.
![Page 59: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/59.jpg)
Profit Maximizing Model
The expected profit per cycle P(T) consists of a profit P1(t) from a cycle without failure multiplied by the probability that failure does not happens in the cycle, plus a profit P2(T) of a cycle with a failure multiplied by the probability of failure in the cycle.
![Page 60: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/60.jpg)
Model Development
For a cycle without failure P1(t) is given as
For a cycle with failure, assume failure occurred at t, t < T. Then
iCpTTP )(1
P T E pt t T C Cpt f t dt
F TC Ci r
T
i r20( ) [ | ]
( ( )
( )
![Page 61: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/61.jpg)
Model Development
Substituting , we set
T
rii TFCCdttptfTRCpTTP0
)()()()()()(
F T R T( ) ( ) 1
P T p R t dt C R T C Cr
T
i r( ) ( ) ( ) 0
![Page 62: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/62.jpg)
Model Development
ri
T
r CCTRCdttRpTP )()()(0
TCCTRCdttRpTUPT
rir /)()()(0
![Page 63: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/63.jpg)
Inspection Problem
Consider the the last inspection model also given in section 3.72 . Derive the optimal inspection schedule for a machine with an exponential time to failure density function with parameter ß in terms of p, Cr, Ci, and
. Find the schedule if
= 0.01, p = 500, Cr = 4000 and Ci = 50
![Page 64: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/64.jpg)
Imperfect Maintenance
What is imperfect maintenance?The classical assumption that maintenance will bring the equipment to as good as new is not realistic. Imperfect maintenance introduced by Nakagawa that maintenance will improve the equipment condition and its status will be between new and condition before maintenance.
![Page 65: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/65.jpg)
Factors Affecting Condition After Maintenance
1. Spare parts
2. PM procedures
3. Workmanship
![Page 66: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/66.jpg)
Approaches for Modeling Imperfect Maintenance 1. An equipment after PM has the
same failure rate as before PM or is good as new with certain probabilities.
(2) The equipment age reduces by x
unit of time by each PM. (3) The age and the failure rate of an
equipment are reduced to the original ones at the beginning of all PM in proportion to the PM cost.
![Page 67: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/67.jpg)
Delay Time Modeling
The delay time concept in its simplest form defines a two stage failure process. In the first stage a defect becomes detectable and in the second stage this detectable defect gives rise eventually to failure of the equipment. The period h between the time when the defect is first detectable and the time of failure is called delay time.
![Page 68: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/68.jpg)
Delay Time Modeling
It has been possible to obtain subjective estimate of the probability density function f(h) of the delay time h. The knowledge about f(h) enables the construction of models of the relationship between the inspection period T and other variables such as the expected downtime or the expected operating cost per unit time.
![Page 69: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/69.jpg)
Delay Time Basic Inspection Model
Model assumptions:
• Defects arise either fixed as breakdown repairs or inspection repairs.
• An inspection is performed every T units of time at cost Ci and requires d units of time d<<<T
• Inspection is perfect
• Defects that are identified at inspection are fixed within inspection period.
![Page 70: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/70.jpg)
Delay Time Inspection Model
Model assumptions:
• Time of origin of fault is assumed uniform. Faults arise k per unit time
• The probability density function of delay time f(h) is known.
![Page 71: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/71.jpg)
Model DevelopmentSuppose that a fault arising within the period (0,T) has a delay time in the interval (h,h+dh), the probability of this event being f(h) dh. This fault will be repaired as a breakdown repair if the fault arises in period (0,T-h) see figure 9.4, otherwise as an inspection repair. The probability of the fault arising before (T-h), given that a fault will arise, is (T-h/T) (assumption 4). The probability that a fault is repaired as a breakdown and has delay time in (h,h+dh) is given by:
![Page 72: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/72.jpg)
Delay Time Process
Delay time process. If a defect occurs before
T-h it will be repaired as breakdown repair.
0 T-h T
h
![Page 73: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/73.jpg)
Model Development
dhhTfhT )(/)(
.)()(0
dhhfT
hTTP
T
h
![Page 74: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/74.jpg)
Downtime Delay Model
dTPkTddT
TD b
)()(
1)(
![Page 75: Chapter 3 w Preventive Maintenance : Concepts, Modeling and Analysis.](https://reader038.fdocuments.us/reader038/viewer/2022110321/56649ce65503460f949b3bfa/html5/thumbnails/75.jpg)
Expected Cost Model
Ipf CTPCTPCkTdT
TC
)(1)()(
1)(