Type of design projects
1. Variation of an exist.2. Improvement of existing product.3. Development of a new product for a
single or small run.4. Development of a new product for mass
production.
![Page 3: Chapter 3 Project definition and planning](https://reader030.fdocuments.us/reader030/viewer/2022033021/56816468550346895dd654a3/html5/thumbnails/3.jpg)
3
Form a team
Member of design team:Product design engineer, project manager,
manufacturing engineering, detailer, drafter, technician, material specialist, quality control/quality assurance specialist, industrial engineer, assembly manager, vender or supplier representative.
![Page 4: Chapter 3 Project definition and planning](https://reader030.fdocuments.us/reader030/viewer/2022033021/56816468550346895dd654a3/html5/thumbnails/4.jpg)
Engineering design teams structure
![Page 5: Chapter 3 Project definition and planning](https://reader030.fdocuments.us/reader030/viewer/2022033021/56816468550346895dd654a3/html5/thumbnails/5.jpg)
5
![Page 6: Chapter 3 Project definition and planning](https://reader030.fdocuments.us/reader030/viewer/2022033021/56816468550346895dd654a3/html5/thumbnails/6.jpg)
6
Structure of design team1. Functional organization(13%).2. Functional matrix(26%).3. Balance matrix(16%).4. Project Matrix(28%)5. Project team(16%).
![Page 7: Chapter 3 Project definition and planning](https://reader030.fdocuments.us/reader030/viewer/2022033021/56816468550346895dd654a3/html5/thumbnails/7.jpg)
7
Planning for deliverable
Drawing, prototype, bill of material, result of analysis, test results, others…
![Page 8: Chapter 3 Project definition and planning](https://reader030.fdocuments.us/reader030/viewer/2022033021/56816468550346895dd654a3/html5/thumbnails/8.jpg)
8
The five steps in planning
Step 1 Identify the taskStep 2 State the objective for each taskStep 3 Estimate the personnel, time, and other
resources needed to meet the objectivesStep 4 Develop a sequence for the taskStep 5 Estimate the product development cost
![Page 9: Chapter 3 Project definition and planning](https://reader030.fdocuments.us/reader030/viewer/2022033021/56816468550346895dd654a3/html5/thumbnails/9.jpg)
9
Develop the TaskIdentify the
tasks
State the object for each the tasks, output should be
defined
Estimate the personnel, time to meet the
requirement of each object
![Page 10: Chapter 3 Project definition and planning](https://reader030.fdocuments.us/reader030/viewer/2022033021/56816468550346895dd654a3/html5/thumbnails/10.jpg)
10
![Page 11: Chapter 3 Project definition and planning](https://reader030.fdocuments.us/reader030/viewer/2022033021/56816468550346895dd654a3/html5/thumbnails/11.jpg)
11
• Accurate method
![Page 12: Chapter 3 Project definition and planning](https://reader030.fdocuments.us/reader030/viewer/2022033021/56816468550346895dd654a3/html5/thumbnails/12.jpg)
12
PC=PC=1*1+2*4+3*3=18
![Page 13: Chapter 3 Project definition and planning](https://reader030.fdocuments.us/reader030/viewer/2022033021/56816468550346895dd654a3/html5/thumbnails/13.jpg)
13
Product support 5-10%
Optimistic time
Most likely time
Pessimistic time
![Page 14: Chapter 3 Project definition and planning](https://reader030.fdocuments.us/reader030/viewer/2022033021/56816468550346895dd654a3/html5/thumbnails/14.jpg)
14
Design structure matrix (used to determine the relation between task)
![Page 15: Chapter 3 Project definition and planning](https://reader030.fdocuments.us/reader030/viewer/2022033021/56816468550346895dd654a3/html5/thumbnails/15.jpg)
15
Sequence the tasks and set up the scaduleGantt Chart
![Page 16: Chapter 3 Project definition and planning](https://reader030.fdocuments.us/reader030/viewer/2022033021/56816468550346895dd654a3/html5/thumbnails/16.jpg)
16
他們喜好的 樂於學習,好分享過去生活經驗 四處旅遊包含國內外 重視生活娛樂品質 活耀於實體社團 重視養生保健他們擁有的 金字塔高端消費能力 豐富的人際關係 下一代已擁有獨立經濟能力 擁有可支配的自由時間他們具備的 財務自由 時間自由 寬廣的人生歷練他們想要的 足以信賴的心靈同伴 心靈層次的人生體驗 更高水準的退休生活 更加被重視的個人服務
了解我們的主要對象Who are they, Where are they, What are they
Research the Market
![Page 17: Chapter 3 Project definition and planning](https://reader030.fdocuments.us/reader030/viewer/2022033021/56816468550346895dd654a3/html5/thumbnails/17.jpg)
Estimate the product development cost
• Time need• Human resource need• Equipment need• Facility need• Support need• Material need