Chapter 10

IT Project Quality Management

Copyright 2012 John Wiley & Sons, Inc.10-1

Page 2: Chapter 10 IT Project Quality Management Copyright 2012 John Wiley & Sons, Inc. 10-1.

The Importance of Project Quality Management

2

Scope

Time Cost

Quality

Page 3: Chapter 10 IT Project Quality Management Copyright 2012 John Wiley & Sons, Inc. 10-1.

The Importance of Project Quality Management

People seem to accept systems being down occasionally or needing to reboot their PCs

But quality is very important in many IT projects

3

Page 4: Chapter 10 IT Project Quality Management Copyright 2012 John Wiley & Sons, Inc. 10-1.

What Is Project Quality?

4

Page 5: Chapter 10 IT Project Quality Management Copyright 2012 John Wiley & Sons, Inc. 10-1.

The Cost of Quality

The cost of quality is the cost of conformance plus the cost of nonconformance

Cost Categories Related to Quality

5

Page 6: Chapter 10 IT Project Quality Management Copyright 2012 John Wiley & Sons, Inc. 10-1.

Project Quality Management

6

• Software bugs account for about 40% computer systems failure

• Software horror stories www.risks.org http://www.cs.tau.ac.il/~nachumd/horror.html

• In 2008, software glitch was the reason for London Stock Exchange (LSE) failure

• In 2003, software failure caused blackout in the Northeast corridor of the U.S. and parts of Canada

Page 7: Chapter 10 IT Project Quality Management Copyright 2012 John Wiley & Sons, Inc. 10-1.

7

Costs/Hour of Downtime Due to Software Defects

Business Cost per Hour Downtime

Automated teller machines (medium-sized bank) $14,500

Package shipping service $28,250

Telephone ticket sales $69,000

Catalog sales center $90,000

Airline reservation center (small airline) $89,500

Page 9: Chapter 10 IT Project Quality Management Copyright 2012 John Wiley & Sons, Inc. 10-1.

What Is Project Quality Management?

Project quality management ensures that the project will satisfy the needs for which it was undertaken

Processes include:

9

Page 10: Chapter 10 IT Project Quality Management Copyright 2012 John Wiley & Sons, Inc. 10-1.

Project Quality Management Summary

10

Page 11: Chapter 10 IT Project Quality Management Copyright 2012 John Wiley & Sons, Inc. 10-1.

1) Planning Quality

Implies the ability to anticipate situations and prepare actions to bring about the desired outcome

Important to prevent defects by:

11

Page 12: Chapter 10 IT Project Quality Management Copyright 2012 John Wiley & Sons, Inc. 10-1.

Quality and IT Projects

Customers have difficulty explaining exactly what they want in an IT project.

What are the important scope aspects of IT projects that impact quality?

12

Page 13: Chapter 10 IT Project Quality Management Copyright 2012 John Wiley & Sons, Inc. 10-1.

Who’s Responsible for the Quality of Projects?

Several organizations and references:

International Organization for Standardization (www.iso.org)

IEEE (www.ieee.org)

13

Page 14: Chapter 10 IT Project Quality Management Copyright 2012 John Wiley & Sons, Inc. 10-1.

2) Performing Quality Assurance

Performing Quality Assurance through:

14

Page 15: Chapter 10 IT Project Quality Management Copyright 2012 John Wiley & Sons, Inc. 10-1.

Testing

Many IT professionals think of testing as a stage that comes near the end of IT product development

15

Page 16: Chapter 10 IT Project Quality Management Copyright 2012 John Wiley & Sons, Inc. 10-1.

Types of Tests

16

Page 17: Chapter 10 IT Project Quality Management Copyright 2012 John Wiley & Sons, Inc. 10-1.

Testing Alone Is Not Enough

Watts S. Humphrey, a renowned expert on software quality, defines a software defect as anything that must be changed before delivery of the program

Testing does not sufficiently prevent software defects because

Why?

Page 18: Chapter 10 IT Project Quality Management Copyright 2012 John Wiley & Sons, Inc. 10-1.

3) Controlling Quality

The main outputs of quality control are: Acceptance decisions Rework Process adjustments

Seven Basic Tools of Quality Flowchart Run Chart Scatter Diagram Histogram

18

Pareto Diagram Control Chart Cause and Effect Diagram

Page 19: Chapter 10 IT Project Quality Management Copyright 2012 John Wiley & Sons, Inc. 10-1.

Flowcharts

19

Page 20: Chapter 10 IT Project Quality Management Copyright 2012 John Wiley & Sons, Inc. 10-1.

Run Charts

20

Page 21: Chapter 10 IT Project Quality Management Copyright 2012 John Wiley & Sons, Inc. 10-1.

Scatter diagram

21

Page 22: Chapter 10 IT Project Quality Management Copyright 2012 John Wiley & Sons, Inc. 10-1.

Histograms

22

Page 23: Chapter 10 IT Project Quality Management Copyright 2012 John Wiley & Sons, Inc. 10-1.

Pareto Charts

23

Page 24: Chapter 10 IT Project Quality Management Copyright 2012 John Wiley & Sons, Inc. 10-1.

Quality Control Charts

24

Page 25: Chapter 10 IT Project Quality Management Copyright 2012 John Wiley & Sons, Inc. 10-1.

The Seven Run Rule

You can use quality control charts and the seven run rule to look for patterns in data

25

Page 26: Chapter 10 IT Project Quality Management Copyright 2012 John Wiley & Sons, Inc. 10-1.

Checksheet

26

Page 27: Chapter 10 IT Project Quality Management Copyright 2012 John Wiley & Sons, Inc. 10-1.

Cause-and-Effect Diagrams

27