    CHAPTER 1 SUBSTRUCTURE

    1.1 Earthwork

  • 8/11/2019 Chapter 1 Substructure

    2/20

    INTRODUCTION Earthwork: the processes whereby the surface of the

    earth is excavated and transported to and compactedat another location.

    The introduction of the internal combustion engine,electric power and hydraulic power have led to thedevelopment of a wide range of earthwork plant (size,capacity and efficiency).

    Scale: ranges from small works (the excavation ofditches and trenches for drainage and pits and trenchesfor foundations) to the large earthworks (highways anddams).

  • 8/11/2019 Chapter 1 Substructure

    3/20

    INTRODUCTION carried out at an early stage in a construction project,

    completion of the earthworks within the scheduledtime is often the key to the completion on time of thewhole project

    success often depends on:

    o an adequate site investigation and preparingpractical and satisfactory designs of theearthworks.

    o the choice and efficient use of the correct typesand size of plant to meet the particularrequirements of the site.

  • 8/11/2019 Chapter 1 Substructure

    4/20

    SCOPE OF EARTHWORKS

    Site clearing (Pembersihan tapak)

    Cutting and excavation (Pengorekan dan pemotongan)

    Transport and moving (Pemunggahan,Pengangkutandan Penuangan)

    Compaction (Pemadatan)

    Sloping (Pencerunan)

  • 8/11/2019 Chapter 1 Substructure

    5/20

    Site clearing

    Clearing, grubbing, demolishing, breaking up andremoving all trees, shrubs, vegetation, butts,structures such as walls, fences and other obstructionwithin the site which have been designated to bedemolished or removed

    All spoils and debris shall be removed and disposed ofoff-site at an approved certified construction landfill

  • 8/11/2019 Chapter 1 Substructure

    6/20

    Site clearing

  • 8/11/2019 Chapter 1 Substructure

    7/20

    Cutting and excavation

    Most construction projects require the movement ofearthwork on site. This will result in altering theexisting elevation to a different or finish elevation.

    To determine the amount of soil to be moved, theestimator needs to have a plot plan or topographicsurvey.

    This drawing is developed by plotting the readings(elevations) obtained from a topographic field surveyusually performed by a licensed land surveyor.

  • 8/11/2019 Chapter 1 Substructure

    8/20

    Cutting and excavation

    Part of the permanent works (e.g. cuttings)

    A temporary expedient in the construction of theworks (e.g. for foundations and drainage)

    The sides of the excavations are required to remainstable during their design life, can be achieved by: excavating the material to a stable slope angle

    by retaining or supporting the material.

  • 8/11/2019 Chapter 1 Substructure

    9/20

    Cutting and excavation

  • 8/11/2019 Chapter 1 Substructure

    10/20

    Cutting and excavation

  • 8/11/2019 Chapter 1 Substructure

    11/20

    Transport and moving

    Trucks are used to transport excavated material,aggregates and construction material

    As the primary hauling unit provides a high degree of

    flexibility. Found in the crust of the earth

    Classified as rock or soil

    Soil characteristics that affect a soils behaviour forconstruction purposes.

  • 8/11/2019 Chapter 1 Substructure

    12/20

    Transport and moving

    Lab tests are required to fully determine a soils

    physical and chemical properties which control those

    characteristics.

  • 8/11/2019 Chapter 1 Substructure

    13/20

    Transport and moving

  • 8/11/2019 Chapter 1 Substructure

    14/20

    Compaction

    Increased bearing capacity

    Increased compressibility

    Reduce permeability Improve stability

    Heavy/highway vs. building foundation compaction

    operations

  • 8/11/2019 Chapter 1 Substructure

    15/20

    Compaction

  • 8/11/2019 Chapter 1 Substructure

    16/20

    Sloping

    Function of the natural angle of repose, density,surface and subsurface water flow.

    Early stabilization of surfaces is critical

    Eliminate points of concentrated flow using slopedrains as outlets.

    Difficult slopes may require riprap, gabions, or othermeasures for permanent stabilization .

  • 8/11/2019 Chapter 1 Substructure

    17/20

    Sloping

  • 8/11/2019 Chapter 1 Substructure

    18/20

    Sloping

  • 8/11/2019 Chapter 1 Substructure

    19/20

    KEYS TO SUCCESSFULEARTHWORK OPERATIONS

    1. Control surface and subsurface water

    2. Maintain optimum moisture range by drying, mixing ,

    or wetting3. Identify and monitor cut & fill quantities

    4. Good layout (horizontal & vertical control)

    5. Minimize handling - minimize stockpiling

  • 8/11/2019 Chapter 1 Substructure

    20/20

    KEYS TO SUCCESSFULEARTHWORK OPERATIONS

    6. Optimize haul lengths

    7. Minimize cycle time

    8. Proper selection and sizing of excavators and haulunits

    9. Alternate haul unit wheel paths

    10. Experienced personnel in the field