Chapter 1 - Nuclear Regulatory CommissionLa Cross License T Revision 1. G The La C that is ow...

19
LA CROSSE BOILING WATER REACTOR LICENSE TERMINATION PLAN CHAPTER 1 GENERAL INFORMATION

Transcript of Chapter 1 - Nuclear Regulatory CommissionLa Cross License T Revision 1. G The La C that is ow...

Page 1: Chapter 1 - Nuclear Regulatory CommissionLa Cross License T Revision 1. G The La C that is ow located o Village o LACBW S4601 St Genoa, W The site i for LACB LACBW spent nuc license.

LA CROSSE BOILING WATER REACTOR

LICENSE TERMINATION PLAN

CHAPTER 1

GENERAL INFORMATION

Page 2: Chapter 1 - Nuclear Regulatory CommissionLa Cross License T Revision 1. G The La C that is ow located o Village o LACBW S4601 St Genoa, W The site i for LACB LACBW spent nuc license.

La CrossLicense TRevision

1.  Gen1.1. 1.2. 1.3. 

1.3.1.3.1.3.1.3.41.3.1.3.1.3.

1.4. 1.5. 

1.5.1.5.1.5.1.5.41.5.1.5.1.5.1.5.

1.6. 1.7. 

Figure 1-Figure 1-Figure 1-Figure 1-

se Boiling WTermination

n 0

neral InformaPurpose .....DecommissFacility ......1.  Site De2.  Current3.  Meteor4.  Geolog5.  Surface6.  Ground7.  EnvironOperationalPlan Summ1.  Genera2.  Site Ch3.  Identifi4.  Remed5.  Final R6.  Compli7.  Update8.  SupplemRegulatory References

-1  Site Re-2  Site Ov-3  LACBW-4  Topogr

Water ReactorPlan

ation ..............................

sioning Obje...................escription ....t/Future Lanrology and Cgy and Seisme Water Hydd Water Hydns and Naturl Backgroundary .............

al Informatioharacterizatioication of Re

diation Plans Radiation Suriance with th

e of the Site-ment to the ENotification...................

egional Locaverview .......WR Buildingraphical Map

r

TABLE O

....................

....................ective ...................................................

nd Use .........Climatology .mology .........drology ........drology ........ral Resourced .....................................

on .................on ................emaining Sit...................

rvey Plan ....he RadiologiSpecific DecEnvironmen

ns of Change....................

LIST O

ation .................................gs ................p ..................

1-i

OF CONTE

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................es .................................................................................................te Dismantle........................................ical Criteria commission

ntal Report ...es .....................................

OF FIGURE

....................

....................

....................

....................

ENTS

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................ement Activi........................................for License

ning Costs ................................................................

RES

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................ities .....................................................Termination

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................n ..................................................................................................

....................

....................

....................

....................

... 1-1 

... 1-1 

... 1-1 

... 1-2 

... 1-2 

... 1-3 

... 1-3 

... 1-3 

... 1-4 

... 1-5 

... 1-5 

... 1-6 

... 1-7 

... 1-7 

... 1-7 

... 1-8 

... 1-8 

... 1-9 

... 1-9 

... 1-9 

... 1-9 

. 1-10 

. 1-11 

. 1-13 

. 1-14 

. 1-15 

. 1-16 

Page 3: Chapter 1 - Nuclear Regulatory CommissionLa Cross License T Revision 1. G The La C that is ow located o Village o LACBW S4601 St Genoa, W The site i for LACB LACBW spent nuc license.

La CrossLicense TRevision

ALARA

AMCG

AMSL

BGS

DCGL

DQO

DSAR

FSS

FRS

GWH

ISFSI

LACBW

LSA

LTP

MARSSI

MYBP

NRC

ODCM

PSDAR

RESRAD

STS

USACE

se Boiling WTermination

n 0

As Lo

Avera

Above

Below

Deriv

Data Q

Defue

Final

Final

Gigaw

Indep

WR La Cr

Low S

Licen

IM Multi-

Millio

Nucle

Off-S

Post-S

D RESid

Sourc

US Ar

Water ReactorPlan

LIST OF

ow As Reaso

age Member

e Mean Sea

w Ground Su

ed Concentr

Quality Obje

eled Safety A

Status Surve

Radiation Su

watt-Hours

endent Spen

rosse Boiling

Specific Act

se Terminati

-Agency Rad

on Years Bef

ear Regulator

ite Dose Cal

Shutdown D

dual RADioa

e Term Surv

rmy Corp of

r

ACRONYM

onably Achie

of the Critic

Level

urface

ration Guide

ectives

Analysis Rep

ey

urvey

nt Fuel Stora

g Water Reac

ivity

ion Plan

diation Surv

fore Present

ry Commiss

lculation Ma

ecommissio

active Mater

vey

f Engineers

1-ii

MS AND AB

evable

cal Group

line Level

port

age Installatio

ctor

vey and Site

ion

anual

ning Activit

rials

BBREVIAT

on

Investigatio

ties Report

TIONS

n Manual

Page 4: Chapter 1 - Nuclear Regulatory CommissionLa Cross License T Revision 1. G The La C that is ow located o Village o LACBW S4601 St Genoa, W The site i for LACB LACBW spent nuc license.

La CrossLicense TRevision

1. G

The La Cthat is owlocated oVillage o

LACBWS4601 StGenoa, W

The site ifor LACB

LACBWspent nuclicense.

In a lettrequestedmaintenafrom DaiSolutions

1.1. P

The objepermit th50 licensgeneral li

This Licewas writtfor LicenReview Paccompathe LTP r

1.2. D

The decoLACBWremaininthe requidocumenthat is dAverage

se Boiling WTermination

n 0

General In

Crosse Boiliwned by Dairon the Dairyof Genoa, Ve

WR tate Road 35WI. 54632-88

is licensed uBWR and 72

WR has been clear fuel st

ter dated Od Nuclear Rance and deiryland to Sos.

Purpose

ctive of decohe release of se except foicense provi

ense Terminten followin

nse TerminaPlan for Evaanied by a prrequire NRC

Decommissio

ommissioninWR can submng ISFSI liceirements of

nts the procedistinguishab

Member of

Water ReactorPlan

nformation

ing Water Rryland Poweyland Genoaernon Count

5 846

under Posses2-046 for the

shut down ored in the L

October 8, 2Regulatory Cecommissionolutions. In

ommissioninthe site for ur the area suisions of 10 C

nation Plan (Lng the guidantion Plans foluating Nuclroposed licenC prior appro

oning Objec

ng objectivemit a requestensed facility

10 CFR 20ess that will ble from bathe Critical

r

n

Reactor (LACer Cooperatia site on thty, Wisconsin

ssion Only Le Independen

since 1987 LACBWR I

2015 (1), DCommission ning authoritn May 2016,

ng LACBWRunrestricted urrounding tCFR 72 Sub

LTP) satisfience in Regu

for Nuclear Plear Power Rnse amendmoval.

ctive

e is to condt to the NRCy) in accorda0.1402, Radbe used to dckground raGroup (AM

1-1

CBWR) wave (Dairylan

he east shoren with an ad

License No. Dnt Spent Fue

and is curreISFSI will b

Dairyland an(NRC) con

ties, under the NRC pr

R is to reducuse and allothe ISFSI.

bpart K.

es the requirulatory GuidPower ReacReactor Lice

ment that est

duct remediC for unrestance with Su

diological Crdemonstrate adioactivity

MCG) from a

as a 50 Megnd). This une of the Mi

ddress of:

DPR-45 withel Storage In

ently undergbe maintaine

nd LaCrossensent to tranPossession rovided cons

ce the residuow for the terThe ISFSI f

rement of 10de 1.179, Stactors (2) andense Terminablishes the

iation and stricted releasubpart E of 1riteria for Uthat the dosdoes not e

all applicable

gawatt Electrnit, also knowississippi Ri

h Docket Nunstallation (I

going decomed under an

eSolutions, nsfer Dairyla

Only Licensent to trans

ual radioactivrmination offacility is li

0 CFR 50.82andard Formd in NUREGnation Plans

criteria for

survey operse of the sit10 CFR PartUnrestrictedse from residexceed 25 me pathways o

ric (MWe) Bwn as Genoaiver south o

umbers of 50SFSI).

mmissioningamended Pa

LLC (Solutand’s possesnse No. DPRsfer the licen

vity to levelf the 10 CFRcensed unde

2(a)(9). Thismat and ConG-1700, Stan

(3). This Lwhen chang

rations suchte (other that 20 after med Use. The dual radioacmrem/year toover a 1,000

BWR a 2, is of the

0-409

. The art 50

tions) ssion, R-45, nse to

s that R Part er the

s LTP ntents ndard

LTP is ges to

h that an the eeting

LTP ctivity o the

0 year

Page 5: Chapter 1 - Nuclear Regulatory CommissionLa Cross License T Revision 1. G The La C that is ow located o Village o LACBW S4601 St Genoa, W The site i for LACB LACBW spent nuc license.

La CrossLicense TRevisionperiod anAchievab

1.3. F

1.3.1. LACBWMississipsouth of nearby pLACBWmile 678approximrail road(AMSL) Boiling W

The licenLACBWplant, offand inclu

the

the coa

an a(Ge

an a

a pa

The site iMississipmiles upThe site i35. A Bcommercthis rail National LACBWand sturgLACBW

se Boiling WTermination

n 0 nd that residuble” (ALAR

Facility

Site Desc

WR is locatedppi River, abthe city of Lprominent f

WR are longit8.6 on the mately 300 fe. The reactoper NURE

Water Reacto

nsed site coWR comprisin

f of Highwaude:

LACBWR p

land north oal (and later o

area directlyenoa Station

area south o

arcel of land

is bordered oppi River anstream, manis bordered o

Burlington Ncial freight aline. The sWildlife &

WR, is the Gegeon. On th

WR plant, is a

Water ReactorPlan

ual radioactiA).

cription

d in southwbout 1 mile

La Crosse, Wfeatures suchtude 91o, 13’Mississippi

feet from theor stands onG-0191, Enor (4).

omprises a ng only 1.5 ay 35. The p

plant,

of LACBWRoil) fueled p

y south of LA #3) approxi

f Genoa #3 w

d to the east o

on the northnd Highway naged by theon the west b

Northern-Santalong the eassite is borde

& Fish Refugenoa Nationhe southwes

a public boat

r

ivity has bee

western Wiscsouth of the

WI. See Figuh as highw’, 53.35” WeRiver abov

e Mississippin filled land nvironmental

total of 163acres. The

prominent fe

R, including power plant (

ACBWR witimately 175

where the IS

of Highway

h by the Miss35. The U.

e U.S. Armyby the Missita Fe rail linstern portionered to the sge Pool 9 a

nal Fish Hatcstern corner t launching r

1-2

en reduced to

consin, in Ve Village of ure 1-1 for a

ways, rivers est and latituve the mouti River and at an elevat

l Statement

3.5 acres (5site is acce

eatures on th

the site swit(removed in

th an operatifeet from th

SFSI is locat

35, across fr

sissippi Rive.S. Lock & D

y Corp of Enissippi Riverne, located bn of the site;south by a sarea. Furthechery whichof the site,

ramp with a p

o levels that

Vernon Counf Genoa, WI

map showinand lakes.

ude 43o, 33’,th of the O475 feet wetion of 639 related to

5) which is essed by a rhe site are sh

tchyard and 1989),

ional 350-Mhe LACBWR

ted, and

from LACBW

er and a narrDam No. 8 ngineers (USr and is bordbetween the ; there are nsegment of ter south, ap

h raises enda, approximaparking lot.

are “As Low

nty, on the eand approx

ng the site lo The map

, 36.22” NorOhio River. est of the car

feet Above Operation o

owned by road on the hown in Fig

the site of th

Mwe fossil geR plant,

WR.

row strip of is located a

SACE), Rocdered on the

site and Higno passenger the Upper M

pproximatelyangered musately 0.75 m

w As Reason

east shore oximately 19 mocation, inclu coordinaterth. The site

The reactrgo-carryingMean Sea L

of the La C

Dairyland, south side o

gures 1-2 an

he former G-

enerating stat

land betweeapproximatelck Island Dis

east by Highghway 35 ca

r trains whicMississippi Ry 2.4 miles ssels, brook

miles south o

nably

of the miles uding

es for e is at tor is

g-only Level

Crosse

with of the nd 1-3

-1

tion

en the ly 0.6 strict. hway arries h use River from trout

of the

Page 6: Chapter 1 - Nuclear Regulatory CommissionLa Cross License T Revision 1. G The La C that is ow located o Village o LACBW S4601 St Genoa, W The site i for LACB LACBW spent nuc license.

La CrossLicense TRevision1.3.2. The site the Genothe presecontinue future lanThe speinterim establish

1.3.3. The La Cin Genoaweather rdata inclu

Temperathe extreAverage summer and 1995

Monthly spring an

The bluffshows prwinds foLACBWaverage w

1.3.4. LACBWphysiogrPleistoceearly Palwhich haarea. Ma

Bedrock WisconsiPresent compositdolomiteboth side

se Boiling WTermination

n 0 Current/

has been cooa 3 facility ence of the a

as an indusnd use, otherent nuclear storage faced and ready

Meteorol

Crosse Munia maintain related inforudes: wind s

atures in the emes being temperatureseason. A r

5. The recor

precipitationd summer s

ffs of the Misrevailing souor the month

WR Site wherwind speeds

Geology

WR is locataphic provi

ene Epoch aleozoic age. as been modaximum relie

in the site rin Dome by[MYBP]) stion. The Ps, sandstonees of the Mi

Water ReactorPlan

Future Lan

ontinuously uand supportash landfillsstrial-use pror than perhapfuel is expe

cility, or liy to receive L

logy and Cli

cipal Airporlong standin

rmation in thspeed and dir

La Crosse rmore marke

es range fromrecord maxird low was -4

on averages easons and o

ssissippi Rivutherly windhs of Novere the river are typically

and Seismo

ted within ince. The and is charac

Moderate tdified by a mef in the regi

region consisy early Paleedimentary

Paleozoic roces and shalesississippi riv

r

nd Use

used for induing operatio, as well as operty after ps recreationected to remicensed temLACBWR f

imatology

rt located in ng active w

he La Crosserection, temp

region are tyed because m 20 °F in thmum tempe43 °F in Janu

in the area one to three

ver Valley chs for seven mmber througvalley runs y 6-10 mph.

ology

the WiscoWisconsin

cterized by to strong relmantle of loion is about

sts of Pre-Caeozoic (Camstrata. Ba

cks are 1,20s. About 600ver in the pl

1-3

ustrial purpoons (e.g. barg

the on-site decommiss

nal, can be emain at the mporary mofuel.

the town of weather statie – Genoa reperature, and

ypical of theof the riverhe three mo

erature of 10uary of 1873

ranges frominches per m

hannel the wmonths of thgh March onorth-south

onsin DriftlDriftless

flat lying nlief has been

oess and glac1,000 feet.

ambrian crymbrian and asement roc0-1,300 feet0 feet of thislant vicinity

oses since 1ge washing, ISFSI, it is

sioning is coenvisioned oISFSI until

onitored retr

f La Crosse aions that megion of the d precipitati

e extremes or valley locaonths of the w08 °F was re3.

m three to fmonth for the

winds at the Lhe year with of the year.

are from th

less sectionsection was

naturally disn produced ocial outwash

ystalline rockOrdovician,

cks in the st thick in ths sequence isy. Prior to t

941. Due toswitchyard)anticipated

ompleted. Nover the next

a federal rerievable sto

and the USAmonitor and

Mississippi on (6) (7).

of a contineation of the winter seasoecorded in J

five inches pe rest of the

LACBWR Sprevailing n Predomina

he north and

n of the Cs not glaci

ssected sedimon the unglah in the larg

ks exposed a, 572 Milliosite vicinity

he site vicinis exposed althe Pleistoce

o the presen) on the propthat the site

No other cret several decepository, oorage facilit

ACE Lock 8 archive stanRiver. Coll

ntal climateLACBWR

on to 72 °F iJuly of both

per month iyear.

Site. Airportnorth to northant winds a

d south. Mo

Central Lowiated duringmentary rocaciated landsger valleys o

at the crest oon Years By are of graity and conslong the blufene Epoch (

nce of perty, e will edible cades. offsite ty is

Dam ndard lected

e with Site.

in the 1936

in the

t data hwest at the onthly

wland g the ks of scape of the

of the Before

anitic sist of ffs on (more

Page 7: Chapter 1 - Nuclear Regulatory CommissionLa Cross License T Revision 1. G The La C that is ow located o Village o LACBW S4601 St Genoa, W The site i for LACB LACBW spent nuc license.

La CrossLicense TRevisionthan 2 Mtoday. It

The site Region csynclinesSuperior formed d

Major upSome miMYBP). of the Wsediment

Many faucapable ageologic mapped iseveral nfound anseismicitsite” (8).

Seismic 2008 ocdecommi

1.3.5. The LACthe vicinPrairie duwidth. T

There is land, islasloughs athe uplanchannel a

The mainare operaof the sitdistance the site.

Part of thplant. Tone to th

se Boiling WTermination

n 0 MYBP) the rit was buried

is located consists of s and archessyncline, Fo

during the La

plift and dowinor tilting o The site is

Wisconsin Atary strata in

ults have beaccording toconditions i

in the site renuclear poweny evidencety. Therefor

activity (maccurred oveissioning (9)

Surface W

CBWR site iity of the situ Chien, app

The valley wa

little or no aands betweeand meandernd where trare wooded.

n channel ofated by the Ute) the river iof 20 miles,

he licensed herefore, dr

he south, so

Water ReactorPlan

iver had carvby post-glac

within the a vast area

s. Major strorest City baate Pre-Camb

wn-warping aoccurred durilocated on th

Arch, a soutn the vicinity

een mappedo the criteriain the site viegion, but iner plant sitese of capablre, capable

agnitudes raer 180 mile).

Water Hydr

is in the Mite, the valleyproximatelyalls rise shar

agricultural en river charing river chributary stre The flat up

f the river vaUSACE for nis nearly fouthen gradua

area (27 acainage at ththat only p

r

ved a gorge cial sedimen

Central Staba of large cructural featasin, Michigbrian and Ea

also occurreing and follohe southwesthward proj

y dip less tha

d in the site a in 10 CFR icinity that r

nvestigationss in the regioe faulting. faulting doe

anging from es from th

rology

ssissippi Rivy is deeply cy 40 miles sorply 500 to 6

use of the riannels and ehannels. Nuams intercep

pland areas a

aries greatly navigational ur miles widally widens a

cres) is on ae site has berecipitation

1-4

as much as nt.

ble Region circular uplitures includgan Basin, anarly Paleozo

ed during latowing the Plt flank of theection of th

an 20 feet per

region. No100, Appen

represent hazs of all of theon, in additio Additiona

es not need

3.5 to 5.4)e site and

ver valley ancut into highlouth, the val600 feet from

iver valley fextensions o

umerous shorpt the main

and some of t

in width abopurposes. A

de. Below thas the river a

a filled in areen establishthat falls on

150 to 210

tectonic proifts and sed

de the Wiscond Illinois B

oic (more tha

te Paleozoic leistocene ge Wisconsinhe Wisconsir mile to the

one of thesendix A. Per zard to the fese faults duon to studies

ally, the areto be consi

that has bedid not i

nd is relativly dissected lley varies b

m river level

floor which of low lyingrt, steep-side

n river vallethe tributary

ove and beloAbove Dam he site, the riapproaches D

rea south ofhed. One vn the bluff a

feet deeper

ovince. Thdimentary baonsin DomeBasin. Thesan 435 MYB

(330 MYBPlaciations (2

n Dome and in Dome.

e southwest.

e faults are the US NR

facility. Numuring the cous for the LAea is one odered in the

een noted beimpact plan

vely flat (seeuplands. Fr

between 2.5 .

consists primg flood plaied valleys hey. Both wy valleys are

ow the site. No. 8 (abou

iver is relativDam No. 9,

f the originavalley drains adjacent to t

than can be

he Central Sasins, and b

e and Arch, e structures

BP).

P to 240 MY2 MYBP to 0the western For this re

considered RC, “There a

merous faulturse of validCBWR, hav

of relativelye analysis o

etween 1975nt operation

e Figure 1-4rom La Crosand 4.5 mil

marily of min cut by pave been cu

walls of the cultivated.

A series of ut 0.75 mile vely narrow33 miles sou

al Genoa-1 s to the norththe site and

e seen

Stable broad Lake were

YBP). 0.001 flank

eason,

to be are no ts are

dating ve not y low f this

5 and ns or

4). In sse to les in

arshy onds,

ut into main

dams north for a uth of

steam h and on a

Page 8: Chapter 1 - Nuclear Regulatory CommissionLa Cross License T Revision 1. G The La C that is ow located o Village o LACBW S4601 St Genoa, W The site i for LACB LACBW spent nuc license.

La CrossLicense TRevisionsmall popresentlyproblems

For a disand townpublishedDavenpopurposesmiles dowother knoChien, 40

1.3.6. Groundwfeet Belcommunfill matergroundwriver. Bsamplingvertical glikely du

As the swhich is but not penetratinof the rivwater quhas been

There areanalyzedHighway

1.3.7. The LACof Genoawest shocommunWisconsi(Populati

The areaincludes Agricultu

se Boiling WTermination

n 0 rtion of the

y channeled s of flash flo

tance of 40 mns along thed records, th

ort, Iowa, ab, excluding twnstream. Rown users o0 miles down

Ground W

water beneathlow Groundication withrial likely flo

water is also ased on a re

g in support gradient. Hoe to high riv

ite has valleunderlain byin valleys

ng the Mounver valley flouality of the

no extensiv

e onsite potad. Regionally 35 with the

Environs

CBWR Facila (populationore is Reno,ity in Iowa iin, an unincoion data is fr

a within a fHouston C

ure and fore

Water ReactorPlan

upland arealong the h

oods have oc

miles downse river are ohe nearest m

bout 195 mithe adjacent River water f river watenriver.

Water Hydr

h the site is d Surface (h the adjacenows towardslikely to floeview of the

of the Genowever, ther

ver stages an

ey sand ovey Mount Simcharacterize

nt Simon layoor. Use of deep aquifee withdrawa

able and groly, there are

e water table

s and Natur

lity is 17 miln about 260)

Minnesota,is New Albinorporated harom 2013 Ci

five-mile radCounty, Minestry are the

r

a contributehighway andcurred at the

stream of theobtained frommajor city uiles downstrfossil plant,at the Lansinr for industr

rology

first encoun(BGS) and nt Mississipps the west anow towards e groundwatnoa 3 fossil re are some d flooding.

erlaying a lamon sandstoned by sub-yer flow to thf water from ers is poorer al of water an

oundwater me five dome encountered

al Resource

les south of t). The near, an unincorn (pop. 513)amlet, is situity-Data.com

dius is prednnesota, ane predomina

1-5

es to runoff d railroad toe site.

e site, virtuam ground wusing river wream. The n, is the steamng plant is urial purposes

ntered at deptthe water

pi River. Gnd dischargethe west butter elevationstation, it aperiods whe

ayer of Eau ne, wells havlayers of Mhe surface inthese artesithan that fr

nd no signifi

monitoring westic wells sd from 20 to

es

the City of Lest communrporated ham), located fivuated five m

m) (9).

dominantly ind a small ant land use

directly acro prevent in

ally all municwater. On thwater for dnearest use

m-power planused for conds between L

ths ranging table aqui

Groundwateres into the Mut then may n measuremeappears thatere the grad

Claire sandve been driv

Mount Simondicating an ian aquifers rom shallowficant decrea

wells which asouth of theo 45 feet BG

La Crosse annity (three mmlet of abouve miles sou

miles south o

in Vernon Cportion of

es in Verno

ross the sitenterference w

cipal water she basis of

direct humanof river wa

nt in Lansingdenser cooli

LACBWR si

from approxifer is in r in the shall

Mississippi Rturn and floents collectet there is a dients are rev

dstone of thven in areas on sandstonartesian heahas been lim

w aquifers. Ase in the arte

are periodice LACBWR S.

nd a mile soumiles to the n

ut 350 peoputhwest of thof the plant o

County, Wisf Allamakeeon County a

e. This runowith traffic.

supplies for readily avai

n consumptiater for indug, Iowa, aboing. There aite and Prair

ximately 15 strong hydrlow deposit

River. The dow parallel ted during roslight down

versed and t

he Cambrianclosest to th

ne. Deep ad about the mited becausAs a result, esian head.

ally sampledR site and ea

uth of the Vinorthwest) ople. The nehe plant. Vicon the east s

sconsin, bute County, Ias well as in

off is No

cities ilable ion is ustrial out 15 are no rie du

to 25 raulic s and eeper to the outine nward this is

n Age he site wells level

se the there

d and ast of

illage on the earest ctory, shore.

t also Iowa. n the

Page 9: Chapter 1 - Nuclear Regulatory CommissionLa Cross License T Revision 1. G The La C that is ow located o Village o LACBW S4601 St Genoa, W The site i for LACB LACBW spent nuc license.

La CrossLicense TRevisionneighborCounty's and marsof the cou

The primyears, thagricultuwoodlandhardwoo

A modesthroughointensity-commercand less related tononagricueast of LA

Land in twithin abottomlaportion osite, occuto the eas

Refuge bfor 2.5 mincluding26 and ho

Approximwater areThe fivepopulatio

1.4. O

Key stati

Allis-perfo

Dairyturbin

Allis-

Initia

se Boiling WTermination

n 0 ring counties

gross area ishlands is clunty's gross

mary agriculthere has beeural land to d. The foresds.

st amount oout Vernon C-use categorce, public, tr

than 0.3% o the proceultural induACBWR.

the vicinity oa five-mile ands includedof the Villagupies less thast and northe

bottomland amiles. Rougg vacation houseboats ar

mately 3.5 sea and refug-mile radius

on is 522.

Operational

ion mileston

-Chalmers, uormed startup

yland enteredne-generator

-Chalmers d

al Criticality

Water ReactorPlan

s on the weis agriculturlassified as uarea (10).

tural activityen a markewoodland. sts yield sub

f sandstone County. Furtries of residransportation

of gross aressing of agstries of the

of the LACBradius, app

d in the Uppge of Genoaan 100 acreseast consistin

and water sughly a third oomes and bore moored at

quare miles ge bottomlans includes a

Backgroun

es are presen

under contrap of the LAC

d into a contr for product

dockets appli

achieved: J

r

est side of tre and woodlundeveloped

y is dairy fad trend towAbout two-

bstantial amo

and limestother, 85% of

dential and pn, and utilitierea. Local gricultural ane industrial p

BWR Site is proximately per Mississipa, the only ss. The neareng of small t

urface, lying of the area roathouses, at several poin

of Iowa arend, although

a portion of

nd

nted in Chap

act with the ACBWR from

tact to purchtion of electr

ication for co

July 11, 1967

1-6

the Mississilands. Abou

d. Total dev

arming, meaward the co-fifths of theounts of oak

one quarryinf the developpark land. Tes) account findustry co

nd forest prpark in Viro

overwhelmione third

ppi River Wubstantial co

est residencetrailer parks

mainly in Mremains undare scattered nts at times d

within the Lh there is so

the incorpo

pter 2 of this

AEC, designm 1962 to 196

hase steam frricity: June 1

onstruction:

7,

ippi River. ut 3.4%, con

veloped land

at animals, anversion ofe total land

k and lesser q

ng also takeped land in VThe more infor less than

onsists almoroducts. Ooqua, Wisco

ingly rural ais account

Wildlife and Fommunity in

es to the LACand residen

Minnesota, exder cultivatiod along the sduring the y

LACBWR fome agricultorated town

s LTP. The m

ned, fabricate67,

rom the nucl1962,

November 5

Nearly 90%nsisting maid accounts fo

and crop farf Vernon C

in farms isquantities of

es place at aVernon Countensive lan

n 15% of totaost exclusiveOne notable onsin located

and undeveloted for by Fish Refugen the five mCBWR Site

nces on small

xtend west oon. A few dshoreline neayear.

five-mile radtural use onof New Al

major milest

ed, construct

lear plant to

5, 1962,

% of the Venly of wateror less than

rming. In rounty's mar

s now devotf maple and

a number of unty is in thend uses (indual developedely of operaexception i

d 25 miles t

oped. Of thewater area

e. The develmile radius o

are within al acreages.

of the reactodozen residear State Hig

dius. Most on the bottomlbin, whose

tones are:

ted and

operate a

ernon r area 6.6%

recent rginal ted to other

f sites e low-ustry, d land ations is the to the

e area a and loped of the a mile

or site ences, hway

f it is mland.

total

Page 10: Chapter 1 - Nuclear Regulatory CommissionLa Cross License T Revision 1. G The La C that is ow located o Village o LACBW S4601 St Genoa, W The site i for LACB LACBW spent nuc license.

La CrossLicense TRevision

Low

Provi

Provi

LACB

Final

Comp

The reac96,274.6 The unit

The LACTurbine Storage Tare curreand metaVessel. holds fiv

1.5. P

1.5.1. The LTPlicense awith the Safety AamendmeThe subs

1.5.2. LTP Chaand extenremain asite charadetermin

The LACField WoAugust 2basis for specified(MARSSchange th

se Boiling WTermination

n 0

power testin

isional Oper

isional Oper

BWR perma

l reactor defu

pletion of fu

tor was critihours. Theavailability

CBWR unit Building, 1BTank Vault, ntly undergo

allic radioactThe ISFSI, e above-grou

Plan Summa

General I

P describes thand to releas

requirementAnalysis Repent that estabsections belo

Site Char

apter 2 discunt of radioacat the time oacterization,

ned to be imp

CBWR RadioWork (11) an

2015 Field Wdividing the

d in NUREGSIM) (13) fohe original c

Water ReactorPlan

ng completed

rating author

rating Licens

anently shut

ueling was c

uel loading in

ical for a tote total gross factor was 6

consists ofB Diesel GeVentilation

oing decommtive equipmelocated soutund Dry Sto

ary

Information

he process use the site fots in 10 CFRport (DSARblishes the c

ow provide a

racterizatio

usses the site ctive contamof license ter

Solutions wpacted by the

ological Chand LACBWRWork (12) pe site into suG-1575, Muor classificaclassification

r

d: Septembe

rization issue

se, DPRA-45

down: Apri

completed on

nto the ISFS

tal of 103,28electrical en

62.9%.

f major builenerator Buil

Stack, Lowmissioning (ent has beenth of the Genorage Casks w

n

used to meet or unrestrictR 50.82(a)(9

R). The LTPcriteria for wa brief summ

n

characterizamination on si

rmination, sowill plan reme operation o

aracterizatioR Radiologicrovided the

urvey units. ulti-Agency ation. Data n of an area,

1-7

er 1967,

ed (DPRA-6

5 issued: Au

il 30, 1987,

n June 11, 19

I was compl

87.5 hours. nergy genera

dings and slding, Waste

w Specific Asee Figure 1

n removed sinnoa 3 fossil with 333 spe

the requiremted use. Th9) and is subP submittal

when changesmary of the ot

ation that haite prior to roils, and gro

mediation andof LACBWR

on Survey Rcal Charactfoundation

The surveyRadiation from subse

, within the

6): October 3

ugust 28, 19

987, and

leted on Sep

The 50 MWated was 4.0

structures sue Treatment

Activity (LSA1-3). Intermnce 2007, instation, bec

ent fuel asse

ments for terhe LTP has bbmitted as a

is accompas to the LTPther seven ch

as been conduremediation, ound water. d Final RadiR.

Report for Oterization Sufor further

y units were Survey and

equent chararequirement

31, 1969,

73,

ptember 19, 2

We generato047 Gigawat

uch as the Rt Building, UA) building a

mittent systemncluding the came operatiemblies.

rminating thebeen prepar

a supplementanied by a

P require priohapters of th

ducted to deteincluding st Based on t

iation Survey

October and Survey Repo

site charactevaluated ag

d Site Invesacterization ts of this LT

2012.

or was on lintt-Hours (GW

Reactor BuilUndergroundand others w

ms dismantleReactor Pre

ional in 2012

e 10 CFR Paed in accordt to the Defuproposed lic

or NRC apprhe LTP.

ermine the ntructures thathe results oys (FRS) in

d November rt for June

terization angainst the crstigation Ma

may be usTP, up to the

ne for WH).

lding, d Gas which ement essure 2 and

art 50 dance fueled cense roval.

nature at will of the areas

2014 thru

nd the riteria anual ed to

e time

Page 11: Chapter 1 - Nuclear Regulatory CommissionLa Cross License T Revision 1. G The La C that is ow located o Village o LACBW S4601 St Genoa, W The site i for LACB LACBW spent nuc license.

La CrossLicense TRevisionof FRS, remediat

1.5.3. LTP Chainformati

A des

A sum

Estim

An esdispo

Descr

Solutionsin NUREFacilitiesaccordanRadioactadministr

Activitiethan thodecommioperating

The infosections remainin

1.5.4. LTP Chdecommiin 10 CFremediat

The selecof contamsurfaces.at backgrcontaminstructurastandard other meDerived

se Boiling WTermination

n 0 as long as tion in the ar

Identifica

apter 3 idention provided

scription of t

mmary of ra

mates of asso

stimate of thosal, and

riptions of p

s is decommEG-0586, Gs, Supplemen

nce with thetive Waste rative, work

s conducted ose conductissioning acg activities th

rmation proof the LTP

ng dismantlem

Remedia

hapter 4 disissioning to FR 20.1402ion activitie

cted remediamination. T Very limiteround levels

nation has bl surfaces iand pressu

ethods. SurConcentrati

Water ReactorPlan

the classificarea.

ation of Rem

tifies the remd in Chapter

the areas and

diological co

ociated occup

he types and

proposed con

missioning LGeneric Envi

nt 1, Volumee Solutions

Program, control and

during decoted during ctivities is bhat occurred

vided in ChP and proviment activiti

tion Plans

scusses the reduce resid. This chaps on the Rad

ation methodThe principaed soil contas or a small been identifinclude scabre washing,

rface and suon Guidelin

r

ation reflect

maining Site

maining site 3 includes:

d equipment

onditions tha

pational radi

quantities o

ntrol mechan

LACBWR inironmental Ie 1, (14). Ts Safety an

Off-Site Ddecommissi

ommissioninplant oper

bounded byd during majo

hapter 3 suppides sufficieies.

various redual contamipter also di

diation Prote

ds used are dal materialsamination is

fraction of fied to datebbling and wiping, gr

ubsurface sone Level (DC

1-8

ts the level o

e Dismantle

dismantlem

t that need fu

at may be en

iation dose,

f radioactive

nisms to ensu

n accordanceImpact Stat

The decommnd Health PDose Calcuioning imple

ng do not porations. T

y previouslyor maintenan

ports the assent detail to

emediation ination to levscusses the ction Progra

dependent up that may bexpected; anthe drinking

e. Remediashaving, ch

rit blasting, oil with activCGL) will b

of residual a

ement Activ

ment and dec

urther remed

ncountered,

e material ge

ure areas are

e with the Dtement on D

missioning acProgram, Raulation Maementation p

ose any greatThe radioloy analyzed rnce and outa

sessment of o identify r

techniques vels that comALARA ev

am.

pon the contbe subject tny noted grog water stanation technihipping, spomechanical vity levels ibe removed

activity exis

vities

contaminatio

diation,

enerated for

e not re-cont

DECON alterDecommissioctivities willadiation Protanual (ODCprocedures.

ter radiologiogical risk radiological age activities

f impacts conresources ne

that may mply with thvaluation an

taminated mto remediatioundwater sandards; and ques that monge and a fracturing in excess ofand dispose

sting prior to

on activities.

release and

taminated.

rnative desconing of Nul be conducttection Prog

CM), and

ical or safetyassociated risk for fo

s.

nsidered in eeded during

be used dhe release crnd the impa

material and eon are strucamples haveno surface w

may be usedabrasive blaand cuttingf the approped as radioa

o any

The

cribed uclear ted in gram, plant

y risk with

ormer

other g the

during riteria act of

extent ctural been water d for sting, , and priate active

Page 12: Chapter 1 - Nuclear Regulatory CommissionLa Cross License T Revision 1. G The La C that is ow located o Village o LACBW S4601 St Genoa, W The site i for LACB LACBW spent nuc license.

La CrossLicense TRevisionwaste. excavatoenvironmadequate

1.5.5. LTP Chapackagesof a Finremainindemonstruse speci

The FRSObjectiveassessmethat are iISFSI, w

1.5.6. LTP Chcomplianunrestrictscenariosanalysis, exposure

LTP Chacontaminwork towArgonne code to dlicense te

1.5.7. LTP Chareleasingwith the

1.5.8. LTP ChasignificanterminatiCFR 50.

se Boiling WTermination

n 0 Soil remedirs. Remed

mental contro erosion, sed

Final Rad

apter 5 preses, and instrucnal Status Sng building rate that the ified in 10 C

S Plan descres (DQO), suent and compidentified as

which will sti

Complian

hapter 6 prence with theted use. Chs, exposure

DCGLs ane compliance

apter 6 usesnation and rwards and be

National Ladetermine thermination.

Update o

apter 7 prog the site forfunds curren

Supplem

apter 8 updant environmion activities82(a)(9)(ii)(

Water ReactorPlan

ation equipmdiation of sool procedurediment, and

diation Surv

ents the FRSctions to perurvey (FSSbasements. LACBWR f

CFR 20.1402

ribes the devurvey methopliance. Ths impacted. ll remain a l

nce with the

esents the e radiologicapter 6 discu

pathways, nd Dose Face scenario an

s radiologicradioactivity e verified byaboratory REhe radiologic

of the Site-Sp

ovides an upr unrestrictedntly available

ent to the E

ates the Envimental impas. This sectG). In accor

r

ment will inoils will inces, as well air emission

vey Plan

S Plan whichrform the FR) for open The FRS

facility and s (e.g. annual

velopment oods and instrhe FRS Plan

The adjaceicensed area

e Radiologic

radiologicalcal criteria fusses the site

computatioctors, the dend evaluation

cal informatconcentrati

y the FSS orESidual RAcal release c

pecific Deco

pdated estimd use. This e in the deco

Environmen

ironmental Racts association of the Lrdance with

1-9

nclude, but clude the usas appropria

n controls du

h will be useRS of the LA

land areas Plan descr

site comply l dose limit o

of the surveyrumentation,addresses ont areas tha

a, will not be

cal Criteria

l informatiofor license e-specific inonal modelserivation of n of alternati

ion from Cion levels thr STS discus

ADioactive mcriteria for r

ommissionin

mate of thechapter also

ommissionin

tal Report

Report for Lted with th

LTP is prepar10 CFR 51

not be limse of establiate work pa

uring soil rem

ed to develoACBWR site

and a Sourribes the finwith radioloof 25 mrem

y plan, surv, data collectonly LACBWat are classife subject to F

a for License

on and metermination

nventory of rs used for area factor

ive exposure

Chapter 2 anhat Chapter ssed in Chap

materials (REremaining st

ng Costs

e remaining o compares tng trust fund

LACBWR whe site’s deared pursuan.53(d), Solu

mited to, bacished excav

ackage instrumediation.

op the site pr. The FRS Prce Term Snal survey

ogical criterito AMCG p

vey design ation and pro

WR structurefied as non-iFRS.

e Terminati

ethods used and release

radionuclidedose mode

rs, the basis e scenarios.

nd establish4 remediati

pter 5. SoluESRAD) v7.tructures an

decommissthe estimate

d.

with new infoecommissionnt to 10 CFRutions consid

ck and trackvation safetyuctions to en

rocedures, suPlan is comp

Survey (STSprocess use

ia for unrestrplus ALARA

and Data Quocessing, andes and land impacted an

ion

to demone of the sits, future laneling, sensi

for the sel

es the allowion methodsutions applie.0 dose mod

nd soils to en

sioning costed remaining

ormation andning and lic

R 51.53(d) anders Chapter

k hoe y and nsure

urvey prised S) for ed to ricted

A).

uality d data areas

nd the

strate te for nd use itivity lected

wable s will ed the deling nable

ts for g cost

d any cense nd 10 r 8 to

Page 13: Chapter 1 - Nuclear Regulatory CommissionLa Cross License T Revision 1. G The La C that is ow located o Village o LACBW S4601 St Genoa, W The site i for LACB LACBW spent nuc license.

La CrossLicense TRevisionbe a supimpacts a

LTP ChNUREG-referencethat the adverse eenvironmLACBWhave resuEnvironmNUREG-

1.6. R

SolutionsLACBWdocumenDecommRevision LTP in aLTP, wit50.82(a)(

SolutionsconditionNRC app

Requ

Resu

Detradecom

DecreClassnotifi

Increminim

Increlevel an inv

Chantest, o

Incre

se Boiling WTermination

n 0 pplement to associated w

apter 8 com-0586, whiche nuclear facenvironmeneffects outsi

mental impaWR dated De

ulted in no mental Asse-0191 related

Regulatory N

s is submittiWR spans a pntation is unissioning PlMarch 2014

accordance wthout prior N(6), and 10 C

s is also subn that establproval. Chan

uires Commi

lts in signifi

acts or negatmmissioning

eases a surves 2 to Class 3ication prior

ases the DCmum detecta

ases the radi(or correspovestigation o

nges the statior

ases the Typ

Water ReactorPlan

the Environwith the execu

mpares the h provides acility. The

ntal effects fide the boun

acts was doecember 198

significant essment in d to operatio

Notification

ng the LTP period that innique in thalan and Post4 (15) whichwith 10 CFRNRC approv

CFR 50.82(a

bmitting a prlishes the crnges to the L

ssion approv

cant environ

tes the reasong,

ey unit area 3; or Class 1r to impleme

GLs (or decable concentr

ioactivity levonding sourcoccurs),

istical test ap

pe I decision

r

nmental Repution of the

described a generic env

environmenfor decommnds of NURcumented in87. LACBWenvironmensupport of

on of LACBW

s of Change

as a supplemncludes seveat the requit-Shutdown Dh serves as t

R 50.71(e). val, in acco

a)(7).

roposed ameriteria for dLTP require

val pursuant

nmental impa

nable assura

classificatio to Class 3 wnting the ch

creases dose rations (for b

vel, relative ce term inven

pplied to one

n error.

1-10

port addressidescribed de

decommissivironmental ntal assessm

missioning LAREG-0586. n a supplemWR decommntal impact the August

WR, dated A

es

ment to the Deral decommired safety aDecommissiothe DSAR foOnce approvrdance with

endment to tetermining wprior NRC a

to 10 CFR 5

acts not prev

ance that ade

on (i.e., impawithout provange in class

factors fromboth scan an

to the applicntory levels

e other than t

ing the actuaecommission

oning attribassessment f

ment performACBWR arReview of

ment to themissioning anot previou

t 7, 1991, April 21, 198

DSAR. Becmissioning re

analyses areoning Activi

for LACBWRved, Solutio

h the criteria

the LACBWwhen changapproval wh

50.59,

viously revie

equate funds

acted to not ividing NRC sification,

m the Basemend fixed mea

cable derivedin the Basem

the Sign test

al or potentining activiti

butes to thofor the decom

med by Solure minimal apost-operat

e Environmand dismantusly evaluatDecommiss80.

cause the licegulation chae included ities Report R. Solution

ons may maka in 10 CFR

WR license thges to the Len the chang

ewed,

will be avai

impacted, Cla minimum

ent Fill Modasurement m

d concentratment Fill Mo

t or Wilcoxo

ial environmes.

ose identifiemmissioning

utions determand there aring license ental Reportlement actived in the N

sioning Ord

censing histoanges, the Din the LAC(D-Plan/PSD

ns will updatke changes tR 50.59, 10

hat adds a licLTP require ge:

ilable for

lass 1 to Cla14 day

del) and relatmethods),

tion guidelinodel), at whi

on Rank Sum

mental

ed in g of a mined re no stage

rt for vities

NRC's er or

ory of DSAR CBWR DAR) te the to the CFR

cense prior

ass 2;

ted

ne ich

m

Page 14: Chapter 1 - Nuclear Regulatory CommissionLa Cross License T Revision 1. G The La C that is ow located o Village o LACBW S4601 St Genoa, W The site i for LACB LACBW spent nuc license.

La CrossLicense TRevisionThe cont

Gerard PVice PreLaCrosseS4601 StGenoa, W(224) 789gpvannoo

1.7. R

1. LAL

2. UC2

3. Ufo

4. UreC

5. LP

6. w

7. w

8. DD

9. ht

10. 2

11. ES

12. ES

13. UR

14. USN

se Boiling WTermination

n 0 act for LTP

P. van Noordsident, RegueSolutions, Ltate Road 35WI. 54632-889-4025 ordennen@en

References

Letter from DApplication fLicense Ame

U.S. Nuclear Content of Li

011.

U.S. Nuclear or Evaluating

U.S. Nuclear elated to Ope

Cooperative -

Letter from Dlanning for I

www.wunder

www.mvp.wc

Dairyland PoDecommissio

ttp://www.ci

008 Vernon

EnergySolutiurvey Repor

EnergySolutiurvey Repor

U.S. Nuclear Radiation Sur

U.S. Nuclear tatement on

November 20

Water ReactorPlan

information

dennen ulatory AffaiLLC 5 846

nergysolution

Dairyland Pofor Order Apndments, da

Regulatory icense Termi

Regulatory g Nuclear Po

Regulatory eration of th- April 1980

Dairyland PoISFSI, LAC

rground.com

c.usace.army

wer Cooperaoning Plan, r

ity-data.com

County Tax

ons GG-EO-rt for Octobe

ons LC-RS-rt for June th

Regulatory rvey and Site

Regulatory Decommiss

002.

r

n, including a

irs

ns.com

ower Cooperpproving Licated October

Commissionination Plan

Commissionower Reacto

Commissionhe La Crosse .

ower Compan-14029, Mar

m.

y.mil/project

ative, LaCrorevised Nove

m/city/Genoa

x Assessmen

-313196-RSer and Novem

PN-164017-hru August 2

Commissione Investigati

Commissionsioning of Nu

1-11

any submitte

ative to the Ncense Transfe

8, 2015.

n, Regulators for Nuclea

n NUREG-1or License Te

n NUREG-0Boiling Wa

ny to the Nurch 10, 2008

ts/Lock 8.

osse Boiling ember 2003.

a-Wisconsin.

nt Rolls.

S-RP-001, LAmber 2014 F

-001, LACB2015 Field W

n, NUREG-1ion Manual (

n NUREG-0uclear Facili

ed changes a

Nuclear Regfer and Confo

ry Guide 1.1ar Power Rea

1700, Revisioermination P

0191, Final Eater Reactor

uclear Regul8.

Water Reac.

.html.

ACBWR RaField Work –

BWR RadioloWork – Nove

1575, Revisi(MARSSIM

0586, Generiities, Supple

and updates,

gulatory Comforming Adm

79, Standardactors, Revis

on 1, StandaPlans – Apri

Environmentby Dairylan

atory Comm

ctor (LACBW

adiological C– November

ogical Charaember 2015.

ion 1, Multi-M), August 20

ic Environmement 1, Vol

is:

mmission, ministrative

d Format andsion 1 - June

ard Review Pil 2003.

tal Statemennd Power

mission, Subj

WR)

Characterizatr 2015.

acterization

-Agency 000.

mental Impactlume 1 –

d e

Plan

nt

ject:

tion

t

Page 15: Chapter 1 - Nuclear Regulatory CommissionLa Cross License T Revision 1. G The La C that is ow located o Village o LACBW S4601 St Genoa, W The site i for LACB LACBW spent nuc license.

La CrossLicense TRevision15. D

D

se Boiling WTermination

n 0 Dairyland PoDecommissio

Water ReactorPlan

wer Cooperaoning Activit

r

ative, LACBties Report (

1-12

BWR Decom(D-Plan/PSD

mmissioning DAR), Revis

Plan and Posion - March

ost-Shutdownh 2014.

n

Page 16: Chapter 1 - Nuclear Regulatory CommissionLa Cross License T Revision 1. G The La C that is ow located o Village o LACBW S4601 St Genoa, W The site i for LACB LACBW spent nuc license.

La CrossLicense TRevision

se Boiling WTermination

n 0

Water ReactorPlan

Fig

r

ure 1-1 S

1-13

Site Regionaal Location

Page 17: Chapter 1 - Nuclear Regulatory CommissionLa Cross License T Revision 1. G The La C that is ow located o Village o LACBW S4601 St Genoa, W The site i for LACB LACBW spent nuc license.

La CrossLicense TRevision

se Boiling WTermination

n 0

Water ReactorPlan

r

Figure 1-2

1-14

2 Site Ovverview

Page 18: Chapter 1 - Nuclear Regulatory CommissionLa Cross License T Revision 1. G The La C that is ow located o Village o LACBW S4601 St Genoa, W The site i for LACB LACBW spent nuc license.

LLR

La Crosse BoilinLicense TerminRevision 0

ng Water Reactation Plan

or

Figure 1-3

1-15

LACBWR Buuildings

Page 19: Chapter 1 - Nuclear Regulatory CommissionLa Cross License T Revision 1. G The La C that is ow located o Village o LACBW S4601 St Genoa, W The site i for LACB LACBW spent nuc license.

La CrossLicense TRevision

se Boiling WTermination

n 0

Water ReactorPlan

Fi

r

igure 1-4

1-16

Topographhical Map