Channel ExcavationOctober 30, 2010
How to do a channel, Side Drain, Side Ditches etc..
1.0 IntroductionThis works consist of excavation for all channels, drains, ditches where in side and out side ofthe right of way showing on the Drawing or as instructed by the Engineer. The proper drainageshall be provided by constructing, shaping, finishing or backfilling where necessary involved inconformity with the required alignment, levels, grades and cross sections.
2.0 AbbreviationQAE - Quality Assurance EngineerQAI - Quality Assurance InspectorQCI - Quality Control InspectorSE - Site EngineerSEO - Safety and Environmental OfficerTO - Technical OfficerQAS - Quality Assurance SystemME - Materials Engineer (Contractor)
3.0 Resource Allocation
3.1 Man power
QAIQCISite Engineer -01Supervisor-01Flagmen ( If necessary)-02Surveyor-01Surveyor helpers-05SK/USK labours-08Operators- As required
3.2 Equipment & Tools
Back-hoe loaderWheel Loader( If necessary)Dump trucks(15 tons)RammersTractor TrailerCompacting rollersLevel instrument
Page 2Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Level instrumentMortar pansMamotiesPick axesCrow-barsWheel barrowsShovelsSafety Inventory01. 10 No of barrels02. 02 No of signal Men03. 10No Traffic Jackets with Retro reflective patches/stripes04. Sufficient barricade tapes.05. 05 No barricade boards with Retro reflective stripes06. 02 No Stop and Go signs07. 03 No Road works ahead08. 01 No Road Works ahead, End09. 05 No of traffic cones10. 04 No. of Blinking Lights
4.0 Quality Control Procedures
4.1 Sampling and testing
Embankment Filling Material:Samples would be collected from the work execution areas and would be placed in a polythene bag providing identification tag. All required testswould be carried out in the materials testing laboratory for identification suitability of the Excavation Materials. The areas where backfilling isrequired for the conformity of the design levels, the works would be carried out with approved filling materials in layer by layer as described intechnical specifications. Required test would be carried out after placing and compacting to check the degree of compaction.
4.2 Inspection Check listTo ensure that the all activities being performed with the expected quality, an inspection check list would be filled by the person in charge for theChannel excavation in case of covering pre construction, during construction. The inspection check list shall include the specific requirements,safety and environmental measures.
4.3 Dimension ControlChannel excavation would be carried out according to the designed cross sections conformity with typical section issued for construction. Therequired shape, depth and offset of the excavation would be properly maintained during construction and those requirements would be checked withthe inspection check list.
5.0 Methodology
5.1 Setting Out• The setting out would be carried out in the area where the Engineer’s approval is given for channel excavation.• Levels of excavation would be marked by the surveyor using pegs.• The line of the Excavation would be marked with lime powder or any other proper manner
5.2 Excavation and Shaping• The set out area would be subjected for the excavation with machinery or in manual manner conformity with designed line and levels• The shape of the drain would be maintained to satisfy the typical sections issued for the construction.• All materials suitable for embankment Construction removed from excavations would be used in Embankment construction or any other fillingspecified to fill with Embankment Materials.• Materials deemed not suitable for embankment filling would be disposed of to approved disposal locations• Any area backfilling have to be done to form earth drains, filling would be done using approved filling material instructed by the Engineer
Page 3Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Be Sociable, Share!
TweetSuka
0Suka
StumbleUponSubmit
Related posts:
1. Borrow Excavation2. Borrow Excavation3. Flow Chart Borrow Excavation4. Subgrade Preparation5. Check List Borrow Excavation6. survey Methodology
Posted by Civil Engineer | Filed Under Civil Engineering Planning, Highway Engineering, Road Projects
« Inspection Test Plan Subgrade Self Compacting Concrete »
Comments
Got something to say?
Name (required)
Email Address(required)
Website
Speak your mind
Submit Comment
ShareShare
Page 4Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Submit Comment
CAPTCHA Code *
Recent PostsProject Management – Materials ControlPROJECT CONTROL METHODSDumpy LevelTHE AIM OF CONTRACT INSPECTIONHow to check strength of soil (Soil Tests)Levelling and Final Trimming Using Motor GraderRoad Construction Engineer’s Responsibility in Industrial MattersAdding water or drying material by using motor graderTechniques on Using a Motor Grader.How to maintain motor graders – 1How to maintain motor graders – 2
Project Management
Concrete VibratorPokerwww.dongkungroup.com
Concete Vibrator PokerConcrete Poker
Archives
Select Month
CategoriesBS Codes (24)Building Construction (15)Civil Engineering Books (1)Civil Engineering Disasters (5)Civil Engineering Laboratory (5)Civil Engineering Planning (90)Civil Engineering Videos (5)Civil Engineering Wonders (2)Construction Equipments (8)Construction Industry (20)Construction Management (32)Disaster Management (3)Engineering Hydrology (5)Form work (5)Foundation Engineering (11)Highway Engineering (125)highway sri lanka (25)Laboratory Formats (15)
Page 5Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Laboratory Formats (15)Mix Design (1)project management (18)Project Management Courses (4)Projects in Sri Lanka (12)Road Projects (107)SCC (6)Structural Engineering (30)Uncategorized (1)Water Projects (16)
Share Valuble Content with Your Friends
Recent CommentsMoneer on Sub Base Constructionmahesh on Mix design of self compacting concretehttp://yahoo.com on Construction VideosSHIVAPRASAD on How to maintain Motor Graders – 3SHIVAPRASAD on How to maintain Motor Graders – 3
Civil Engineering
Page 6Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Civil Engineering
Page 7Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Civil Engineering
Page 8Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Page 9Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Page 10Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Page 11Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Page 12Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Page 13Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Page 14Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Page 15Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Page 16Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Page 17Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Page 18Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Page 19Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Page 20Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Page 21Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Page 22Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Page 23Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Page 24Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Page 25Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Page 26Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Page 27Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Page 28Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Page 29Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Page 30Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Page 31Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Page 32Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Page 33Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Page 34Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Page 35Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Page 36Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Page 37Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Page 38Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Page 39Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Page 40Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Page 41Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Page 42Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Page 43Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Page 44Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Page 45Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Page 46Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Page 47Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Page 48Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Page 49Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Page 50Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Page 51Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Page 52Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Page 53Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Page 54Channel Excavation
11/25/2013 11:55:35 AMhttp://www.goda02.com/channel-excavation
Copyright © 2013 Civil Engineering Sri Lanka · All rights reserved.