Challenges taking offshore wind to the next level · Challenges taking offshore wind to the next...
Transcript of Challenges taking offshore wind to the next level · Challenges taking offshore wind to the next...
![Page 1: Challenges taking offshore wind to the next level · Challenges taking offshore wind to the next level MAPPING SCIENTIFIC NEEDS IN THE ARCTIC AND NORTHERN AREAS Norway House – Brussels](https://reader034.fdocuments.us/reader034/viewer/2022051915/6006d655590b30152106a0df/html5/thumbnails/1.jpg)
Challenges taking offshore wind to the next levelMAPPING SCIENTIFIC NEEDS IN THE ARCTIC AND NORTHERN AREASNorway House – Brussels 11.10.2012
Classification: External l 2012-10-03
![Page 2: Challenges taking offshore wind to the next level · Challenges taking offshore wind to the next level MAPPING SCIENTIFIC NEEDS IN THE ARCTIC AND NORTHERN AREAS Norway House – Brussels](https://reader034.fdocuments.us/reader034/viewer/2022051915/6006d655590b30152106a0df/html5/thumbnails/2.jpg)
What is needed to develop a competitive technology?
![Page 3: Challenges taking offshore wind to the next level · Challenges taking offshore wind to the next level MAPPING SCIENTIFIC NEEDS IN THE ARCTIC AND NORTHERN AREAS Norway House – Brussels](https://reader034.fdocuments.us/reader034/viewer/2022051915/6006d655590b30152106a0df/html5/thumbnails/3.jpg)
Cost reduction is possible but takes time
![Page 4: Challenges taking offshore wind to the next level · Challenges taking offshore wind to the next level MAPPING SCIENTIFIC NEEDS IN THE ARCTIC AND NORTHERN AREAS Norway House – Brussels](https://reader034.fdocuments.us/reader034/viewer/2022051915/6006d655590b30152106a0df/html5/thumbnails/4.jpg)
The potential is there….
• Huge markets with load centers close to sea
• Political will important
• Vast wind resources in place
• Electrical infrastructure is essential
• Local supply chain important
![Page 5: Challenges taking offshore wind to the next level · Challenges taking offshore wind to the next level MAPPING SCIENTIFIC NEEDS IN THE ARCTIC AND NORTHERN AREAS Norway House – Brussels](https://reader034.fdocuments.us/reader034/viewer/2022051915/6006d655590b30152106a0df/html5/thumbnails/5.jpg)
A structured approach is needed !
• Innovation
• Implementation
• Industrialization
![Page 6: Challenges taking offshore wind to the next level · Challenges taking offshore wind to the next level MAPPING SCIENTIFIC NEEDS IN THE ARCTIC AND NORTHERN AREAS Norway House – Brussels](https://reader034.fdocuments.us/reader034/viewer/2022051915/6006d655590b30152106a0df/html5/thumbnails/6.jpg)
You need a innovative concept
6
![Page 7: Challenges taking offshore wind to the next level · Challenges taking offshore wind to the next level MAPPING SCIENTIFIC NEEDS IN THE ARCTIC AND NORTHERN AREAS Norway House – Brussels](https://reader034.fdocuments.us/reader034/viewer/2022051915/6006d655590b30152106a0df/html5/thumbnails/7.jpg)
From idea to commercial concept
Model test2005
Concept2001
Full-scale prototype
2009
Pilot Park, 3-6 turbines<5 years
Large Parks, 500
MW<10 years
![Page 8: Challenges taking offshore wind to the next level · Challenges taking offshore wind to the next level MAPPING SCIENTIFIC NEEDS IN THE ARCTIC AND NORTHERN AREAS Norway House – Brussels](https://reader034.fdocuments.us/reader034/viewer/2022051915/6006d655590b30152106a0df/html5/thumbnails/8.jpg)
Hywind Demo – in operation since 2009
Main dataWTG: 2.3 MWTurbine weight: 138 tonsDraft: 100 mDisplacement: 5300 m3
Diameter at water line: 6 mWater depth: 200 m
• Concept is proven
• Survived winter storms
• Very good characteristics
![Page 9: Challenges taking offshore wind to the next level · Challenges taking offshore wind to the next level MAPPING SCIENTIFIC NEEDS IN THE ARCTIC AND NORTHERN AREAS Norway House – Brussels](https://reader034.fdocuments.us/reader034/viewer/2022051915/6006d655590b30152106a0df/html5/thumbnails/9.jpg)
Industrialization is needed to improve cost
Concept development•Upscaling
•Design optimization
•Mooring systems
Cost-efficient fabrication•Fabrication friendly design
•Efficient mass production
Assembly and installation•Efficient installation vessels
•Onshore assembly
![Page 10: Challenges taking offshore wind to the next level · Challenges taking offshore wind to the next level MAPPING SCIENTIFIC NEEDS IN THE ARCTIC AND NORTHERN AREAS Norway House – Brussels](https://reader034.fdocuments.us/reader034/viewer/2022051915/6006d655590b30152106a0df/html5/thumbnails/10.jpg)
It is possible!
• A future market is essential to trigger development
• Implementation by Public – Private -Partnership is needed to launch projects
• Innovation is necessary in all development phases
• Industrialization and supply chain involvement is key to success
![Page 11: Challenges taking offshore wind to the next level · Challenges taking offshore wind to the next level MAPPING SCIENTIFIC NEEDS IN THE ARCTIC AND NORTHERN AREAS Norway House – Brussels](https://reader034.fdocuments.us/reader034/viewer/2022051915/6006d655590b30152106a0df/html5/thumbnails/11.jpg)
Jan Fredrik StadaasTechnology Manager Offshore [email protected]: +47 41 44 00 46
www.statoil.com
Classification: Internal 2012-10-0311