Challenges and Solutions for achieving a Renewable Electric Grid in India By Dr. Rahul Walawalkar...
-
Upload
lenard-nelson -
Category
Documents
-
view
217 -
download
1
Transcript of Challenges and Solutions for achieving a Renewable Electric Grid in India By Dr. Rahul Walawalkar...
![Page 1: Challenges and Solutions for achieving a Renewable Electric Grid in India By Dr. Rahul Walawalkar VP, Emerging Tech & Markets, Customized Energy Solutions.](https://reader038.fdocuments.us/reader038/viewer/2022103122/56649d045503460f949d7ae5/html5/thumbnails/1.jpg)
Challenges and Solutions for achieving a
Renewable Electric Grid in IndiaBy
Dr. Rahul WalawalkarVP, Emerging Tech & Markets, Customized Energy Solutions
Secretary, ESA Executive Director, IESA Vice Chair, GESA
![Page 2: Challenges and Solutions for achieving a Renewable Electric Grid in India By Dr. Rahul Walawalkar VP, Emerging Tech & Markets, Customized Energy Solutions.](https://reader038.fdocuments.us/reader038/viewer/2022103122/56649d045503460f949d7ae5/html5/thumbnails/2.jpg)
India Electricity Generation & Anticipated Installed Capacity Additions
![Page 3: Challenges and Solutions for achieving a Renewable Electric Grid in India By Dr. Rahul Walawalkar VP, Emerging Tech & Markets, Customized Energy Solutions.](https://reader038.fdocuments.us/reader038/viewer/2022103122/56649d045503460f949d7ae5/html5/thumbnails/3.jpg)
India – Wind and Solar Resource Availability
Solar Map
13-17 GW of wind anticipated by 2013
Goal of 20 GW of solar by 2022
![Page 4: Challenges and Solutions for achieving a Renewable Electric Grid in India By Dr. Rahul Walawalkar VP, Emerging Tech & Markets, Customized Energy Solutions.](https://reader038.fdocuments.us/reader038/viewer/2022103122/56649d045503460f949d7ae5/html5/thumbnails/4.jpg)
112632 MW 1810 hrs
124710 MW 2000 hrs
Ramp Rate – 110 MW / min
Typical All India daily load curve
![Page 5: Challenges and Solutions for achieving a Renewable Electric Grid in India By Dr. Rahul Walawalkar VP, Emerging Tech & Markets, Customized Energy Solutions.](https://reader038.fdocuments.us/reader038/viewer/2022103122/56649d045503460f949d7ae5/html5/thumbnails/5.jpg)
Challenges in Renewables Integration
Source: Dr. Michael Milligan NREL / AWEA : Dr. Jay Apt, CMU
![Page 6: Challenges and Solutions for achieving a Renewable Electric Grid in India By Dr. Rahul Walawalkar VP, Emerging Tech & Markets, Customized Energy Solutions.](https://reader038.fdocuments.us/reader038/viewer/2022103122/56649d045503460f949d7ae5/html5/thumbnails/6.jpg)
Variation of wind generation over a day
![Page 7: Challenges and Solutions for achieving a Renewable Electric Grid in India By Dr. Rahul Walawalkar VP, Emerging Tech & Markets, Customized Energy Solutions.](https://reader038.fdocuments.us/reader038/viewer/2022103122/56649d045503460f949d7ae5/html5/thumbnails/7.jpg)
All India Wind Energy Generation on Daily Basis
![Page 8: Challenges and Solutions for achieving a Renewable Electric Grid in India By Dr. Rahul Walawalkar VP, Emerging Tech & Markets, Customized Energy Solutions.](https://reader038.fdocuments.us/reader038/viewer/2022103122/56649d045503460f949d7ae5/html5/thumbnails/8.jpg)
Transmission Upgrades – Green Corridors• Green Corridors planned forTamil
Nadu, Gujarat, Rajasthan, Karnataka, Andhra Pradesh, Maharashtra, Himachal Pradesh and Jammu & Kashmir.
• The transmission system costing about Rs. 32,000 crores (5 billion US $) have been planned to cater to the needs of about 32 GW RE capacity addition program for the 12th Plan (2012-17).
• INR 2000 Cr. (~$333 Million) investment anticipated for energy storage investments.
• Currently looking for 1-5 MW pilot demonstration projects for technology validation
![Page 9: Challenges and Solutions for achieving a Renewable Electric Grid in India By Dr. Rahul Walawalkar VP, Emerging Tech & Markets, Customized Energy Solutions.](https://reader038.fdocuments.us/reader038/viewer/2022103122/56649d045503460f949d7ae5/html5/thumbnails/9.jpg)
India Grid Frequency
![Page 10: Challenges and Solutions for achieving a Renewable Electric Grid in India By Dr. Rahul Walawalkar VP, Emerging Tech & Markets, Customized Energy Solutions.](https://reader038.fdocuments.us/reader038/viewer/2022103122/56649d045503460f949d7ae5/html5/thumbnails/10.jpg)
Introducing Ancillary Services in India
10
![Page 11: Challenges and Solutions for achieving a Renewable Electric Grid in India By Dr. Rahul Walawalkar VP, Emerging Tech & Markets, Customized Energy Solutions.](https://reader038.fdocuments.us/reader038/viewer/2022103122/56649d045503460f949d7ae5/html5/thumbnails/11.jpg)
Implementing new Indian Grid Code• Wind / Solar developers may have to pay financial penalties
for deviations of more than ±30% of forecast• Wind energy generators will be able to fine tune their
schedules (based on forecasting) as close as three hours before actual generation.
• The operational frequency band has been further tightened from ‘50.3 Hz to 49.2 Hz’ to ‘50.2 to 49.5 Hz’.
• This is generating interest in exploring better forecasting as well as integrating storage for wind farms
• This provision is currently put on hold as policy makers are exploring alternative options
![Page 12: Challenges and Solutions for achieving a Renewable Electric Grid in India By Dr. Rahul Walawalkar VP, Emerging Tech & Markets, Customized Energy Solutions.](https://reader038.fdocuments.us/reader038/viewer/2022103122/56649d045503460f949d7ae5/html5/thumbnails/12.jpg)
Wind Forecasting ErrorsInsights from initial scheduling trials
Source: GLDC
Gujarat Maharashtra
Source: MSLDC
![Page 13: Challenges and Solutions for achieving a Renewable Electric Grid in India By Dr. Rahul Walawalkar VP, Emerging Tech & Markets, Customized Energy Solutions.](https://reader038.fdocuments.us/reader038/viewer/2022103122/56649d045503460f949d7ae5/html5/thumbnails/13.jpg)
India – Grid Frequency Analysis
![Page 14: Challenges and Solutions for achieving a Renewable Electric Grid in India By Dr. Rahul Walawalkar VP, Emerging Tech & Markets, Customized Energy Solutions.](https://reader038.fdocuments.us/reader038/viewer/2022103122/56649d045503460f949d7ae5/html5/thumbnails/14.jpg)
Wind scheduling withAdvanced Wind Forecasting and Energy Storage
![Page 15: Challenges and Solutions for achieving a Renewable Electric Grid in India By Dr. Rahul Walawalkar VP, Emerging Tech & Markets, Customized Energy Solutions.](https://reader038.fdocuments.us/reader038/viewer/2022103122/56649d045503460f949d7ae5/html5/thumbnails/15.jpg)
Energy Storage for Wind Smoothing
Wind Farm Output With Firming
9
10
11
12
13
14
15
1 68
13
5
20
22
69
33
64
03
47
05
37
60
4
67
17
38
80
58
72
93
91
00
6
10
73
11
40
12
07
12
74
13
41
14
08
14
75
15
42
16
09
16
76
17
43
18
10
18
77
19
44
20
11
20
78
21
45
22
12
22
79
23
46
24
13
24
80
25
47
2 Hour Event 2 Second Resolution
MW
s
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Stat
e of
Cha
rge
![Page 16: Challenges and Solutions for achieving a Renewable Electric Grid in India By Dr. Rahul Walawalkar VP, Emerging Tech & Markets, Customized Energy Solutions.](https://reader038.fdocuments.us/reader038/viewer/2022103122/56649d045503460f949d7ae5/html5/thumbnails/16.jpg)
Solar PV – Storage Hybrid Solutions
![Page 17: Challenges and Solutions for achieving a Renewable Electric Grid in India By Dr. Rahul Walawalkar VP, Emerging Tech & Markets, Customized Energy Solutions.](https://reader038.fdocuments.us/reader038/viewer/2022103122/56649d045503460f949d7ae5/html5/thumbnails/17.jpg)
Role of Energy Storage in Grid
![Page 18: Challenges and Solutions for achieving a Renewable Electric Grid in India By Dr. Rahul Walawalkar VP, Emerging Tech & Markets, Customized Energy Solutions.](https://reader038.fdocuments.us/reader038/viewer/2022103122/56649d045503460f949d7ae5/html5/thumbnails/18.jpg)
Mapping Storage Technologies
![Page 19: Challenges and Solutions for achieving a Renewable Electric Grid in India By Dr. Rahul Walawalkar VP, Emerging Tech & Markets, Customized Energy Solutions.](https://reader038.fdocuments.us/reader038/viewer/2022103122/56649d045503460f949d7ae5/html5/thumbnails/19.jpg)
Energy Storage Technology Landscape• Pumped Hydro• Compressed Air Energy Storage
– Dresser Rand, LightSail, SustainX
• Sodium based (NaS, NaNiCl , Na-Ion)– NGK, GE, FIAMM, Aquion
• Flow Batteries (VRB/ZBB)– Deeya, Gildemeister, UniEnergy, UTC, Prudent– ZBB, Premium Power, Primus, RedFlow
• Flywheels – Beacon, Temporal Power
• Li-Ion Batteries – A123, Altairnano, Electrovaya, Enerdel, Microvast, Panasonic, Samsung,
SAFT, Toshiba,
19
![Page 20: Challenges and Solutions for achieving a Renewable Electric Grid in India By Dr. Rahul Walawalkar VP, Emerging Tech & Markets, Customized Energy Solutions.](https://reader038.fdocuments.us/reader038/viewer/2022103122/56649d045503460f949d7ae5/html5/thumbnails/20.jpg)
Price Trend for Capital cost
20
![Page 21: Challenges and Solutions for achieving a Renewable Electric Grid in India By Dr. Rahul Walawalkar VP, Emerging Tech & Markets, Customized Energy Solutions.](https://reader038.fdocuments.us/reader038/viewer/2022103122/56649d045503460f949d7ae5/html5/thumbnails/21.jpg)
India Opportunities
![Page 22: Challenges and Solutions for achieving a Renewable Electric Grid in India By Dr. Rahul Walawalkar VP, Emerging Tech & Markets, Customized Energy Solutions.](https://reader038.fdocuments.us/reader038/viewer/2022103122/56649d045503460f949d7ae5/html5/thumbnails/22.jpg)
India Opportunities• India plans to integrate 50GW renewables (30 GW wind and 20 GW Solar)
between 2014-2020.• Proposed ancillary service introduction by CERC could create a 3-4 GW
opportunity for frequency regulation by 2018• 600,000 telecom towers – 70% + utilize DG for backup / primary source have
been mandated by regulators to reduce diesel consumption• Over 100,000 Bank ATMs that need backup solutions• India Plans to Install 26 Million Solar-powered Water Pumps (over 9 Million
diesel powered water pumps in operation)• Over 300 million people currently do not have access to grid electricity and
India’s National Mission for energy access aims to provide at least 8 hours of access by 2017
• India’s National Electric Mobility Mission aims to get 6 million EV / HEVs (including 2 wheelers) on road by 2020
• Indian railways is 5th largest rail network with over 65,000 km of rail network and is driving integration of energy storage for public transportation systems22
![Page 23: Challenges and Solutions for achieving a Renewable Electric Grid in India By Dr. Rahul Walawalkar VP, Emerging Tech & Markets, Customized Energy Solutions.](https://reader038.fdocuments.us/reader038/viewer/2022103122/56649d045503460f949d7ae5/html5/thumbnails/23.jpg)
India Energy Storage Alliance India Energy Storage Alliance was launched in
2012 to help technology and system integration companies involved in energy storage and microgrids to understand and capture opportunities in thro growing market
In 2013 launched IESA-Knowledge Partner Network with a goal of addressing energy storage applications in over 10 key sectors of Indian economy
For more details visit www.indiaesa.info
IESA KPNMembers
![Page 24: Challenges and Solutions for achieving a Renewable Electric Grid in India By Dr. Rahul Walawalkar VP, Emerging Tech & Markets, Customized Energy Solutions.](https://reader038.fdocuments.us/reader038/viewer/2022103122/56649d045503460f949d7ae5/html5/thumbnails/24.jpg)
India Energy Storage Alliance
For more information visit: www.indiaesa.info
![Page 25: Challenges and Solutions for achieving a Renewable Electric Grid in India By Dr. Rahul Walawalkar VP, Emerging Tech & Markets, Customized Energy Solutions.](https://reader038.fdocuments.us/reader038/viewer/2022103122/56649d045503460f949d7ae5/html5/thumbnails/25.jpg)
IESA Road Map 2014
25
1. Working with key stake holders and policy makers for developing national and state level policies related to energy storage applications for energy access, renewable integration, diesel replacement, ancillary services and electric transportation. Collaborations with other trade groups such as INWEA and WTMA MERC Smart Grid Co-ordination Committee CEA – ISGF smart grid regional workshops for utilities and regulators MNRE – Energy Storage Standing Committee International collaboration through GESA initiatives and IRENA workshop
2. Developing a detailed reports & white papers Introduction of ancillary services in India and role of energy storage
technologies in improving grid reliability and power quality Series of market reports developed on energy storage potential for wind,
solar and telecom sector.
![Page 26: Challenges and Solutions for achieving a Renewable Electric Grid in India By Dr. Rahul Walawalkar VP, Emerging Tech & Markets, Customized Energy Solutions.](https://reader038.fdocuments.us/reader038/viewer/2022103122/56649d045503460f949d7ae5/html5/thumbnails/26.jpg)
IESA Road Map 2014
26
3. Undertaking research on mapping various storage technologies with high potential applications in India such as renewable integration and diesel replacement.
4. Focusing on building international partnerships by bringing special IESA delegations and hosting IESA Pavilions to showcase member companies at key global events such as Energy Storage Europe – Dusseldorf, Germany (March 2014) ESA Annual Meeting - Washington DC, USA (June 2014) Energy Storage China (June 2014) Energy Storage North America (Sept 2014) Energy Storage Summit – Japan (November 2014) Energy Storage India – New Delhi (Dec 3-5, 2014)
5. IESA-ETN: Emerging Tech News Quarterly magazine Inaugural Earth Day issue Launched on Earth Day 2nd issue to be launched at ESA Annual conference, June
![Page 27: Challenges and Solutions for achieving a Renewable Electric Grid in India By Dr. Rahul Walawalkar VP, Emerging Tech & Markets, Customized Energy Solutions.](https://reader038.fdocuments.us/reader038/viewer/2022103122/56649d045503460f949d7ae5/html5/thumbnails/27.jpg)
www.esiexpo.in
![Page 28: Challenges and Solutions for achieving a Renewable Electric Grid in India By Dr. Rahul Walawalkar VP, Emerging Tech & Markets, Customized Energy Solutions.](https://reader038.fdocuments.us/reader038/viewer/2022103122/56649d045503460f949d7ae5/html5/thumbnails/28.jpg)
Summary
India presents large opportunities for renewable energy integration as well as energy storage & microgrid technologies
We need fundamental policy reforms as well as better implementation mechanisms for existing policies to avoid recurrence of such event in future
Emerging technologies including advanced controls, energy storage and Demand Response can provide the required technical solutions for coping with similar challenges in new future.
Need industry to come together to address policy barriers and educate potential customers for enabling fast adoption of these technologies.
Need industry to get involved with IESA to achieve this change.
![Page 29: Challenges and Solutions for achieving a Renewable Electric Grid in India By Dr. Rahul Walawalkar VP, Emerging Tech & Markets, Customized Energy Solutions.](https://reader038.fdocuments.us/reader038/viewer/2022103122/56649d045503460f949d7ae5/html5/thumbnails/29.jpg)
Contact US
29
Customized Energy Solutions India Pvt. Ltd.A 501, GO Square
Aundh - Hinjewadi Link Rd, WakadPune, Maharashtra 411057 India
Phone: [email protected]
Customized Energy Solutions Ltd.1528 Walnut Street, 22nd Floor
Philadelphia, PA 19102 USA
Phone: +1-215-875-9440Fax: +1-215-875-9490
Dr. Rahul WalawalkarExecutive Director,
India Energy Storage [email protected]
US Cell: +1-516-639-5391 India Cell: +950-303-1765