Challenges And Impact On Airport Planning Design
Failure
Case study
![Page 2: Challenges airport planning](https://reader037.fdocuments.us/reader037/viewer/2022102814/54bbad6e4a7959864d8b457a/html5/thumbnails/2.jpg)
Challenges in airport planning design• Costing/Money
– Better material – always expensive – Facilities meet customers expectation
• Geographical condition– Suitable land current and future development
• Up to date facility– technology – Competitive
• Design– Uncertainties capacity
• pax forecasting
• Natural Disaster– Earthquake
• Revenue– Profitability
• Airport• airlines
Case study
![Page 3: Challenges airport planning](https://reader037.fdocuments.us/reader037/viewer/2022102814/54bbad6e4a7959864d8b457a/html5/thumbnails/3.jpg)
Impact Design Failure Effected
• Runway- distance , runway material • Parking bay facilities-equipment• Apron services- equipment• Future expansion- capacity• New aircraft model –A380 facilities• Passenger flow movement
Case study
![Page 4: Challenges airport planning](https://reader037.fdocuments.us/reader037/viewer/2022102814/54bbad6e4a7959864d8b457a/html5/thumbnails/4.jpg)
Collapse of Charles De Gaulle Airport, Paris Terminal 2E
Case study Example accident
![Page 5: Challenges airport planning](https://reader037.fdocuments.us/reader037/viewer/2022102814/54bbad6e4a7959864d8b457a/html5/thumbnails/5.jpg)
What went wrongChronology
• 7:00 am Sunday, May 23rd 2004• Boarding area in terminal 2E at CDG
Airport collapsed• collapse of the glass structure as
well ,the aerobridges that connected the terminal(PLB)
• Six persons died and 3 more were injured.
Case study
![Page 6: Challenges airport planning](https://reader037.fdocuments.us/reader037/viewer/2022102814/54bbad6e4a7959864d8b457a/html5/thumbnails/6.jpg)
Case study
![Page 7: Challenges airport planning](https://reader037.fdocuments.us/reader037/viewer/2022102814/54bbad6e4a7959864d8b457a/html5/thumbnails/7.jpg)
![Page 8: Challenges airport planning](https://reader037.fdocuments.us/reader037/viewer/2022102814/54bbad6e4a7959864d8b457a/html5/thumbnails/8.jpg)
ISSUES• CUTTING CORNERS
– Save budget material– Not follow standard procedures– COUTERFIT /BOGUS PART
• DESIGN LAYOUT– Multiple concept– Design structure
• CONTRACTOR HISTORY• Problem on previous construction• Personnel• Human factor• Decision making
Case study
![Page 9: Challenges airport planning](https://reader037.fdocuments.us/reader037/viewer/2022102814/54bbad6e4a7959864d8b457a/html5/thumbnails/9.jpg)
Impact
• Airport closed down-business stop running• Passengers/aircraft movement-scheduling• Complain from airlines and customer• Compensation to families • Airport got bad name• Renovation maintenance cost
![Page 10: Challenges airport planning](https://reader037.fdocuments.us/reader037/viewer/2022102814/54bbad6e4a7959864d8b457a/html5/thumbnails/10.jpg)
SPECIAL THANKS TO NATIONAL GEOGRAPHIC CHANNEL AIRPORT DESIGNQ&A