Chapter 6 - Part 2 Chapter 6 - Part 2 SPC – Attribute Control Charts

description

Control Charts

Transcript of Ch6-2 SPC-Attribute Control Charts

Page 1: Ch6-2 SPC-Attribute Control Charts

Chapter 6 - Part 2Chapter 6 - Part 2

SPC – Attribute Control Charts

Page 2: Ch6-2 SPC-Attribute Control Charts

Types of Control ChartsTypes of Control Charts Attribute charts

Monitor fraction of defective units Monitor number of defects Difference between “defective unit” and a

“defect?” A defective unit is a unit that is either defective. A defect is flaw on a given unit of a product. A unit can have many defects. A defective unit may be defined as, for example, a unit

that has 3 or more defects.

Page 3: Ch6-2 SPC-Attribute Control Charts

Types of Control ChartsTypes of Control Charts Variables charts

Monitors continuous quality characteristics. Continuous values (variables data) can

theoretically assume an infinite number of values in some interval. Time Weight Ounces Diameter

Page 4: Ch6-2 SPC-Attribute Control Charts

Types of ControlTypes of Control

Control Chart Monitors

Attribute control charts

p chart Process fraction defective

c chart number of defects

u chart defects per unit

Variables control charts

X-bar chart Process mean

R chart (Range Chart) Process variability

Page 5: Ch6-2 SPC-Attribute Control Charts

Use of p-ChartsUse of p-Charts

When observations can be placed into two categories. Good or bad Pass or fail Operate or doesn’t operate

Page 6: Ch6-2 SPC-Attribute Control Charts

p-chartp-chart A company that makes light bulbs wants to

monitor the fraction of defective bulbs. The company decides to select a random

sample of 100 bulbs in each day over a 5 day period

Each of the 100 bulbs are tested to determine if they light up.

Page 7: Ch6-2 SPC-Attribute Control Charts

p-chartp-chart If a bulb does not light up, the bulb is

defective. The company wants to

Estimate the percentage of defective bulbs and Determine if the percentage of defective bulbs

is increasing over time. A p chart is the appropriate tool for providing

the company with this information.

Page 8: Ch6-2 SPC-Attribute Control Charts

NotationNotation

Sample size = n = 100

Number of samples (subgroups) = k = 5

X = number of defective bulbs in a sample

p = sample fraction defective = ???

p-bar = estimated process fraction defective P = process fraction defective (unknown)

p-bar is an estimate of P

Page 9: Ch6-2 SPC-Attribute Control Charts

Inspection ResultsInspection Results

Day n X1 100 202 100 53 100 304 100 355 100 24

Page 10: Ch6-2 SPC-Attribute Control Charts

Compute Compute pp and and pp-bar-bar

Day n X p=X/n1 100 20 0.202 100 5 0.053 100 30 0.304 100 35 0.355 100 24 0.24

Sum 1.14p-bar 0.23

Page 11: Ch6-2 SPC-Attribute Control Charts

pp-bar -bar (Estimated Process Fraction (Estimated Process Fraction

Defective)Defective)

k

pp bar -p

23.05

14.1

k

pp

Page 12: Ch6-2 SPC-Attribute Control Charts

n

pppLCL

n

pppUCL

)1(3

)1(3

p-Chart Control Limitsp-Chart Control Limits

Page 13: Ch6-2 SPC-Attribute Control Charts

104.100

)23.1(23.323.

356.100

)23.1(23.323.

LCL

UCL

p-Chart - Control Limitsp-Chart - Control Limits

Page 14: Ch6-2 SPC-Attribute Control Charts

p-Chart for Bulbs

0

0.1

0.2

0.3

0.4

1 2 3 4 5

Day

p

LCL

UCL

p-bar

p

Page 15: Ch6-2 SPC-Attribute Control Charts

InterpretationInterpretation The estimated fraction of defective bulbs

produced is .23. On Day 2, p was below the LCL. This means that a special cause occurred on

that day to cause the process to go out of control.

The special cause shifted the process fraction defective downward.

This special cause was therefore favorable and should be ???

Page 16: Ch6-2 SPC-Attribute Control Charts

InterpretationInterpretation After Day 2, the special cause lost its impact

because on Day 4, the process appears to be back in control and at old fraction defective of .23.

Until the special cause is identified and made part of the process, the process will be unstable and unpredictable.

It is therefore impossible to obtain a statistical valid estimate of the process fraction defective because it can change from day to day.

Page 17: Ch6-2 SPC-Attribute Control Charts

UCL

LCL

p-Chart

Process fractions defective is shifting (trending) upward

SamplingDistribution

P = process fraction

defective PP

PP

Trend Within Control LimitsTrend Within Control Limits

Page 18: Ch6-2 SPC-Attribute Control Charts

ApplicationsApplications Think of an application of a p-chart in:

Sales Shipping department Law

Page 19: Ch6-2 SPC-Attribute Control Charts

Use of c-ChartsUse of c-Charts

When we are interested in monitoring number of defects on a given unit of product or service. Scratches, chips, dents on an airplane wing Errors on an invoice Pot holes on a 5-mile section of highway Complaints received per day

Opportunity for a defect must be infinite. Probability of a defect on any one location

or any one point in time must be small.

Page 20: Ch6-2 SPC-Attribute Control Charts

c-Chartc-Chart

c-chart notation:

c = number of defects

k = number of samples

defects ofnumber mean estimatedc bar -c

Page 21: Ch6-2 SPC-Attribute Control Charts

c-Chartc-Chart

A car company wants to monitor the number of paint defects on a certain new model of one of its cars.

• Each day one car in inspected.• The results after 5 days are shown on the

next slide.

Page 22: Ch6-2 SPC-Attribute Control Charts

c-Chartc-Chart

Day c c-bar LCL UCL1 5 6.6 0 14.3072 2 6.6 0 14.3073 8 6.6 0 14.3074 7 6.6 0 14.3075 11 6.6 0 14.307

Sum c 33c-bar 6.60

Page 23: Ch6-2 SPC-Attribute Control Charts

k

cc

c-Chart - Meanc-Chart - Mean

6.65

33

k

cc

Page 24: Ch6-2 SPC-Attribute Control Charts

ccUCL

ccLCL

3

3

c-Chart – Control Limitsc-Chart – Control Limits

Page 25: Ch6-2 SPC-Attribute Control Charts

307.14

6.636.6

3

0or 107.1

6.636.6

3

ccUCL

ccLCL

c-Chart – Control Limitsc-Chart – Control Limits

Page 26: Ch6-2 SPC-Attribute Control Charts

c-Chart for Number of Paint Defects

0

2

4

6

8

10

12

14

16

1 2 3 4 5

Car

c, n

um

be

r o

f d

efe

cts

c

LCL

UCL

c-bar

Page 27: Ch6-2 SPC-Attribute Control Charts

ConclusionConclusion Process shows upward trend. Even though trend is within the control limits,

the process is out of control. Mean is shifting upward This is due to an unfavorable special cause. Must identify special cause and eliminate it

from process. Who is responsible for finding and eliminating

special cause?

Page 28: Ch6-2 SPC-Attribute Control Charts

Mini CaseMini Case Think of an application of a c-chart bank.

Page 29: Ch6-2 SPC-Attribute Control Charts

u-Chartu-Chart With a c chart, the sample size is one unit.

A u-chart is like a c-chart, except that the sample size is greater than one unit.

As a result, a u-chart tracks the number of defects per unit.

A c-chart monitors the number of defects on one unit.

Page 30: Ch6-2 SPC-Attribute Control Charts

u-Chartu-Chart A car company monitors the number of paint defects per car by taking a sample of 5 cars each day over the next 6 days.

The results are shown on next side.

Page 31: Ch6-2 SPC-Attribute Control Charts

Day n c u=c/n u-bar LCL UCL1 5 45 9.0 10.5 6.18 14.8882 5 58 11.6 10.5 6.18 14.8883 5 48 9.6 10.5 6.18 14.8884 5 53 10.6 10.5 6.18 14.8885 5 68 13.6 10.5 6.18 14.8886 5 44 8.8 10.5 6.18 14.888

Sum u 63.2u-bar 10.5

u-Chartu-Chart

Page 32: Ch6-2 SPC-Attribute Control Charts

k

uu

5.106

2.63

k

uu

u-Chartu-Chart

Page 33: Ch6-2 SPC-Attribute Control Charts

n

uuUCL

n

uuLCL

3

3

u-Chartu-Chart

Page 34: Ch6-2 SPC-Attribute Control Charts

89.145

5.1035.10

3

18.65

5.1035.10

3

n

uuUCL

n

uuLCL

u-Chartu-Chart

Page 35: Ch6-2 SPC-Attribute Control Charts

u-Chartu-Chart

u-Chart Number of Paint Defects Per Car

0

2

4

6

8

10

12

14

16

1 2 3 4 5 6

Car

c, n

um

ber

of

def

ects

LCL

UCL

u

u-bar

Page 36: Ch6-2 SPC-Attribute Control Charts

ConclusionConclusion The process appears stable. We can therefore get a statistically valid

estimate the process mean number of defects per car.

Our estimate of the mean number of paint defects per car is 10.5, the center line on the control chart.

Thus, we expect each car to have, on average, 10.5 paint defects.

Page 37: Ch6-2 SPC-Attribute Control Charts

ConclusionConclusion Although the process is stable, the number of

defects per car is too high. Deming calls this a stable process for the

production of defective product. Important take away:

A stable process (process in control) is not necessarily a good process because it can be in control at the wrong level.

A stable process is predictable, but this doesn’t mean that what is being predicted is favorable.

Page 38: Ch6-2 SPC-Attribute Control Charts

Mini CaseMini Case Who is responsible for improving this

process?

What is required to improve the process?

Page 39: Ch6-2 SPC-Attribute Control Charts

u-Chart vs. c-Chartu-Chart vs. c-Chart

n

cu

If n = 1, u = c and .cu

Control limits of the two chart will thereforebe the same.

Page 40: Ch6-2 SPC-Attribute Control Charts

Sample SizeSample Size

Control Chart When To Use Sample Size

p-Chart Monitor the proportion of defectives in a process

At least 50

c-Chart Monitor the number of defects

1

u-chart Monitor the number of defects per unit

>1

Page 41: Ch6-2 SPC-Attribute Control Charts

In PracticeIn Practice You need 25 to 30 samples before computing

initial control limits. When a special cause occurs, you should

eliminate that sample and re-compute control limits if Special cause is identified Eliminated or made part of process

To identify special causes, workers must keep log sheet, where they record any changes they make to the process.

Page 42: Ch6-2 SPC-Attribute Control Charts

Tracking ImprovementsTracking Improvements

UCL

LCL

LCLLCL

UCLUCL

Process not centeredand not stable

Process centeredand stable

Additional improvementsmade to the process