Transcript of CFCL summer training presentation on steam turbine plant
1
Industrial Training Seminar
on Steam
TurbinesPresented to:Bhupender GoyalHoDMechanical Engineering
Presented By:Priyam Nandwana
7th Sem ME13EMHME040
Maharishi ArvindIPA-1 RIICCO Industrial Area, Ranpur, Kota-325003, Ph.: 0744-5122256 (M) 9829112371
INTERNATIONAL INSTITUTE OF TECHNOLOGY
01/05/2023 2
Overview Introduction Power Plant & Technical Details General Process of thermal Power Plant DM Plant Gas Handling Plant Fuel Lab Compressor Power Plant Equipments
01/05/2023 3
Introduction
Chambal Fertiliser & Chemical Limited
Placed At Gadepan villageOn Kalisindh River
01/05/2023 4
VICE PRESIDENT OPERATIONS
GMMAINTENANCE
-Mechanical-Electrical-Instrumentation-Civil
GMPRODUCTION
-Ammonia-Urea-Offsite and Utilities-Steam-Power-Process water-Urea -Bagging
DGM TECHNICAL SECTION AND
PROJECTS
-Process Engineering-Project Engineering-Inspection
Power Plant & Technical details
01/05/2023 5
General Process of thermal Power Plant
Energy Transformatio
n
Expansion
Condensation
Compression
RANKINE CYCLE
01/05/2023 6
Supportive Plants
DM Plant
Gas Handling Plant
Fuel Lab
Compressor
01/05/2023 7
DM Plant Need Impurities
Dissolved Undissolved Other Material
Main Sub Division Pre-treatment water Plant Demineralise Water Plant
01/05/2023 8
Gas Handling Plant
Natural Gas Is used Taken from GAIL through Pipeline
01/05/2023 9
Fuel Lab
Determination of volatile matter
Determination of calorific value
Determination of Moisture
01/05/2023 10
Compressor House
01/05/2023 11
Power Plant Equipments LP Heater Additional LP Heater Deaerator Boiler Feed pump HP Heater 1,2 Economizer FD Fan Air Heater Gas Feeder Exhaust Fan Boiler Drum
01/05/2023 12
DM Plant LP Heater Dearator Feed
Pump
HP Heater 1
HP Heater 2BoilerSteam
Turbine Generator 24KW
01/05/2023 13
Major Turbine at CFCL PLANT
`TAG. NO. DIRVEN
EQUIPMENT
MAKE MODEL OUTPUTKW
SPEEDRPM
AMM-1 TK-431 SYN. GAS COMP.K431
MHI SHE-7BD 24000 10681
AMM-1 TK-421 PROCESS AIR
COMP. K-421
MAN GHH DK 063/130 10645 7003
UREA-1 TK-01 CO2- COMPRESS
ORK-01
BHEL EHNK 32/36/643
5390 7976
AMM-2 AGT-601 SYN. GAS COMP.
AGB-601
MHI 5EH-7BD 20100 10908
AMM-2 AGT-201 PROCESS AIR
COMP. AGB-201
SIEMENS EHNK 32/36 14100 7500
AMM-2 AGT-701 REFRIGRATION COMP.AGB-701
SHIN C6-R6-A 8260 8800
UREA-2 UGT 1101/2101
CO2- COMPRESS
ORUGB
1101/2101
SIEMENS EHNK 25/28 6370 7600
01/05/2023 14
ANY QUERY
01/05/2023 15
THANK YOU