CESI Brasil: back to the future - SafeOnline.it · CESI Brasil: back to the future ... revamping...
Transcript of CESI Brasil: back to the future - SafeOnline.it · CESI Brasil: back to the future ... revamping...
CESI Brasil:back to the futureMatteo CodazziMatteo CodazziMatteo CodazziMatteo CodazziChief Executive Officer
Roma, 17 Febbraio 2014
Master Safe
Roma
CESI is a leading player in engineering, CESI is a leading player in engineering, CESI is a leading player in engineering, CESI is a leading player in engineering, testing and testing and testing and testing and power systems power systems power systems power systems consulting for the electricity sector worldwideconsulting for the electricity sector worldwideconsulting for the electricity sector worldwideconsulting for the electricity sector worldwide
2222
Mannheim
Berlin
Milan
Dubai
Rio de Janeiro
---- 17/02/2014
Master Safe
Roma
CESI has a long CESI has a long CESI has a long CESI has a long llllegacy egacy egacy egacy in in in in offering independent offering independent offering independent offering independent aaaadvise dvise dvise dvise and and and and unbiased unbiased unbiased unbiased ssssolutions olutions olutions olutions to to to to clients clients clients clients in the in the in the in the energy energy energy energy wwwworldorldorldorld
3333----
Revenues breakdown by clients [%]
70%
50%
30%
50%
2006 2013
ForeignForeignForeignForeign
DomesticDomesticDomesticDomestic
CESI
Testing &Certification
Consulting, Solutions& Services
Engineering, Environment -
ISMES
17/02/2014
Brazil Brazil Brazil Brazil iiiis a key market for CESIs a key market for CESIs a key market for CESIs a key market for CESI
4444Roma ----
Master Safe
2014 Brazil, CEI2014 Brazil, CEI2014 Brazil, CEI2014 Brazil, CEIP&D Owner’s engineering
Photovoltaic power plants
2014 Brazil2014 Brazil2014 Brazil2014 BrazilBID, Arco Norte
ProjectFeasibility study for 4
countries interconnection(French Guyana,
Suriname, Guyana, North Brazil)
2014 Brazil, 2014 Brazil, 2014 Brazil, 2014 Brazil, EGPDams Safety
Assessment and revamping Hydro
power plants
17/02/2014
2012 Brazil, 2012 Brazil, 2012 Brazil, 2012 Brazil, EGPItaipu - Monitoring the
biggest hydroelectric plant of the world (15.000 MW)
2013 Brazil, 2013 Brazil, 2013 Brazil, 2013 Brazil, ieieieieMadeiraMadeiraMadeiraMadeira
Feasibility studies Rio Madeira HVDC
link
2013 Brazil, 2013 Brazil, 2013 Brazil, 2013 Brazil, TAESATAESATAESATAESAFeasibility studies
Belo Monte HVDC link
2013 Brazil, 2013 Brazil, 2013 Brazil, 2013 Brazil, FurnasFurnasFurnasFurnasP&D Project Smart
Grids for Transmission
Brazilian ChallengesBrazilian ChallengesBrazilian ChallengesBrazilian Challenges
5555Roma ----
Generation
� Hydropower potential
� Revamping of existing hydropower plants
� key-market for Solar Plants
� Wind power is under continuous evolution
Transmission
Distribution
� Long distance High Voltage Transmission Systems
� System security and reliability infrastructure
� Interconnections with neighboring countries
� Smart metering and smart grids are a growing trend
� GIS and high voltage underground cables
1
2
3
17/02/2014
Master Safe
CESI ECESI ECESI ECESI Experience xperience xperience xperience in Power System in Power System in Power System in Power System and Renewable Integration and Renewable Integration and Renewable Integration and Renewable Integration studiesstudiesstudiesstudies
6666----Roma
LibyaLibyaLibyaLibya, GECOL / , GECOL / , GECOL / , GECOL / REAOLREAOLREAOLREAOLUpdate of defense plan & Wind integration studies
Chile Chile Chile Chile Transmission Master Plan
Algeria Algeria Algeria Algeria , , , , SonelgazSonelgazSonelgazSonelgazUpdate of
Defense and Restoration Plans
Germany, Germany, Germany, Germany, DesertecDesertecDesertecDesertec I.I.I.I.I.I.I.I.2050 Highways EU-North
Africa
Belgium, ECBelgium, ECBelgium, ECBelgium, ECBaltic Countries Interconnections
Egypt, Egypt, Egypt, Egypt, ItalgenItalgenItalgenItalgenWind integration study
Serbia, EMSSerbia, EMSSerbia, EMSSerbia, EMSTechnical assistance for Serbian TSO
Arab Countries, Arab Countries, Arab Countries, Arab Countries, AFESDAFESDAFESDAFESDFeasibility Study of the Electrical Interconnection and Energy Trade
Jordan, MEMR Jordan, MEMR Jordan, MEMR Jordan, MEMR Wind integration study
Ireland, NIEIreland, NIEIreland, NIEIreland, NIETransmission development
plan to integrate RES generation
Ecuador, CELECEcuador, CELECEcuador, CELECEcuador, CELECMaster Plan of transmission
network
Brazil, Brazil, Brazil, Brazil, TAESATAESATAESATAESAMaster Plan of transmission
network
1
BID, Arco Norte ProjectBID, Arco Norte ProjectBID, Arco Norte ProjectBID, Arco Norte ProjectFeasibility study for 4
countries interconnection
17/02/2014
Master Safe
Tunisia, STEGTunisia, STEGTunisia, STEGTunisia, STEGWind integration study
7777
World World World World Leader in HVDC TechnologyLeader in HVDC TechnologyLeader in HVDC TechnologyLeader in HVDC Technology
----
Master Safe
Feasibility Stage Implementation Stage
2
40,000 km of new Transmission Lines by 2020
17/02/2014Roma
8888
Distribution: World Leader in Smart Grids & Smart Metering Distribution: World Leader in Smart Grids & Smart Metering Distribution: World Leader in Smart Grids & Smart Metering Distribution: World Leader in Smart Grids & Smart Metering
----Roma
Master Safe
3
Key Projects Major Clients
ItalyItalyItalyItaly - Telegestore (2001-2009) 30 30 30 30 MillionMillionMillionMillion Meters
Spain Spain Spain Spain ---- Endesa (2009-ongoing)16 16 16 16 Million Million Million Million meters
MaltaMaltaMaltaMalta - Enelmalta (2010) 0.4 Million 0.4 Million 0.4 Million 0.4 Million Meters
MontenegroMontenegroMontenegroMontenegro - EPCG (2011-2014)0.7 0.7 0.7 0.7 Million Million Million Million meters
Project ongoing / completedProject ongoing / completedProject ongoing / completedProject ongoing / completedPotential ProjectPotential ProjectPotential ProjectPotential Project
Main Areas
Uzbekistan Uzbekistan Uzbekistan Uzbekistan – Uzbekenergo (2013-15)4 Million 4 Million 4 Million 4 Million meters
Serbia Serbia Serbia Serbia – EPS (2012-2014)3.4 3.4 3.4 3.4 Million Million Million Million meters
Saudi Saudi Saudi Saudi Arabia Arabia Arabia Arabia ---- ECRA ((((2012) 2012) 2012) 2012) Design a Strategy Strategy Strategy Strategy for Smart Meters
60 millions digital meters to be Installed by 2022
17/02/2014
9999
Dam Safety and Management references around the Dam Safety and Management references around the Dam Safety and Management references around the Dam Safety and Management references around the globeglobeglobeglobe
----Roma
Itaipu -The biggest hydroelectric plant of the
world (15.000 MW)
1
Hydropower potential amounts to 260 GW of which only 78 GW is currently exploited, by 828 hydroelectric plants.
17/02/2014
Master Safe
10101010
Solar Technology: 30Solar Technology: 30Solar Technology: 30Solar Technology: 30----year experience in R&D and Production of year experience in R&D and Production of year experience in R&D and Production of year experience in R&D and Production of high efficiency solar cells based on IIIhigh efficiency solar cells based on IIIhigh efficiency solar cells based on IIIhigh efficiency solar cells based on III----V compounds (V compounds (V compounds (V compounds (GaASGaASGaASGaAS))))
----Roma
SP
AC
EE
AR
TH
SPACE 29%CPV 40%
1
17/02/2014
Master Safe