water resource specialists
Contributors Andrey Shvidchenko, Brent Wolfe and Jimmy Pan (Northwest Hydraulic Consultants); Dan Charlton, Tesfaye Demissie, and Mark Johnson (Coachella Valley Water District);
Soma Balachandran (GENTERRA); and Robert Bezek (FEMA)
Certification Process for North Indio
East Side Dike in the Coachella Valley
September 7, 2016
Brady McDaniel (Northwest Hydraulic Consultants)
![Page 2: Certification Process for North Indio East Side Dike in the … · 2018. 4. 2. · West Shore of Salton Sea . Salton Sea . Watershed . Imperial Co. San Diego Co. San Bernardino Co.](https://reader033.fdocuments.us/reader033/viewer/2022053021/5fc63366af78844cd819ad56/html5/thumbnails/2.jpg)
water resource specialists
Presentation Outline • Site Background • Description of Overall System • Local Levee Partnership Team (LLPT) • Hydrology and Hydraulics Study • Erosion and Scour • Geotechnical Investigation • FEMA Preliminary Review • Next Steps in Certification Process
![Page 3: Certification Process for North Indio East Side Dike in the … · 2018. 4. 2. · West Shore of Salton Sea . Salton Sea . Watershed . Imperial Co. San Diego Co. San Bernardino Co.](https://reader033.fdocuments.us/reader033/viewer/2022053021/5fc63366af78844cd819ad56/html5/thumbnails/3.jpg)
Thousand Palms Watershed
Morongo Wash Watershed
North Indio Watershed
East La Quinta Watershed
Bear Creek Watershed
Other Rancho Mirage
Watershed
Palm Valley Watershed
East & West Magnesia
Watershed
Deep Canyon Watershed
Dikes No. 2 & 4 Watershed
Mecca/North Shore SMP Watershed
Coachella Valley Water District Stormwater Unit Boundary
RCFCWCD
RCFCWCD Oasis Area Watershed
Mecca/North Shore Area Watershed
Salton Sea West Shore of Salton Sea Watershed
Imperial Co.
San Diego Co.
San Bernardino Co.
Riverside Co.
CVWD Watersheds
![Page 4: Certification Process for North Indio East Side Dike in the … · 2018. 4. 2. · West Shore of Salton Sea . Salton Sea . Watershed . Imperial Co. San Diego Co. San Bernardino Co.](https://reader033.fdocuments.us/reader033/viewer/2022053021/5fc63366af78844cd819ad56/html5/thumbnails/4.jpg)
water resource specialists
East Side Dike (Adams to I-10)
• Unaccredited • USBR Facility • CVWD Operated/Regional Flood
Control • Designed for Standard Project
Flood • Originally Built to Protect the
Coachella Canal and Downstream Farmland
• Development Downstream • 9 Mile Stretch of Levee Applying
for Certification • 144 Square Mile Watershed
![Page 5: Certification Process for North Indio East Side Dike in the … · 2018. 4. 2. · West Shore of Salton Sea . Salton Sea . Watershed . Imperial Co. San Diego Co. San Bernardino Co.](https://reader033.fdocuments.us/reader033/viewer/2022053021/5fc63366af78844cd819ad56/html5/thumbnails/5.jpg)
water resource specialists
![Page 6: Certification Process for North Indio East Side Dike in the … · 2018. 4. 2. · West Shore of Salton Sea . Salton Sea . Watershed . Imperial Co. San Diego Co. San Bernardino Co.](https://reader033.fdocuments.us/reader033/viewer/2022053021/5fc63366af78844cd819ad56/html5/thumbnails/6.jpg)
water resource specialists
FEMA Effective FIRM
![Page 7: Certification Process for North Indio East Side Dike in the … · 2018. 4. 2. · West Shore of Salton Sea . Salton Sea . Watershed . Imperial Co. San Diego Co. San Bernardino Co.](https://reader033.fdocuments.us/reader033/viewer/2022053021/5fc63366af78844cd819ad56/html5/thumbnails/7.jpg)
water resource specialists
Local Levee Partnership Team (LLPT)
• Coordination with tribal, territorial, state, local officials and levee owners
• Participant List Developed by FEMA and CVWD • Participants
– FEMA, CVWD, NHC, USBR, Riverside County, Cabazon and 29 Palms Band of Mission Indians, Torres Martinez Desert Cahuilla Indians, Coachella Valley Association of Governments, City of Indio, City of Coachella, Local HOA’s and Others
![Page 8: Certification Process for North Indio East Side Dike in the … · 2018. 4. 2. · West Shore of Salton Sea . Salton Sea . Watershed . Imperial Co. San Diego Co. San Bernardino Co.](https://reader033.fdocuments.us/reader033/viewer/2022053021/5fc63366af78844cd819ad56/html5/thumbnails/8.jpg)
water resource specialists
LLPT Meetings • Meetings held periodically to review available data,
documentation and information • Discuss the participants concerns • Provide preliminary maps • Outline potential next steps in the analysis and
mapping process • Meeting (#1) held after H&H Report was complete • Meeting (#2) held after Erosion and Geotechnical
Studies
![Page 9: Certification Process for North Indio East Side Dike in the … · 2018. 4. 2. · West Shore of Salton Sea . Salton Sea . Watershed . Imperial Co. San Diego Co. San Bernardino Co.](https://reader033.fdocuments.us/reader033/viewer/2022053021/5fc63366af78844cd819ad56/html5/thumbnails/9.jpg)
water resource specialists
Technical Study Overview
• Hydrology and Hydraulics • Erosion and Scour Study • Geotechnical Investigation • Erosion Protection Design (Next Step)
![Page 10: Certification Process for North Indio East Side Dike in the … · 2018. 4. 2. · West Shore of Salton Sea . Salton Sea . Watershed . Imperial Co. San Diego Co. San Bernardino Co.](https://reader033.fdocuments.us/reader033/viewer/2022053021/5fc63366af78844cd819ad56/html5/thumbnails/10.jpg)
water resource specialists
Hydrology and Hydraulics • HEC-HMS Model
NOAA Atlas 14; Multiple Storm Centerings; CVWD Standards
• MIKE 2D Models – Floodplain Routing from Alluvial Fans – Sediment Analysis on Water Levels – Fine and Coarse Mesh
• Sufficient Freeboard Throughout
![Page 11: Certification Process for North Indio East Side Dike in the … · 2018. 4. 2. · West Shore of Salton Sea . Salton Sea . Watershed . Imperial Co. San Diego Co. San Bernardino Co.](https://reader033.fdocuments.us/reader033/viewer/2022053021/5fc63366af78844cd819ad56/html5/thumbnails/11.jpg)
water resource specialists
Watersheds
![Page 12: Certification Process for North Indio East Side Dike in the … · 2018. 4. 2. · West Shore of Salton Sea . Salton Sea . Watershed . Imperial Co. San Diego Co. San Bernardino Co.](https://reader033.fdocuments.us/reader033/viewer/2022053021/5fc63366af78844cd819ad56/html5/thumbnails/12.jpg)
water resource specialists
2D Model Domain
![Page 13: Certification Process for North Indio East Side Dike in the … · 2018. 4. 2. · West Shore of Salton Sea . Salton Sea . Watershed . Imperial Co. San Diego Co. San Bernardino Co.](https://reader033.fdocuments.us/reader033/viewer/2022053021/5fc63366af78844cd819ad56/html5/thumbnails/13.jpg)
water resource specialists
Hydraulic Results
![Page 14: Certification Process for North Indio East Side Dike in the … · 2018. 4. 2. · West Shore of Salton Sea . Salton Sea . Watershed . Imperial Co. San Diego Co. San Bernardino Co.](https://reader033.fdocuments.us/reader033/viewer/2022053021/5fc63366af78844cd819ad56/html5/thumbnails/14.jpg)
water resource specialists
Hydraulic Results
![Page 15: Certification Process for North Indio East Side Dike in the … · 2018. 4. 2. · West Shore of Salton Sea . Salton Sea . Watershed . Imperial Co. San Diego Co. San Bernardino Co.](https://reader033.fdocuments.us/reader033/viewer/2022053021/5fc63366af78844cd819ad56/html5/thumbnails/15.jpg)
water resource specialists
Potential Flooding (Breach Scenario)
![Page 16: Certification Process for North Indio East Side Dike in the … · 2018. 4. 2. · West Shore of Salton Sea . Salton Sea . Watershed . Imperial Co. San Diego Co. San Bernardino Co.](https://reader033.fdocuments.us/reader033/viewer/2022053021/5fc63366af78844cd819ad56/html5/thumbnails/16.jpg)
water resource specialists
Erosion and Scour
• Potential Scour Calculation, using CVWD Standard Procedures (Blench Regime)
• MIKE Model Results Used • Peak Unit Discharge • Threshold Velocities • Effective Flow Width (Lacey Equation) • Scour Protection Needed for 12,300 feet of Dike
(~2.3 miles); Upstream Reach Only
![Page 17: Certification Process for North Indio East Side Dike in the … · 2018. 4. 2. · West Shore of Salton Sea . Salton Sea . Watershed . Imperial Co. San Diego Co. San Bernardino Co.](https://reader033.fdocuments.us/reader033/viewer/2022053021/5fc63366af78844cd819ad56/html5/thumbnails/17.jpg)
water resource specialists
Erosion Protection Reaches
![Page 18: Certification Process for North Indio East Side Dike in the … · 2018. 4. 2. · West Shore of Salton Sea . Salton Sea . Watershed . Imperial Co. San Diego Co. San Bernardino Co.](https://reader033.fdocuments.us/reader033/viewer/2022053021/5fc63366af78844cd819ad56/html5/thumbnails/18.jpg)
water resource specialists
Geotechnical Investigation • Completed by GENTERRA • Used H&H and Erosion and Scour Report Findings • Seepage and Slope Stability met Minimum Factors
of Safety • O&M Plan for Seismic Activity Required • Recommended Soil Cement Blanket Liner for
Areas of Potential Erosion • Estimated Cost of Soil Cement $6 Million to $7.5
Million
![Page 19: Certification Process for North Indio East Side Dike in the … · 2018. 4. 2. · West Shore of Salton Sea . Salton Sea . Watershed . Imperial Co. San Diego Co. San Bernardino Co.](https://reader033.fdocuments.us/reader033/viewer/2022053021/5fc63366af78844cd819ad56/html5/thumbnails/19.jpg)
water resource specialists
Overall Summary • Updated Hydrology and Hydraulics • Adequate Freeboard for Reach • Stability and Seepage Minimum Factors of Safety • Slope Protection Necessary for 2.3 miles of Dike • Recommendation of 8-foot wide soil cement
blanket liner where Erosion and Scour Analysis Showed Potential Erosion
![Page 20: Certification Process for North Indio East Side Dike in the … · 2018. 4. 2. · West Shore of Salton Sea . Salton Sea . Watershed . Imperial Co. San Diego Co. San Bernardino Co.](https://reader033.fdocuments.us/reader033/viewer/2022053021/5fc63366af78844cd819ad56/html5/thumbnails/20.jpg)
water resource specialists
FEMA Review • FEMA Provided General Overall Review of CVWD
Documents – Hydrology and Hydraulics Report – Geotechnical Analysis – Erosion and Scour Analysis
• If recommendations are implemented the dike should meet the requirements of 44 CFR Section 65.10 of the NFIP Regulations
![Page 21: Certification Process for North Indio East Side Dike in the … · 2018. 4. 2. · West Shore of Salton Sea . Salton Sea . Watershed . Imperial Co. San Diego Co. San Bernardino Co.](https://reader033.fdocuments.us/reader033/viewer/2022053021/5fc63366af78844cd819ad56/html5/thumbnails/21.jpg)
water resource specialists
Certification Steps Completed
• H&H Report – Freeboard Estimation – Sediment Transport
• Erosion and Scour Study – Embankment Protection
• Geotechnical Investigation – Stability – Seepage – Potential Settling of Levee
![Page 22: Certification Process for North Indio East Side Dike in the … · 2018. 4. 2. · West Shore of Salton Sea . Salton Sea . Watershed . Imperial Co. San Diego Co. San Bernardino Co.](https://reader033.fdocuments.us/reader033/viewer/2022053021/5fc63366af78844cd819ad56/html5/thumbnails/22.jpg)
water resource specialists
Next Steps for Certification
• Feedback from LLPT Meeting #2 • Technical Review from FEMA • Detailed Design of Erosion Protection Measures,
Plans and Specifications • Complete Remaining 44 CFR 65.10 Requirements
– Topographic Workmap, Engineering Drawings, O&M Plan and Closure/Interior Drainage Reports
• LLPT Meeting #3 • Application for CLOMR
![Page 23: Certification Process for North Indio East Side Dike in the … · 2018. 4. 2. · West Shore of Salton Sea . Salton Sea . Watershed . Imperial Co. San Diego Co. San Bernardino Co.](https://reader033.fdocuments.us/reader033/viewer/2022053021/5fc63366af78844cd819ad56/html5/thumbnails/23.jpg)
water resource specialists
Timeline • Re-mapping of Flood Hazards (2 to 3 years)
– LAMP Procedure – Physical Map Revision (PMR)
• Certification of Levee (3 to 4 years) – Design of Erosion Protection and Environmental Studies (ESA) – CLOMR – Prepare Bid Document and Select Contractor – Construction followed by LOMR
• Moving Towards Certification Only